Bridge Statistics for Phoenix, Arizona (AZ)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- National Bridge Inventory (NBI) Statistics
- 1,288Number of bridges
- 19,341ft / 5,895mTotal length
- $437,000Total costs
- 50,743,979Total average daily traffic
- 3,024,079Total average daily truck traffic
- National Bridge Inventory (NBI) Registered Bridges for Phoenix
- No street view available for this location
- New bridges - historical statistics
- 51920-1929
- 141930-1939
- 121940-1949
- 191950-1959
- 781960-1969
- 891970-1979
- 2821980-1989
- 3271990-1999
- 2882000-2009
- 1682010-2019
- 62020-2022
- Reconstructed bridges - Historical Statistics
- 21940-1949
- 41950-1959
- 81960-1969
- 181970-1979
- 151980-1989
- 181990-1999
- 242000-2009
- 32010-2019
- 162020-2022
- Bridge Condition - Deck
- 10.1%Very good
- 59.2%Good
- 26.9%Satisfactory
- 3.5%Fair
- 0.4%Poor
- Bridge Condition - Superstructure
- 21.2%Very good
- 58.1%Good
- 16.2%Satisfactory
- 4.4%Fair
- 0.2%Poor
- Bridge Condition - Substructure
- 14.2%Very good
- 67.0%Good
- 17.1%Satisfactory
- 1.8%Fair
- Bridge Condition - Channel
- 43.2%Excellent
- 44.4%Very good
- 6.9%Good
- 3.9%Satisfactory
- 1.6%Fair
- 0.2%Poor
- 0.9%Serious
- Bridge Condition - Culverts
- 15.1%Very good
- 69.2%Good
- 13.4%Satisfactory
- 2.0%Fair
- 0.3%Poor
Find on map >> Show street view
Structure Number: 1996, Location: at SE Junction of I 17 (Lat: 33.427100, Lng: -112.038200), Route carried "under" structure: Ramp Interstate 10, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 12,754 (year 2019), Truck Traffic: 4%, Features Intersected: WB 10 Ramp, Facility Carried by Structure: I 17 SB
Minimum Vertical Clearance: 8.05m (26.41ft), Kilometerpoint: 240.549, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 47.2m (154.9ft)
Structure Number: 1996, Location: at SE Junction of I 17 (Lat: 33.427100, Lng: -112.038200), Route carried "under" structure: Ramp Interstate 10, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 12,754 (year 2019), Truck Traffic: 4%, Features Intersected: WB 10 Ramp, Facility Carried by Structure: I 17 SB
Minimum Vertical Clearance: 8.05m (26.41ft), Kilometerpoint: 240.549, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 47.2m (154.9ft)
Find on map >> Show street view
Structure Number: 1997, Location: at SE Jct With I 17 (Lat: 33.427900, Lng: -112.035200), Route carried "under" structure: Interstate 10, Year Built: 1987, Structure Length: 0. m, Average Daily Traffic: 203,152 (year 2019), Truck Traffic: 4%, Features Intersected: I 10 & SB 17-WB 10, Facility Carried by Structure: I 17 NB
Minimum Vertical Clearance: 8.05m (26.41ft), Kilometerpoint: 240.710, Lanes on structure: 3, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 56.4m (185.0ft)
Structure Number: 1997, Location: at SE Jct With I 17 (Lat: 33.427900, Lng: -112.035200), Route carried "under" structure: Interstate 10, Year Built: 1987, Structure Length: 0. m, Average Daily Traffic: 203,152 (year 2019), Truck Traffic: 4%, Features Intersected: I 10 & SB 17-WB 10, Facility Carried by Structure: I 17 NB
Minimum Vertical Clearance: 8.05m (26.41ft), Kilometerpoint: 240.710, Lanes on structure: 3, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 56.4m (185.0ft)
Find on map >> Show street view
Structure Number: 1998, Location: 4.15 E of Jct I 17 (Lat: 33.461900, Lng: -112.041600), Route carried "under" structure: Interstate 10, Year Built: 1987, Structure Length: 0. m, Average Daily Traffic: 183,042 (year 2019), Truck Traffic: 7%, Features Intersected: WB10, Rmp EN, WS, SS, NN, Facility Carried by Structure: HOV Ramp
Minimum Vertical Clearance: 8.84m (29.00ft), Kilometerpoint: 236.895, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 54.9m (180.1ft)
Structure Number: 1998, Location: 4.15 E of Jct I 17 (Lat: 33.461900, Lng: -112.041600), Route carried "under" structure: Interstate 10, Year Built: 1987, Structure Length: 0. m, Average Daily Traffic: 183,042 (year 2019), Truck Traffic: 7%, Features Intersected: WB10, Rmp EN, WS, SS, NN, Facility Carried by Structure: HOV Ramp
Minimum Vertical Clearance: 8.84m (29.00ft), Kilometerpoint: 236.895, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 54.9m (180.1ft)
Find on map >> Show street view
Structure Number: 2, Location: 0.3 mi E Jct I 17 (Lat: 33.431300, Lng: -112.037300), Route carried "under" structure: City street , Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 22,134 (year 2015), Truck Traffic: 15%, Features Intersected: 24th Street, Facility Carried by Structure: I 10
Minimum Vertical Clearance: 5.47m (17.95ft), Kilometerpoint: 0.000, Lanes on structure: 13, Lanes under structure: 13, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.0m (128.0ft)
Structure Number: 2, Location: 0.3 mi E Jct I 17 (Lat: 33.431300, Lng: -112.037300), Route carried "under" structure: City street , Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 22,134 (year 2015), Truck Traffic: 15%, Features Intersected: 24th Street, Facility Carried by Structure: I 10
Minimum Vertical Clearance: 5.47m (17.95ft), Kilometerpoint: 0.000, Lanes on structure: 13, Lanes under structure: 13, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.0m (128.0ft)
Find on map >> Show street view
Structure Number: 2004, Location: 3.41 mi W Jct US 60 (Lat: 33.411500, Lng: -112.010900), Route carried "under" structure: Interstate 10, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 134,095 (year 2019), Truck Traffic: 9%, Features Intersected: I 10, Facility Carried by Structure: University Drive
Minimum Vertical Clearance: 5.95m (19.52ft), Kilometerpoint: 243.800, Lanes on structure: 6, Lanes under structure: 12, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 40.5m (132.9ft)
Structure Number: 2004, Location: 3.41 mi W Jct US 60 (Lat: 33.411500, Lng: -112.010900), Route carried "under" structure: Interstate 10, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 134,095 (year 2019), Truck Traffic: 9%, Features Intersected: I 10, Facility Carried by Structure: University Drive
Minimum Vertical Clearance: 5.95m (19.52ft), Kilometerpoint: 243.800, Lanes on structure: 6, Lanes under structure: 12, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 40.5m (132.9ft)
Find on map >> Show street view
Structure Number: 2016, Location: 3.8 mi South of Jct US 60 (Lat: 33.334400, Lng: -111.972600), Route carried "under" structure: Interstate 10, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 208,312 (year 2017), Truck Traffic: 4%, Features Intersected: I 10, Facility Carried by Structure: Warner Road
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 255.387, Lanes on structure: 7, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.9m (130.9ft)
Structure Number: 2016, Location: 3.8 mi South of Jct US 60 (Lat: 33.334400, Lng: -111.972600), Route carried "under" structure: Interstate 10, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 208,312 (year 2017), Truck Traffic: 4%, Features Intersected: I 10, Facility Carried by Structure: Warner Road
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 255.387, Lanes on structure: 7, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.9m (130.9ft)
Find on map >> Show street view
Structure Number: 2017, Location: 4.8 mi South of Jct US 60 (Lat: 33.319900, Lng: -111.972700), Route carried "under" structure: Interstate 10, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 191,433 (year 2017), Truck Traffic: 4%, Features Intersected: I 10, Facility Carried by Structure: Ray Road
Minimum Vertical Clearance: 5.07m (16.63ft), Kilometerpoint: 257.012, Lanes on structure: 8, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.9m (130.9ft)
Structure Number: 2017, Location: 4.8 mi South of Jct US 60 (Lat: 33.319900, Lng: -111.972700), Route carried "under" structure: Interstate 10, Year Built: 1986, Structure Length: 0. m, Average Daily Traffic: 191,433 (year 2017), Truck Traffic: 4%, Features Intersected: I 10, Facility Carried by Structure: Ray Road
Minimum Vertical Clearance: 5.07m (16.63ft), Kilometerpoint: 257.012, Lanes on structure: 8, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.9m (130.9ft)
Find on map >> Show street view
Structure Number: 2021, Location: 0.3 mi E I 10 (Lat: 33.462000, Lng: -112.030700), Route carried "under" structure: City street , Year Built: 1987, Structure Length: 0. m, Average Daily Traffic: 29,891 (year 2016), Truck Traffic: 5%, Features Intersected: 24th St, Facility Carried by Structure: Loop 202
Minimum Vertical Clearance: 5.34m (17.52ft), Kilometerpoint: 0.000, Lanes on structure: 9, Lanes under structure: 9, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 74.1m (243.1ft)
Structure Number: 2021, Location: 0.3 mi E I 10 (Lat: 33.462000, Lng: -112.030700), Route carried "under" structure: City street , Year Built: 1987, Structure Length: 0. m, Average Daily Traffic: 29,891 (year 2016), Truck Traffic: 5%, Features Intersected: 24th St, Facility Carried by Structure: Loop 202
Minimum Vertical Clearance: 5.34m (17.52ft), Kilometerpoint: 0.000, Lanes on structure: 9, Lanes under structure: 9, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 74.1m (243.1ft)
Find on map >> Show street view
Structure Number: 2022, Location: 1.7 mi E of Jct I 10 (Lat: 33.460800, Lng: -112.013200), Route carried "under" structure: City street , Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 37,805 (year 2016), Truck Traffic: 5%, Features Intersected: 32nd Street, Facility Carried by Structure: Loop 202
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 0.000, Lanes on structure: 9, Lanes under structure: 9, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 57.6m (189.0ft)
Structure Number: 2022, Location: 1.7 mi E of Jct I 10 (Lat: 33.460800, Lng: -112.013200), Route carried "under" structure: City street , Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 37,805 (year 2016), Truck Traffic: 5%, Features Intersected: 32nd Street, Facility Carried by Structure: Loop 202
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 0.000, Lanes on structure: 9, Lanes under structure: 9, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 57.6m (189.0ft)
Find on map >> Show street view
Structure Number: 2024, Location: 2.7 mi E of Jct I 10 (Lat: 33.459200, Lng: -111.995500), Route carried "under" structure: City street , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 14,842 (year 2016), Truck Traffic: 5%, Features Intersected: 40th Street, Facility Carried by Structure: SL 202
Minimum Vertical Clearance: 5.45m (17.88ft), Kilometerpoint: 0.000, Lanes on structure: 11, Lanes under structure: 11, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 46.6m (152.9ft)
Structure Number: 2024, Location: 2.7 mi E of Jct I 10 (Lat: 33.459200, Lng: -111.995500), Route carried "under" structure: City street , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 14,842 (year 2016), Truck Traffic: 5%, Features Intersected: 40th Street, Facility Carried by Structure: SL 202
Minimum Vertical Clearance: 5.45m (17.88ft), Kilometerpoint: 0.000, Lanes on structure: 11, Lanes under structure: 11, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 46.6m (152.9ft)
Find on map >> Show street view
Structure Number: 2031, Location: 0.3 mi E Jct I 10 (Lat: 33.437700, Lng: -112.034400), Route carried "under" structure: City street , Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 18,731 (year 2015), Truck Traffic: 8%, Features Intersected: 24th Street, Facility Carried by Structure: I 10 Sky Harb Ramp
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 43.3m (142.1ft)
Structure Number: 2031, Location: 0.3 mi E Jct I 10 (Lat: 33.437700, Lng: -112.034400), Route carried "under" structure: City street , Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 18,731 (year 2015), Truck Traffic: 8%, Features Intersected: 24th Street, Facility Carried by Structure: I 10 Sky Harb Ramp
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 43.3m (142.1ft)
Find on map >> Show street view
Structure Number: 2032, Location: 0.3 mi E Jct I 10 (Lat: 33.437700, Lng: -112.034700), Route carried "under" structure: City street , Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 18,731 (year 2017), Truck Traffic: 8%, Features Intersected: 24th Street, Facility Carried by Structure: I 10 Sky Harb Ramp
Minimum Vertical Clearance: 5.06m (16.60ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 42.7m (140.1ft)
Structure Number: 2032, Location: 0.3 mi E Jct I 10 (Lat: 33.437700, Lng: -112.034700), Route carried "under" structure: City street , Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 18,731 (year 2017), Truck Traffic: 8%, Features Intersected: 24th Street, Facility Carried by Structure: I 10 Sky Harb Ramp
Minimum Vertical Clearance: 5.06m (16.60ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 42.7m (140.1ft)
Find on map >> Show street view
Structure Number: 2033, Location: 0.1 mi N of I 10 (Lat: 33.462200, Lng: -112.083000), Route carried "under" structure: ServiceState highway 10, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 44,348 (year 2020), Truck Traffic: 5%, Features Intersected: 7th Avenue, Facility Carried by Structure: 7th Ave Ped OP
Minimum Vertical Clearance: 5.37m (17.62ft), Kilometerpoint: 232.808, Lanes under structure: 8, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 35.4m (116.1ft)
Structure Number: 2033, Location: 0.1 mi N of I 10 (Lat: 33.462200, Lng: -112.083000), Route carried "under" structure: ServiceState highway 10, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 44,348 (year 2020), Truck Traffic: 5%, Features Intersected: 7th Avenue, Facility Carried by Structure: 7th Ave Ped OP
Minimum Vertical Clearance: 5.37m (17.62ft), Kilometerpoint: 232.808, Lanes under structure: 8, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 35.4m (116.1ft)
Find on map >> Show street view
Structure Number: 2055, Location: 12.3 mi N of Jct US 60 (Lat: 33.654400, Lng: -112.114500), Route carried "under" structure: City street , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 27,631 (year 2019), Truck Traffic: 9%, Features Intersected: Union Hills Drive, Facility Carried by Structure: I 17 NB & SB
Minimum Vertical Clearance: 5.37m (17.62ft), Kilometerpoint: 0.000, Lanes on structure: 11, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Structure Number: 2055, Location: 12.3 mi N of Jct US 60 (Lat: 33.654400, Lng: -112.114500), Route carried "under" structure: City street , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 27,631 (year 2019), Truck Traffic: 9%, Features Intersected: Union Hills Drive, Facility Carried by Structure: I 17 NB & SB
Minimum Vertical Clearance: 5.37m (17.62ft), Kilometerpoint: 0.000, Lanes on structure: 11, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 24.4m (80.1ft)
Find on map >> Show street view
Structure Number: 207, Location: 22.19 mi N of Jct I 10 (Lat: 33.669300, Lng: -112.135000), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 19,799 (year 2020), Truck Traffic: 2%, Features Intersected: 35th Avenue, Facility Carried by Structure: SL 101
Minimum Vertical Clearance: 5.57m (18.27ft), Kilometerpoint: 0.000, Lanes on structure: 9, Lanes under structure: 9, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 29.3m (96.1ft)
Structure Number: 207, Location: 22.19 mi N of Jct I 10 (Lat: 33.669300, Lng: -112.135000), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 19,799 (year 2020), Truck Traffic: 2%, Features Intersected: 35th Avenue, Facility Carried by Structure: SL 101
Minimum Vertical Clearance: 5.57m (18.27ft), Kilometerpoint: 0.000, Lanes on structure: 9, Lanes under structure: 9, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 29.3m (96.1ft)
Find on map >> Show street view
Structure Number: 2081, Location: 3.95 mi N/I 10 (Lat: 33.494000, Lng: -112.264400), Route carried "under" structure: State highway 101, Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 135,617 (year 2019), Truck Traffic: 7%, Features Intersected: Loop 101, Facility Carried by Structure: Indian School Rd
Minimum Vertical Clearance: 5.88m (19.29ft), Kilometerpoint: 6.357, Lanes on structure: 8, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 39.0m (128.0ft)
Structure Number: 2081, Location: 3.95 mi N/I 10 (Lat: 33.494000, Lng: -112.264400), Route carried "under" structure: State highway 101, Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 135,617 (year 2019), Truck Traffic: 7%, Features Intersected: Loop 101, Facility Carried by Structure: Indian School Rd
Minimum Vertical Clearance: 5.88m (19.29ft), Kilometerpoint: 6.357, Lanes on structure: 8, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 39.0m (128.0ft)
Find on map >> Show street view
Structure Number: 2082, Location: 5.00 mi North of I 10 (Lat: 33.508200, Lng: -112.269100), Route carried "under" structure: City street , Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 33,700 (year 2018), Truck Traffic: 3%, Features Intersected: Camelback Rd, Facility Carried by Structure: Loop 101 NB
Minimum Vertical Clearance: 5.64m (18.50ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 63.1m (207.0ft)
Structure Number: 2082, Location: 5.00 mi North of I 10 (Lat: 33.508200, Lng: -112.269100), Route carried "under" structure: City street , Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 33,700 (year 2018), Truck Traffic: 3%, Features Intersected: Camelback Rd, Facility Carried by Structure: Loop 101 NB
Minimum Vertical Clearance: 5.64m (18.50ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 63.1m (207.0ft)
Find on map >> Show street view
Structure Number: 2086, Location: 2.93 mi North of I 10 (Lat: 33.479200, Lng: -112.263900), Route carried "under" structure: City street , Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 9,012 (year 2017), Truck Traffic: 3%, Features Intersected: Thomas Rd, Facility Carried by Structure: Loop 101 NB
Minimum Vertical Clearance: 5.22m (17.13ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.8m (101.0ft)
Structure Number: 2086, Location: 2.93 mi North of I 10 (Lat: 33.479200, Lng: -112.263900), Route carried "under" structure: City street , Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 9,012 (year 2017), Truck Traffic: 3%, Features Intersected: Thomas Rd, Facility Carried by Structure: Loop 101 NB
Minimum Vertical Clearance: 5.22m (17.13ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.8m (101.0ft)
Find on map >> Show street view
Structure Number: 2087, Location: 12.8 mi N of Jct US 60 (Lat: 33.662000, Lng: -112.114300), Route carried "under" structure: Interstate 17, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 9,012 (year 2017), Truck Traffic: 4%, Features Intersected: I 17, Facility Carried by Structure: Yorkshire Drive
Minimum Vertical Clearance: 5.04m (16.54ft), Kilometerpoint: 345.172, Lanes on structure: 6, Lanes under structure: 12, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.9m (121.1ft)
Structure Number: 2087, Location: 12.8 mi N of Jct US 60 (Lat: 33.662000, Lng: -112.114300), Route carried "under" structure: Interstate 17, Year Built: 1988, Structure Length: 0. m, Average Daily Traffic: 9,012 (year 2017), Truck Traffic: 4%, Features Intersected: I 17, Facility Carried by Structure: Yorkshire Drive
Minimum Vertical Clearance: 5.04m (16.54ft), Kilometerpoint: 345.172, Lanes on structure: 6, Lanes under structure: 12, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.9m (121.1ft)
Find on map >> Show street view
Structure Number: 2115, Location: 4.24 mi E of Jct I 17 (Lat: 33.462500, Lng: -112.033600), Route carried "under" structure: Ramp Interstate 10, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 4,523 (year 2019), Truck Traffic: 5%, Features Intersected: 24th St WB On Ramp, Facility Carried by Structure: WB 202 Off Ramp
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 237.813, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 40.5m (132.9ft)
Structure Number: 2115, Location: 4.24 mi E of Jct I 17 (Lat: 33.462500, Lng: -112.033600), Route carried "under" structure: Ramp Interstate 10, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 4,523 (year 2019), Truck Traffic: 5%, Features Intersected: 24th St WB On Ramp, Facility Carried by Structure: WB 202 Off Ramp
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 237.813, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 40.5m (132.9ft)
Find on map >> Show street view
Structure Number: 2116, Location: 4.24 mi E Jct I 17 (Lat: 33.461500, Lng: -112.033600), Route carried "under" structure: Ramp State highway 202, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 4,546 (year 2019), Truck Traffic: 9%, Features Intersected: 24th St EB Off Ramp
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 35.1m (115.2ft)
Structure Number: 2116, Location: 4.24 mi E Jct I 17 (Lat: 33.461500, Lng: -112.033600), Route carried "under" structure: Ramp State highway 202, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 4,546 (year 2019), Truck Traffic: 9%, Features Intersected: 24th St EB Off Ramp
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 35.1m (115.2ft)
Find on map >> Show street view
Structure Number: 2122, Location: 2.5 mi E Jct I 17 (Lat: 33.462400, Lng: -112.037200), Route carried "under" structure: Ramp Interstate 10, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 167,784 (year 2019), Truck Traffic: 7%, Features Intersected: 10/51/202
Minimum Vertical Clearance: 5.07m (16.63ft), Kilometerpoint: 236.976, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 2122, Location: 2.5 mi E Jct I 17 (Lat: 33.462400, Lng: -112.037200), Route carried "under" structure: Ramp Interstate 10, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 167,784 (year 2019), Truck Traffic: 7%, Features Intersected: 10/51/202
Minimum Vertical Clearance: 5.07m (16.63ft), Kilometerpoint: 236.976, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 2123, Location: at Jct with SL 202 & (Lat: 33.463700, Lng: -112.037500), Route carried "under" structure: Ramp Interstate 10, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 2,813 (year 2019), Truck Traffic: 7%, Features Intersected: McDowell Rd Off Ramp
Minimum Vertical Clearance: 5.61m (18.41ft), Kilometerpoint: 236.992, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 33.5m (109.9ft)
Structure Number: 2123, Location: at Jct with SL 202 & (Lat: 33.463700, Lng: -112.037500), Route carried "under" structure: Ramp Interstate 10, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 2,813 (year 2019), Truck Traffic: 7%, Features Intersected: McDowell Rd Off Ramp
Minimum Vertical Clearance: 5.61m (18.41ft), Kilometerpoint: 236.992, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 33.5m (109.9ft)
Find on map >> Show street view
Structure Number: 2124, Location: at Jct I 10, SL 202, SR 5 (Lat: 33.463600, Lng: -112.038700), Route carried "under" structure: Ramp Interstate 10, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 4,058 (year 2019), Truck Traffic: 7%, Features Intersected: SB McDowell On Ramp
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 236.992, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 45.7m (149.9ft)
Structure Number: 2124, Location: at Jct I 10, SL 202, SR 5 (Lat: 33.463600, Lng: -112.038700), Route carried "under" structure: Ramp Interstate 10, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 4,058 (year 2019), Truck Traffic: 7%, Features Intersected: SB McDowell On Ramp
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 236.992, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 45.7m (149.9ft)
Find on map >> Show street view
Structure Number: 2126, Location: at Jct SR 51 & SL 202 (Lat: 33.461300, Lng: -112.040100), Route carried "under" structure: Interstate 10, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 366,583 (year 2019), Truck Traffic: 7%, Features Intersected: 10/51/202
Minimum Vertical Clearance: 5.53m (18.14ft), Kilometerpoint: 236.912, Lanes on structure: 1, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 57.9m (190.0ft)
Structure Number: 2126, Location: at Jct SR 51 & SL 202 (Lat: 33.461300, Lng: -112.040100), Route carried "under" structure: Interstate 10, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 366,583 (year 2019), Truck Traffic: 7%, Features Intersected: 10/51/202
Minimum Vertical Clearance: 5.53m (18.14ft), Kilometerpoint: 236.912, Lanes on structure: 1, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 57.9m (190.0ft)
Find on map >> Show street view
Structure Number: 2127, Location: Jct I 10, SL 202, SR 51 (Lat: 33.463600, Lng: -112.038700), Route carried "under" structure: Ramp Interstate 10, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 167,784 (year 2019), Truck Traffic: 4%, Features Intersected: 10/51/202, Facility Carried by Structure: SB 51-EB 202 Ramp
Minimum Vertical Clearance: 7.73m (25.36ft), Kilometerpoint: 236.976, Lanes on structure: 1, Lanes under structure: 14, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 53.3m (174.9ft)
Structure Number: 2127, Location: Jct I 10, SL 202, SR 51 (Lat: 33.463600, Lng: -112.038700), Route carried "under" structure: Ramp Interstate 10, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 167,784 (year 2019), Truck Traffic: 4%, Features Intersected: 10/51/202, Facility Carried by Structure: SB 51-EB 202 Ramp
Minimum Vertical Clearance: 7.73m (25.36ft), Kilometerpoint: 236.976, Lanes on structure: 1, Lanes under structure: 14, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 53.3m (174.9ft)
Find on map >> Show street view
Structure Number: 2128, Location: 4.2 mi E of Jct I 17 (Lat: 33.461400, Lng: -112.038000), Route carried "under" structure: Interstate 10, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 178,501 (year 2019), Truck Traffic: 7%, Features Intersected: I 10
Minimum Vertical Clearance: 6.07m (19.91ft), Kilometerpoint: 236.976, Lanes on structure: 1, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 57.0m (187.0ft)
Structure Number: 2128, Location: 4.2 mi E of Jct I 17 (Lat: 33.461400, Lng: -112.038000), Route carried "under" structure: Interstate 10, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 178,501 (year 2019), Truck Traffic: 7%, Features Intersected: I 10
Minimum Vertical Clearance: 6.07m (19.91ft), Kilometerpoint: 236.976, Lanes on structure: 1, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 57.0m (187.0ft)
Find on map >> Show street view
Structure Number: 213, Location: 1/2 mi E of 101 & I 1 (Lat: 33.669300, Lng: -112.100200), Route carried "under" structure: City street , Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 23,737 (year 2018), Truck Traffic: 5%, Features Intersected: 19th Avenue, Facility Carried by Structure: SR 101L EB
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 51.5m (169.0ft)
Structure Number: 213, Location: 1/2 mi E of 101 & I 1 (Lat: 33.669300, Lng: -112.100200), Route carried "under" structure: City street , Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 23,737 (year 2018), Truck Traffic: 5%, Features Intersected: 19th Avenue, Facility Carried by Structure: SR 101L EB
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 51.5m (169.0ft)
Find on map >> Show street view
Structure Number: 2131, Location: 1/2 mi E of 101 & I 1 (Lat: 33.669500, Lng: -112.100200), Route carried "under" structure: City street , Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 23,737 (year 2017), Truck Traffic: 5%, Features Intersected: 19th Avenue, Facility Carried by Structure: SR 101L WB
Minimum Vertical Clearance: 5.07m (16.63ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 51.5m (169.0ft)
Structure Number: 2131, Location: 1/2 mi E of 101 & I 1 (Lat: 33.669500, Lng: -112.100200), Route carried "under" structure: City street , Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 23,737 (year 2017), Truck Traffic: 5%, Features Intersected: 19th Avenue, Facility Carried by Structure: SR 101L WB
Minimum Vertical Clearance: 5.07m (16.63ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 51.5m (169.0ft)
Find on map >> Show street view
Structure Number: 2132, Location: 23.70 mi N of I 10 (Lat: 33.668400, Lng: -112.108600), Route carried "under" structure: State highway 101, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 79,569 (year 2017), Truck Traffic: 7%, Features Intersected: SL 101, Facility Carried by Structure: 23rd Avenue
Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 38.141, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 44.5m (146.0ft)
Structure Number: 2132, Location: 23.70 mi N of I 10 (Lat: 33.668400, Lng: -112.108600), Route carried "under" structure: State highway 101, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 79,569 (year 2017), Truck Traffic: 7%, Features Intersected: SL 101, Facility Carried by Structure: 23rd Avenue
Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 38.141, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 44.5m (146.0ft)
Find on map >> Show street view
Structure Number: 2133, Location: 23.2 mi N of Jct I 10 (Lat: 33.668500, Lng: -112.117300), Route carried "under" structure: State highway 101, Year Built: 1993, Structure Length: 0. m, Average Daily Traffic: 75,818 (year 2019), Truck Traffic: 7%, Features Intersected: SL 101, Facility Carried by Structure: 27th Avenue
Minimum Vertical Clearance: 5.39m (17.68ft), Kilometerpoint: 37.337, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 39.6m (129.9ft)
Structure Number: 2133, Location: 23.2 mi N of Jct I 10 (Lat: 33.668500, Lng: -112.117300), Route carried "under" structure: State highway 101, Year Built: 1993, Structure Length: 0. m, Average Daily Traffic: 75,818 (year 2019), Truck Traffic: 7%, Features Intersected: SL 101, Facility Carried by Structure: 27th Avenue
Minimum Vertical Clearance: 5.39m (17.68ft), Kilometerpoint: 37.337, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 39.6m (129.9ft)
Find on map >> Show street view
Structure Number: 2134, Location: 22.69 mi N of Jct I 10 (Lat: 33.668700, Lng: -112.126300), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 9,426 (year 2020), Truck Traffic: 2%, Features Intersected: 31st Avenue, Facility Carried by Structure: SL 101 EB
Minimum Vertical Clearance: 5.55m (18.21ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 47.5m (155.8ft)
Structure Number: 2134, Location: 22.69 mi N of Jct I 10 (Lat: 33.668700, Lng: -112.126300), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 9,426 (year 2020), Truck Traffic: 2%, Features Intersected: 31st Avenue, Facility Carried by Structure: SL 101 EB
Minimum Vertical Clearance: 5.55m (18.21ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 47.5m (155.8ft)
Find on map >> Show street view
Structure Number: 2135, Location: 22.69 mi N of Jct I 10 (Lat: 33.669000, Lng: -112.126300), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 9,426 (year 2020), Truck Traffic: 2%, Features Intersected: 31st Avenue, Facility Carried by Structure: SL 101 WB
Minimum Vertical Clearance: 5.30m (17.39ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 47.5m (155.8ft)
Structure Number: 2135, Location: 22.69 mi N of Jct I 10 (Lat: 33.669000, Lng: -112.126300), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 9,426 (year 2020), Truck Traffic: 2%, Features Intersected: 31st Avenue, Facility Carried by Structure: SL 101 WB
Minimum Vertical Clearance: 5.30m (17.39ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 47.5m (155.8ft)
Find on map >> Show street view
Structure Number: 2136, Location: 0.55 mi N of Jct L 101 (Lat: 33.676500, Lng: -112.113200), Route carried "under" structure: Interstate 17, Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 119,559 (year 2019), Truck Traffic: 4%, Features Intersected: I 17, Facility Carried by Structure: Rose Garden Lane
Minimum Vertical Clearance: 5.22m (17.13ft), Kilometerpoint: 346.781, Lanes on structure: 6, Lanes under structure: 12, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.7m (127.0ft)
Structure Number: 2136, Location: 0.55 mi N of Jct L 101 (Lat: 33.676500, Lng: -112.113200), Route carried "under" structure: Interstate 17, Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 119,559 (year 2019), Truck Traffic: 4%, Features Intersected: I 17, Facility Carried by Structure: Rose Garden Lane
Minimum Vertical Clearance: 5.22m (17.13ft), Kilometerpoint: 346.781, Lanes on structure: 6, Lanes under structure: 12, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 38.7m (127.0ft)
Find on map >> Show street view
Structure Number: 2137, Location: NW Corner of 101/I 17 TI (Lat: 33.672800, Lng: -112.113700), Route carried "under" structure: Ramp Interstate 17, Year Built: 1997, Structure Length: 0. m, Average Daily Traffic: 7,660 (year 2019), Truck Traffic: 4%, Features Intersected: Rose Garden Lane Ramp A, Facility Carried by Structure: S-E/W Gore
Minimum Vertical Clearance: 4.97m (16.31ft), Kilometerpoint: 346.347, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 25.9m (85.0ft)
Structure Number: 2137, Location: NW Corner of 101/I 17 TI (Lat: 33.672800, Lng: -112.113700), Route carried "under" structure: Ramp Interstate 17, Year Built: 1997, Structure Length: 0. m, Average Daily Traffic: 7,660 (year 2019), Truck Traffic: 4%, Features Intersected: Rose Garden Lane Ramp A, Facility Carried by Structure: S-E/W Gore
Minimum Vertical Clearance: 4.97m (16.31ft), Kilometerpoint: 346.347, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 25.9m (85.0ft)
Find on map >> Show street view
Structure Number: 2138, Location: SW Corner of 101/I 17 TI (Lat: 33.663900, Lng: -112.113300), Route carried "under" structure: Ramp Interstate 17, Year Built: 1997, Structure Length: 0. m, Average Daily Traffic: 5,814 (year 2019), Truck Traffic: 4%, Features Intersected: Utopia Ramp C, Facility Carried by Structure: W-S Ramp
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 345.591, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 8.8m (28.9ft)
Structure Number: 2138, Location: SW Corner of 101/I 17 TI (Lat: 33.663900, Lng: -112.113300), Route carried "under" structure: Ramp Interstate 17, Year Built: 1997, Structure Length: 0. m, Average Daily Traffic: 5,814 (year 2019), Truck Traffic: 4%, Features Intersected: Utopia Ramp C, Facility Carried by Structure: W-S Ramp
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 345.591, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 8.8m (28.9ft)
Find on map >> Show street view
Structure Number: 2139, Location: SE corner of TI (Lat: 33.663900, Lng: -112.113300), Route carried "under" structure: Ramp Interstate 17, Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 28,908 (year 2019), Truck Traffic: 4%, Features Intersected: Ramp N-W, Facility Carried by Structure: Utopia Ramp D
Minimum Vertical Clearance: 5.22m (17.13ft), Kilometerpoint: 345.446, Lanes on structure: 1, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 56.4m (185.0ft)
Structure Number: 2139, Location: SE corner of TI (Lat: 33.663900, Lng: -112.113300), Route carried "under" structure: Ramp Interstate 17, Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 28,908 (year 2019), Truck Traffic: 4%, Features Intersected: Ramp N-W, Facility Carried by Structure: Utopia Ramp D
Minimum Vertical Clearance: 5.22m (17.13ft), Kilometerpoint: 345.446, Lanes on structure: 1, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 56.4m (185.0ft)
Find on map >> Show street view
Structure Number: 214, Location: 3.2 mi E of Jct I 10 (Lat: 33.458600, Lng: -111.987400), Route carried "under" structure: City street , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 22,111 (year 2014), Truck Traffic: 5%, Features Intersected: 44th Street, Facility Carried by Structure: SL 202
Minimum Vertical Clearance: 5.04m (16.54ft), Kilometerpoint: 0.000, Lanes on structure: 9, Lanes under structure: 9, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 214, Location: 3.2 mi E of Jct I 10 (Lat: 33.458600, Lng: -111.987400), Route carried "under" structure: City street , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 22,111 (year 2014), Truck Traffic: 5%, Features Intersected: 44th Street, Facility Carried by Structure: SL 202
Minimum Vertical Clearance: 5.04m (16.54ft), Kilometerpoint: 0.000, Lanes on structure: 9, Lanes under structure: 9, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 2141, Location: 3.2 mi E of Jct I 10 (Lat: 33.459200, Lng: -111.987200), Route carried "under" structure: City street , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 22,111 (year 2014), Truck Traffic: 5%, Features Intersected: 44th Street, Facility Carried by Structure: Ramp to SL 202 WB
Minimum Vertical Clearance: 5.39m (17.68ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 53.3m (174.9ft)
Structure Number: 2141, Location: 3.2 mi E of Jct I 10 (Lat: 33.459200, Lng: -111.987200), Route carried "under" structure: City street , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 22,111 (year 2014), Truck Traffic: 5%, Features Intersected: 44th Street, Facility Carried by Structure: Ramp to SL 202 WB
Minimum Vertical Clearance: 5.39m (17.68ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 53.3m (174.9ft)
Find on map >> Show street view
Structure Number: 2142, Location: 3.11 mi E of Jct I 10 (Lat: 33.459100, Lng: -111.988900), Route carried "under" structure: ServiceOther road , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 8,000 (year 2015), Truck Traffic: 5%, Features Intersected: WB Frontage Road, Facility Carried by Structure: SR 202
Minimum Vertical Clearance: 5.20m (17.06ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 51.8m (169.9ft)
Structure Number: 2142, Location: 3.11 mi E of Jct I 10 (Lat: 33.459100, Lng: -111.988900), Route carried "under" structure: ServiceOther road , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 8,000 (year 2015), Truck Traffic: 5%, Features Intersected: WB Frontage Road, Facility Carried by Structure: SR 202
Minimum Vertical Clearance: 5.20m (17.06ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 51.8m (169.9ft)
Find on map >> Show street view
Structure Number: 2143, Location: 3.2 mi E of Jct I 10 (Lat: 33.457700, Lng: -111.987200), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 22,111 (year 2014), Truck Traffic: 5%, Features Intersected: 44th Street, Facility Carried by Structure: SR 202 off-ramp
Minimum Vertical Clearance: 5.59m (18.34ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 2143, Location: 3.2 mi E of Jct I 10 (Lat: 33.457700, Lng: -111.987200), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 22,111 (year 2014), Truck Traffic: 5%, Features Intersected: 44th Street, Facility Carried by Structure: SR 202 off-ramp
Minimum Vertical Clearance: 5.59m (18.34ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 2144, Location: 3.11 mi E of Jct I 10 (Lat: 33.458200, Lng: -111.989100), Route carried "under" structure: ServiceOther road , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 22,111 (year 2016), Truck Traffic: 7%, Features Intersected: EB Front Road SL 202, Facility Carried by Structure: SL 202 off-ramp
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 39.6m (129.9ft)
Structure Number: 2144, Location: 3.11 mi E of Jct I 10 (Lat: 33.458200, Lng: -111.989100), Route carried "under" structure: ServiceOther road , Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 22,111 (year 2016), Truck Traffic: 7%, Features Intersected: EB Front Road SL 202, Facility Carried by Structure: SL 202 off-ramp
Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 39.6m (129.9ft)
Find on map >> Show street view
Structure Number: 2154, Location: 2.65 mi N of Jct I 10 (Lat: 33.450900, Lng: -111.983100), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 18,600 (year 2016), Truck Traffic: 3%, Features Intersected: Van Buren Street, Facility Carried by Structure: SR 143 Ramp SB
Minimum Vertical Clearance: 5.25m (17.22ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 32.3m (106.0ft)
Structure Number: 2154, Location: 2.65 mi N of Jct I 10 (Lat: 33.450900, Lng: -111.983100), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 18,600 (year 2016), Truck Traffic: 3%, Features Intersected: Van Buren Street, Facility Carried by Structure: SR 143 Ramp SB
Minimum Vertical Clearance: 5.25m (17.22ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 32.3m (106.0ft)
Find on map >> Show street view
Structure Number: 2155, Location: 2.65 mi N of Jct I 10 (Lat: 33.450900, Lng: -111.982500), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 18,600 (year 2016), Truck Traffic: 3%, Features Intersected: Van Buren Street, Facility Carried by Structure: SR 143 (Hohokam)
Minimum Vertical Clearance: 5.82m (19.09ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 32.3m (106.0ft)
Structure Number: 2155, Location: 2.65 mi N of Jct I 10 (Lat: 33.450900, Lng: -111.982500), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 18,600 (year 2016), Truck Traffic: 3%, Features Intersected: Van Buren Street, Facility Carried by Structure: SR 143 (Hohokam)
Minimum Vertical Clearance: 5.82m (19.09ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 32.3m (106.0ft)
Find on map >> Show street view
Structure Number: 2156, Location: 2.65 mi N of Jct I 10 (Lat: 33.450900, Lng: -111.982700), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 18,600 (year 2016), Truck Traffic: 3%, Features Intersected: Van Buren Street, Facility Carried by Structure: SR 143 SB (Hohokam
Minimum Vertical Clearance: 6.10m (20.01ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 32.3m (106.0ft)
Structure Number: 2156, Location: 2.65 mi N of Jct I 10 (Lat: 33.450900, Lng: -111.982700), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 18,600 (year 2016), Truck Traffic: 3%, Features Intersected: Van Buren Street, Facility Carried by Structure: SR 143 SB (Hohokam
Minimum Vertical Clearance: 6.10m (20.01ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 32.3m (106.0ft)
Find on map >> Show street view
Structure Number: 2157, Location: 2.65 mi N of Jct I 10 (Lat: 33.450900, Lng: -111.982000), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 18,600 (year 2016), Truck Traffic: 3%, Features Intersected: Van Buren Street, Facility Carried by Structure: SR 143 Ramp North
Minimum Vertical Clearance: 5.85m (19.19ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 32.3m (106.0ft)
Structure Number: 2157, Location: 2.65 mi N of Jct I 10 (Lat: 33.450900, Lng: -111.982000), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 18,600 (year 2016), Truck Traffic: 3%, Features Intersected: Van Buren Street, Facility Carried by Structure: SR 143 Ramp North
Minimum Vertical Clearance: 5.85m (19.19ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 32.3m (106.0ft)
Find on map >> Show street view
Structure Number: 2158, Location: 3.00 mi N of Jct I 10 (Lat: 33.453700, Lng: -111.982400), Route carried "under" structure: State highway 143, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 25,934 (year 2018), Truck Traffic: 9%, Features Intersected: SR 143 (Hohokam)
Minimum Vertical Clearance: 5.83m (19.13ft), Kilometerpoint: 4.828, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 41.1m (134.8ft)
Structure Number: 2158, Location: 3.00 mi N of Jct I 10 (Lat: 33.453700, Lng: -111.982400), Route carried "under" structure: State highway 143, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 25,934 (year 2018), Truck Traffic: 9%, Features Intersected: SR 143 (Hohokam)
Minimum Vertical Clearance: 5.83m (19.13ft), Kilometerpoint: 4.828, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 41.1m (134.8ft)
Find on map >> Show street view
Structure Number: 2159, Location: 2.88 mi N of Jct I 10 (Lat: 33.457800, Lng: -111.983900), Route carried "under" structure: State highway 202, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 185,854 (year 2019), Truck Traffic: 9%, Features Intersected: SL 202 and SR 143
Minimum Vertical Clearance: 6.15m (20.18ft), Kilometerpoint: 5.633, Lanes on structure: 1, Lanes under structure: 15, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 53.3m (174.9ft)
Structure Number: 2159, Location: 2.88 mi N of Jct I 10 (Lat: 33.457800, Lng: -111.983900), Route carried "under" structure: State highway 202, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 185,854 (year 2019), Truck Traffic: 9%, Features Intersected: SL 202 and SR 143
Minimum Vertical Clearance: 6.15m (20.18ft), Kilometerpoint: 5.633, Lanes on structure: 1, Lanes under structure: 15, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 53.3m (174.9ft)
Find on map >> Show street view
Structure Number: 216, Location: 2.88 mi N Jct I 10 (Lat: 33.458100, Lng: -111.983700), Route carried "under" structure: State highway 143, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 25,934 (year 2018), Truck Traffic: 9%, Features Intersected: SR 143, Hohokam, Facility Carried by Structure: SL 202, E Papago
Minimum Vertical Clearance: 6.30m (20.67ft), Kilometerpoint: 5.230, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 39.6m (129.9ft)
Structure Number: 216, Location: 2.88 mi N Jct I 10 (Lat: 33.458100, Lng: -111.983700), Route carried "under" structure: State highway 143, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 25,934 (year 2018), Truck Traffic: 9%, Features Intersected: SR 143, Hohokam, Facility Carried by Structure: SL 202, E Papago
Minimum Vertical Clearance: 6.30m (20.67ft), Kilometerpoint: 5.230, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 39.6m (129.9ft)
Find on map >> Show street view
Structure Number: 2161, Location: 2.88 mi N of Jct I 10 (Lat: 33.458400, Lng: -111.983900), Route carried "under" structure: State highway 143, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 25,934 (year 2018), Truck Traffic: 9%, Features Intersected: SR 143 (Hohokam), Facility Carried by Structure: SL 202 (E Papago)
Minimum Vertical Clearance: 5.88m (19.29ft), Kilometerpoint: 5.230, Lanes on structure: 4, Lanes under structure: 5, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 39.6m (129.9ft)
Structure Number: 2161, Location: 2.88 mi N of Jct I 10 (Lat: 33.458400, Lng: -111.983900), Route carried "under" structure: State highway 143, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 25,934 (year 2018), Truck Traffic: 9%, Features Intersected: SR 143 (Hohokam), Facility Carried by Structure: SL 202 (E Papago)
Minimum Vertical Clearance: 5.88m (19.29ft), Kilometerpoint: 5.230, Lanes on structure: 4, Lanes under structure: 5, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 39.6m (129.9ft)
Find on map >> Show street view
Structure Number: 2165, Location: Center of TI-Level 4 (Lat: 33.668300, Lng: -112.116900), Route carried "under" structure: Interstate 17, Year Built: 1997, Structure Length: 0. m, Average Daily Traffic: 307,208 (year 2019), Truck Traffic: 4%, Features Intersected: Rp N-W; Rp S-E; I17; 101, Facility Carried by Structure: E- N Ramp
Minimum Vertical Clearance: 5.46m (17.91ft), Kilometerpoint: 345.848, Lanes on structure: 1, Lanes under structure: 23, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 58.2m (190.9ft)
Structure Number: 2165, Location: Center of TI-Level 4 (Lat: 33.668300, Lng: -112.116900), Route carried "under" structure: Interstate 17, Year Built: 1997, Structure Length: 0. m, Average Daily Traffic: 307,208 (year 2019), Truck Traffic: 4%, Features Intersected: Rp N-W; Rp S-E; I17; 101, Facility Carried by Structure: E- N Ramp
Minimum Vertical Clearance: 5.46m (17.91ft), Kilometerpoint: 345.848, Lanes on structure: 1, Lanes under structure: 23, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 58.2m (190.9ft)
Find on map >> Show street view
Structure Number: 2166, Location: SW Corner 2nd Level of TI (Lat: 33.668200, Lng: -112.116900), Route carried "under" structure: ServiceState highway 101, Year Built: 1997, Structure Length: 0. m, Average Daily Traffic: 14,957 (year 2019), Truck Traffic: 4%, Features Intersected: South Frontage Rd., Facility Carried by Structure: East/South Ramp
Minimum Vertical Clearance: 12.51m (41.04ft), Kilometerpoint: 37.659, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 54.9m (180.1ft)
Structure Number: 2166, Location: SW Corner 2nd Level of TI (Lat: 33.668200, Lng: -112.116900), Route carried "under" structure: ServiceState highway 101, Year Built: 1997, Structure Length: 0. m, Average Daily Traffic: 14,957 (year 2019), Truck Traffic: 4%, Features Intersected: South Frontage Rd., Facility Carried by Structure: East/South Ramp
Minimum Vertical Clearance: 12.51m (41.04ft), Kilometerpoint: 37.659, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 54.9m (180.1ft)
Find on map >> Show street view
Structure Number: 2167, Location: 3rd Level Center of TI (Lat: 33.667600, Lng: -112.112800), Route carried "under" structure: Interstate 17, Year Built: 1997, Structure Length: 0. m, Average Daily Traffic: 307,208 (year 2019), Truck Traffic: 7%, Features Intersected: I 17; 101L; S Frntage Rd, Facility Carried by Structure: North-West Ramp
Minimum Vertical Clearance: 5.43m (17.81ft), Kilometerpoint: 345.848, Lanes on structure: 2, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 54.9m (180.1ft)
Structure Number: 2167, Location: 3rd Level Center of TI (Lat: 33.667600, Lng: -112.112800), Route carried "under" structure: Interstate 17, Year Built: 1997, Structure Length: 0. m, Average Daily Traffic: 307,208 (year 2019), Truck Traffic: 7%, Features Intersected: I 17; 101L; S Frntage Rd, Facility Carried by Structure: North-West Ramp
Minimum Vertical Clearance: 5.43m (17.81ft), Kilometerpoint: 345.848, Lanes on structure: 2, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 54.9m (180.1ft)
Find on map >> Show street view
Structure Number: 2168, Location: SE Quadrant of 17/101 TI (Lat: 33.667800, Lng: -112.111700), Route carried "under" structure: ServiceState highway 101, Year Built: 1997, Structure Length: 0. m, Average Daily Traffic: 7,008 (year 2019), Truck Traffic: 2%, Features Intersected: S Frontage Road
Minimum Vertical Clearance: 8.03m (26.35ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 56.4m (185.0ft)
Structure Number: 2168, Location: SE Quadrant of 17/101 TI (Lat: 33.667800, Lng: -112.111700), Route carried "under" structure: ServiceState highway 101, Year Built: 1997, Structure Length: 0. m, Average Daily Traffic: 7,008 (year 2019), Truck Traffic: 2%, Features Intersected: S Frontage Road
Minimum Vertical Clearance: 8.03m (26.35ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 56.4m (185.0ft)
Find on map >> Show street view
Structure Number: 2169, Location: 4th Level Center of TI (Lat: 33.669200, Lng: -112.109600), Route carried "under" structure: Interstate 17, Year Built: 1997, Structure Length: 0. m, Average Daily Traffic: 307,208 (year 2019), Truck Traffic: 4%, Features Intersected: I 17; 101L; 27th Ramp C, Facility Carried by Structure: West-South Ramp
Minimum Vertical Clearance: 5.81m (19.06ft), Kilometerpoint: 345.848, Lanes on structure: 2, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 57.9m (190.0ft)
Structure Number: 2169, Location: 4th Level Center of TI (Lat: 33.669200, Lng: -112.109600), Route carried "under" structure: Interstate 17, Year Built: 1997, Structure Length: 0. m, Average Daily Traffic: 307,208 (year 2019), Truck Traffic: 4%, Features Intersected: I 17; 101L; 27th Ramp C, Facility Carried by Structure: West-South Ramp
Minimum Vertical Clearance: 5.81m (19.06ft), Kilometerpoint: 345.848, Lanes on structure: 2, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 57.9m (190.0ft)
Find on map >> Show street view
Structure Number: 217, Location: N-E Cr 3rd Ll 101/I 17 TI (Lat: 33.669400, Lng: -112.109600), Route carried "under" structure: ServiceState highway 101, Year Built: 1998, Structure Length: 0. m, Average Daily Traffic: 8,674 (year 2019), Truck Traffic: 2%, Features Intersected: North Frontage Rd
Minimum Vertical Clearance: 12.50m (41.01ft), Kilometerpoint: 37.868, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 57.9m (190.0ft)
Structure Number: 217, Location: N-E Cr 3rd Ll 101/I 17 TI (Lat: 33.669400, Lng: -112.109600), Route carried "under" structure: ServiceState highway 101, Year Built: 1998, Structure Length: 0. m, Average Daily Traffic: 8,674 (year 2019), Truck Traffic: 2%, Features Intersected: North Frontage Rd
Minimum Vertical Clearance: 12.50m (41.01ft), Kilometerpoint: 37.868, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 57.9m (190.0ft)
Find on map >> Show street view
Structure Number: 2171, Location: 3rd Level I 17/SR 101 TI (Lat: 33.670700, Lng: -112.113900), Route carried "under" structure: Interstate 17, Year Built: 1998, Structure Length: 0. m, Average Daily Traffic: 137,919 (year 2019), Truck Traffic: 7%, Features Intersected: I 17, SR 101L and S FR
Minimum Vertical Clearance: 5.96m (19.55ft), Kilometerpoint: 345.848, Lanes on structure: 1, Lanes under structure: 12, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 58.8m (192.9ft)
Structure Number: 2171, Location: 3rd Level I 17/SR 101 TI (Lat: 33.670700, Lng: -112.113900), Route carried "under" structure: Interstate 17, Year Built: 1998, Structure Length: 0. m, Average Daily Traffic: 137,919 (year 2019), Truck Traffic: 7%, Features Intersected: I 17, SR 101L and S FR
Minimum Vertical Clearance: 5.96m (19.55ft), Kilometerpoint: 345.848, Lanes on structure: 1, Lanes under structure: 12, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 58.8m (192.9ft)
Find on map >> Show street view
Structure Number: 2172, Location: N/W Corner of 101/I 17 TI (Lat: 33.670400, Lng: -112.114600), Route carried "under" structure: ServiceState highway 101, Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 16,159 (year 2019), Truck Traffic: 4%, Features Intersected: North Fontage Rd
Minimum Vertical Clearance: 8.80m (28.87ft), Kilometerpoint: 346.009, Lanes on structure: 1, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 53.3m (174.9ft)
Structure Number: 2172, Location: N/W Corner of 101/I 17 TI (Lat: 33.670400, Lng: -112.114600), Route carried "under" structure: ServiceState highway 101, Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 16,159 (year 2019), Truck Traffic: 4%, Features Intersected: North Fontage Rd
Minimum Vertical Clearance: 8.80m (28.87ft), Kilometerpoint: 346.009, Lanes on structure: 1, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 53.3m (174.9ft)
Find on map >> Show street view
Structure Number: 2173, Location: SW Corner of TI (Lat: 33.668300, Lng: -112.117500), Route carried "under" structure: City street , Year Built: 1997, Structure Length: 0. m, Average Daily Traffic: 19,567 (year 2019), Truck Traffic: 2%, Features Intersected: 27th Avenue, Facility Carried by Structure: East - N/S Gore
Minimum Vertical Clearance: 8.81m (28.90ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 47.9m (157.2ft)
Structure Number: 2173, Location: SW Corner of TI (Lat: 33.668300, Lng: -112.117500), Route carried "under" structure: City street , Year Built: 1997, Structure Length: 0. m, Average Daily Traffic: 19,567 (year 2019), Truck Traffic: 2%, Features Intersected: 27th Avenue, Facility Carried by Structure: East - N/S Gore
Minimum Vertical Clearance: 8.81m (28.90ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 47.9m (157.2ft)
Find on map >> Show street view
Structure Number: 2174, Location: Rose Garden & I-17 NB (Lat: 33.671300, Lng: -112.112600), Route carried "under" structure: Ramp Interstate 17, Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 9,257 (year 2019), Truck Traffic: 9%, Features Intersected: Rose Garden Ramp B
Minimum Vertical Clearance: 5.04m (16.54ft), Kilometerpoint: 346.170, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 51.8m (169.9ft)
Structure Number: 2174, Location: Rose Garden & I-17 NB (Lat: 33.671300, Lng: -112.112600), Route carried "under" structure: Ramp Interstate 17, Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 9,257 (year 2019), Truck Traffic: 9%, Features Intersected: Rose Garden Ramp B
Minimum Vertical Clearance: 5.04m (16.54ft), Kilometerpoint: 346.170, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 51.8m (169.9ft)
Find on map >> Show street view
Structure Number: 2175, Location: NW Corner of 101/I 17 TI (Lat: 33.669400, Lng: -112.117000), Route carried "under" structure: City street , Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 19,567 (year 2019), Truck Traffic: 2%, Features Intersected: 27 Ave, Facility Carried by Structure: N/S-West Gore
Minimum Vertical Clearance: 5.45m (17.88ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 47.5m (155.8ft)
Structure Number: 2175, Location: NW Corner of 101/I 17 TI (Lat: 33.669400, Lng: -112.117000), Route carried "under" structure: City street , Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 19,567 (year 2019), Truck Traffic: 2%, Features Intersected: 27 Ave, Facility Carried by Structure: N/S-West Gore
Minimum Vertical Clearance: 5.45m (17.88ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 47.5m (155.8ft)
Find on map >> Show street view
Structure Number: 2176, Location: SE Quadrant I17/101L JCT (Lat: 33.668400, Lng: -112.110200), Route carried "under" structure: City street , Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 5,005 (year 2017), Truck Traffic: 5%, Features Intersected: 23rd Avenue, Facility Carried by Structure: N/S - 101 E Gore
Minimum Vertical Clearance: 5.29m (17.36ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 56.4m (185.0ft)
Structure Number: 2176, Location: SE Quadrant I17/101L JCT (Lat: 33.668400, Lng: -112.110200), Route carried "under" structure: City street , Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 5,005 (year 2017), Truck Traffic: 5%, Features Intersected: 23rd Avenue, Facility Carried by Structure: N/S - 101 E Gore
Minimum Vertical Clearance: 5.29m (17.36ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 56.4m (185.0ft)
Find on map >> Show street view
Structure Number: 2177, Location: N/E Corner of 101/I 17 TI (Lat: 33.669200, Lng: -112.108300), Route carried "under" structure: City street , Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 5,245 (year 2019), Truck Traffic: 2%, Features Intersected: 23rd Ave, Facility Carried by Structure: WB 101L to I 17
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 55.5m (182.1ft)
Structure Number: 2177, Location: N/E Corner of 101/I 17 TI (Lat: 33.669200, Lng: -112.108300), Route carried "under" structure: City street , Year Built: 1999, Structure Length: 0. m, Average Daily Traffic: 5,245 (year 2019), Truck Traffic: 2%, Features Intersected: 23rd Ave, Facility Carried by Structure: WB 101L to I 17
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 55.5m (182.1ft)
Find on map >> Show street view
Structure Number: 2178, Location: Center of TI 2nd Level (Lat: 33.667800, Lng: -112.113600), Route carried "under" structure: State highway 101, Year Built: 1997, Structure Length: 0. m, Average Daily Traffic: 91,048 (year 2019), Truck Traffic: 7%, Features Intersected: 101L, S Frontage Rd, Facility Carried by Structure: I 17 SB
Minimum Vertical Clearance: 5.42m (17.78ft), Kilometerpoint: 37.659, Lanes on structure: 5, Lanes under structure: 7, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 55.8m (183.1ft)
Structure Number: 2178, Location: Center of TI 2nd Level (Lat: 33.667800, Lng: -112.113600), Route carried "under" structure: State highway 101, Year Built: 1997, Structure Length: 0. m, Average Daily Traffic: 91,048 (year 2019), Truck Traffic: 7%, Features Intersected: 101L, S Frontage Rd, Facility Carried by Structure: I 17 SB
Minimum Vertical Clearance: 5.42m (17.78ft), Kilometerpoint: 37.659, Lanes on structure: 5, Lanes under structure: 7, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 55.8m (183.1ft)
Find on map >> Show street view
Structure Number: 2179, Location: 2nd Level Center of TI (Lat: 33.667800, Lng: -112.113300), Route carried "under" structure: State highway 101, Year Built: 1997, Structure Length: 0. m, Average Daily Traffic: 91,048 (year 2019), Truck Traffic: 7%, Features Intersected: 101L & South Front Rd, Facility Carried by Structure: I 17 North Bound
Minimum Vertical Clearance: 5.41m (17.75ft), Kilometerpoint: 37.659, Lanes on structure: 5, Lanes under structure: 7, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 55.8m (183.1ft)
Structure Number: 2179, Location: 2nd Level Center of TI (Lat: 33.667800, Lng: -112.113300), Route carried "under" structure: State highway 101, Year Built: 1997, Structure Length: 0. m, Average Daily Traffic: 91,048 (year 2019), Truck Traffic: 7%, Features Intersected: 101L & South Front Rd, Facility Carried by Structure: I 17 North Bound
Minimum Vertical Clearance: 5.41m (17.75ft), Kilometerpoint: 37.659, Lanes on structure: 5, Lanes under structure: 7, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 55.8m (183.1ft)
Find on map >> Show street view
Structure Number: 218, Location: N/W Side of 101/I 17 TI (Lat: 33.669972, Lng: -112.113472), Route carried "under" structure: ServiceState highway 17, Year Built: 1997, Structure Length: 0. m, Average Daily Traffic: 16,159 (year 2019), Truck Traffic: 4%, Features Intersected: N Frontage Rd
Minimum Vertical Clearance: 5.38m (17.65ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 3, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 42.7m (140.1ft)
Structure Number: 218, Location: N/W Side of 101/I 17 TI (Lat: 33.669972, Lng: -112.113472), Route carried "under" structure: ServiceState highway 17, Year Built: 1997, Structure Length: 0. m, Average Daily Traffic: 16,159 (year 2019), Truck Traffic: 4%, Features Intersected: N Frontage Rd
Minimum Vertical Clearance: 5.38m (17.65ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 3, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 42.7m (140.1ft)
Find on map >> Show street view
Structure Number: 2181, Location: 2nd Ll N Ct 101/I 17 TI (Lat: 33.669778, Lng: -112.113111), Route carried "under" structure: ServiceState highway 17, Year Built: 1997, Structure Length: 0. m, Average Daily Traffic: 16,159 (year 2019), Truck Traffic: 6%, Features Intersected: North Frontage Rd
Minimum Vertical Clearance: 5.53m (18.14ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 3, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 42.7m (140.1ft)
Structure Number: 2181, Location: 2nd Ll N Ct 101/I 17 TI (Lat: 33.669778, Lng: -112.113111), Route carried "under" structure: ServiceState highway 17, Year Built: 1997, Structure Length: 0. m, Average Daily Traffic: 16,159 (year 2019), Truck Traffic: 6%, Features Intersected: North Frontage Rd
Minimum Vertical Clearance: 5.53m (18.14ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 3, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 42.7m (140.1ft)
Find on map >> Show street view
Structure Number: 2183, Location: 1.73 mi W of Jct I 10 (Lat: 33.436300, Lng: -111.978900), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 6,143 (year 2016), Truck Traffic: 5%, Features Intersected: Sky Harbor Blvd, Facility Carried by Structure: SR 143
Minimum Vertical Clearance: 6.09m (19.98ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 40.5m (132.9ft)
Structure Number: 2183, Location: 1.73 mi W of Jct I 10 (Lat: 33.436300, Lng: -111.978900), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 6,143 (year 2016), Truck Traffic: 5%, Features Intersected: Sky Harbor Blvd, Facility Carried by Structure: SR 143
Minimum Vertical Clearance: 6.09m (19.98ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 40.5m (132.9ft)
Find on map >> Show street view
Structure Number: 2187, Location: 7 mi W of Jct I 17 (Lat: 33.462300, Lng: -112.229500), Route carried "under" structure: Interstate 10, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 213,062 (year 2017), Truck Traffic: 10%, Features Intersected: 7 10 EB-WB & Drain Chnl, Facility Carried by Structure: 79th Avenue
Minimum Vertical Clearance: 5.19m (17.03ft), Kilometerpoint: 219.032, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.9m (130.9ft)
Structure Number: 2187, Location: 7 mi W of Jct I 17 (Lat: 33.462300, Lng: -112.229500), Route carried "under" structure: Interstate 10, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 213,062 (year 2017), Truck Traffic: 10%, Features Intersected: 7 10 EB-WB & Drain Chnl, Facility Carried by Structure: 79th Avenue
Minimum Vertical Clearance: 5.19m (17.03ft), Kilometerpoint: 219.032, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.9m (130.9ft)
Find on map >> Show street view
Structure Number: 219, Location: 2.87 mi E of Jct I 17 (Lat: 33.410500, Lng: -111.995400), Route carried "under" structure: Interstate 10, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 300,553 (year 2019), Truck Traffic: 4%, Features Intersected: I 10, Facility Carried by Structure: 40th Street
Minimum Vertical Clearance: 5.25m (17.22ft), Kilometerpoint: 244.749, Lanes on structure: 7, Lanes under structure: 11, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 51.8m (169.9ft)
Structure Number: 219, Location: 2.87 mi E of Jct I 17 (Lat: 33.410500, Lng: -111.995400), Route carried "under" structure: Interstate 10, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 300,553 (year 2019), Truck Traffic: 4%, Features Intersected: I 10, Facility Carried by Structure: 40th Street
Minimum Vertical Clearance: 5.25m (17.22ft), Kilometerpoint: 244.749, Lanes on structure: 7, Lanes under structure: 11, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 51.8m (169.9ft)
Find on map >> Show street view
Structure Number: 2193, Location: 7.0 mi N Jct I-10 (Lat: 33.558300, Lng: -112.038100), Route carried "under" structure: City street , Year Built: 1993, Structure Length: 0. m, Average Daily Traffic: 20,213 (year 2018), Truck Traffic: 5%, Features Intersected: Northern Avenue, Facility Carried by Structure: SR 51
Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 32.9m (107.9ft)
Structure Number: 2193, Location: 7.0 mi N Jct I-10 (Lat: 33.558300, Lng: -112.038100), Route carried "under" structure: City street , Year Built: 1993, Structure Length: 0. m, Average Daily Traffic: 20,213 (year 2018), Truck Traffic: 5%, Features Intersected: Northern Avenue, Facility Carried by Structure: SR 51
Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 32.9m (107.9ft)
Find on map >> Show street view
Structure Number: 2198, Location: 3.45 mi E Jct I 10 & (Lat: 33.457100, Lng: -111.978800), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 6,112 (year 2014), Truck Traffic: 10%, Features Intersected: 48th Street, Facility Carried by Structure: SR 202 EB
Minimum Vertical Clearance: 5.30m (17.39ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 29.3m (96.1ft)
Structure Number: 2198, Location: 3.45 mi E Jct I 10 & (Lat: 33.457100, Lng: -111.978800), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 6,112 (year 2014), Truck Traffic: 10%, Features Intersected: 48th Street, Facility Carried by Structure: SR 202 EB
Minimum Vertical Clearance: 5.30m (17.39ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 29.3m (96.1ft)
Find on map >> Show street view
Structure Number: 2207, Location: East of 99 Av North of 10 (Lat: 33.464600, Lng: -112.268400), Route carried "under" structure: City street , Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 134,044 (year 2019), Truck Traffic: 3%, Features Intersected: McDowell Rd & Rid Canal, Facility Carried by Structure: 101L Ramp W-N
Minimum Vertical Clearance: 6.35m (20.83ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 31.4m (103.0ft)
Structure Number: 2207, Location: East of 99 Av North of 10 (Lat: 33.464600, Lng: -112.268400), Route carried "under" structure: City street , Year Built: 2000, Structure Length: 0. m, Average Daily Traffic: 134,044 (year 2019), Truck Traffic: 3%, Features Intersected: McDowell Rd & Rid Canal, Facility Carried by Structure: 101L Ramp W-N
Minimum Vertical Clearance: 6.35m (20.83ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 31.4m (103.0ft)
Find on map >> Show street view
Structure Number: 2208, Location: 3.89 mi E Jct I 10 & (Lat: 33.454900, Lng: -111.971800), Route carried "under" structure: Ramp State highway 202, Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 15,736 (year 2017), Truck Traffic: 5%, Features Intersected: Ramp B(52nd St Off Rmp)
Minimum Vertical Clearance: 5.24m (17.19ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 5, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 21.3m (69.9ft)
Structure Number: 2208, Location: 3.89 mi E Jct I 10 & (Lat: 33.454900, Lng: -111.971800), Route carried "under" structure: Ramp State highway 202, Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 15,736 (year 2017), Truck Traffic: 5%, Features Intersected: Ramp B(52nd St Off Rmp)
Minimum Vertical Clearance: 5.24m (17.19ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 5, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 21.3m (69.9ft)
Find on map >> Show street view
Structure Number: 2209, Location: 3.89 mi E Jct I 10 & (Lat: 33.455000, Lng: -111.971600), Route carried "under" structure: Ramp State highway 202, Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 15,496 (year 2017), Truck Traffic: 5%, Features Intersected: Ramp B(52nd ST Off Ramp)
Minimum Vertical Clearance: 5.10m (16.73ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 21.3m (69.9ft)
Structure Number: 2209, Location: 3.89 mi E Jct I 10 & (Lat: 33.455000, Lng: -111.971600), Route carried "under" structure: Ramp State highway 202, Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 15,496 (year 2017), Truck Traffic: 5%, Features Intersected: Ramp B(52nd ST Off Ramp)
Minimum Vertical Clearance: 5.10m (16.73ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 21.3m (69.9ft)
Find on map >> Show street view
Structure Number: 221, Location: 4.04 mi E Jct I10 & S (Lat: 33.453500, Lng: -111.970200), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 17,971 (year 2014), Truck Traffic: 10%, Features Intersected: 52nd Street, Facility Carried by Structure: SR 202L EB
Minimum Vertical Clearance: 5.34m (17.52ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 5, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 42.7m (140.1ft)
Structure Number: 221, Location: 4.04 mi E Jct I10 & S (Lat: 33.453500, Lng: -111.970200), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 17,971 (year 2014), Truck Traffic: 10%, Features Intersected: 52nd Street, Facility Carried by Structure: SR 202L EB
Minimum Vertical Clearance: 5.34m (17.52ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 5, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 42.7m (140.1ft)
Find on map >> Show street view
Structure Number: 2211, Location: 4.04 mi E Jct I10 & S (Lat: 33.453700, Lng: -111.970100), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 17,971 (year 2014), Truck Traffic: 6%, Features Intersected: 52nd Street, Facility Carried by Structure: SR 202L WB
Minimum Vertical Clearance: 5.19m (17.03ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 42.7m (140.1ft)
Structure Number: 2211, Location: 4.04 mi E Jct I10 & S (Lat: 33.453700, Lng: -111.970100), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 17,971 (year 2014), Truck Traffic: 6%, Features Intersected: 52nd Street, Facility Carried by Structure: SR 202L WB
Minimum Vertical Clearance: 5.19m (17.03ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 42.7m (140.1ft)
Find on map >> Show street view
Structure Number: 2212, Location: 4.20 mi E Jct I 10 & (Lat: 33.451100, Lng: -111.969100), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 15,161 (year 2014), Truck Traffic: 10%, Features Intersected: Van Buren Street, Facility Carried by Structure: EB L 202(E Papago)
Minimum Vertical Clearance: 5.12m (16.80ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 5, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 2212, Location: 4.20 mi E Jct I 10 & (Lat: 33.451100, Lng: -111.969100), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 15,161 (year 2014), Truck Traffic: 10%, Features Intersected: Van Buren Street, Facility Carried by Structure: EB L 202(E Papago)
Minimum Vertical Clearance: 5.12m (16.80ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 5, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 2213, Location: 4.2 mi E Jct I 10 & S (Lat: 33.451100, Lng: -111.968800), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 17,971 (year 2014), Truck Traffic: 10%, Features Intersected: Van Buren Street, Facility Carried by Structure: WB L202 (E Papago)
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 2213, Location: 4.2 mi E Jct I 10 & S (Lat: 33.451100, Lng: -111.968800), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 17,971 (year 2014), Truck Traffic: 10%, Features Intersected: Van Buren Street, Facility Carried by Structure: WB L202 (E Papago)
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 2214, Location: 4.5 mi E Jct I 10 & S (Lat: 33.446500, Lng: -111.969100), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 13,785 (year 2016), Truck Traffic: 10%, Features Intersected: Washington St(FAU 5041), Facility Carried by Structure: EB L202 (E Papago)
Minimum Vertical Clearance: 5.41m (17.75ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 32.0m (105.0ft)
Structure Number: 2214, Location: 4.5 mi E Jct I 10 & S (Lat: 33.446500, Lng: -111.969100), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 13,785 (year 2016), Truck Traffic: 10%, Features Intersected: Washington St(FAU 5041), Facility Carried by Structure: EB L202 (E Papago)
Minimum Vertical Clearance: 5.41m (17.75ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 32.0m (105.0ft)
Find on map >> Show street view
Structure Number: 2215, Location: 4.5 mi E Jct I 10 & S (Lat: 33.446500, Lng: -111.968800), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 13,785 (year 2016), Truck Traffic: 10%, Features Intersected: Washington St(FAU 5041), Facility Carried by Structure: WB L 202
Minimum Vertical Clearance: 6.29m (20.64ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 5, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 32.0m (105.0ft)
Structure Number: 2215, Location: 4.5 mi E Jct I 10 & S (Lat: 33.446500, Lng: -111.968800), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 13,785 (year 2016), Truck Traffic: 10%, Features Intersected: Washington St(FAU 5041), Facility Carried by Structure: WB L 202
Minimum Vertical Clearance: 6.29m (20.64ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 5, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 32.0m (105.0ft)
Find on map >> Show street view
Structure Number: 2219, Location: 5.02 mi E Jct I 10 (Lat: 33.439800, Lng: -111.967100), Route carried "under" structure: City street , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 47,900 (year 2015), Truck Traffic: 9%, Features Intersected: Sky Harbor Blvd WB, Facility Carried by Structure: SR 202L EB
Minimum Vertical Clearance: 5.43m (17.81ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 36.6m (120.1ft)
Structure Number: 2219, Location: 5.02 mi E Jct I 10 (Lat: 33.439800, Lng: -111.967100), Route carried "under" structure: City street , Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 47,900 (year 2015), Truck Traffic: 9%, Features Intersected: Sky Harbor Blvd WB, Facility Carried by Structure: SR 202L EB
Minimum Vertical Clearance: 5.43m (17.81ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 36.6m (120.1ft)
Find on map >> Show street view
Structure Number: 222, Location: 5.02 mi E Jct I 10 (Lat: 33.439900, Lng: -111.966900), Route carried "under" structure: Ramp State highway 202, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 47,900 (year 2015), Truck Traffic: 9%, Features Intersected: Sky Harbor Blvd WB
Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 8.079, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 36.6m (120.1ft)
Structure Number: 222, Location: 5.02 mi E Jct I 10 (Lat: 33.439900, Lng: -111.966900), Route carried "under" structure: Ramp State highway 202, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 47,900 (year 2015), Truck Traffic: 9%, Features Intersected: Sky Harbor Blvd WB
Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 8.079, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 36.6m (120.1ft)
Find on map >> Show street view
Structure Number: 2221, Location: 5.48 mi E Jct I 10 & (Lat: 33.438300, Lng: -111.965400), Route carried "under" structure: Ramp State highway 202, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2015), Truck Traffic: 5%, Features Intersected: Sky Har. Blvd EB Ramp F
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 8.304, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 25.0m (82.0ft)
Structure Number: 2221, Location: 5.48 mi E Jct I 10 & (Lat: 33.438300, Lng: -111.965400), Route carried "under" structure: Ramp State highway 202, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2015), Truck Traffic: 5%, Features Intersected: Sky Har. Blvd EB Ramp F
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 8.304, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 25.0m (82.0ft)
Find on map >> Show street view
Structure Number: 2222, Location: Deer Valley Rd/I-17 (Lat: 33.683600, Lng: -112.112400), Route carried "under" structure: City street , Year Built: 2009, Structure Length: 0. m, Average Daily Traffic: 24,310 (year 2019), Truck Traffic: 6%, Features Intersected: Deer Valley Road, Facility Carried by Structure: I-17
Minimum Vertical Clearance: 5.22m (17.13ft), Kilometerpoint: 0.000, Lanes on structure: 12, Lanes under structure: 7, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.9m (85.0ft)
Structure Number: 2222, Location: Deer Valley Rd/I-17 (Lat: 33.683600, Lng: -112.112400), Route carried "under" structure: City street , Year Built: 2009, Structure Length: 0. m, Average Daily Traffic: 24,310 (year 2019), Truck Traffic: 6%, Features Intersected: Deer Valley Road, Facility Carried by Structure: I-17
Minimum Vertical Clearance: 5.22m (17.13ft), Kilometerpoint: 0.000, Lanes on structure: 12, Lanes under structure: 7, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.9m (85.0ft)
Find on map >> Show street view
Structure Number: 2223, Location: 9.5 mi N Jct I-10 (Lat: 33.582500, Lng: -112.010700), Route carried "under" structure: State highway 51, Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 147,712 (year 2018), Truck Traffic: 7%, Features Intersected: SR 51, Facility Carried by Structure: Shea Blvd
Minimum Vertical Clearance: 5.62m (18.44ft), Kilometerpoint: 15.257, Lanes on structure: 7, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 28.3m (92.8ft)
Structure Number: 2223, Location: 9.5 mi N Jct I-10 (Lat: 33.582500, Lng: -112.010700), Route carried "under" structure: State highway 51, Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 147,712 (year 2018), Truck Traffic: 7%, Features Intersected: SR 51, Facility Carried by Structure: Shea Blvd
Minimum Vertical Clearance: 5.62m (18.44ft), Kilometerpoint: 15.257, Lanes on structure: 7, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 28.3m (92.8ft)
Find on map >> Show street view
Structure Number: 2224, Location: 9.0 mi N Jct I-10 (Lat: 33.576200, Lng: -112.013000), Route carried "under" structure: State highway 51, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 168,878 (year 2018), Truck Traffic: 7%, Features Intersected: SR 51, Facility Carried by Structure: 32nd Street
Minimum Vertical Clearance: 5.70m (18.70ft), Kilometerpoint: 14.532, Lanes on structure: 5, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 51.8m (169.9ft)
Structure Number: 2224, Location: 9.0 mi N Jct I-10 (Lat: 33.576200, Lng: -112.013000), Route carried "under" structure: State highway 51, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 168,878 (year 2018), Truck Traffic: 7%, Features Intersected: SR 51, Facility Carried by Structure: 32nd Street
Minimum Vertical Clearance: 5.70m (18.70ft), Kilometerpoint: 14.532, Lanes on structure: 5, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 51.8m (169.9ft)
Find on map >> Show street view
Structure Number: 2225, Location: 8.5 mi N Jct I-10 (Lat: 33.573900, Lng: -112.020400), Route carried "under" structure: State highway 51, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 168,878 (year 2018), Truck Traffic: 5%, Features Intersected: SR 51 & WFR, Facility Carried by Structure: 29th St Ped UP
Minimum Vertical Clearance: 6.86m (22.51ft), Kilometerpoint: 13.776, Lanes under structure: 12, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 39.9m (130.9ft)
Structure Number: 2225, Location: 8.5 mi N Jct I-10 (Lat: 33.573900, Lng: -112.020400), Route carried "under" structure: State highway 51, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 168,878 (year 2018), Truck Traffic: 5%, Features Intersected: SR 51 & WFR, Facility Carried by Structure: 29th St Ped UP
Minimum Vertical Clearance: 6.86m (22.51ft), Kilometerpoint: 13.776, Lanes under structure: 12, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 39.9m (130.9ft)
Find on map >> Show street view
Structure Number: 224, Location: 2.4 mi N of Jct I 10 (Lat: 33.447400, Lng: -111.981700), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 18,600 (year 2016), Truck Traffic: 3%, Features Intersected: Washington Street, Facility Carried by Structure: SR 143 (Hohokam)
Minimum Vertical Clearance: 4.47m (14.67ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 57.0m (187.0ft)
Structure Number: 224, Location: 2.4 mi N of Jct I 10 (Lat: 33.447400, Lng: -111.981700), Route carried "under" structure: City street , Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 18,600 (year 2016), Truck Traffic: 3%, Features Intersected: Washington Street, Facility Carried by Structure: SR 143 (Hohokam)
Minimum Vertical Clearance: 4.47m (14.67ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 57.0m (187.0ft)
Find on map >> Show street view
Structure Number: 2247, Location: 8.9 mi North of Jct I 10 (Lat: 33.495000, Lng: -112.113300), Route carried "under" structure: Interstate 17, Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 169,022 (year 2019), Truck Traffic: 9%, Features Intersected: I 17, Facility Carried by Structure: Indian School Road
Minimum Vertical Clearance: 5.24m (17.19ft), Kilometerpoint: 326.584, Lanes on structure: 12, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.2m (86.0ft)
Structure Number: 2247, Location: 8.9 mi North of Jct I 10 (Lat: 33.495000, Lng: -112.113300), Route carried "under" structure: Interstate 17, Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 169,022 (year 2019), Truck Traffic: 9%, Features Intersected: I 17, Facility Carried by Structure: Indian School Road
Minimum Vertical Clearance: 5.24m (17.19ft), Kilometerpoint: 326.584, Lanes on structure: 12, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.2m (86.0ft)