Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Trenton, Tennessee (TN)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 65Number of bridges
  • 492ft / 150mTotal length
  • $15,424,000Total costs
  • 158,158Total average daily traffic
  • 11,950Total average daily truck traffic
  • 266,580Total future (year 2039) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Trenton
  • No street view available for this location

New bridges in Trenton, TN - historical statistics
  • New bridges - historical statistics
  • 51920-1929
  • 61930-1939
  • 11950-1959
  • 51960-1969
  • 51970-1979
  • 81980-1989
  • 131990-1999
  • 142000-2009
  • 82010-2019
Reconstructed bridges in Trenton, TN - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 01980-1989
  • 21990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Trenton, TN
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.2%Very good
  • 35.5%Good
  • 45.2%Satisfactory
  • 12.9%Fair
  • 3.2%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.9%Very good
  • 29.0%Good
  • 41.9%Satisfactory
  • 16.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.5%Very good
  • 41.9%Good
  • 32.3%Satisfactory
  • 12.9%Fair
  • 6.5%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 24.2%Good
  • 71.0%Satisfactory
  • 3.2%Fair
  • 1.6%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 47.1%Good
  • 38.2%Satisfactory
  • 8.8%Fair
  • 5.9%Poor
Find on map >>   Show street view

Structure Number: 27015940001,  Location: 3.0 MI NW JCT SR104&SR367 (Lat: 36.020556,  Lng: -88.965667),  Route carried "on" structure: County highway 1594,  Year Built: 1990,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 305 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 528 (year 2039),  Design Load: HS 20,  Features Intersected: ROGERS BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.9m (16.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 49.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 270A2150001,  Location: 4.5 MI E JCT SR5&SR185 (Lat: 36.058083,  Lng: -88.905694),  Route carried "on" structure: County highway 215,  Year Built: 2018,  Status: Open,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 10 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 16 (year 2039),  Design Load: HL 93,  Features Intersected: CAMP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.418,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 81.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 58.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 270A2240001,  Location: 2.1 MI SW JCT SR54&SR185 (Lat: 36.031333,  Lng: -88.913250),  Route carried "on" structure: County highway 224,  Year Built: 1970,  Status: Temporarily open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 32 (year 2041),  Design Load: HS 20,  Features Intersected: BRANCH OF CAMP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.756,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Poor,  Channel: Satisfactory,  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $269,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $404,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 270A2260001,  Location: 1.7 MI SW JCT SR54&SR185 (Lat: 36.043167,  Lng: -88.913333),  Route carried "on" structure: County highway 226,  Year Built: 1983,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 10 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 16 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH OF CAMP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.352,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 270A3400001,  Location: 5.6 MI SE JCT SR43&SR54 (Lat: 35.997222,  Lng: -88.792944),  Route carried "on" structure: County highway 340,  Year Built: 1995,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 80 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 128 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.226,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021
Find on map >>   Show street view

Structure Number: 270A3490001,  Location: 4.8 MI S JCT SR43&SR54 (Lat: 36.005472,  Lng: -88.809583),  Route carried "on" structure: County highway 349,  Year Built: 2019,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 90 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 144 (year 2040),  Design Load: HL 93,  Features Intersected: BRANCH OF RUTHERFORD FK.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.237,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 270A3610001,  Location: 3.2 MI NE JCT SR5&SR54 (Lat: 36.004111,  Lng: -88.874750),  Route carried "on" structure: County highway 361,  Year Built: 1972,  Status: Posted for load,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 370 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 592 (year 2040),  Design Load: HS 20,  Features Intersected: BR THOMPSON LEVEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.353,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $119,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $179,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 270A3610003,  Location: 1.1 MI SE JCT SR5&SR54 (Lat: 35.986056,  Lng: -88.926972),  Route carried "on" structure: County highway 361,  Year Built: 1975,  Status: Posted for load,  Structure Length: 1.18m (3.87ft),  Average Daily Traffic: 890 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,424 (year 2041),  Features Intersected: BR N FORK FORKED DEER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 30.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $114,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $172,000 ( Estimate for 2021),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 270A3700001,  Location: 3.5 MI E JCT SR5&SR54 (Lat: 36.001306,  Lng: -88.870278),  Route carried "on" structure: County highway 370,  Year Built: 1983,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 60 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 96 (year 2039),  Design Load: HS 20,  Features Intersected: BR THOMPSON LEVEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.688,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 270A4800001,  Location: IN CITY OF TRENTON (Lat: 35.957833,  Lng: -88.942833),  Route carried "on" structure: City street 480,  Year Built: 2006,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 160 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 256 (year 2039),  Design Load: HS 20,  Features Intersected: BR OF N FORK FORKED DEER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 270A7250001,  Location: 3.4 MI SE JCT SR5&SR186 (Lat: 35.928556,  Lng: -88.898889),  Route carried "on" structure: County highway 725,  Year Built: 1995,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 50 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 80 (year 2040),  Design Load: HS 20,  Features Intersected: PARKER BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.972,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $163,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $245,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 270A7310001,  Location: 4.1 MI S JCT SR54&SR367 (Lat: 35.907528,  Lng: -88.941250),  Route carried "on" structure: County highway 731,  Year Built: 1980,  Year Reconstructed: 2004,  Status: Posted for load,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 20 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 32 (year 2040),  Design Load: H 15,  Features Intersected: BRANCH OF CAIN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.821,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 36.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 270A7320001,  Location: 3.1 MI SW JCT SR54&SR367 (Lat: 35.922194,  Lng: -88.943917),  Route carried "on" structure: County highway 732,  Year Built: 1986,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 150 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 240 (year 2039),  Design Load: HS 20,  Features Intersected: CAIN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.438,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.7m (18.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 270A7340001,  Location: 4.3 MI SE JCT SR54&SR367 (Lat: 35.905417,  Lng: -88.934889),  Route carried "on" structure: County highway 734,  Year Built: 1995,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 130 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 208 (year 2039),  Design Load: HS 20,  Features Intersected: CAIN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 270A9460001,  Location: 3.8 MI SW JCT SR54&SR367 (Lat: 35.933467,  Lng: -88.998367),  Route carried "on" structure: County highway 946,  Year Built: 2010,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 50 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 80 (year 2039),  Design Load: HL 93,  Features Intersected: BRANCH OF DAVIS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.510,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 270A9500001,  Location: 4.4 MI SW JCT SR54&SR367 (Lat: 35.957472,  Lng: -89.019667),  Route carried "on" structure: County highway 950,  Year Built: 1996,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 60 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 96 (year 2039),  Design Load: HS 20,  Features Intersected: BUCK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 27S80310005,  Location: 5.2 MI NE JCT SR54&CROCK. (Lat: 35.916361,  Lng: -89.009806),  Route carried "on" structure: County highway 854,  Year Built: 1965,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 411 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 912 (year 2039),  Design Load: H 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 71.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021
Find on map >>   Show street view

Structure Number: 27S80320007,  Location: 3.8 MI.SOUTH OF TRENTON (Lat: 35.924222,  Lng: -88.884611),  Route carried "on" structure: State highway 186,  Year Built: 1985,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 2,171 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,104 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.574,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 55.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 27S80320009,  Location: 3.1 MI.SOUTH OF TRENTON (Lat: 35.933083,  Lng: -88.896444),  Route carried "on" structure: State highway 186,  Year Built: 2012,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 2,171 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,104 (year 2040),  Design Load: HL 93,  Features Intersected: PARKER BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.103,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 27S80320011,  Location: SOUTH OF NEW HOPE (Lat: 35.934861,  Lng: -88.897639),  Route carried "on" structure: State highway 186,  Year Built: 2012,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 2,171 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,104 (year 2040),  Design Load: HL 93,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.328,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 62.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 27S80320013,  Location: NEAR NEW HOPE (Lat: 35.944583,  Lng: -88.904194),  Route carried "on" structure: State highway 186,  Year Built: 2012,  Status: Open,  Structure Length: 2.18m (7.15ft),  Average Daily Traffic: 2,171 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,104 (year 2040),  Design Load: HL 93,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.551,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.8m (71.5ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 63.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 27S80320015,  Location: NEAR NEW HOPE (Lat: 35.956028,  Lng: -88.914583),  Route carried "on" structure: State highway 186,  Year Built: 2012,  Status: Open,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 2,171 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,104 (year 2040),  Design Load: HL 93,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.145,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.7m (94.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 67.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 27S81690001,  Location: 1 MI.E.OF BARRONS CORNERS (Lat: 36.050694,  Lng: -88.914528),  Route carried "on" structure: State highway 185,  Year Built: 1965,  Status: Posted for load,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 887 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,392 (year 2040),  Design Load: H 15,  Features Intersected: CAMP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.527,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 29.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $112,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $169,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27SR0050011,  Location: 2.8 MI.S.OF TRENTON (Lat: 35.900278,  Lng: -88.936861),  Route carried "on" structure: US 45,  Year Built: 1994,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 8,527 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 15,664 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: FAP 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.305,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.19m (3.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $363,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $545,000 ( Estimate for 2019)
Find on map >>   Show street view

Structure Number: 27SR0050013,  Location: 2.5 MI.S.OF TRENTON (Lat: 35.915222,  Lng: -88.938333),  Route carried "on" structure: US 45,  Year Built: 1994,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 8,527 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 13,643 (year 2042),  Design Load: HS 20,  Features Intersected: CAIN CREEK,  Facility Carried by Structure: FAP 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.916,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.7m (81.0ft),  Skew: 6 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.5m (27.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.16m (7.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $754,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $1,132,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 27SR0050015,  Location: 2.3MI SO. OF TRENTON (Lat: 35.916333,  Lng: -88.938528),  Route carried "on" structure: US 45,  Year Built: 1994,  Status: Open,  Structure Length: 0.71m (2.33ft),  Average Daily Traffic: 8,527 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 15,664 (year 2039),  Design Load: HS 20,  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: FAP 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.013,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.3m (83.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.71m (2.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $353,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $530,000 ( Estimate for 2019)
Find on map >>   Show street view

Structure Number: 27SR0050017,  Location: NORTH TRENTON CITY LIMITS (Lat: 35.981833,  Lng: -88.930167),  Route carried "on" structure: US 45,  Year Built: 1963,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 12.34m (40.49ft),  Average Daily Traffic: 11,162 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 17,859 (year 2042),  Design Load: HS 20,  Features Intersected: N. FK. FORKED DEER RIVER,  Facility Carried by Structure: FAP 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.561,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.34m (40.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $917,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $1,376,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 27SR0050019,  Location: 1.3 MI.NORTH OF TRENTON (Lat: 36.006750,  Lng: -88.949306),  Route carried "on" structure: County highway 2483,  Year Built: 2001,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 2,880 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,704 (year 2039),  Design Load: HS 20,  Features Intersected: DRAINAGE DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.6m (18.4ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021
Find on map >>   Show street view

Structure Number: 27SR0050021,  Location: 2.7 MI.N.OF TRENTON (Lat: 36.022000,  Lng: -88.961806),  Route carried "on" structure: County highway 2483,  Year Built: 1929,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 2,880 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,704 (year 2041),  Design Load: H 15,  Features Intersected: ROGERS BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.173,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft)

Condition: Channel: Fair,  Culverts: Poor,  Operating Rating: 62.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $149,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $224,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 27SR0050023,  Location: 2.6 MI.N.OF TRENTON (Lat: 36.023278,  Lng: -88.962583),  Route carried "on" structure: County highway 2483,  Year Built: 1929,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 2,880 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 4,608 (year 2041),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.334,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Fair,  Culverts: Poor,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $301,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 27SR0050039,  Location: .25 MI N OF TRENTON (Lat: 35.985000,  Lng: -88.930083),  Route carried "on" structure: US 45,  Year Built: 1960,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 11,162 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 15,392 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: FAP 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.899,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021
Find on map >>   Show street view

Structure Number: 27SR0050043,  Location: 2 MI S JCT SR54 & SR367 (Lat: 35.933611,  Lng: -88.940750),  Route carried "on" structure: US 45,  Year Built: 1994,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 8,527 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 15,664 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: FAP 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.443,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.3m (86.3ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $269,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $404,000 ( Estimate for 2019)
Find on map >>   Show street view

Structure Number: 27SR0050051,  Location: 3.0 MI. NORTH OF HUMBOLT (Lat: 35.898194,  Lng: -88.932000),  Route carried "on" structure: State highway 5,  Year Built: 2000,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 8,527 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 15,664 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.905,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 14 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.2m (17.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $372,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $559,000 ( Estimate for 2019)
Find on map >>   Show street view

Structure Number: 27SR0050061,  Location: 2 MI N OF SR104 (Lat: 36.012972,  Lng: -88.964583),  Route carried "on" structure: US 45,  Year Built: 2001,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 3,991 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 7,248 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: FAP 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.322,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 23 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $279,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $419,000 ( Estimate for 2019)
Find on map >>   Show street view

Structure Number: 27SR0050071,  Location: 1.5 MI N OF SR 104 (Lat: 36.005944,  Lng: -88.951306),  Route carried "on" structure: US 45,  Year Built: 2001,  Status: Open,  Structure Length: 1.30m (4.27ft),  Average Daily Traffic: 3,991 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,386 (year 2042),  Design Load: HS 20,  Features Intersected: BRANCH,  Facility Carried by Structure: FAP 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.826,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 23 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.3m (17.4ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $476,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $715,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 27SR0050073,  Location: 2 MI N OF SR104 (Lat: 36.018167,  Lng: -88.970611),  Route carried "on" structure: US 45,  Year Built: 2001,  Status: Open,  Structure Length: 0.80m (2.62ft),  Average Daily Traffic: 3,991 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 7,248 (year 2039),  Design Load: HS 20,  Features Intersected: ROGER BRANCH,  Facility Carried by Structure: FAP 5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.095,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $265,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $398,000 ( Estimate for 2019)
Find on map >>   Show street view

Structure Number: 27SR0055001,  Location: 0.75 MI.N. JCT. FAS 8032 (Lat: 35.988944,  Lng: -88.940139),  Route carried "on" structure: State highway 367,  Year Built: 2005,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 2,652 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,096 (year 2039),  Design Load: HS 20,  Features Intersected: N. FK. FORKED DEER RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.424,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 27SR0055003,  Location: IN TRENTON CITY LIMITS (Lat: 35.991611,  Lng: -88.938750),  Route carried "on" structure: State highway 367,  Year Built: 1926,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,547 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,992 (year 2039),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.745,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 14.9m (48.9ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 27SR0055005,  Location: IN TRENTON CITY LIMITS (Lat: 35.997278,  Lng: -88.940778),  Route carried "on" structure: State highway 367,  Year Built: 1927,  Year Reconstructed: 1960,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,547 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,992 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.421,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 44.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021
Find on map >>   Show street view

Structure Number: 27SR0540007,  Location: 4.8 MI.SW.OF TRENTON (Lat: 35.916111,  Lng: -89.008028),  Route carried "on" structure: State highway 54,  Year Built: 1992,  Status: Open,  Structure Length: 3.12m (10.24ft),  Average Daily Traffic: 2,234 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,640 (year 2040),  Design Load: HS 20,  Features Intersected: DAVIS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.868,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 65.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.12m (10.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $207,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $311,000 ( Estimate for 2020),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 27SR0540009,  Location: 3.8 MI.SW.OF TRENTON (Lat: 35.927000,  Lng: -88.998333),  Route carried "on" structure: State highway 54,  Year Built: 1996,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 2,234 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,574 (year 2042),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.364,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.3m (20.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 27SR0540011,  Location: 3 MI.SW.OF TRENTON (Lat: 35.936667,  Lng: -88.989611),  Route carried "on" structure: State highway 54,  Year Built: 1929,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 2,234 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,640 (year 2039),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.668,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $171,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $257,000 ( Estimate for 2019)
Discuss Trenton, Tennessee (TN) on our hugely popular Tennessee forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.