Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Sikeston, Missouri (MO)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 63Number of bridges
  • 650ft / 198mTotal length
  • $6,797,000Total costs
  • 305,296Total average daily traffic
  • 86,448Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Sikeston
  • No street view available for this location

New bridges in Sikeston, MO - historical statistics
  • New bridges - historical statistics
  • 91940-1949
  • 41950-1959
  • 241960-1969
  • 31970-1979
  • 21980-1989
  • 111990-1999
  • 42000-2009
  • 52010-2019
  • 12020-2022
Reconstructed bridges in Sikeston, MO - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 11970-1979
  • 61980-1989
  • 21990-1999
Average Bridge Daily Traffic in Sikeston, MO
Average Bridge Truck Traffic in Sikeston, MO
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.0%Excellent
  • 12.0%Very good
  • 30.0%Good
  • 36.0%Satisfactory
  • 16.0%Fair
  • 2.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.0%Excellent
  • 22.0%Very good
  • 30.0%Good
  • 36.0%Satisfactory
  • 8.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.0%Excellent
  • 8.0%Very good
  • 38.0%Good
  • 34.0%Satisfactory
  • 14.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.4%Very good
  • 36.6%Good
  • 26.8%Satisfactory
  • 29.3%Fair
  • 4.9%Poor
Find on map >>   Show street view

Structure Number: 6626,  Location: S 14 T 26 N R 13 E (Lat: 36.890314,  Lng: -89.624222),  Route carried "on" structure: State highway Y,  Year Built: 1956,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 2,403 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,965 (year 2041),  Design Load: H 15,  Features Intersected: DRAIN DTCH 4, DIST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.399,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.32m (1.05ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $274,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $411,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 693,  Location: S 15 T 26 N R 14 E (Lat: 36.892658,  Lng: -89.533547),  Route carried "on" structure: Interstate 55,  Year Built: 1962,  Status: Open,  Structure Length: 8.50m (27.89ft),  Average Daily Traffic: 7,990 (year 2021),  Truck Traffic: 34%,  Average Future Daily Traffic: 15,181 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: US 62, UP RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 229.057,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 11 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 694,  Location: S 15 T 26 N R 14 E (Lat: 36.892694,  Lng: -89.533222),  Route carried "on" structure: Interstate 55,  Year Built: 1962,  Status: Open,  Structure Length: 8.50m (27.89ft),  Average Daily Traffic: 11,333 (year 2021),  Truck Traffic: 34%,  Average Future Daily Traffic: 21,533 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: US 62, UP RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 108.589,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 11 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 695,  Location: S 27 T 26 N R 14 E (Lat: 36.873375,  Lng: -89.533242),  Route carried "on" structure: Interstate 55,  Year Built: 1962,  Status: Open,  Structure Length: 8.35m (27.40ft),  Average Daily Traffic: 11,333 (year 2021),  Truck Traffic: 34%,  Average Future Daily Traffic: 21,533 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: IS 57
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 231.192,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 12 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 47.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.93m (3.05ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $983,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,474,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 696,  Location: S 27 T 26 N R 14 E (Lat: 36.873647,  Lng: -89.532925),  Route carried "on" structure: Interstate 55,  Year Built: 1962,  Status: Open,  Structure Length: 8.35m (27.40ft),  Average Daily Traffic: 13,218 (year 2021),  Truck Traffic: 59%,  Average Future Daily Traffic: 25,114 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: IS 57
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 106.478,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 12 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 47.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.93m (3.05ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $983,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,474,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 8141,  Location: S 27 T 26 N R 14 E (Lat: 36.871978,  Lng: -89.537778),  Route carried "on" structure: State highway AA,  Year Built: 1962,  Status: Posted for load,  Structure Length: 7.80m (25.59ft),  Average Daily Traffic: 1,664 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,413 (year 2041),  Design Load: H 15,  Features Intersected: US 60
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.103,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 22.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 13.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,006,000,  Roadway Improvement Cost: $101,000,  Total Project Cost: $1,508,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8298,  Location: S 34 T 26 N R 14 E (Lat: 36.855397,  Lng: -89.532800),  Route carried "on" structure: State highway AA,  Year Built: 1964,  Status: Open,  Structure Length: 7.89m (25.89ft),  Average Daily Traffic: 863 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,338 (year 2041),  Design Load: H 15,  Features Intersected: IS 55
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.210,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 27.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 16.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 933,  Location: S 10 T 25 N R 14 E (Lat: 36.823278,  Lng: -89.532494),  Route carried "on" structure: Interstate 55,  Year Built: 1964,  Status: Open,  Structure Length: 7.62m (25.00ft),  Average Daily Traffic: 13,218 (year 2021),  Truck Traffic: 59%,  Average Future Daily Traffic: 24,453 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: N CUT DTCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 236.764,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 934,  Location: S 10 T 25 N R 14 E (Lat: 36.823722,  Lng: -89.532214),  Route carried "on" structure: Interstate 55,  Year Built: 1964,  Status: Open,  Structure Length: 7.62m (25.00ft),  Average Daily Traffic: 13,218 (year 2021),  Truck Traffic: 59%,  Average Future Daily Traffic: 24,453 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: N CUT DTCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 100.924,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 4096,  Location: S 689 T 26 N R 14 E (Lat: 36.855806,  Lng: -89.582625),  Route carried "under" structure: US 61,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 15,130 (year 2021),  Truck Traffic: 6%,  Features Intersected: US 61,  Facility Carried by Structure: US 60 E
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 522.034,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: 4097,  Location: S 689 T 26 N R 14 E (Lat: 36.855875,  Lng: -89.583164),  Route carried "under" structure: US 61,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 15,130 (year 2021),  Truck Traffic: 6%,  Features Intersected: US 61,  Facility Carried by Structure: US 60 W
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 522.006,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: 693,  Location: S 15 T 26 N R 14 E (Lat: 36.892658,  Lng: -89.533547),  Route carried "under" structure: US 62,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 16,534 (year 2021),  Truck Traffic: 7%,  Features Intersected: US 62,  Facility Carried by Structure: IS 55 S
Minimum Vertical Clearance: 6.86m (22.51ft),  Kilometerpoint: 100.137,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 694,  Location: S 15 T 26 N R 14 E (Lat: 36.892694,  Lng: -89.533222),  Route carried "under" structure: US 62,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 14,249 (year 2021),  Truck Traffic: 7%,  Features Intersected: US 62,  Facility Carried by Structure: IS 55 N
Minimum Vertical Clearance: 6.91m (22.67ft),  Kilometerpoint: 100.166,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 695,  Location: S 27 T 26 N R 14 E (Lat: 36.873375,  Lng: -89.533242),  Route carried "under" structure: Interstate 57,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 6,900 (year 2021),  Truck Traffic: 40%,  Features Intersected: IS 57,  Facility Carried by Structure: IS 55 S
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 35.522,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 695,  Location: S 27 T 26 N R 14 E (Lat: 36.873375,  Lng: -89.533242),  Route carried "under" structure: Interstate 57,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 9,103 (year 2021),  Truck Traffic: 44%,  Features Intersected: IS 57,  Facility Carried by Structure: IS 55 S
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.385,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 696,  Location: S 27 T 26 N R 14 E (Lat: 36.873647,  Lng: -89.532925),  Route carried "under" structure: Interstate 57,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 6,900 (year 2021),  Truck Traffic: 40%,  Features Intersected: IS 57,  Facility Carried by Structure: IS 55 N
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 35.489,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 696,  Location: S 27 T 26 N R 14 E (Lat: 36.873647,  Lng: -89.532925),  Route carried "under" structure: Interstate 57,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 9,103 (year 2021),  Truck Traffic: 44%,  Features Intersected: IS 57,  Facility Carried by Structure: IS 55 N
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.415,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 8141,  Location: S 27 T 26 N R 14 E (Lat: 36.871978,  Lng: -89.537778),  Route carried "under" structure: US 60,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 4,461 (year 2021),  Truck Traffic: 29%,  Features Intersected: US 60,  Facility Carried by Structure: RT AA S
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 509.580,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 8141,  Location: S 27 T 26 N R 14 E (Lat: 36.871978,  Lng: -89.537778),  Route carried "under" structure: US 60,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 4,609 (year 2021),  Truck Traffic: 22%,  Features Intersected: US 60,  Facility Carried by Structure: RT AA S
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 39.632,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 8298,  Location: S 34 T 26 N R 14 E (Lat: 36.855397,  Lng: -89.532800),  Route carried "under" structure: Interstate 55,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 13,218 (year 2021),  Truck Traffic: 59%,  Features Intersected: IS 55,  Facility Carried by Structure: RT AA S
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 233.230,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 8298,  Location: S 34 T 26 N R 14 E (Lat: 36.855397,  Lng: -89.532800),  Route carried "under" structure: Interstate 55,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 13,218 (year 2021),  Truck Traffic: 59%,  Features Intersected: IS 55,  Facility Carried by Structure: RT AA S
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 104.476,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 21.3m (69.9ft)

Discuss Sikeston, Missouri (MO) on our hugely popular Missouri forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.