Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for North Washington, Colorado (CO)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 66Number of bridges
  • 1,119ft / 341mTotal length
  • $4,245,000Total costs
  • 4,503,365Total average daily traffic
  • 491,839Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for North Washington
  • No street view available for this location

New bridges in North Washington, CO - historical statistics
  • New bridges - historical statistics
  • 41960-1969
  • 31970-1979
  • 21980-1989
  • 441990-1999
  • 102000-2009
  • 32010-2019
Average Bridge Daily Traffic in North Washington, CO
Average Bridge Truck Traffic in North Washington, CO
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 56.4%Good
  • 33.3%Satisfactory
  • 2.6%Fair
  • 7.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 17.9%Very good
  • 51.3%Good
  • 25.6%Satisfactory
  • 5.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 17.9%Very good
  • 53.8%Good
  • 17.9%Satisfactory
  • 7.7%Fair
  • 2.6%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 66.7%Very good
  • 8.3%Good
  • 16.7%Satisfactory
  • 8.3%Fair
Find on map >>   Show street view

Structure Number: E-17-QY,  Location: .2 MI S. OF I76 & BRO (Lat: 39.812492,  Lng: -104.987592),  Route carried "on" structure: State highway 53A,  Year Built: 1993,  Status: Open,  Structure Length: 0.90m (2.95ft),  Average Daily Traffic: 14,000 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 15,820 (year 2038),  Design Load: HS 20,  Features Intersected: 64TH ST DRAIN CANAL,  Facility Carried by Structure: SH 53 ML
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.551,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Out-to-Out Width: 146.3m (480.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2019
Find on map >>   Show street view

Structure Number: E-17-VS,  Location: I-25NB to SH224 70th Ave (Lat: 39.820861,  Lng: -104.982250),  Route carried "on" structure: Ramp State highway 224A,  Year Built: 1998,  Status: Open,  Structure Length: 9.21m (30.22ft),  Average Daily Traffic: 10,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,700 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CLEAR CREEK R,  Facility Carried by Structure: I25 NBND TO SH224
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.090,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.0m (101.7ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 67.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: E-17-IC,  Location: IN COMMERCE CITY (Lat: 39.819458,  Lng: -104.959142),  Route carried "under" structure: Interstate 270A,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 11,975 (year 2016),  Truck Traffic: 14%,  Features Intersected: I 270 ML,  Facility Carried by Structure: YORK STREET
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 2.089,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 43.0m (141.1ft)

Find on map >>   Show street view

Structure Number: E-17-NX,  Location: NW OF I76 and I25 INT (Lat: 39.819536,  Lng: -104.983797),  Route carried "under" structure: Interstate 25A,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 219,000 (year 2011),  Truck Traffic: 10%,  Features Intersected: RAMP, CLEAR CREEK R,  Facility Carried by Structure: RAMP TO I 76 WBND
Minimum Vertical Clearance: 6.00m (19.69ft),  Kilometerpoint: 349.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 61.0m (200.1ft)

Find on map >>   Show street view

Structure Number: E-17-NZ,  Location: I25 & I76 JCT (Lat: 39.817900,  Lng: -104.983758),  Route carried "under" structure: Interstate 25A,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 235,000 (year 2011),  Truck Traffic: 10%,  Features Intersected: I 25 ML R,  Facility Carried by Structure: RAMP TO I 76 WBND
Minimum Vertical Clearance: 6.40m (21.00ft),  Kilometerpoint: 348.204,  Lanes on structure: 2,  Lanes under structure: 13,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 68.6m (225.1ft)

Find on map >>   Show street view

Structure Number: E-17-OA,  Location: 0.1 MI W. OF I25+I76 JCT (Lat: 39.815847,  Lng: -104.985658),  Route carried "under" structure: Ramp Interstate 25A,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 196,700 (year 2005),  Truck Traffic: 10%,  Features Intersected: RAMP TO I 25 SBND,  Facility Carried by Structure: I 76 ML EBND
Minimum Vertical Clearance: 7.00m (22.97ft),  Kilometerpoint: 348.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.4m (139.1ft)

Find on map >>   Show street view

Structure Number: E-17-OB,  Location: 0.1 MI W. OF I25+I76 JCT (Lat: 39.816111,  Lng: -104.985664),  Route carried "under" structure: Ramp Interstate 25A,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 196,700 (year 2005),  Truck Traffic: 10%,  Features Intersected: RAMP TO I 25 SBND,  Facility Carried by Structure: I 76 ML WBND
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 348.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.4m (139.1ft)

Find on map >>   Show street view

Structure Number: E-17-OC,  Location: I 76 AND I 25 (Lat: 39.816986,  Lng: -104.983733),  Route carried "under" structure: Interstate 25A,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 235,000 (year 2011),  Truck Traffic: 10%,  Features Intersected: I 25 ML,  Facility Carried by Structure: I 76 ML EBND
Minimum Vertical Clearance: 6.02m (19.75ft),  Kilometerpoint: 348.107,  Lanes on structure: 2,  Lanes under structure: 13,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 70.7m (232.0ft)

Find on map >>   Show street view

Structure Number: E-17-OD,  Location: I 76 AND I 25 (Lat: 39.817283,  Lng: -104.983742),  Route carried "under" structure: Interstate 25A,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 235,000 (year 2011),  Truck Traffic: 10%,  Features Intersected: I 25 ML,  Facility Carried by Structure: I 76 ML WBND
Minimum Vertical Clearance: 5.84m (19.16ft),  Kilometerpoint: 348.123,  Lanes on structure: 2,  Lanes under structure: 14,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 70.7m (232.0ft)

Find on map >>   Show street view

Structure Number: E-17-OE,  Location: 0.1 MI E. OF I25+I76 JCT (Lat: 39.819367,  Lng: -104.980622),  Route carried "under" structure: Ramp Interstate 25A,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 237,900 (year 2005),  Truck Traffic: 11%,  Features Intersected: RAMP TO I 25 NBND R,  Facility Carried by Structure: I76 WB OFF RAMP
Minimum Vertical Clearance: 7.00m (22.97ft),  Kilometerpoint: 348.000,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.4m (139.1ft)

Find on map >>   Show street view

Structure Number: E-17-OF,  Location: 0.2 MI E OF I 25 (Lat: 39.818778,  Lng: -104.980703),  Route carried "under" structure: Ramp Interstate 25A,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 23,790 (year 2005),  Truck Traffic: 11%,  Features Intersected: RAMP TO I 25 NBND,  Facility Carried by Structure: I 76 EBND ML
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 348.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.0m (137.8ft)

Find on map >>   Show street view

Structure Number: E-17-OG,  Location: 0.2 MI E OF I 25 (Lat: 39.819097,  Lng: -104.980647),  Route carried "under" structure: Ramp Interstate 25A,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 23,790 (year 2005),  Truck Traffic: 11%,  Features Intersected: RAMP TO I 25 NBND,  Facility Carried by Structure: I 76 WBND ML
Minimum Vertical Clearance: 6.00m (19.69ft),  Kilometerpoint: 348.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.4m (139.1ft)

Find on map >>   Show street view

Structure Number: E-17-OH,  Location: I25 & I76 JCT (Lat: 39.816442,  Lng: -104.983733),  Route carried "under" structure: Ramp Interstate 25A,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 196,700 (year 2005),  Truck Traffic: 10%,  Features Intersected: I 25 ML, HOV, RAMP,  Facility Carried by Structure: RAMP TO I 25 NBND
Minimum Vertical Clearance: 5.72m (18.77ft),  Kilometerpoint: 348.059,  Lanes on structure: 1,  Lanes under structure: 14,  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 67.7m (222.1ft)

Find on map >>   Show street view

Structure Number: E-17-OI,  Location: 0.1 MI W. OF I25+I76 JCT (Lat: 39.815697,  Lng: -104.985292),  Route carried "under" structure: Ramp Interstate 25A,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 196,700 (year 2005),  Truck Traffic: 10%,  Features Intersected: RAMP TO I 25 SBND R,  Facility Carried by Structure: RAMP TO I 25 NBND
Minimum Vertical Clearance: 7.00m (22.97ft),  Kilometerpoint: 348.000,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 42.4m (139.1ft)

Find on map >>   Show street view

Structure Number: E-17-OK,  Location: .4 MI W OF JCT I76 & (Lat: 39.814400,  Lng: -104.987817),  Route carried "under" structure: State highway 53A,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 14,000 (year 2011),  Truck Traffic: 9%,  Features Intersected: SH 53 ML,  Facility Carried by Structure: EB76 RMP TO I25 NB
Minimum Vertical Clearance: 6.35m (20.83ft),  Kilometerpoint: 1.609,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 31.0m (101.7ft)

Find on map >>   Show street view

Structure Number: E-17-OL,  Location: EBnd I 76 OVER BROADWAY (Lat: 39.814578,  Lng: -104.987825),  Route carried "under" structure: State highway 53A,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2011),  Truck Traffic: 7%,  Features Intersected: SH 53 ML-BROADWAY,  Facility Carried by Structure: I 76 EBND
Minimum Vertical Clearance: 6.17m (20.24ft),  Kilometerpoint: 1.625,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: E-17-OM,  Location: I76 OVER JCT I76 and I25 (Lat: 39.814853,  Lng: -104.987817),  Route carried "under" structure: State highway 53A,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2011),  Truck Traffic: 7%,  Features Intersected: SH 53 ML-BROADWAY,  Facility Carried by Structure: I 76 ML WBND
Minimum Vertical Clearance: 5.97m (19.59ft),  Kilometerpoint: 1.641,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 33.0m (108.3ft)

Find on map >>   Show street view

Structure Number: E-17-ON,  Location: I 76 OVER BROADWAY (Lat: 39.815217,  Lng: -104.987842),  Route carried "under" structure: State highway 53A,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2011),  Truck Traffic: 7%,  Features Intersected: SH 53 ML-BROADWAY R,  Facility Carried by Structure: RAMP TO I 76 WBND
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 1.657,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 39.0m (128.0ft)

Find on map >>   Show street view

Structure Number: E-17-OP,  Location: .4 MI W OF JCT I76 Ramp (Lat: 39.814228,  Lng: -104.987856),  Route carried "under" structure: State highway 53A,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 14,000 (year 2011),  Truck Traffic: 9%,  Features Intersected: SH 53 ML R,  Facility Carried by Structure: I76 EB TO I25 SB
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 1.593,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: E-17-OT,  Location: 1 MI W OF JCT I25 & I-70 (Lat: 39.810489,  Lng: -104.997272),  Route carried "under" structure: Interstate 76A,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 86,000 (year 2018),  Truck Traffic: 13%,  Features Intersected: I 76 ML,  Facility Carried by Structure: HURON STREET
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 0.150,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.0m (121.4ft)

Find on map >>   Show street view

Structure Number: E-17-PV,  Location: ESIDE OF I25-I76 INT. (Lat: 39.820517,  Lng: -104.980525),  Route carried "under" structure: Ramp Interstate 25A,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2018),  Truck Traffic: 11%,  Features Intersected: RAMP TO I 25 NBND R,  Facility Carried by Structure: ACCESS ROAD
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.195,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 14.7m (48.2ft)

Find on map >>   Show street view

Structure Number: E-17-QC,  Location: NE OF JCT I25 (Lat: 39.823981,  Lng: -104.962389),  Route carried "under" structure: Ramp Interstate 76A,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 41,600 (year 2005),  Truck Traffic: 17%,  Features Intersected: I76 EB ON RAMP FROM I270,  Facility Carried by Structure: I76 WB ML
Minimum Vertical Clearance: 5.77m (18.93ft),  Kilometerpoint: 11.106,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 44.5m (146.0ft)

Find on map >>   Show street view

Structure Number: E-17-QD,  Location: NE OF JCT I25 (Lat: 39.823614,  Lng: -104.962208),  Route carried "under" structure: Ramp Interstate 270B,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 41,600 (year 2005),  Truck Traffic: 17%,  Features Intersected: I270B RAMP TO I76 WB,  Facility Carried by Structure: I76 ONRMP FROM 270
Minimum Vertical Clearance: 6.42m (21.06ft),  Kilometerpoint: 1.751,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 47.5m (155.8ft)

Find on map >>   Show street view

Structure Number: E-17-QS,  Location: 1.1 MI NE OF JCT I25 (Lat: 39.823422,  Lng: -104.964589),  Route carried "under" structure: Interstate 270A,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 83,000 (year 2011),  Truck Traffic: 14%,  Features Intersected: I 270 ML,  Facility Carried by Structure: I76 ML EBND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 54.9m (180.1ft)

Find on map >>   Show street view

Structure Number: E-17-QT,  Location: 1.1 MI NE OF JCT I25 (Lat: 39.823639,  Lng: -104.964881),  Route carried "under" structure: Interstate 270A,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 83,000 (year 2011),  Truck Traffic: 14%,  Features Intersected: I 270 ML,  Facility Carried by Structure: I76 ML WBND
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.003,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 54.9m (180.1ft)

Find on map >>   Show street view

Structure Number: E-17-RC,  Location: 58TH AVE. (Lat: 39.801692,  Lng: -104.985414),  Route carried "under" structure: Interstate 25A,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 192,000 (year 2011),  Truck Traffic: 11%,  Features Intersected: I 25 ML,  Facility Carried by Structure: SH 53 ML
Minimum Vertical Clearance: 5.97m (19.59ft),  Kilometerpoint: 346.328,  Lanes on structure: 7,  Lanes under structure: 11,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 58.3m (191.3ft)

Discuss North Washington, Colorado (CO) on our hugely popular Colorado forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.