Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Phoenix, Arizona (AZ)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 1,288Number of bridges
  • 19,341ft / 5,895mTotal length
  • $437,000Total costs
  • 50,743,979Total average daily traffic
  • 3,024,079Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Phoenix
  • No street view available for this location

New bridges in Phoenix, AZ - historical statistics
  • New bridges - historical statistics
  • 51920-1929
  • 141930-1939
  • 121940-1949
  • 191950-1959
  • 781960-1969
  • 891970-1979
  • 2821980-1989
  • 3271990-1999
  • 2882000-2009
  • 1682010-2019
  • 62020-2022
Reconstructed bridges in Phoenix, AZ - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21940-1949
  • 41950-1959
  • 81960-1969
  • 181970-1979
  • 151980-1989
  • 181990-1999
  • 242000-2009
  • 32010-2019
  • 162020-2022
Average Bridge Daily Traffic in Phoenix, AZ
Average Bridge Truck Traffic in Phoenix, AZ
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.1%Very good
  • 59.2%Good
  • 26.9%Satisfactory
  • 3.5%Fair
  • 0.4%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 21.2%Very good
  • 58.1%Good
  • 16.2%Satisfactory
  • 4.4%Fair
  • 0.2%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.2%Very good
  • 67.0%Good
  • 17.1%Satisfactory
  • 1.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 43.2%Excellent
  • 44.4%Very good
  • 6.9%Good
  • 3.9%Satisfactory
  • 1.6%Fair
  • 0.2%Poor
  • 0.9%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 15.1%Very good
  • 69.2%Good
  • 13.4%Satisfactory
  • 2.0%Fair
  • 0.3%Poor
Find on map >>   Show street view

Structure Number: 1996,  Location: at SE Junction of I 17 (Lat: 33.427100,  Lng: -112.038200),  Route carried "under" structure: Ramp Interstate 10,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 12,754 (year 2019),  Truck Traffic: 4%,  Features Intersected: WB 10 Ramp,  Facility Carried by Structure: I 17 SB
Minimum Vertical Clearance: 8.05m (26.41ft),  Kilometerpoint: 240.549,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 47.2m (154.9ft)

Find on map >>   Show street view

Structure Number: 1997,  Location: at SE Jct With I 17 (Lat: 33.427900,  Lng: -112.035200),  Route carried "under" structure: Interstate 10,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 203,152 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 10 & SB 17-WB 10,  Facility Carried by Structure: I 17 NB
Minimum Vertical Clearance: 8.05m (26.41ft),  Kilometerpoint: 240.710,  Lanes on structure: 3,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 56.4m (185.0ft)

Find on map >>   Show street view

Structure Number: 1998,  Location: 4.15 E of Jct I 17 (Lat: 33.461900,  Lng: -112.041600),  Route carried "under" structure: Interstate 10,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 183,042 (year 2019),  Truck Traffic: 7%,  Features Intersected: WB10, Rmp EN, WS, SS, NN,  Facility Carried by Structure: HOV Ramp
Minimum Vertical Clearance: 8.84m (29.00ft),  Kilometerpoint: 236.895,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 54.9m (180.1ft)

Find on map >>   Show street view

Structure Number: 2,  Location: 0.3 mi E Jct I 17 (Lat: 33.431300,  Lng: -112.037300),  Route carried "under" structure: City street ,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 22,134 (year 2015),  Truck Traffic: 15%,  Features Intersected: 24th Street,  Facility Carried by Structure: I 10
Minimum Vertical Clearance: 5.47m (17.95ft),  Kilometerpoint: 0.000,  Lanes on structure: 13,  Lanes under structure: 13,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.0m (128.0ft)

Find on map >>   Show street view

Structure Number: 2004,  Location: 3.41 mi W Jct US 60 (Lat: 33.411500,  Lng: -112.010900),  Route carried "under" structure: Interstate 10,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 134,095 (year 2019),  Truck Traffic: 9%,  Features Intersected: I 10,  Facility Carried by Structure: University Drive
Minimum Vertical Clearance: 5.95m (19.52ft),  Kilometerpoint: 243.800,  Lanes on structure: 6,  Lanes under structure: 12,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: 2016,  Location: 3.8 mi South of Jct US 60 (Lat: 33.334400,  Lng: -111.972600),  Route carried "under" structure: Interstate 10,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 208,312 (year 2017),  Truck Traffic: 4%,  Features Intersected: I 10,  Facility Carried by Structure: Warner Road
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 255.387,  Lanes on structure: 7,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>   Show street view

Structure Number: 2017,  Location: 4.8 mi South of Jct US 60 (Lat: 33.319900,  Lng: -111.972700),  Route carried "under" structure: Interstate 10,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 191,433 (year 2017),  Truck Traffic: 4%,  Features Intersected: I 10,  Facility Carried by Structure: Ray Road
Minimum Vertical Clearance: 5.07m (16.63ft),  Kilometerpoint: 257.012,  Lanes on structure: 8,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>   Show street view

Structure Number: 2021,  Location: 0.3 mi E I 10 (Lat: 33.462000,  Lng: -112.030700),  Route carried "under" structure: City street ,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 29,891 (year 2016),  Truck Traffic: 5%,  Features Intersected: 24th St,  Facility Carried by Structure: Loop 202
Minimum Vertical Clearance: 5.34m (17.52ft),  Kilometerpoint: 0.000,  Lanes on structure: 9,  Lanes under structure: 9,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 74.1m (243.1ft)

Find on map >>   Show street view

Structure Number: 2022,  Location: 1.7 mi E of Jct I 10 (Lat: 33.460800,  Lng: -112.013200),  Route carried "under" structure: City street ,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 37,805 (year 2016),  Truck Traffic: 5%,  Features Intersected: 32nd Street,  Facility Carried by Structure: Loop 202
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 9,  Lanes under structure: 9,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 57.6m (189.0ft)

Find on map >>   Show street view

Structure Number: 2024,  Location: 2.7 mi E of Jct I 10 (Lat: 33.459200,  Lng: -111.995500),  Route carried "under" structure: City street ,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 14,842 (year 2016),  Truck Traffic: 5%,  Features Intersected: 40th Street,  Facility Carried by Structure: SL 202
Minimum Vertical Clearance: 5.45m (17.88ft),  Kilometerpoint: 0.000,  Lanes on structure: 11,  Lanes under structure: 11,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>   Show street view

Structure Number: 2031,  Location: 0.3 mi E Jct I 10 (Lat: 33.437700,  Lng: -112.034400),  Route carried "under" structure: City street ,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 18,731 (year 2015),  Truck Traffic: 8%,  Features Intersected: 24th Street,  Facility Carried by Structure: I 10 Sky Harb Ramp
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 43.3m (142.1ft)

Find on map >>   Show street view

Structure Number: 2032,  Location: 0.3 mi E Jct I 10 (Lat: 33.437700,  Lng: -112.034700),  Route carried "under" structure: City street ,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 18,731 (year 2017),  Truck Traffic: 8%,  Features Intersected: 24th Street,  Facility Carried by Structure: I 10 Sky Harb Ramp
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 2033,  Location: 0.1 mi N of I 10 (Lat: 33.462200,  Lng: -112.083000),  Route carried "under" structure: ServiceState highway 10,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 44,348 (year 2020),  Truck Traffic: 5%,  Features Intersected: 7th Avenue,  Facility Carried by Structure: 7th Ave Ped OP
Minimum Vertical Clearance: 5.37m (17.62ft),  Kilometerpoint: 232.808,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 35.4m (116.1ft)

Find on map >>   Show street view

Structure Number: 2055,  Location: 12.3 mi N of Jct US 60 (Lat: 33.654400,  Lng: -112.114500),  Route carried "under" structure: City street ,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 27,631 (year 2019),  Truck Traffic: 9%,  Features Intersected: Union Hills Drive,  Facility Carried by Structure: I 17 NB & SB
Minimum Vertical Clearance: 5.37m (17.62ft),  Kilometerpoint: 0.000,  Lanes on structure: 11,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 207,  Location: 22.19 mi N of Jct I 10 (Lat: 33.669300,  Lng: -112.135000),  Route carried "under" structure: City street ,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 19,799 (year 2020),  Truck Traffic: 2%,  Features Intersected: 35th Avenue,  Facility Carried by Structure: SL 101
Minimum Vertical Clearance: 5.57m (18.27ft),  Kilometerpoint: 0.000,  Lanes on structure: 9,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 2081,  Location: 3.95 mi N/I 10 (Lat: 33.494000,  Lng: -112.264400),  Route carried "under" structure: State highway 101,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 135,617 (year 2019),  Truck Traffic: 7%,  Features Intersected: Loop 101,  Facility Carried by Structure: Indian School Rd
Minimum Vertical Clearance: 5.88m (19.29ft),  Kilometerpoint: 6.357,  Lanes on structure: 8,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 39.0m (128.0ft)

Find on map >>   Show street view

Structure Number: 2082,  Location: 5.00 mi North of I 10 (Lat: 33.508200,  Lng: -112.269100),  Route carried "under" structure: City street ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 33,700 (year 2018),  Truck Traffic: 3%,  Features Intersected: Camelback Rd,  Facility Carried by Structure: Loop 101 NB
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 63.1m (207.0ft)

Find on map >>   Show street view

Structure Number: 2086,  Location: 2.93 mi North of I 10 (Lat: 33.479200,  Lng: -112.263900),  Route carried "under" structure: City street ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 9,012 (year 2017),  Truck Traffic: 3%,  Features Intersected: Thomas Rd,  Facility Carried by Structure: Loop 101 NB
Minimum Vertical Clearance: 5.22m (17.13ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 2087,  Location: 12.8 mi N of Jct US 60 (Lat: 33.662000,  Lng: -112.114300),  Route carried "under" structure: Interstate 17,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 9,012 (year 2017),  Truck Traffic: 4%,  Features Intersected: I 17,  Facility Carried by Structure: Yorkshire Drive
Minimum Vertical Clearance: 5.04m (16.54ft),  Kilometerpoint: 345.172,  Lanes on structure: 6,  Lanes under structure: 12,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.9m (121.1ft)

Find on map >>   Show street view

Structure Number: 2115,  Location: 4.24 mi E of Jct I 17 (Lat: 33.462500,  Lng: -112.033600),  Route carried "under" structure: Ramp Interstate 10,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 4,523 (year 2019),  Truck Traffic: 5%,  Features Intersected: 24th St WB On Ramp,  Facility Carried by Structure: WB 202 Off Ramp
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 237.813,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: 2116,  Location: 4.24 mi E Jct I 17 (Lat: 33.461500,  Lng: -112.033600),  Route carried "under" structure: Ramp State highway 202,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 4,546 (year 2019),  Truck Traffic: 9%,  Features Intersected: 24th St EB Off Ramp
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 2122,  Location: 2.5 mi E Jct I 17 (Lat: 33.462400,  Lng: -112.037200),  Route carried "under" structure: Ramp Interstate 10,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 167,784 (year 2019),  Truck Traffic: 7%,  Features Intersected: 10/51/202
Minimum Vertical Clearance: 5.07m (16.63ft),  Kilometerpoint: 236.976,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 2123,  Location: at Jct with SL 202 & (Lat: 33.463700,  Lng: -112.037500),  Route carried "under" structure: Ramp Interstate 10,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 2,813 (year 2019),  Truck Traffic: 7%,  Features Intersected: McDowell Rd Off Ramp
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 236.992,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 2124,  Location: at Jct I 10, SL 202, SR 5 (Lat: 33.463600,  Lng: -112.038700),  Route carried "under" structure: Ramp Interstate 10,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 4,058 (year 2019),  Truck Traffic: 7%,  Features Intersected: SB McDowell On Ramp
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 236.992,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 2126,  Location: at Jct SR 51 & SL 202 (Lat: 33.461300,  Lng: -112.040100),  Route carried "under" structure: Interstate 10,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 366,583 (year 2019),  Truck Traffic: 7%,  Features Intersected: 10/51/202
Minimum Vertical Clearance: 5.53m (18.14ft),  Kilometerpoint: 236.912,  Lanes on structure: 1,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 57.9m (190.0ft)

Find on map >>   Show street view

Structure Number: 2127,  Location: Jct I 10, SL 202, SR 51 (Lat: 33.463600,  Lng: -112.038700),  Route carried "under" structure: Ramp Interstate 10,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 167,784 (year 2019),  Truck Traffic: 4%,  Features Intersected: 10/51/202,  Facility Carried by Structure: SB 51-EB 202 Ramp
Minimum Vertical Clearance: 7.73m (25.36ft),  Kilometerpoint: 236.976,  Lanes on structure: 1,  Lanes under structure: 14,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 2128,  Location: 4.2 mi E of Jct I 17 (Lat: 33.461400,  Lng: -112.038000),  Route carried "under" structure: Interstate 10,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 178,501 (year 2019),  Truck Traffic: 7%,  Features Intersected: I 10
Minimum Vertical Clearance: 6.07m (19.91ft),  Kilometerpoint: 236.976,  Lanes on structure: 1,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 57.0m (187.0ft)

Find on map >>   Show street view

Structure Number: 213,  Location: 1/2 mi E of 101 & I 1 (Lat: 33.669300,  Lng: -112.100200),  Route carried "under" structure: City street ,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 23,737 (year 2018),  Truck Traffic: 5%,  Features Intersected: 19th Avenue,  Facility Carried by Structure: SR 101L EB
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 51.5m (169.0ft)

Find on map >>   Show street view

Structure Number: 2131,  Location: 1/2 mi E of 101 & I 1 (Lat: 33.669500,  Lng: -112.100200),  Route carried "under" structure: City street ,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 23,737 (year 2017),  Truck Traffic: 5%,  Features Intersected: 19th Avenue,  Facility Carried by Structure: SR 101L WB
Minimum Vertical Clearance: 5.07m (16.63ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 51.5m (169.0ft)

Find on map >>   Show street view

Structure Number: 2132,  Location: 23.70 mi N of I 10 (Lat: 33.668400,  Lng: -112.108600),  Route carried "under" structure: State highway 101,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 79,569 (year 2017),  Truck Traffic: 7%,  Features Intersected: SL 101,  Facility Carried by Structure: 23rd Avenue
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 38.141,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 44.5m (146.0ft)

Find on map >>   Show street view

Structure Number: 2133,  Location: 23.2 mi N of Jct I 10 (Lat: 33.668500,  Lng: -112.117300),  Route carried "under" structure: State highway 101,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 75,818 (year 2019),  Truck Traffic: 7%,  Features Intersected: SL 101,  Facility Carried by Structure: 27th Avenue
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 37.337,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 2134,  Location: 22.69 mi N of Jct I 10 (Lat: 33.668700,  Lng: -112.126300),  Route carried "under" structure: City street ,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 9,426 (year 2020),  Truck Traffic: 2%,  Features Intersected: 31st Avenue,  Facility Carried by Structure: SL 101 EB
Minimum Vertical Clearance: 5.55m (18.21ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 47.5m (155.8ft)

Find on map >>   Show street view

Structure Number: 2135,  Location: 22.69 mi N of Jct I 10 (Lat: 33.669000,  Lng: -112.126300),  Route carried "under" structure: City street ,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 9,426 (year 2020),  Truck Traffic: 2%,  Features Intersected: 31st Avenue,  Facility Carried by Structure: SL 101 WB
Minimum Vertical Clearance: 5.30m (17.39ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 47.5m (155.8ft)

Find on map >>   Show street view

Structure Number: 2136,  Location: 0.55 mi N of Jct L 101 (Lat: 33.676500,  Lng: -112.113200),  Route carried "under" structure: Interstate 17,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 119,559 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 17,  Facility Carried by Structure: Rose Garden Lane
Minimum Vertical Clearance: 5.22m (17.13ft),  Kilometerpoint: 346.781,  Lanes on structure: 6,  Lanes under structure: 12,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: 2137,  Location: NW Corner of 101/I 17 TI (Lat: 33.672800,  Lng: -112.113700),  Route carried "under" structure: Ramp Interstate 17,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 7,660 (year 2019),  Truck Traffic: 4%,  Features Intersected: Rose Garden Lane Ramp A,  Facility Carried by Structure: S-E/W Gore
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 346.347,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 2138,  Location: SW Corner of 101/I 17 TI (Lat: 33.663900,  Lng: -112.113300),  Route carried "under" structure: Ramp Interstate 17,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 5,814 (year 2019),  Truck Traffic: 4%,  Features Intersected: Utopia Ramp C,  Facility Carried by Structure: W-S Ramp
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 345.591,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 8.8m (28.9ft)

Find on map >>   Show street view

Structure Number: 2139,  Location: SE corner of TI (Lat: 33.663900,  Lng: -112.113300),  Route carried "under" structure: Ramp Interstate 17,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 28,908 (year 2019),  Truck Traffic: 4%,  Features Intersected: Ramp N-W,  Facility Carried by Structure: Utopia Ramp D
Minimum Vertical Clearance: 5.22m (17.13ft),  Kilometerpoint: 345.446,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 56.4m (185.0ft)

Find on map >>   Show street view

Structure Number: 214,  Location: 3.2 mi E of Jct I 10 (Lat: 33.458600,  Lng: -111.987400),  Route carried "under" structure: City street ,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 22,111 (year 2014),  Truck Traffic: 5%,  Features Intersected: 44th Street,  Facility Carried by Structure: SL 202
Minimum Vertical Clearance: 5.04m (16.54ft),  Kilometerpoint: 0.000,  Lanes on structure: 9,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 2141,  Location: 3.2 mi E of Jct I 10 (Lat: 33.459200,  Lng: -111.987200),  Route carried "under" structure: City street ,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 22,111 (year 2014),  Truck Traffic: 5%,  Features Intersected: 44th Street,  Facility Carried by Structure: Ramp to SL 202 WB
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 2142,  Location: 3.11 mi E of Jct I 10 (Lat: 33.459100,  Lng: -111.988900),  Route carried "under" structure: ServiceOther road ,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 8,000 (year 2015),  Truck Traffic: 5%,  Features Intersected: WB Frontage Road,  Facility Carried by Structure: SR 202
Minimum Vertical Clearance: 5.20m (17.06ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 51.8m (169.9ft)

Find on map >>   Show street view

Structure Number: 2143,  Location: 3.2 mi E of Jct I 10 (Lat: 33.457700,  Lng: -111.987200),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 22,111 (year 2014),  Truck Traffic: 5%,  Features Intersected: 44th Street,  Facility Carried by Structure: SR 202 off-ramp
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 2144,  Location: 3.11 mi E of Jct I 10 (Lat: 33.458200,  Lng: -111.989100),  Route carried "under" structure: ServiceOther road ,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 22,111 (year 2016),  Truck Traffic: 7%,  Features Intersected: EB Front Road SL 202,  Facility Carried by Structure: SL 202 off-ramp
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 2154,  Location: 2.65 mi N of Jct I 10 (Lat: 33.450900,  Lng: -111.983100),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 18,600 (year 2016),  Truck Traffic: 3%,  Features Intersected: Van Buren Street,  Facility Carried by Structure: SR 143 Ramp SB
Minimum Vertical Clearance: 5.25m (17.22ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 2155,  Location: 2.65 mi N of Jct I 10 (Lat: 33.450900,  Lng: -111.982500),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 18,600 (year 2016),  Truck Traffic: 3%,  Features Intersected: Van Buren Street,  Facility Carried by Structure: SR 143 (Hohokam)
Minimum Vertical Clearance: 5.82m (19.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 2156,  Location: 2.65 mi N of Jct I 10 (Lat: 33.450900,  Lng: -111.982700),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 18,600 (year 2016),  Truck Traffic: 3%,  Features Intersected: Van Buren Street,  Facility Carried by Structure: SR 143 SB (Hohokam
Minimum Vertical Clearance: 6.10m (20.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 2157,  Location: 2.65 mi N of Jct I 10 (Lat: 33.450900,  Lng: -111.982000),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 18,600 (year 2016),  Truck Traffic: 3%,  Features Intersected: Van Buren Street,  Facility Carried by Structure: SR 143 Ramp North
Minimum Vertical Clearance: 5.85m (19.19ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 2158,  Location: 3.00 mi N of Jct I 10 (Lat: 33.453700,  Lng: -111.982400),  Route carried "under" structure: State highway 143,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 25,934 (year 2018),  Truck Traffic: 9%,  Features Intersected: SR 143 (Hohokam)
Minimum Vertical Clearance: 5.83m (19.13ft),  Kilometerpoint: 4.828,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>   Show street view

Structure Number: 2159,  Location: 2.88 mi N of Jct I 10 (Lat: 33.457800,  Lng: -111.983900),  Route carried "under" structure: State highway 202,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 185,854 (year 2019),  Truck Traffic: 9%,  Features Intersected: SL 202 and SR 143
Minimum Vertical Clearance: 6.15m (20.18ft),  Kilometerpoint: 5.633,  Lanes on structure: 1,  Lanes under structure: 15,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 216,  Location: 2.88 mi N Jct I 10 (Lat: 33.458100,  Lng: -111.983700),  Route carried "under" structure: State highway 143,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 25,934 (year 2018),  Truck Traffic: 9%,  Features Intersected: SR 143, Hohokam,  Facility Carried by Structure: SL 202, E Papago
Minimum Vertical Clearance: 6.30m (20.67ft),  Kilometerpoint: 5.230,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 2161,  Location: 2.88 mi N of Jct I 10 (Lat: 33.458400,  Lng: -111.983900),  Route carried "under" structure: State highway 143,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 25,934 (year 2018),  Truck Traffic: 9%,  Features Intersected: SR 143 (Hohokam),  Facility Carried by Structure: SL 202 (E Papago)
Minimum Vertical Clearance: 5.88m (19.29ft),  Kilometerpoint: 5.230,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 2165,  Location: Center of TI-Level 4 (Lat: 33.668300,  Lng: -112.116900),  Route carried "under" structure: Interstate 17,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 307,208 (year 2019),  Truck Traffic: 4%,  Features Intersected: Rp N-W; Rp S-E; I17; 101,  Facility Carried by Structure: E- N Ramp
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 345.848,  Lanes on structure: 1,  Lanes under structure: 23,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 58.2m (190.9ft)

Find on map >>   Show street view

Structure Number: 2166,  Location: SW Corner 2nd Level of TI (Lat: 33.668200,  Lng: -112.116900),  Route carried "under" structure: ServiceState highway 101,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 14,957 (year 2019),  Truck Traffic: 4%,  Features Intersected: South Frontage Rd.,  Facility Carried by Structure: East/South Ramp
Minimum Vertical Clearance: 12.51m (41.04ft),  Kilometerpoint: 37.659,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 54.9m (180.1ft)

Find on map >>   Show street view

Structure Number: 2167,  Location: 3rd Level Center of TI (Lat: 33.667600,  Lng: -112.112800),  Route carried "under" structure: Interstate 17,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 307,208 (year 2019),  Truck Traffic: 7%,  Features Intersected: I 17; 101L; S Frntage Rd,  Facility Carried by Structure: North-West Ramp
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 345.848,  Lanes on structure: 2,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 54.9m (180.1ft)

Find on map >>   Show street view

Structure Number: 2168,  Location: SE Quadrant of 17/101 TI (Lat: 33.667800,  Lng: -112.111700),  Route carried "under" structure: ServiceState highway 101,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 7,008 (year 2019),  Truck Traffic: 2%,  Features Intersected: S Frontage Road
Minimum Vertical Clearance: 8.03m (26.35ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 56.4m (185.0ft)

Find on map >>   Show street view

Structure Number: 2169,  Location: 4th Level Center of TI (Lat: 33.669200,  Lng: -112.109600),  Route carried "under" structure: Interstate 17,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 307,208 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 17; 101L; 27th Ramp C,  Facility Carried by Structure: West-South Ramp
Minimum Vertical Clearance: 5.81m (19.06ft),  Kilometerpoint: 345.848,  Lanes on structure: 2,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 57.9m (190.0ft)

Find on map >>   Show street view

Structure Number: 217,  Location: N-E Cr 3rd Ll 101/I 17 TI (Lat: 33.669400,  Lng: -112.109600),  Route carried "under" structure: ServiceState highway 101,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 8,674 (year 2019),  Truck Traffic: 2%,  Features Intersected: North Frontage Rd
Minimum Vertical Clearance: 12.50m (41.01ft),  Kilometerpoint: 37.868,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 57.9m (190.0ft)

Find on map >>   Show street view

Structure Number: 2171,  Location: 3rd Level I 17/SR 101 TI (Lat: 33.670700,  Lng: -112.113900),  Route carried "under" structure: Interstate 17,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 137,919 (year 2019),  Truck Traffic: 7%,  Features Intersected: I 17, SR 101L and S FR
Minimum Vertical Clearance: 5.96m (19.55ft),  Kilometerpoint: 345.848,  Lanes on structure: 1,  Lanes under structure: 12,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 58.8m (192.9ft)

Find on map >>   Show street view

Structure Number: 2172,  Location: N/W Corner of 101/I 17 TI (Lat: 33.670400,  Lng: -112.114600),  Route carried "under" structure: ServiceState highway 101,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 16,159 (year 2019),  Truck Traffic: 4%,  Features Intersected: North Fontage Rd
Minimum Vertical Clearance: 8.80m (28.87ft),  Kilometerpoint: 346.009,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 53.3m (174.9ft)

Find on map >>   Show street view

Structure Number: 2173,  Location: SW Corner of TI (Lat: 33.668300,  Lng: -112.117500),  Route carried "under" structure: City street ,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 19,567 (year 2019),  Truck Traffic: 2%,  Features Intersected: 27th Avenue,  Facility Carried by Structure: East - N/S Gore
Minimum Vertical Clearance: 8.81m (28.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 47.9m (157.2ft)

Find on map >>   Show street view

Structure Number: 2174,  Location: Rose Garden & I-17 NB (Lat: 33.671300,  Lng: -112.112600),  Route carried "under" structure: Ramp Interstate 17,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 9,257 (year 2019),  Truck Traffic: 9%,  Features Intersected: Rose Garden Ramp B
Minimum Vertical Clearance: 5.04m (16.54ft),  Kilometerpoint: 346.170,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 51.8m (169.9ft)

Find on map >>   Show street view

Structure Number: 2175,  Location: NW Corner of 101/I 17 TI (Lat: 33.669400,  Lng: -112.117000),  Route carried "under" structure: City street ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 19,567 (year 2019),  Truck Traffic: 2%,  Features Intersected: 27 Ave,  Facility Carried by Structure: N/S-West Gore
Minimum Vertical Clearance: 5.45m (17.88ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 47.5m (155.8ft)

Find on map >>   Show street view

Structure Number: 2176,  Location: SE Quadrant I17/101L JCT (Lat: 33.668400,  Lng: -112.110200),  Route carried "under" structure: City street ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 5,005 (year 2017),  Truck Traffic: 5%,  Features Intersected: 23rd Avenue,  Facility Carried by Structure: N/S - 101 E Gore
Minimum Vertical Clearance: 5.29m (17.36ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 56.4m (185.0ft)

Find on map >>   Show street view

Structure Number: 2177,  Location: N/E Corner of 101/I 17 TI (Lat: 33.669200,  Lng: -112.108300),  Route carried "under" structure: City street ,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 5,245 (year 2019),  Truck Traffic: 2%,  Features Intersected: 23rd Ave,  Facility Carried by Structure: WB 101L to I 17
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 55.5m (182.1ft)

Find on map >>   Show street view

Structure Number: 2178,  Location: Center of TI 2nd Level (Lat: 33.667800,  Lng: -112.113600),  Route carried "under" structure: State highway 101,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 91,048 (year 2019),  Truck Traffic: 7%,  Features Intersected: 101L, S Frontage Rd,  Facility Carried by Structure: I 17 SB
Minimum Vertical Clearance: 5.42m (17.78ft),  Kilometerpoint: 37.659,  Lanes on structure: 5,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 55.8m (183.1ft)

Find on map >>   Show street view

Structure Number: 2179,  Location: 2nd Level Center of TI (Lat: 33.667800,  Lng: -112.113300),  Route carried "under" structure: State highway 101,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 91,048 (year 2019),  Truck Traffic: 7%,  Features Intersected: 101L & South Front Rd,  Facility Carried by Structure: I 17 North Bound
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 37.659,  Lanes on structure: 5,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 55.8m (183.1ft)

Find on map >>   Show street view

Structure Number: 218,  Location: N/W Side of 101/I 17 TI (Lat: 33.669972,  Lng: -112.113472),  Route carried "under" structure: ServiceState highway 17,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 16,159 (year 2019),  Truck Traffic: 4%,  Features Intersected: N Frontage Rd
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 2181,  Location: 2nd Ll N Ct 101/I 17 TI (Lat: 33.669778,  Lng: -112.113111),  Route carried "under" structure: ServiceState highway 17,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 16,159 (year 2019),  Truck Traffic: 6%,  Features Intersected: North Frontage Rd
Minimum Vertical Clearance: 5.53m (18.14ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 2183,  Location: 1.73 mi W of Jct I 10 (Lat: 33.436300,  Lng: -111.978900),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 6,143 (year 2016),  Truck Traffic: 5%,  Features Intersected: Sky Harbor Blvd,  Facility Carried by Structure: SR 143
Minimum Vertical Clearance: 6.09m (19.98ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: 2187,  Location: 7 mi W of Jct I 17 (Lat: 33.462300,  Lng: -112.229500),  Route carried "under" structure: Interstate 10,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 213,062 (year 2017),  Truck Traffic: 10%,  Features Intersected: 7 10 EB-WB & Drain Chnl,  Facility Carried by Structure: 79th Avenue
Minimum Vertical Clearance: 5.19m (17.03ft),  Kilometerpoint: 219.032,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>   Show street view

Structure Number: 219,  Location: 2.87 mi E of Jct I 17 (Lat: 33.410500,  Lng: -111.995400),  Route carried "under" structure: Interstate 10,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 300,553 (year 2019),  Truck Traffic: 4%,  Features Intersected: I 10,  Facility Carried by Structure: 40th Street
Minimum Vertical Clearance: 5.25m (17.22ft),  Kilometerpoint: 244.749,  Lanes on structure: 7,  Lanes under structure: 11,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 51.8m (169.9ft)

Find on map >>   Show street view

Structure Number: 2193,  Location: 7.0 mi N Jct I-10 (Lat: 33.558300,  Lng: -112.038100),  Route carried "under" structure: City street ,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 20,213 (year 2018),  Truck Traffic: 5%,  Features Intersected: Northern Avenue,  Facility Carried by Structure: SR 51
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 2198,  Location: 3.45 mi E Jct I 10 & (Lat: 33.457100,  Lng: -111.978800),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 6,112 (year 2014),  Truck Traffic: 10%,  Features Intersected: 48th Street,  Facility Carried by Structure: SR 202 EB
Minimum Vertical Clearance: 5.30m (17.39ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 2207,  Location: East of 99 Av North of 10 (Lat: 33.464600,  Lng: -112.268400),  Route carried "under" structure: City street ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 134,044 (year 2019),  Truck Traffic: 3%,  Features Intersected: McDowell Rd & Rid Canal,  Facility Carried by Structure: 101L Ramp W-N
Minimum Vertical Clearance: 6.35m (20.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 2208,  Location: 3.89 mi E Jct I 10 & (Lat: 33.454900,  Lng: -111.971800),  Route carried "under" structure: Ramp State highway 202,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 15,736 (year 2017),  Truck Traffic: 5%,  Features Intersected: Ramp B(52nd St Off Rmp)
Minimum Vertical Clearance: 5.24m (17.19ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 2209,  Location: 3.89 mi E Jct I 10 & (Lat: 33.455000,  Lng: -111.971600),  Route carried "under" structure: Ramp State highway 202,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 15,496 (year 2017),  Truck Traffic: 5%,  Features Intersected: Ramp B(52nd ST Off Ramp)
Minimum Vertical Clearance: 5.10m (16.73ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 221,  Location: 4.04 mi E Jct I10 & S (Lat: 33.453500,  Lng: -111.970200),  Route carried "under" structure: City street ,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 17,971 (year 2014),  Truck Traffic: 10%,  Features Intersected: 52nd Street,  Facility Carried by Structure: SR 202L EB
Minimum Vertical Clearance: 5.34m (17.52ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 2211,  Location: 4.04 mi E Jct I10 & S (Lat: 33.453700,  Lng: -111.970100),  Route carried "under" structure: City street ,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 17,971 (year 2014),  Truck Traffic: 6%,  Features Intersected: 52nd Street,  Facility Carried by Structure: SR 202L WB
Minimum Vertical Clearance: 5.19m (17.03ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 2212,  Location: 4.20 mi E Jct I 10 & (Lat: 33.451100,  Lng: -111.969100),  Route carried "under" structure: City street ,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 15,161 (year 2014),  Truck Traffic: 10%,  Features Intersected: Van Buren Street,  Facility Carried by Structure: EB L 202(E Papago)
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 2213,  Location: 4.2 mi E Jct I 10 & S (Lat: 33.451100,  Lng: -111.968800),  Route carried "under" structure: City street ,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 17,971 (year 2014),  Truck Traffic: 10%,  Features Intersected: Van Buren Street,  Facility Carried by Structure: WB L202 (E Papago)
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 2214,  Location: 4.5 mi E Jct I 10 & S (Lat: 33.446500,  Lng: -111.969100),  Route carried "under" structure: City street ,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 13,785 (year 2016),  Truck Traffic: 10%,  Features Intersected: Washington St(FAU 5041),  Facility Carried by Structure: EB L202 (E Papago)
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 2215,  Location: 4.5 mi E Jct I 10 & S (Lat: 33.446500,  Lng: -111.968800),  Route carried "under" structure: City street ,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 13,785 (year 2016),  Truck Traffic: 10%,  Features Intersected: Washington St(FAU 5041),  Facility Carried by Structure: WB L 202
Minimum Vertical Clearance: 6.29m (20.64ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 2219,  Location: 5.02 mi E Jct I 10 (Lat: 33.439800,  Lng: -111.967100),  Route carried "under" structure: City street ,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 47,900 (year 2015),  Truck Traffic: 9%,  Features Intersected: Sky Harbor Blvd WB,  Facility Carried by Structure: SR 202L EB
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 222,  Location: 5.02 mi E Jct I 10 (Lat: 33.439900,  Lng: -111.966900),  Route carried "under" structure: Ramp State highway 202,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 47,900 (year 2015),  Truck Traffic: 9%,  Features Intersected: Sky Harbor Blvd WB
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 8.079,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 2221,  Location: 5.48 mi E Jct I 10 & (Lat: 33.438300,  Lng: -111.965400),  Route carried "under" structure: Ramp State highway 202,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2015),  Truck Traffic: 5%,  Features Intersected: Sky Har. Blvd EB Ramp F
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 8.304,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 2222,  Location: Deer Valley Rd/I-17 (Lat: 33.683600,  Lng: -112.112400),  Route carried "under" structure: City street ,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 24,310 (year 2019),  Truck Traffic: 6%,  Features Intersected: Deer Valley Road,  Facility Carried by Structure: I-17
Minimum Vertical Clearance: 5.22m (17.13ft),  Kilometerpoint: 0.000,  Lanes on structure: 12,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 2223,  Location: 9.5 mi N Jct I-10 (Lat: 33.582500,  Lng: -112.010700),  Route carried "under" structure: State highway 51,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 147,712 (year 2018),  Truck Traffic: 7%,  Features Intersected: SR 51,  Facility Carried by Structure: Shea Blvd
Minimum Vertical Clearance: 5.62m (18.44ft),  Kilometerpoint: 15.257,  Lanes on structure: 7,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 28.3m (92.8ft)

Find on map >>   Show street view

Structure Number: 2224,  Location: 9.0 mi N Jct I-10 (Lat: 33.576200,  Lng: -112.013000),  Route carried "under" structure: State highway 51,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 168,878 (year 2018),  Truck Traffic: 7%,  Features Intersected: SR 51,  Facility Carried by Structure: 32nd Street
Minimum Vertical Clearance: 5.70m (18.70ft),  Kilometerpoint: 14.532,  Lanes on structure: 5,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 51.8m (169.9ft)

Find on map >>   Show street view

Structure Number: 2225,  Location: 8.5 mi N Jct I-10 (Lat: 33.573900,  Lng: -112.020400),  Route carried "under" structure: State highway 51,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 168,878 (year 2018),  Truck Traffic: 5%,  Features Intersected: SR 51 & WFR,  Facility Carried by Structure: 29th St Ped UP
Minimum Vertical Clearance: 6.86m (22.51ft),  Kilometerpoint: 13.776,  Lanes under structure: 12,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>   Show street view

Structure Number: 224,  Location: 2.4 mi N of Jct I 10 (Lat: 33.447400,  Lng: -111.981700),  Route carried "under" structure: City street ,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 18,600 (year 2016),  Truck Traffic: 3%,  Features Intersected: Washington Street,  Facility Carried by Structure: SR 143 (Hohokam)
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 57.0m (187.0ft)

Find on map >>   Show street view

Structure Number: 2247,  Location: 8.9 mi North of Jct I 10 (Lat: 33.495000,  Lng: -112.113300),  Route carried "under" structure: Interstate 17,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 169,022 (year 2019),  Truck Traffic: 9%,  Features Intersected: I 17,  Facility Carried by Structure: Indian School Road
Minimum Vertical Clearance: 5.24m (17.19ft),  Kilometerpoint: 326.584,  Lanes on structure: 12,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Discuss Phoenix, Arizona (AZ) on our hugely popular Arizona forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.