Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Trinidad, Colorado (CO)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 49Number of bridges
  • 1,040ft / 317mTotal length
  • $6,665,000Total costs
  • 286,951Total average daily traffic
  • 28,374Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Trinidad
  • No street view available for this location

New bridges in Trinidad, CO - historical statistics
  • New bridges - historical statistics
  • 51930-1939
  • 21940-1949
  • 61950-1959
  • 91960-1969
  • 31970-1979
  • 21980-1989
  • 51990-1999
  • 72000-2009
  • 102010-2019
Average Bridge Daily Traffic in Trinidad, CO
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.1%Very good
  • 36.4%Good
  • 33.3%Satisfactory
  • 21.2%Fair
  • 3.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 18.2%Very good
  • 36.4%Good
  • 30.3%Satisfactory
  • 12.1%Fair
  • 3.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.1%Very good
  • 42.4%Good
  • 33.3%Satisfactory
  • 12.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 41.7%Very good
  • 25.0%Good
  • 29.2%Satisfactory
  • 4.2%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 66.7%Satisfactory
Find on map >>   Show street view

Structure Number: P-18-BI,  Location: In TRINIDAD (Lat: 37.165297,  Lng: -104.511994),  Route carried "under" structure: City street ,  Year Built: 2009,  Structure Length: 0. m,  Features Intersected: MAIN STREET,  Facility Carried by Structure: I 25 ML NBND
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: P-18-BJ,  Location: IN TRINIDAD (Lat: 37.165311,  Lng: -104.512233),  Route carried "under" structure: City street ,  Year Built: 2012,  Structure Length: 0. m,  Features Intersected: MAIN STREET,  Facility Carried by Structure: I 25 ML SBND
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: P-18-BS,  Location: 1.8 MI S. OF TRINIDAD (Lat: 37.134292,  Lng: -104.521681),  Route carried "under" structure: Interstate 25A,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 3,300 (year 2014),  Truck Traffic: 16%,  Features Intersected: I 25 ML,  Facility Carried by Structure: COUNTY ROAD 18.9
Minimum Vertical Clearance: 6.00m (19.69ft),  Kilometerpoint: 0.047,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 16.5m (54.1ft)

Find on map >>   Show street view

Structure Number: P-18-BY,  Location: IN TRINIDAD (Lat: 37.169308,  Lng: -104.511014),  Route carried "under" structure: US 12A,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 8,100 (year 2011),  Truck Traffic: 2%,  Features Intersected: SH 12,RR,CTY STS. DITCH,  Facility Carried by Structure: I 25 ML NBND
Minimum Vertical Clearance: 7.34m (24.08ft),  Kilometerpoint: 113.251,  Lanes on structure: 2,  Lanes under structure: 10,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 76.8m (252.0ft)

Find on map >>   Show street view

Structure Number: P-18-CE,  Location: IN TRINIDAD (Lat: 37.169342,  Lng: -104.511283),  Route carried "under" structure: US 12A,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 8,100 (year 2011),  Truck Traffic: 2%,  Features Intersected: SH12,RR,CITY ST,DITCH,  Facility Carried by Structure: I 25 ML SBND
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 113.249,  Lanes on structure: 2,  Lanes under structure: 11,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 69.5m (228.0ft)

Find on map >>   Show street view

Structure Number: P-18-CM,  Location: I25 OVER CITY STREET (Lat: 37.171339,  Lng: -104.509906),  Route carried "under" structure: City street ,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 0000),  Features Intersected: CITY STREET,  Facility Carried by Structure: I25 RAMP
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: P-19-BA,  Location: 2.9 MI NO OF JCT SH 239 (Lat: 37.226356,  Lng: -104.492736),  Route carried "under" structure: Interstate 25A,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 2014),  Truck Traffic: 16%,  Features Intersected: I 25 ML,  Facility Carried by Structure: COUNTY ROAD 32.4
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.235,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Discuss Trinidad, Colorado (CO) on our hugely popular Colorado forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.