Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Southeast, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 58Number of bridges
  • 922ft / 281mTotal length
  • $242,770,000Total costs
  • 1,107,535Total average daily traffic
  • 81,250Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Southeast
  • No street view available for this location

New bridges in Southeast, NY - historical statistics
  • New bridges - historical statistics
  • 21900-1909
  • 11910-1919
  • 11920-1929
  • 11930-1939
  • 11940-1949
  • 371960-1969
  • 61970-1979
  • 11980-1989
  • 21990-1999
  • 12000-2009
  • 52010-2019
Average Bridge Daily Traffic in Southeast, NY
Average Bridge Truck Traffic in Southeast, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.6%Excellent
  • 5.7%Very good
  • 17.1%Good
  • 54.3%Satisfactory
  • 14.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.1%Excellent
  • 8.1%Very good
  • 13.5%Good
  • 37.8%Satisfactory
  • 27.0%Fair
  • 5.4%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.1%Excellent
  • 5.4%Very good
  • 24.3%Good
  • 40.5%Satisfactory
  • 18.9%Fair
  • 2.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Very good
  • 41.7%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 100349,  Location: 2.1 MI E JCT RTS 6+52 (Lat: 41.416458,  Lng: -73.646747),  Route carried "on" structure: US 6,  Year Built: 2006,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 13,786 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 13,850 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: MIDDLE BRANCH RESERVOIR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.559,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.4m (57.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.5m (119.8ft),  Curb-To-Curb Width: 17.4m (57.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.74m (12.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,841,000,  Roadway Improvement Cost: $1,078,000,  Total Project Cost: $2,920,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 1016671,  Location: .7 MI N JCT I684 & I84 (Lat: 41.400072,  Lng: -73.591208),  Route carried "on" structure: State highway 22,  Year Built: 1994,  Status: Open,  Structure Length: 12.01m (39.40ft),  Average Daily Traffic: 10,499 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 10,548 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: E BR CROTON RIVER, ACCES
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.817,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 49.9m (163.7ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.00m (39.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $8,079,000,  Roadway Improvement Cost: $4,731,000,  Total Project Cost: $12,810,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1016672,  Location: .7 MI N JCT I684 & I84 (Lat: 41.399844,  Lng: -73.591119),  Route carried "on" structure: State highway 22,  Year Built: 1994,  Status: Open,  Structure Length: 12.25m (40.19ft),  Average Daily Traffic: 10,499 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 10,548 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: E BR CROTON RIVER, ACCES
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.817,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 48.1m (157.8ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.25m (40.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $8,218,000,  Roadway Improvement Cost: $4,813,000,  Total Project Cost: $13,031,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103258,  Location: 0.1 MI W JCT RTS I84+I684 (Lat: 41.392242,  Lng: -73.599850),  Route carried "on" structure: Ramp Interstate 84,  Year Built: 1967,  Status: Open,  Structure Length: 7.35m (24.11ft),  Average Daily Traffic: 14,810 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 25,079 (year 2040),  Design Load: HS 20,  Features Intersected: 84I 84I84031097, RTE I84
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.434,  Lanes on structure: 1,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.34m (24.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,282,000,  Roadway Improvement Cost: $1,336,000,  Total Project Cost: $3,618,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1032591,  Location: JCT RTS I684+I84 (Lat: 41.390542,  Lng: -73.598203),  Route carried "on" structure: Interstate 684,  Year Built: 1967,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 29,466 (year 2000),  Truck Traffic: 15%,  Design Load: HS 20,  Features Intersected: 84I84I84031097, RTE I84
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.197,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.29m (27.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $3,150,000,  Roadway Improvement Cost: $1,845,000,  Total Project Cost: $4,995,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1032592,  Location: JCT RTS I684+I84 (Lat: 41.390378,  Lng: -73.597958),  Route carried "on" structure: Interstate 684,  Year Built: 1967,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 30,897 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 52,321 (year 2040),  Design Load: HS 20,  Features Intersected: 84I84I84031097, RTE I84
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.213,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.2m (82.7ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.29m (27.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $4,106,000,  Roadway Improvement Cost: $2,405,000,  Total Project Cost: $6,511,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10326,  Location: 0.3 MI E JCT RTS I84+I684 (Lat: 41.388389,  Lng: -73.594069),  Route carried "on" structure: County highway ,  Year Built: 1967,  Status: Open,  Structure Length: 9.36m (30.71ft),  Average Daily Traffic: 3,183 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,938 (year 2040),  Design Load: HS 20,  Features Intersected: 84I 84I84031101 WB, RTE,  Facility Carried by Structure: STARR RIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.977,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.5m (96.8ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.54m (31.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $3,289,000,  Roadway Improvement Cost: $1,926,000,  Total Project Cost: $5,216,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1032611,  Location: 1.0 MI E JCT RTS I84+I684 (Lat: 41.383883,  Lng: -73.582622),  Route carried "on" structure: Interstate 84,  Year Built: 1967,  Status: Open,  Structure Length: 5.30m (17.39ft),  Average Daily Traffic: 38,348 (year 2012),  Truck Traffic: 12%,  Design Load: HS 20,  Features Intersected: RTE 121
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.345,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.30m (17.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,137,000,  Roadway Improvement Cost: $1,251,000,  Total Project Cost: $3,388,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1032612,  Location: 1.0 MI E JCT RTS I84+I684 (Lat: 41.383231,  Lng: -73.582381),  Route carried "on" structure: Interstate 84,  Year Built: 1967,  Status: Open,  Structure Length: 5.30m (17.39ft),  Average Daily Traffic: 31,478 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 53,305 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 121
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.329,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 91.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.30m (17.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,118,000,  Roadway Improvement Cost: $1,240,000,  Total Project Cost: $3,358,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1032621,  Location: 2.2 MI E JCT RTS I84+I684 (Lat: 41.385044,  Lng: -73.559411),  Route carried "on" structure: Interstate 84,  Year Built: 2014,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 38,348 (year 2012),  Truck Traffic: 12%,  Design Load: HL 93,  Features Intersected: DINGLE RIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.292,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.49m (8.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,210,000,  Roadway Improvement Cost: $708,000,  Total Project Cost: $1,918,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1032622,  Location: 2.2 MI E JCT RTS I84+I684 (Lat: 41.384664,  Lng: -73.559369),  Route carried "on" structure: Interstate 84,  Year Built: 2014,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 31,478 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 53,305 (year 2040),  Design Load: HL 93,  Features Intersected: DINGLE RIDGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.260,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.49m (8.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,210,000,  Roadway Improvement Cost: $708,000,  Total Project Cost: $1,918,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1033051,  Location: 1.9 MI S JCT RTS I684+I84 (Lat: 41.372431,  Lng: -73.614450),  Route carried "on" structure: Interstate 684,  Year Built: 1967,  Status: Open,  Structure Length: 4.60m (15.09ft),  Average Daily Traffic: 29,466 (year 2000),  Truck Traffic: 15%,  Design Load: HS 20,  Features Intersected: CO RD 55
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.623,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.4m (53.8ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 77.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $3,105,000,  Roadway Improvement Cost: $1,818,000,  Total Project Cost: $4,923,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1033052,  Location: 1.9 MI S JCT I684 & I84 (Lat: 41.372278,  Lng: -73.614142),  Route carried "on" structure: Interstate 684,  Year Built: 1967,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 30,897 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 52,321 (year 2040),  Design Load: HS 20,  Features Intersected: COUNTY ROAD 55
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.623,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.0m (55.8ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 78.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.93m (16.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $3,301,000,  Roadway Improvement Cost: $1,933,000,  Total Project Cost: $5,235,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 104561,  Location: 2.4 MI W JCT RTS 312+22 (Lat: 41.433253,  Lng: -73.614953),  Route carried "on" structure: State highway 312,  Year Built: 1977,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 10,965 (year 2015),  Truck Traffic: 4%,  Average Future Daily Traffic: 13,320 (year 2040),  Features Intersected: MNRR BE LINE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.395,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: Railroad,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $991,000,  Roadway Improvement Cost: $580,000,  Total Project Cost: $1,571,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 105002,  Location: .8 MI S JCT SH22 &US6/202 (Lat: 41.389861,  Lng: -73.619267),  Route carried "on" structure: Other road ,  Year Built: 1930,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 3,334 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,125 (year 2040),  Features Intersected: E BR CROTON RIVER,  Facility Carried by Structure: COUNTY ROAD 56
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.6m (70.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 56.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 14.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $2,469,000,  Roadway Improvement Cost: $1,446,000,  Total Project Cost: $3,915,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 10528,  Location: I84 INT 19 (Lat: 41.424700,  Lng: -73.626875),  Route carried "on" structure: State highway 312,  Year Built: 1968,  Status: Open,  Structure Length: 7.68m (25.20ft),  Average Daily Traffic: 16,800 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 20,408 (year 2040),  Features Intersected: 84I 84I84031068, RTE I84
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.786,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 40.8m (133.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 62.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.68m (25.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $3,354,000,  Roadway Improvement Cost: $1,964,000,  Total Project Cost: $5,318,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1052811,  Location: 0.4 MI E I84 EXIT 19 (Lat: 41.419778,  Lng: -73.622342),  Route carried "on" structure: Interstate 84,  Year Built: 1968,  Status: Open,  Structure Length: 7.74m (25.39ft),  Average Daily Traffic: 30,039 (year 2011),  Truck Traffic: 15%,  Design Load: HS 20,  Features Intersected: MNRR HA LINE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 106.033,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.74m (25.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $4,149,000,  Roadway Improvement Cost: $2,430,000,  Total Project Cost: $6,579,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1052812,  Location: 0.4 MI E I84 EXIT 19 (Lat: 41.419192,  Lng: -73.622486),  Route carried "on" structure: Interstate 84,  Year Built: 1968,  Status: Open,  Structure Length: 7.86m (25.79ft),  Average Daily Traffic: 21,559 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 36,508 (year 2040),  Design Load: HS 20,  Features Intersected: MNRR HA LINE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.874,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 55.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.86m (25.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $4,390,000,  Roadway Improvement Cost: $2,571,000,  Total Project Cost: $6,960,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1052821,  Location: 0.9 MI E I84 INT 19 (Lat: 41.413194,  Lng: -73.616494),  Route carried "on" structure: Interstate 84,  Year Built: 1968,  Status: Open,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 30,039 (year 2011),  Truck Traffic: 15%,  Design Load: HS 20,  Features Intersected: MNRR BE LINE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.775,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.54m (14.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $2,292,000,  Roadway Improvement Cost: $1,342,000,  Total Project Cost: $3,634,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1052822,  Location: 0.9 MI E I84 INT 19 (Lat: 41.412878,  Lng: -73.616756),  Route carried "on" structure: Interstate 84,  Year Built: 1968,  Status: Open,  Structure Length: 4.54m (14.90ft),  Average Daily Traffic: 21,559 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 36,508 (year 2040),  Design Load: HS 20,  Features Intersected: MNRR BE LINE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.759,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.54m (14.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $2,292,000,  Roadway Improvement Cost: $1,342,000,  Total Project Cost: $3,634,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1052831,  Location: 1.1 MI E I84 INT 19 (Lat: 41.410800,  Lng: -73.613575),  Route carried "on" structure: Interstate 84,  Year Built: 1968,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 30,039 (year 2011),  Truck Traffic: 15%,  Design Load: HS 20,  Features Intersected: COUNTY ROAD 58
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.113,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.2m (95.8ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 45.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.07m (10.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,212,000,  Roadway Improvement Cost: $1,295,000,  Total Project Cost: $3,508,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1052832,  Location: 1.1 MI E I84 INT 19 (Lat: 41.410625,  Lng: -73.614000),  Route carried "on" structure: Interstate 84,  Year Built: 1968,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 21,559 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 36,508 (year 2040),  Design Load: HS 20,  Features Intersected: COUNTY ROAD 58
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.113,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.2m (95.8ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 45.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.07m (10.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,240,000,  Roadway Improvement Cost: $1,312,000,  Total Project Cost: $3,552,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1052841,  Location: JCT RTS I84+6+22 (Lat: 41.398183,  Lng: -73.600694),  Route carried "on" structure: Interstate 84,  Year Built: 1970,  Status: Open,  Structure Length: 38.01m (124.70ft),  Average Daily Traffic: 30,039 (year 2011),  Truck Traffic: 15%,  Design Load: HS 20,  Features Intersected: Argonne Ave, Riverside D
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.706,  Lanes on structure: 2,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 46.0m (150.9ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 43.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 38.00m (124.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $22,541,000,  Roadway Improvement Cost: $13,200,000,  Total Project Cost: $35,741,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1052842,  Location: JCT RTS I84+6+22 (Lat: 41.398086,  Lng: -73.601069),  Route carried "on" structure: Interstate 84,  Year Built: 1970,  Status: Open,  Structure Length: 37.64m (123.49ft),  Average Daily Traffic: 21,559 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 36,508 (year 2040),  Design Load: HS 20,  Features Intersected: Argonne Ave, Riverside D
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.674,  Lanes on structure: 2,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 45.4m (149.0ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 43.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 37.64m (123.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $22,334,000,  Roadway Improvement Cost: $13,079,000,  Total Project Cost: $35,413,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1054241,  Location: JCT I684 & US 6 (Lat: 41.394269,  Lng: -73.596347),  Route carried "on" structure: Interstate 684,  Year Built: 1967,  Status: Open,  Structure Length: 13.26m (43.50ft),  Average Daily Traffic: 29,466 (year 2000),  Truck Traffic: 15%,  Design Load: HS 20,  Features Intersected: RTE 6, MNRR BE LINE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.567,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 46.9m (153.9ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 96.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.25m (43.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $6,467,000,  Roadway Improvement Cost: $3,787,000,  Total Project Cost: $10,254,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1054242,  Location: JCT I684 & US 6 (Lat: 41.393950,  Lng: -73.596175),  Route carried "on" structure: Interstate 684,  Year Built: 1967,  Status: Open,  Structure Length: 14.54m (47.70ft),  Average Daily Traffic: 30,897 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 52,321 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 6, MNRR BE LINE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.599,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 37.1m (121.7ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 98.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.53m (47.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $7,025,000,  Roadway Improvement Cost: $4,114,000,  Total Project Cost: $11,139,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 105425,  Location: 1.4 MI S JCT I84 & I684 (Lat: 41.375667,  Lng: -73.606131),  Route carried "on" structure: Other road ,  Year Built: 1967,  Status: Open,  Structure Length: 8.60m (28.22ft),  Average Daily Traffic: 1,129 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,396 (year 2040),  Design Load: HS 20,  Features Intersected: 684I684I84021021 - NB, R,  Facility Carried by Structure: TURK HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.772,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.9m (81.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.59m (28.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $3,268,000,  Roadway Improvement Cost: $1,914,000,  Total Project Cost: $5,182,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1054269,  Location: .1 MI N JCT SH22 &US6/202 (Lat: 41.393733,  Lng: -73.594450),  Route carried "on" structure: Ramp State highway 22,  Year Built: 1965,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 4.94m (16.21ft),  Average Daily Traffic: 5,262 (year 2011),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,286 (year 2040),  Design Load: HS 20,  Features Intersected: MNRR BEACON LINE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.013,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 31 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.93m (16.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,757,000,  Roadway Improvement Cost: $1,614,000,  Total Project Cost: $4,371,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 105427,  Location: .1 MI N JCT I684 & I84 (Lat: 41.392369,  Lng: -73.597300),  Route carried "on" structure: Ramp Interstate ,  Year Built: 1967,  Status: Open,  Structure Length: 6.64m (21.78ft),  Average Daily Traffic: 14,810 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 25,079 (year 2040),  Design Load: HS 20,  Features Intersected: 684I684I84021034, RTE I6,  Facility Carried by Structure: RAMP G OF I84
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 1,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.64m (21.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,127,000,  Roadway Improvement Cost: $1,246,000,  Total Project Cost: $3,373,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 222402,  Location: 1.9 MI NE OF CROTON FALLS (Lat: 41.374061,  Lng: -73.647533),  Route carried "on" structure: Other road ,  Year Built: 1910,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 281 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 393 (year 2039),  Features Intersected: E BR CROTON RIVER,  Facility Carried by Structure: RESERVOIR ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.673,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 44.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 11.2 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,733,000,  Roadway Improvement Cost: $2,186,000,  Total Project Cost: $5,920,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 222403,  Location: 1.3 MI EAST OF BREWSTER (Lat: 41.401669,  Lng: -73.591858),  Route carried "on" structure: Other road ,  Year Built: 1920,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 2,022 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,831 (year 2040),  Features Intersected: E BR CROTON RIVER,  Facility Carried by Structure: SODOM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 40.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 11.2 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $670,000,  Roadway Improvement Cost: $392,000,  Total Project Cost: $1,062,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 222404,  Location: 1 MILE NORTH OF BREWSTER (Lat: 41.410403,  Lng: -73.622100),  Route carried "on" structure: Other road ,  Year Built: 2018,  Status: Open,  Structure Length: 9.36m (30.71ft),  Average Daily Traffic: 643 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 795 (year 2040),  Design Load: HL 93,  Features Intersected: MNRR HA LINE, TONETTA BR,  Facility Carried by Structure: PROSPECT HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Owner: Railroad,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 47.2m (154.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 61.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 9.35m (30.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $3,876,000,  Roadway Improvement Cost: $2,270,000,  Total Project Cost: $6,145,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 222408,  Location: 2.2 MI NE OF CROTON FALLS (Lat: 41.374483,  Lng: -73.638147),  Route carried "on" structure: Other road ,  Year Built: 1908,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 369 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 517 (year 2039),  Features Intersected: E BR CROTON RIVER,  Facility Carried by Structure: LOWER MINE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: Local Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.9m (81.7ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 48.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 16.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $2,147,000,  Roadway Improvement Cost: $1,257,000,  Total Project Cost: $3,405,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33455,  Location: 4.5 MI.NW OF BREWSTER (Lat: 41.447258,  Lng: -73.556450),  Route carried "on" structure: County highway ,  Year Built: 1978,  Status: Open,  Structure Length: 5.70m (18.70ft),  Average Daily Traffic: 6,059 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 7,360 (year 2040),  Design Load: HS 20,  Features Intersected: E BRANCH CROTON R,  Facility Carried by Structure: DOANSBRG RD CR 65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.027,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.69m (18.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,626,000,  Roadway Improvement Cost: $1,538,000,  Total Project Cost: $4,164,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334551,  Location: 2.9 MI E OF BREWSTER (Lat: 41.410283,  Lng: -73.562131),  Route carried "on" structure: County highway ,  Year Built: 1962,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 5,009 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,197 (year 2040),  Design Load: H 20,  Features Intersected: E BRANCH CROTON R,  Facility Carried by Structure: MILLTOWN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.271,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.98m (9.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,138,000,  Roadway Improvement Cost: $666,000,  Total Project Cost: $1,804,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334552,  Location: .9 MILE NORTH OF BREWSTER (Lat: 41.409611,  Lng: -73.619053),  Route carried "on" structure: County highway ,  Year Built: 1986,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 2,437 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,960 (year 2040),  Features Intersected: MNRR BEACON LINE,  Facility Carried by Structure: TONETTA LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.901,  Lanes on structure: 2,  Owner: Railroad,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 76.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 55.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $673,000,  Roadway Improvement Cost: $394,000,  Total Project Cost: $1,066,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 334554,  Location: 4.0 MI E OF MAHOPAC (Lat: 41.387361,  Lng: -73.649392),  Route carried "on" structure: County highway ,  Year Built: 1908,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 2,056 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,543 (year 2040),  Design Load: HS 20,  Features Intersected: MIDDLE BR CROTN R,  Facility Carried by Structure: DREWVLLE RD CR 36
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.969,  Lanes on structure: 2,  Owner: Local Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 82.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.31m (7.58ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Underwater Inspection Date: August 2018,  Bridge Improvement Cost: $3,292,000,  Roadway Improvement Cost: $1,928,000,  Total Project Cost: $5,219,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 103258,  Location: 0.1 MI W JCT RTS I84+I684 (Lat: 41.392242,  Lng: -73.599850),  Route carried "under" structure: Interstate 84,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 73,250 (year 1999),  Features Intersected: 84I 84I84031097, RTE I84
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 15.559,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.6m (70.9ft)

Find on map >>   Show street view

Structure Number: 1032591,  Location: JCT RTS I684+I84 (Lat: 41.390542,  Lng: -73.598203),  Route carried "under" structure: Interstate 84,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 73,250 (year 1999),  Features Intersected: 84I84I84031097, RTE I84
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 15.784,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Discuss Southeast, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.