Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Canton, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 67Number of bridges
  • 1,257ft / 383mTotal length
  • $170,843,000Total costs
  • 1,153,248Total average daily traffic
  • 20,123Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Canton
  • No street view available for this location

New bridges in Canton, GA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 21940-1949
  • 11950-1959
  • 11960-1969
  • 91970-1979
  • 241980-1989
  • 62000-2009
  • 22010-2019
Reconstructed bridges in Canton, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 01970-1979
  • 11980-1989
Average Bridge Daily Traffic in Canton, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 2.9%Very good
  • 88.6%Good
  • 8.6%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Very good
  • 77.1%Good
  • 2.9%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 2.9%Very good
  • 94.3%Good
  • 2.9%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Very good
  • 26.7%Good
  • 23.3%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 63.6%Good
  • 18.2%Satisfactory
  • 18.2%Fair
Find on map >>   Show street view

Structure Number: 575088,  Location: 3.0 MI W OF HOLLY SPRINGS (Lat: 34.199597,  Lng: -84.540678),  Route carried "on" structure: County highway 2568,  Year Built: 2001,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 2,202 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,303 (year 2031),  Design Load: H 15,  Features Intersected: DOWNING CREEK,  Facility Carried by Structure: GOLD BRIDGE CROSSI
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 73.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $238,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $358,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 575089,  Location: 2.8 MI W OF HOLLY SPRINGS (Lat: 34.182028,  Lng: -84.551258),  Route carried "on" structure: County highway 2496,  Year Built: 2003,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 9,520 (year 2011),  Truck Traffic: 3%,  Average Future Daily Traffic: 14,280 (year 2031),  Design Load: H 15,  Features Intersected: ALLATOONA CREEK TRIB,  Facility Carried by Structure: BRIDGE MILL AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 0.0m

Condition: Channel: Very good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 575095,  Location: IN EAST CANTON (Lat: 34.236519,  Lng: -84.464444),  Route carried "on" structure: Ramp Interstate 575,  Year Built: 2007,  Status: Open,  Structure Length: 11.06m (36.29ft),  Average Daily Traffic: 17,280 (year 2008),  Truck Traffic: 1%,  Average Future Daily Traffic: 25,920 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: CANTON CREEK TRIB,  Facility Carried by Structure: RAMP TO SR 20 EBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.9m (121.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,032,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $1,547,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 575108,  Location: 1.6 MI E OF CANTON (Lat: 34.230100,  Lng: -84.460131),  Route carried "on" structure: Alternate County highway 621,  Year Built: 2013,  Status: Open,  Structure Length: 11.06m (36.29ft),  Average Daily Traffic: 26,640 (year 2007),  Truck Traffic: 3%,  Average Future Daily Traffic: 30,000 (year 2012),  Design Load: HS 20+Mod,  Features Intersected: CANTON CREEK,  Facility Carried by Structure: NORTHSIDE CHEROKEE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 42.1m (138.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 13.29m (43.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $32,264,000,  Roadway Improvement Cost: $3,226,000,  Total Project Cost: $48,396,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 575109,  Location: 1.6 MI E OF CANTON (Lat: 34.229847,  Lng: -84.459981),  Route carried "on" structure: Alternate County highway 621,  Year Built: 2013,  Status: Open,  Structure Length: 11.06m (36.29ft),  Average Daily Traffic: 26,640 (year 2007),  Truck Traffic: 3%,  Average Future Daily Traffic: 30,000 (year 2012),  Design Load: HS 20+Mod,  Features Intersected: CANTON CREEK,  Facility Carried by Structure: NORTHSIDE CHEROKEE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 42.1m (138.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 13.29m (43.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $32,264,000,  Roadway Improvement Cost: $3,226,000,  Total Project Cost: $48,396,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 570006,  Location: 1.9 MI NE OF CANTON (Lat: 34.254058,  Lng: -84.467169),  Route carried "under" structure: Interstate 575,  Structure Length: 0. m,  Average Daily Traffic: 19,600 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 5 BUSINESS,  Facility Carried by Structure: SR 5 BUSINESS
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 32.187,  Lanes on structure: 5,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 570011,  Location: LEVEL 2 OF TRI-LEVEL (Lat: 34.219439,  Lng: -84.489378),  Route carried "under" structure: Interstate 575,  Structure Length: 0. m,  Average Daily Traffic: 34,300 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 20 (EBL) (A-588),  Facility Carried by Structure: SR20 (EBL) (A-588)
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 27.359,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 570012,  Location: IN EAST CANTON (Lat: 34.238058,  Lng: -84.466069),  Route carried "under" structure: Ramp Interstate 575,  Structure Length: 0. m,  Average Daily Traffic: 32,200 (year 2007),  Truck Traffic: 1%,  Features Intersected: SR 20 EBL,  Facility Carried by Structure: SR 20 (EBL)
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 30.578,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 570012,  Location: IN EAST CANTON (Lat: 34.238058,  Lng: -84.466069),  Route carried "under" structure: Ramp Interstate 575,  Structure Length: 0. m,  Average Daily Traffic: 32,200 (year 2007),  Truck Traffic: 1%,  Features Intersected: SR 20 EBL,  Facility Carried by Structure: SR 20 (EBL)
Minimum Vertical Clearance: 6.42m (21.06ft),  Kilometerpoint: 30.578,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 570012,  Location: IN EAST CANTON (Lat: 34.238058,  Lng: -84.466069),  Route carried "under" structure: Interstate 575,  Structure Length: 0. m,  Average Daily Traffic: 32,200 (year 2007),  Truck Traffic: 1%,  Features Intersected: SR 20 EBL,  Facility Carried by Structure: SR 20 (EBL)
Minimum Vertical Clearance: 5.81m (19.06ft),  Kilometerpoint: 30.578,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 570013,  Location: IN EAST CANTON (Lat: 34.238319,  Lng: -84.466008),  Route carried "under" structure: Ramp Interstate 575,  Structure Length: 0. m,  Average Daily Traffic: 20,500 (year 2007),  Truck Traffic: 8%,  Features Intersected: SR 20 WBL,  Facility Carried by Structure: SR 20 (WBL)
Minimum Vertical Clearance: 5.63m (18.47ft),  Kilometerpoint: 30.578,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 570013,  Location: IN EAST CANTON (Lat: 34.238319,  Lng: -84.466008),  Route carried "under" structure: Interstate 575,  Structure Length: 0. m,  Average Daily Traffic: 20,500 (year 2007),  Truck Traffic: 8%,  Features Intersected: SR 20 WBL,  Facility Carried by Structure: SR 20 (WBL)
Minimum Vertical Clearance: 5.53m (18.14ft),  Kilometerpoint: 30.578,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 570013,  Location: IN EAST CANTON (Lat: 34.238319,  Lng: -84.466008),  Route carried "under" structure: Ramp Interstate 575,  Structure Length: 0. m,  Average Daily Traffic: 20,500 (year 2007),  Truck Traffic: 8%,  Features Intersected: SR 20 WBL,  Facility Carried by Structure: SR 20 (WBL)
Minimum Vertical Clearance: 5.84m (19.16ft),  Kilometerpoint: 30.578,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 570031,  Location: 1.5 MI N OF HOLLY SPRGS (Lat: 34.197400,  Lng: -84.501528),  Route carried "under" structure: Interstate 575,  Structure Length: 0. m,  Average Daily Traffic: 34,300 (year 1999),  Truck Traffic: 1%,  Features Intersected: CR 309 UNIVETER ROAD,  Facility Carried by Structure: UNIVETER ROAD
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 24.140,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 570032,  Location: IN SOUTH CANTON (Lat: 34.219997,  Lng: -84.491439),  Route carried "under" structure: State highway 20,  Structure Length: 0. m,  Average Daily Traffic: 16,400 (year 1999),  Truck Traffic: 1%,  Features Intersected: CR 341 KILLIAN STREET,  Facility Carried by Structure: KILLIAN STREET
Minimum Vertical Clearance: 7.11m (23.33ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 570032,  Location: IN SOUTH CANTON (Lat: 34.219997,  Lng: -84.491439),  Route carried "under" structure: Ramp State highway 20,  Structure Length: 0. m,  Average Daily Traffic: 2,200 (year 1990),  Truck Traffic: 1%,  Features Intersected: CR 341 KILLIAN STREET,  Facility Carried by Structure: KILLIAN STREET
Minimum Vertical Clearance: 5.74m (18.83ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 570033,  Location: 1.7 MI S OF CANTON (Lat: 34.211158,  Lng: -84.491989),  Route carried "under" structure: Interstate 575,  Structure Length: 0. m,  Average Daily Traffic: 34,300 (year 1999),  Truck Traffic: 1%,  Features Intersected: CR 333 MCHELEN ROAD,  Facility Carried by Structure: BRICK MILL ROAD
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 25.750,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 570046,  Location: IN SOUTH CANTON (Lat: 34.223519,  Lng: -84.484228),  Route carried "under" structure: State highway 140,  Structure Length: 0. m,  Average Daily Traffic: 6,550 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 417 (I-575) NBL,  Facility Carried by Structure: I-575 (NBL)
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 25.750,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 570047,  Location: IN SOUTH CANTON (Lat: 34.223689,  Lng: -84.484469),  Route carried "under" structure: State highway 140,  Structure Length: 0. m,  Average Daily Traffic: 6,550 (year 1995),  Truck Traffic: 1%,  Features Intersected: SR 417 (I-575) SBL,  Facility Carried by Structure: I-575 (SBL)
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 25.750,  Lanes on structure: 3,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 570055,  Location: TOP OF TRI LEVEL (Lat: 34.219569,  Lng: -84.489339),  Route carried "under" structure: State highway 20,  Structure Length: 0. m,  Average Daily Traffic: 2,810 (year 1999),  Truck Traffic: 1%,  Features Intersected: RMP I-575 TO SR 20 WBL
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 17.703,  Lanes on structure: 1,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 570071,  Location: IN SOUTH CANTON (Lat: 34.220889,  Lng: -84.496308),  Route carried "under" structure: State highway 20,  Structure Length: 0. m,  Average Daily Traffic: 16,400 (year 1999),  Truck Traffic: 1%,  Features Intersected: FAS 1375 MARIETTA STREET,  Facility Carried by Structure: MARIETTA STREET
Minimum Vertical Clearance: 9.52m (31.23ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 570076,  Location: 4.9 MI NE OF CANTON (Lat: 34.292228,  Lng: -84.436339),  Route carried "under" structure: Interstate 575,  Structure Length: 0. m,  Average Daily Traffic: 19,600 (year 1999),  Truck Traffic: 1%,  Features Intersected: CR 55 LOWER BETHANY RD,  Facility Carried by Structure: LOWER BETHANY RD
Minimum Vertical Clearance: 7.95m (26.08ft),  Kilometerpoint: 37.015,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 570077,  Location: 3.8 MI NE OF CANTON (Lat: 34.280878,  Lng: -84.450528),  Route carried "under" structure: Interstate 575,  Structure Length: 0. m,  Average Daily Traffic: 19,600 (year 1999),  Truck Traffic: 1%,  Features Intersected: CR 86 OLD PAGE PLACE RD,  Facility Carried by Structure: OLD PAGE PLACE RD
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 35.406,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 570078,  Location: 3.8 MI NE OF CANTON (Lat: 34.282389,  Lng: -84.450939),  Route carried "under" structure: Interstate 575,  Structure Length: 0. m,  Average Daily Traffic: 19,600 (year 1999),  Truck Traffic: 1%,  Features Intersected: CR 86 OLD PAGE PLACE RD.,  Facility Carried by Structure: OLD PAGE PLACE RD
Minimum Vertical Clearance: 6.22m (20.41ft),  Kilometerpoint: 35.406,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 570079,  Location: 3.2 MI NE OF CANTON (Lat: 34.276039,  Lng: -84.459619),  Route carried "under" structure: Interstate 575,  Structure Length: 0. m,  Average Daily Traffic: 19,600 (year 1999),  Truck Traffic: 1%,  Features Intersected: CR100 CHARLIE BURGESS DR,  Facility Carried by Structure: OLD VANDIEVER DR
Minimum Vertical Clearance: 5.30m (17.39ft),  Kilometerpoint: 35.406,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 57008,  Location: 3.2 MI NE OF CANTON (Lat: 34.274408,  Lng: -84.458978),  Route carried "under" structure: Interstate 575,  Structure Length: 0. m,  Average Daily Traffic: 19,600 (year 1999),  Truck Traffic: 1%,  Features Intersected: CR100 CHARLIE BURGESS DR,  Facility Carried by Structure: OLD VANDIEVER DR
Minimum Vertical Clearance: 5.20m (17.06ft),  Kilometerpoint: 35.406,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Discuss Canton, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.