Bridge Statistics for Ashland, Oregon (OR)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- New bridges - historical statistics
- 11910-1919
- 41950-1959
- 161960-1969
- 21970-1979
- 11980-1989
- 41990-1999
- 132000-2009
- 42010-2019
- Bridge Condition - Deck
- 6.5%Very good
- 35.5%Good
- 41.9%Satisfactory
- 9.7%Fair
- 6.5%Poor
- Bridge Condition - Superstructure
- 16.1%Very good
- 51.6%Good
- 19.4%Satisfactory
- 9.7%Fair
- 3.2%Poor
- Bridge Condition - Substructure
- 3.2%Very good
- 29.0%Good
- 54.8%Satisfactory
- 9.7%Fair
- 3.2%Poor
- Bridge Condition - Channel
- 4.5%Very good
- 50.0%Good
- 27.3%Satisfactory
- 18.2%Fair
- Bridge Condition - Culverts
- 33.3%Good
- 33.3%Satisfactory
- 33.3%Fair
Find on map >> Show street view
Structure Number: 21358 001 01917, Location: 2.5 MI N ASHLAND NCL (Lat: 42.227981, Lng: -122.740686), Route carried "under" structure: Interstate 5, Year Built: 2011, Structure Length: 0. m, Average Daily Traffic: 35,410 (year 2020), Truck Traffic: 11%, Features Intersected: I-5 (HWY 001), Facility Carried by Structure: VALLEY VIEW RD CON
Minimum Vertical Clearance: 7.24m (23.75ft), Kilometerpoint: 30.851, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 42.1m (138.1ft)
Structure Number: 21358 001 01917, Location: 2.5 MI N ASHLAND NCL (Lat: 42.227981, Lng: -122.740686), Route carried "under" structure: Interstate 5, Year Built: 2011, Structure Length: 0. m, Average Daily Traffic: 35,410 (year 2020), Truck Traffic: 11%, Features Intersected: I-5 (HWY 001), Facility Carried by Structure: VALLEY VIEW RD CON
Minimum Vertical Clearance: 7.24m (23.75ft), Kilometerpoint: 30.851, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 42.1m (138.1ft)