Bridge Statistics for Tifton, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 73Number of bridges
  • 646ft / 197mTotal length
  • $105,225,000Total costs
  • 701,750Total average daily traffic
  • 8,695Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Tifton
  • No street view available for this location

New bridges in Tifton, GA - historical statistics
  • New bridges - historical statistics
  • 31920-1929
  • 61930-1939
  • 11940-1949
  • 111950-1959
  • 31960-1969
  • 91970-1979
  • 201980-1989
  • 41990-1999
  • 32000-2009
  • 42010-2019
Reconstructed bridges in Tifton, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 31970-1979
  • 21980-1989
  • 21990-1999
  • 42000-2009
Average Bridge Daily Traffic in Tifton, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 15.6%Very good
  • 84.4%Good
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.6%Very good
  • 81.3%Good
  • 3.1%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.3%Very good
  • 81.3%Good
  • 12.5%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 27.5%Very good
  • 52.9%Good
  • 13.7%Satisfactory
  • 5.9%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 87.5%Good
  • 9.4%Satisfactory
  • 3.1%Fair
Find on map >>   Show street view

Structure Number: 2775046,  Location: APP 5 MI SSW OF TIFTON (Lat: 31.400789,  Lng: -83.532978),  Route carried "on" structure: County highway 220,  Year Built: 1965,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: H 15,  Features Intersected: LITTLE RIVER TRIB,  Facility Carried by Structure: KELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 2775048,  Location: SOUTH TIFTON (Lat: 31.437228,  Lng: -83.519789),  Route carried "on" structure: City street 235,  Year Built: 1980,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,096 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,644 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: LITTLE RIVER TRIB,  Facility Carried by Structure: SOUTH RIDGE AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $90,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $135,000
Find on map >>   Show street view

Structure Number: 2775049,  Location: APP 1 MI E OF TIFTON (Lat: 31.448578,  Lng: -83.486800),  Route carried "on" structure: County highway 292,  Year Built: 1978,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 2,650 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,975 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NEW RIVER,  Facility Carried by Structure: FLETCHER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $301,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $451,000
Find on map >>   Show street view

Structure Number: 2775052,  Location: IN EAST TIFTON (Lat: 31.453389,  Lng: -83.480758),  Route carried "on" structure: City street 801,  Year Built: 1982,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,096 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,644 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NEW RIVER,  Facility Carried by Structure: BILL BOWEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 2775055,  Location: APP 2 MI NE OF TIFTON (Lat: 31.473719,  Lng: -83.486328),  Route carried "on" structure: City street 4718,  Year Built: 1928,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 3,900 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,850 (year 2031),  Design Load: H 15,  Features Intersected: NEW RIVER,  Facility Carried by Structure: OLD OCILLA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 16.0m (52.5ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 36.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 41.21m (135.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2775056,  Location: NORTH TIFTON (Lat: 31.468569,  Lng: -83.509478),  Route carried "on" structure: City street 612,  Year Built: 1978,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 270 (year 2011),  Truck Traffic: 3%,  Average Future Daily Traffic: 405 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NEW RIVER TRIB,  Facility Carried by Structure: NORTH RIDGE AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $94,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $141,000
Find on map >>   Show street view

Structure Number: 2775058,  Location: EAST TIFTON (Lat: 31.459528,  Lng: -83.493797),  Route carried "on" structure: City street 686,  Year Built: 1980,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 180 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 270 (year 2032),  Features Intersected: NEW RIVER TRIB,  Facility Carried by Structure: MADISON AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $98,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $147,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 277506,  Location: APP 11 MI NW OF TIFTON (Lat: 31.568058,  Lng: -83.649389),  Route carried "on" structure: County highway 1179,  Year Built: 1972,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 260 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 390 (year 2032),  Design Load: H 15,  Features Intersected: DANIELS CREEK,  Facility Carried by Structure: TY TY-SYCAMORE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.40m (37.40ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2020,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $637,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $955,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 2775061,  Location: .2 MI SW TIFTON CITY LIMI (Lat: 31.443019,  Lng: -83.533850),  Route carried "on" structure: County highway 326,  Year Built: 1986,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 1,096 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,644 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: LITTLE RIVER TRIB,  Facility Carried by Structure: McCORMICK DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $145,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $217,000
Find on map >>   Show street view

Structure Number: 2775062,  Location: EAST TIFTON (Lat: 31.456219,  Lng: -83.478478),  Route carried "on" structure: City street 797,  Year Built: 1985,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,096 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,644 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NEW RIVER,  Facility Carried by Structure: MARION DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $193,000
Find on map >>   Show street view

Structure Number: 2775065,  Location: IN TIFTON (Lat: 31.456600,  Lng: -83.489719),  Route carried "on" structure: City street 4713,  Year Built: 1994,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 5,380 (year 2011),  Truck Traffic: 8%,  Average Future Daily Traffic: 8,070 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NEW RIVER,  Facility Carried by Structure: FERRY LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $172,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $258,000
Find on map >>   Show street view

Structure Number: 2775066,  Location: SOUTH TIFTON (Lat: 31.436158,  Lng: -83.521028),  Route carried "on" structure: City street 234,  Year Built: 1980,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,096 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,644 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: LITTLE RIVER TRIB,  Facility Carried by Structure: YOUMANS STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 2775067,  Location: NE TIFTON (Lat: 31.464200,  Lng: -83.497089),  Route carried "on" structure: City street 4718,  Year Built: 1999,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 5,730 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 8,595 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NEW RIVER TRIB,  Facility Carried by Structure: OLD OCILLA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $172,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $258,000
Find on map >>   Show street view

Structure Number: 2775068,  Location: NE TIFTON (Lat: 31.464589,  Lng: -83.499839),  Route carried "on" structure: City street 660,  Year Built: 1999,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 1,096 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,644 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NEW RIVER,  Facility Carried by Structure: PRINCE AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $215,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $322,000
Find on map >>   Show street view

Structure Number: 2775069,  Location: EAST TIFTON (Lat: 31.459178,  Lng: -83.492689),  Route carried "on" structure: City street 683,  Year Built: 1999,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 1,096 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,644 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NEW RIVER TRIB,  Facility Carried by Structure: PINEVIEW AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $170,000
Find on map >>   Show street view

Structure Number: 277507,  Location: NORTH SECTION OF TIFTON (Lat: 31.465758,  Lng: -83.503019),  Route carried "on" structure: State highway 125,  Year Built: 2000,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 10,950 (year 2011),  Truck Traffic: 9%,  Average Future Daily Traffic: 16,425 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NEW RIVER TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.7m (8.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $199,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $298,000
Find on map >>   Show street view

Structure Number: 2775072,  Location: APP 4 MI NW OF TIFTON (Lat: 31.489147,  Lng: -83.574739),  Route carried "on" structure: County highway 109,  Year Built: 2001,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: MILL CREEK,  Facility Carried by Structure: EARLE HUTCHINSON R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 2775074,  Location: APP 4 MI E OF TIFTON (Lat: 31.465208,  Lng: -83.439289),  Route carried "on" structure: County highway 1562,  Year Built: 2004,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 1,100 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,650 (year 2031),  Design Load: HS 15,  Features Intersected: MIDDLE CREEK,  Facility Carried by Structure: FERRY LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $313,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $469,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 277508,  Location: APP 2 MI NE OF TIFTON (Lat: 31.459569,  Lng: -83.478608),  Route carried "on" structure: County highway 72,  Year Built: 2013,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 3,080 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,620 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NEW RIVER OVERF,  Facility Carried by Structure: FERRY LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 40.97m (134.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 2775081,  Location: APP 2MI E OF TIFTON (Lat: 31.459908,  Lng: -83.477558),  Route carried "on" structure: County highway 72,  Year Built: 2013,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 3,080 (year 2007),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,620 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NEW RIVER,  Facility Carried by Structure: FERRY LAKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 2775084,  Location: APP 3 MI N OF TIFTON (Lat: 31.506178,  Lng: -83.515239),  Route carried "on" structure: County highway 544,  Year Built: 2016,  Status: Open,  Structure Length: 7.74m (25.39ft),  Average Daily Traffic: 4,900 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,350 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: I-75 (EXIT 66),  Facility Carried by Structure: BRIGHTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 40.5m (132.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.5m (57.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.30m (30.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $22,570,000,  Roadway Improvement Cost: $2,257,000,  Total Project Cost: $33,855,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2775085,  Location: 4 MI. NW OF TIFTON (Lat: 31.497031,  Lng: -83.553367),  Route carried "on" structure: County highway 34,  Year Built: 1956,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 1,260 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,890 (year 2031),  Design Load: H 15,  Features Intersected: MILL CREEK,  Facility Carried by Structure: ZION HOPE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.9m (19.4ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.57m (5.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $3,818,000,  Roadway Improvement Cost: $381,000,  Total Project Cost: $5,727,000 ( Estimate for 2018)
Find on map >>   Show street view

Structure Number: 2775086,  Location: 5 MILES SE OF TIFTON (Lat: 31.413978,  Lng: -83.442978),  Route carried "on" structure: County highway 193,  Year Built: 2019,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 6%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: NEW RIVER,  Facility Carried by Structure: LOWER BROOKFIELD R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.18m (16.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $12,580,000,  Roadway Improvement Cost: $1,258,000,  Total Project Cost: $18,870,000 ( Estimate for 2019),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2770021,  Location: APP 6 MI N OF TIFTON (Lat: 31.531239,  Lng: -83.524239),  Route carried "under" structure: Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 36,100 (year 1998),  Truck Traffic: 1%,  Features Intersected: CR 107 WESLEY RIGDON RD,  Facility Carried by Structure: WESLEY RIGDON RD
Minimum Vertical Clearance: 6.04m (19.82ft),  Kilometerpoint: 109.435,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 2770031,  Location: APP 2 MI W OF TIFTON (Lat: 31.450172,  Lng: -83.530672),  Route carried "under" structure: US 82,  Structure Length: 0. m,  Average Daily Traffic: 23,000 (year 1998),  Truck Traffic: 1%,  Features Intersected: I-75 (EXIT 62),  Facility Carried by Structure: I-75 (EXIT 62)
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 14.484,  Lanes on structure: 8,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 2770034,  Location: APP 2 MI N OF TIFTON (Lat: 31.474947,  Lng: -83.523303),  Route carried "under" structure: City street 4707,  Structure Length: 0. m,  Average Daily Traffic: 4,100 (year 1998),  Truck Traffic: 1%,  Features Intersected: I-75,  Facility Carried by Structure: I-75
Minimum Vertical Clearance: 7.36m (24.15ft),  Kilometerpoint: 4.828,  Lanes on structure: 7,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 2770036,  Location: APP 3 MI N OF TIFTON (Lat: 31.478528,  Lng: -83.519639),  Route carried "under" structure: US 41,  Structure Length: 0. m,  Average Daily Traffic: 4,000 (year 1998),  Truck Traffic: 1%,  Features Intersected: I-75 (EXIT 64),  Facility Carried by Structure: I-75 (EXIT 64)
Minimum Vertical Clearance: 5.25m (17.22ft),  Kilometerpoint: 19.312,  Lanes on structure: 6,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 2770071,  Location: APP 2 MI W OF TIFTON (Lat: 31.458039,  Lng: -83.530189),  Route carried "under" structure: Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 41,400 (year 1998),  Truck Traffic: 1%,  Features Intersected: M-4708 2ND STREET,  Facility Carried by Structure: 2ND STREET
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 99.779,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 2770078,  Location: APP 2 MI W OF TIFTON (Lat: 31.446019,  Lng: -83.529769),  Route carried "under" structure: Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 51,400 (year 1998),  Truck Traffic: 1%,  Features Intersected: SR 35 (US 319),  Facility Carried by Structure: US 319
Minimum Vertical Clearance: 5.91m (19.39ft),  Kilometerpoint: 98.170,  Lanes on structure: 4,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 2770082,  Location: APP 2 MI W OF TIFTON (Lat: 31.441589,  Lng: -83.527178),  Route carried "under" structure: Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 51,400 (year 1998),  Truck Traffic: 1%,  Features Intersected: SR 35 CONNECTOR,  Facility Carried by Structure: SR 35 CONNECTOR
Minimum Vertical Clearance: 6.04m (19.82ft),  Kilometerpoint: 98.170,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 2770083,  Location: APP 2 MI NW OF TIFTON (Lat: 31.463628,  Lng: -83.529878),  Route carried "under" structure: Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 44,800 (year 1998),  Truck Traffic: 1%,  Features Intersected: M-4710 8TH STREET,  Facility Carried by Structure: 8TH STREET
Minimum Vertical Clearance: 5.35m (17.55ft),  Kilometerpoint: 101.389,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 2775084,  Location: APP 3 MI N OF TIFTON (Lat: 31.506178,  Lng: -83.515239),  Route carried "under" structure: Interstate 75,  Structure Length: 0. m,  Average Daily Traffic: 4,900 (year 2016),  Truck Traffic: 5%,  Features Intersected: FAS 544 BRIGHTON ROAD,  Facility Carried by Structure: BRIGHTON ROAD
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 106.217,  Lanes on structure: 2,  Length of Maximum Span: 0.0m