Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Sunnyside, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 54Number of bridges
  • 384ft / 117mTotal length
  • $98,244,000Total costs
  • 267,565Total average daily traffic
  • 33,803Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Sunnyside
  • No street view available for this location

New bridges in Sunnyside, WA - historical statistics
  • New bridges - historical statistics
  • 31940-1949
  • 51950-1959
  • 91960-1969
  • 141970-1979
  • 181980-1989
  • 11990-1999
  • 32000-2009
  • 12010-2019
Average Bridge Daily Traffic in Sunnyside, WA
Average Bridge Truck Traffic in Sunnyside, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.1%Very good
  • 69.4%Good
  • 20.4%Satisfactory
  • 2.0%Poor
  • 2.0%Critical
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.2%Very good
  • 63.3%Good
  • 18.4%Satisfactory
  • 6.1%Fair
  • 2.0%Poor
  • 2.0%Critical
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 8.2%Very good
  • 77.6%Good
  • 10.2%Satisfactory
  • 4.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 83.3%Very good
  • 7.1%Good
  • 9.5%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Very good
  • 50.0%Good
Find on map >>   Show street view

Structure Number: 83811,  Location: 00.16 E FERSON ROAD (Lat: 46.316667,  Lng: -119.940000),  Route carried "on" structure: County highway 62500,  Year Built: 1961,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,075 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,200 (year 2040),  Design Load: HS 20,  Features Intersected: Black Creek,  Facility Carried by Structure: FACTORY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $517,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $1,034,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 83866,  Location: 00.19 E WEST S.SIDE (Lat: 46.328575,  Lng: -120.072692),  Route carried "on" structure: County highway 61120,  Year Built: 1960,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 6,400 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 8,065 (year 2039),  Design Load: HS 20,  Features Intersected: SNIPES CANAL,  Facility Carried by Structure: YAKIMA VALLEY HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $714,000,  Roadway Improvement Cost: $143,000,  Total Project Cost: $1,429,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 83912,  Location: 00.02 W OF SR 241 (Lat: 46.324422,  Lng: -119.978908),  Route carried "on" structure: City street 62700,  Year Built: 1978,  Status: Posted for load,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 1,895 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,085 (year 2039),  Design Load: HS 20,  Features Intersected: SULPHER CREEK WASTEWAY,  Facility Carried by Structure: EDISON RD.,E.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Very good,  Operating Rating: 11.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 7.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 2.47m (8.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,231,000,  Roadway Improvement Cost: $246,000,  Total Project Cost: $2,462,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 83977,  Location: 00.10 E YAK VAL HWY (Lat: 46.316989,  Lng: -119.982336),  Route carried "on" structure: City street 62500,  Year Built: 1973,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 2,500 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,000 (year 2039),  Design Load: HS 20,  Features Intersected: SULPHER CREEK WASTEWAY,  Facility Carried by Structure: FACTORY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.99m (9.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,490,000,  Roadway Improvement Cost: $298,000,  Total Project Cost: $2,979,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8415,  Location: 00.07 SE OF FACTORY (Lat: 46.315972,  Lng: -119.982972),  Route carried "on" structure: City street 61120,  Year Built: 1970,  Status: Posted for load,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 15,000 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 20,000 (year 2039),  Features Intersected: SULPHUR CREEK WASTEWAY,  Facility Carried by Structure: YAKIMA VALLEY HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 25.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 19.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $836,000,  Roadway Improvement Cost: $167,000,  Total Project Cost: $1,672,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 84256,  Location: 00.19 E OF PENN RD. (Lat: 46.308333,  Lng: -119.986667),  Route carried "on" structure: County highway 61960,  Year Built: 1983,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 1,720 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,025 (year 2040),  Design Load: HS 20,  Features Intersected: SULPHER CREEK WASTEWAY,  Facility Carried by Structure: ALLEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,398,000,  Roadway Improvement Cost: $280,000,  Total Project Cost: $2,797,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 84623,  Location: 00.14 S CHAFFEE RD (Lat: 46.398419,  Lng: -120.041528),  Route carried "on" structure: County highway 63050,  Year Built: 1976,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 220 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 512 (year 2039),  Design Load: HS 20,  Features Intersected: ROZA CANAL,  Facility Carried by Structure: MAPLE GROVE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.1m (88.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.05m (10.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,520,000,  Roadway Improvement Cost: $304,000,  Total Project Cost: $3,040,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 84792,  Location: 00.01 S WILLIAMSON (Lat: 46.390203,  Lng: -120.019953),  Route carried "on" structure: County highway 64750,  Year Built: 1974,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 740 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 760 (year 2039),  Design Load: HS 20,  Features Intersected: ROZA CANAL,  Facility Carried by Structure: SCOON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 17.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 8.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.38m (7.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,186,000,  Roadway Improvement Cost: $237,000,  Total Project Cost: $2,371,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 86291,  Location: 0.01 S SW CRESCENT (Lat: 46.318333,  Lng: -120.021667),  Route carried "on" structure: City street 2,  Year Built: 1997,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 2,670 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,930 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: SNIPES MTN LATERAL CANAL,  Facility Carried by Structure: S. FIRST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.19m (3.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $593,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $1,186,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 86569,  Location: 0.08 W OF BRIDGEMAN (Lat: 46.324436,  Lng: -119.938831),  Route carried "on" structure: County highway 62700,  Year Built: 2001,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 465 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 550 (year 2020),  Design Load: HS 20,  Features Intersected: SVID CANAL,  Facility Carried by Structure: EDISON RD,E.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 37.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,277,000,  Roadway Improvement Cost: $255,000,  Total Project Cost: $2,554,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 87141,  Location: 00.01 W KILLIAN RD. (Lat: 46.330000,  Lng: -119.943333),  Route carried "on" structure: County highway 60160,  Year Built: 2004,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 972 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,040 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SVID CANAL,  Facility Carried by Structure: SHELLER RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.35m (7.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,170,000,  Roadway Improvement Cost: $234,000,  Total Project Cost: $2,341,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 87142,  Location: 00.07 N HUDSON RD. (Lat: 46.361000,  Lng: -120.061936),  Route carried "on" structure: County highway 64250,  Year Built: 2004,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 155 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 171 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: SVID CANAL,  Facility Carried by Structure: FORDYCE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,702,000,  Roadway Improvement Cost: $340,000,  Total Project Cost: $3,405,000 ( Estimate for 2014),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 89137,  Location: 00.01 N. CRESCENT (Lat: 46.322689,  Lng: -120.019436),  Route carried "on" structure: City street 4,  Year Built: 2019,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 2,050 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,221 (year 2040),  Design Load: HL 93,  Features Intersected: Canal,  Facility Carried by Structure: SUNNYSIDE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 81.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 62.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $608,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $1,216,000 ( Estimate for 2014),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 11772E,  Location: 9.7 E JCT SR 223 (Lat: 46.305667,  Lng: -119.999111),  Route carried "under" structure: Interstate 82,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 22,957 (year 2019),  Truck Traffic: 15%,  Features Intersected: I-82,  Facility Carried by Structure: MABTON-SUNNYSIDE
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 109.355,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 35.4m (116.1ft)

Find on map >>   Show street view

Structure Number: 11788J,  Location: 6.5 E JCT SR 223 (Lat: 46.316639,  Lng: -120.055611),  Route carried "under" structure: Interstate 82,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 23,666 (year 2019),  Truck Traffic: 15%,  Features Intersected: I-82,  Facility Carried by Structure: GAP ROAD
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 104.527,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 39.3m (128.9ft)

Find on map >>   Show street view

Structure Number: 11901A,  Location: 10.4 E JCT SR 223 (Lat: 46.306056,  Lng: -119.978444),  Route carried "under" structure: Interstate 82,  Year Built: 1981,  Structure Length: 0. m,  Average Daily Traffic: 19,190 (year 2019),  Truck Traffic: 15%,  Features Intersected: I-82,  Facility Carried by Structure: SR 241
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 110.948,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 35.7m (117.1ft)

Discuss Sunnyside, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.