Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Daytona Beach, Florida (FL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 86Number of bridges
  • 2,119ft / 646mTotal length
  • $17,201,000Total costs
  • 1,986,881Total average daily traffic
  • 264,547Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Daytona Beach
  • No street view available for this location

New bridges in Daytona Beach, FL - historical statistics
  • New bridges - historical statistics
  • 31940-1949
  • 11950-1959
  • 51960-1969
  • 31970-1979
  • 41980-1989
  • 111990-1999
  • 52000-2009
  • 532010-2019
  • 12020-2022
Reconstructed bridges in Daytona Beach, FL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 01980-1989
  • 11990-1999
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Daytona Beach, FL
Average Bridge Truck Traffic in Daytona Beach, FL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.4%Excellent
  • 48.6%Very good
  • 31.4%Good
  • 2.9%Satisfactory
  • 5.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.7%Very good
  • 65.7%Good
  • 2.9%Satisfactory
  • 5.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 25.7%Excellent
  • 37.1%Very good
  • 28.6%Good
  • 5.7%Satisfactory
  • 2.9%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.0%Very good
  • 48.0%Good
  • 48.0%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 42.9%Good
  • 50.0%Satisfactory
  • 7.1%Fair
Find on map >>   Show street view

Structure Number: 794038,  Location: 0.4 Mile West of I-95 (Lat: 29.217208,  Lng: -81.109453),  Route carried "on" structure: County highway ,  Year Built: 1968,  Status: Open,  Structure Length: 7.63m (25.03ft),  Average Daily Traffic: 10,300 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 17,871 (year 2042),  Design Load: HS 20,  Features Intersected: Tomoka River,  Facility Carried by Structure: LPGA Blvd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.124,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.6m (28.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 15.3m (50.2ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 71.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Underwater Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 794042,  Location: 0.1Mi S of LPGA Blvd (Lat: 29.245989,  Lng: -81.036514),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Open,  Structure Length: 0.96m (3.15ft),  Average Daily Traffic: 6,700 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,625 (year 2042),  Design Load: HS 20,  Features Intersected: Halifax Canal,  Facility Carried by Structure: Riverside Dr
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.182,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 58.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Underwater Inspection Date: April 2020
Find on map >>   Show street view

Structure Number: 794096,  Location: 1.4 miles North of US-92 (Lat: 29.214928,  Lng: -81.090986),  Route carried "on" structure: City street ,  Year Built: 1994,  Status: Open,  Structure Length: 1.24m (4.07ft),  Average Daily Traffic: 22,500 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 39,038 (year 2042),  Design Load: HS 20,  Features Intersected: 11th Street Canal,  Facility Carried by Structure: Williamson Blvd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 23.9m (78.4ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Underwater Inspection Date: April 2020
Find on map >>   Show street view

Structure Number: 79412,  Location: 0.25 Mi E of US-1 SR-5 (Lat: 29.208672,  Lng: -81.016683),  Route carried "on" structure: County highway ,  Year Built: 1989,  Status: Open,  Structure Length: 5.04m (16.54ft),  Average Daily Traffic: 7,900 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 13,707 (year 2042),  Design Load: HS 20,  Features Intersected: Halifax River,  Facility Carried by Structure: Orange Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.250,  Lanes on structure: 4,  Owner: County Highway Agency,  Approaching Roadway Width: 20.3m (66.6ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.5m (34.4ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 20.3m (66.6ft),  Out-to-Out Width: 25.5m (83.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 60.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Underwater Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 794189,  Location: 2.0 MI N of US-92 on I-95 (Lat: 29.197983,  Lng: -81.095794),  Route carried "on" structure: County highway ,  Year Built: 2011,  Status: Open,  Structure Length: 13.38m (43.90ft),  Average Daily Traffic: 4,900 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 8,502 (year 2042),  Design Load: HL 93,  Features Intersected: I-95,  Facility Carried by Structure: Dunn Avenue
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.327,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: County Highway Agency,  Approaching Roadway Width: 10.2m (33.5ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 37.5m (123.0ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 0.0m,  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 55.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 794198,  Location: 0.4Mi. West of SR-A1A (Lat: 29.211125,  Lng: -81.011131),  Route carried "on" structure: County highway 4050,  Year Built: 2020,  Status: Open,  Structure Length: 57.45m (188.48ft),  Average Daily Traffic: 7,900 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 13,706 (year 2042),  Design Load: HL 93,  Features Intersected: Halifax River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.763,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Navigation Control: Yes ( Vertical Clearance: 19.8m (65.0ft), Horizontal Clearance: 38.1m (125.0ft)),  Material/Design: Concrete,  Design/Construction: Arch - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 14,  Length of Maximum Span: 67.4m (221.1ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 23 months,  Underwater Inspection Frequency: Every 23 months,  Inspection Date: May 2020,  Underwater Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 795001,  Location: 10ft. East of Nova Road (Lat: 29.183861,  Lng: -81.029692),  Route carried "on" structure: City street ,  Year Built: 1986,  Status: Open,  Structure Length: 0.74m (2.43ft),  Average Daily Traffic: 1,082 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,878 (year 2042),  Design Load: H 10,  Features Intersected: Nova Canal,  Facility Carried by Structure: Woodcliff Drive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.024,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 35.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Underwater Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 790171,  Location: LPGA Blvd. at I-95 (Lat: 29.219964,  Lng: -81.103117),  Route carried "under" structure: Interstate 95,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 74,500 (year 2020),  Truck Traffic: 18%,  Features Intersected: I-95,  Facility Carried by Structure: LPGA Blvd
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 52.444,  Lanes on structure: 6,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.9m (111.2ft)

Find on map >>   Show street view

Structure Number: 790174,  Location: SR-430 WB - Halifax River (Lat: 29.231194,  Lng: -81.022419),  Route carried "under" structure: Business City street ,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2002),  Truck Traffic: 1%,  Features Intersected: IWW Halifax River,  Facility Carried by Structure: SR-430 WB
Minimum Vertical Clearance: 4.51m (14.80ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 75.3m (247.0ft)

Find on map >>   Show street view

Structure Number: 790174,  Location: SR-430 WB - Halifax River (Lat: 29.231194,  Lng: -81.022419),  Route carried "under" structure: Business City street ,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 4,100 (year 2020),  Truck Traffic: 5%,  Features Intersected: IWW Halifax River,  Facility Carried by Structure: SR-430 WB
Minimum Vertical Clearance: 6.46m (21.19ft),  Kilometerpoint: 2.496,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 75.3m (247.0ft)

Find on map >>   Show street view

Structure Number: 790175,  Location: SR-430 EB - Halifax River (Lat: 29.230319,  Lng: -81.021817),  Route carried "under" structure: Business City street ,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 4,100 (year 2020),  Truck Traffic: 5%,  Features Intersected: IWW Halifax River,  Facility Carried by Structure: SR-430 EB
Minimum Vertical Clearance: 6.55m (21.49ft),  Kilometerpoint: 2.464,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Length of Maximum Span: 75.3m (247.0ft)

Find on map >>   Show street view

Structure Number: 790192,  Location: I-4/I-95 Intchg (Lat: 29.155736,  Lng: -81.075828),  Route carried "under" structure: Ramp Interstate ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 2,450 (year 2020),  Truck Traffic: 9%,  Features Intersected: I-95,  Facility Carried by Structure: I-4 WB
Minimum Vertical Clearance: 7.28m (23.88ft),  Kilometerpoint: 2.873,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.3m (135.5ft)

Find on map >>   Show street view

Structure Number: 790192,  Location: I-4/I-95 Intchg (Lat: 29.155736,  Lng: -81.075828),  Route carried "under" structure: Ramp Interstate ,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 2,450 (year 2020),  Truck Traffic: 9%,  Features Intersected: I-95,  Facility Carried by Structure: I-4 WB
Minimum Vertical Clearance: 18.17m (59.61ft),  Kilometerpoint: 0.410,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.3m (135.5ft)

Find on map >>   Show street view

Structure Number: 790192,  Location: I-4/I-95 Intchg (Lat: 29.155736,  Lng: -81.075828),  Route carried "under" structure: Interstate 95,  Year Built: 2019,  Structure Length: 0. m,  Average Daily Traffic: 74,500 (year 2020),  Truck Traffic: 17%,  Features Intersected: I-95,  Facility Carried by Structure: I-4 WB
Minimum Vertical Clearance: 6.52m (21.39ft),  Kilometerpoint: 43.549,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.3m (135.5ft)

Find on map >>   Show street view

Structure Number: 790208,  Location: I-4 EB Ramp A to US-92 (Lat: 29.136944,  Lng: -81.118611),  Route carried "under" structure: Interstate 4,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 25,500 (year 2020),  Truck Traffic: 19%,  Features Intersected: I-4
Minimum Vertical Clearance: 7.86m (25.79ft),  Kilometerpoint: 39.939,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 49.1m (161.1ft)

Find on map >>   Show street view

Structure Number: 79023,  Location: I-4/I-95 Interchange (Lat: 29.155083,  Lng: -81.075472),  Route carried "under" structure: Interstate 95,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 74,500 (year 2020),  Truck Traffic: 18%,  Features Intersected: I-95,  Facility Carried by Structure: I-4 Eastbound
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 44.820,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.0m (131.2ft)

Find on map >>   Show street view

Structure Number: 79023,  Location: I-4/I-95 Interchange (Lat: 29.155083,  Lng: -81.075472),  Route carried "under" structure: Ramp Interstate 95,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 2,450 (year 2020),  Truck Traffic: 9%,  Features Intersected: I-95,  Facility Carried by Structure: I-4 Eastbound
Minimum Vertical Clearance: 6.98m (22.90ft),  Kilometerpoint: 2.953,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.0m (131.2ft)

Find on map >>   Show street view

Structure Number: 79023,  Location: I-4/I-95 Interchange (Lat: 29.155083,  Lng: -81.075472),  Route carried "under" structure: Ramp Interstate 95,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 2,450 (year 2020),  Truck Traffic: 9%,  Features Intersected: I-95,  Facility Carried by Structure: I-4 Eastbound
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.335,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.0m (131.2ft)

Find on map >>   Show street view

Structure Number: 790231,  Location: I-4/I-95 Interchange (Lat: 29.157258,  Lng: -81.076758),  Route carried "under" structure: Interstate 95,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 74,500 (year 2020),  Truck Traffic: 18%,  Features Intersected: I-95
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 45.123,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 51.5m (169.0ft)

Find on map >>   Show street view

Structure Number: 790231,  Location: I-4/I-95 Interchange (Lat: 29.157258,  Lng: -81.076758),  Route carried "under" structure: Ramp Interstate 95,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 2,450 (year 2020),  Truck Traffic: 9%,  Features Intersected: I-95
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 2.375,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 51.5m (169.0ft)

Find on map >>   Show street view

Structure Number: 790232,  Location: I-4/I-95 Interchange (Lat: 29.154778,  Lng: -81.078528),  Route carried "under" structure: Ramp Interstate 4,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 15,500 (year 2020),  Truck Traffic: 21%,  Features Intersected: I-4 WB,  Facility Carried by Structure: Ramp AC
Minimum Vertical Clearance: 5.30m (17.39ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 54.0m (177.2ft)

Find on map >>   Show street view

Structure Number: 790233,  Location: I-4/I-95 Interchange (Lat: 29.154056,  Lng: -81.077583),  Route carried "under" structure: Ramp Interstate 95,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 2020),  Truck Traffic: 18%,  Features Intersected: Ramp F2 & Ramp H1,  Facility Carried by Structure: I-4 Eastbound
Minimum Vertical Clearance: 6.28m (20.60ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.0m (164.0ft)

Find on map >>   Show street view

Structure Number: 790233,  Location: I-4/I-95 Interchange (Lat: 29.154056,  Lng: -81.077583),  Route carried "under" structure: Ramp Interstate 95,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2020),  Truck Traffic: 18%,  Features Intersected: Ramp F2 & Ramp H1,  Facility Carried by Structure: I-4 Eastbound
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 44.339,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.0m (164.0ft)

Find on map >>   Show street view

Structure Number: 790234,  Location: I-95 SB over US-92 (Lat: 29.171825,  Lng: -81.084514),  Route carried "under" structure: US 92,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2020),  Truck Traffic: 5%,  Features Intersected: US-92,  Facility Carried by Structure: I-95 SB
Minimum Vertical Clearance: 7.53m (24.70ft),  Kilometerpoint: 25.606,  Lanes on structure: 3,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.8m (150.3ft)

Find on map >>   Show street view

Structure Number: 790235,  Location: I-95 NB over US-92 (Lat: 29.171997,  Lng: -81.084339),  Route carried "under" structure: US 92,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2020),  Truck Traffic: 5%,  Features Intersected: US-92,  Facility Carried by Structure: I-95 NB
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 25.629,  Lanes on structure: 3,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.4m (149.0ft)

Find on map >>   Show street view

Structure Number: 790236,  Location: I-95 SBCD over US-92 (Lat: 29.171653,  Lng: -81.084611),  Route carried "under" structure: US 92,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2020),  Truck Traffic: 5%,  Features Intersected: US-92,  Facility Carried by Structure: I-95 SBCD
Minimum Vertical Clearance: 7.92m (25.98ft),  Kilometerpoint: 25.595,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.3m (151.9ft)

Find on map >>   Show street view

Structure Number: 790237,  Location: I-95 NB over US-92 (Lat: 29.172225,  Lng: -81.084269),  Route carried "under" structure: US 92,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2020),  Truck Traffic: 5%,  Features Intersected: US-92,  Facility Carried by Structure: I-95 NB
Minimum Vertical Clearance: 7.65m (25.10ft),  Kilometerpoint: 25.647,  Lanes on structure: 3,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.9m (150.6ft)

Find on map >>   Show street view

Structure Number: 790238,  Location: I-95/US-92 Interchange (Lat: 29.171389,  Lng: -81.084761),  Route carried "under" structure: US 92,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 5,700 (year 2018),  Truck Traffic: 18%,  Features Intersected: I-95 & US-92,  Facility Carried by Structure: Ramp J2 & K2
Minimum Vertical Clearance: 7.59m (24.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.9m (137.5ft)

Find on map >>   Show street view

Structure Number: 790239,  Location: I95NB over I95SB On Ramp (Lat: 29.173644,  Lng: -81.085181),  Route carried "under" structure: Ramp US 92,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 6,100 (year 2020),  Truck Traffic: 5%,  Features Intersected: Ramp J2,  Facility Carried by Structure: I-95 NB CD
Minimum Vertical Clearance: 7.50m (24.61ft),  Kilometerpoint: 0.153,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 79024,  Location: Tomoka Farms Rd over I-4 (Lat: 29.152222,  Lng: -81.082778),  Route carried "under" structure: Interstate 4,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 51,000 (year 2020),  Truck Traffic: 19%,  Features Intersected: I-4,  Facility Carried by Structure: Tomoka Farms Road
Minimum Vertical Clearance: 7.28m (23.88ft),  Kilometerpoint: 43.830,  Lanes on structure: 2,  Lanes under structure: 9,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>   Show street view

Structure Number: 790241,  Location: Bellevue Avenue over I-95 (Lat: 29.167778,  Lng: -81.082778),  Route carried "under" structure: Ramp Interstate 95,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 2,450 (year 2020),  Truck Traffic: 9%,  Features Intersected: I-95,  Facility Carried by Structure: Bellevue Avenue
Minimum Vertical Clearance: 7.25m (23.79ft),  Kilometerpoint: 1.933,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.9m (147.3ft)

Find on map >>   Show street view

Structure Number: 790241,  Location: Bellevue Avenue over I-95 (Lat: 29.167778,  Lng: -81.082778),  Route carried "under" structure: Ramp Interstate 95,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 2,450 (year 2020),  Truck Traffic: 9%,  Features Intersected: I-95,  Facility Carried by Structure: Bellevue Avenue
Minimum Vertical Clearance: 7.44m (24.41ft),  Kilometerpoint: 1.363,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.9m (147.3ft)

Find on map >>   Show street view

Structure Number: 790241,  Location: Bellevue Avenue over I-95 (Lat: 29.167778,  Lng: -81.082778),  Route carried "under" structure: Interstate 95,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 74,500 (year 2020),  Truck Traffic: 18%,  Features Intersected: I-95,  Facility Carried by Structure: Bellevue Avenue
Minimum Vertical Clearance: 5.76m (18.90ft),  Kilometerpoint: 46.347,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.9m (147.3ft)

Find on map >>   Show street view

Structure Number: 790244,  Location: I95SB over I95SB On Ramp (Lat: 29.173194,  Lng: -81.085569),  Route carried "under" structure: Ramp US 92,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 6,100 (year 2020),  Truck Traffic: 5%,  Features Intersected: Ramp J2,  Facility Carried by Structure: I-95 SBCD
Minimum Vertical Clearance: 6.95m (22.80ft),  Kilometerpoint: 0.214,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.1m (85.6ft)

Find on map >>   Show street view

Structure Number: 790248,  Location: I-4 Connector over US-92 (Lat: 29.144431,  Lng: -81.118278),  Route carried "under" structure: Interstate 92,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 18,900 (year 2020),  Truck Traffic: 7%,  Features Intersected: US 92,  Facility Carried by Structure: I-4 Ramp B
Minimum Vertical Clearance: 6.61m (21.69ft),  Kilometerpoint: 21.127,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 55.6m (182.4ft)

Find on map >>   Show street view

Structure Number: 790252,  Location: I95SB over I95SB On Ramp (Lat: 29.173342,  Lng: -81.085500),  Route carried "under" structure: Ramp US 92,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 6,100 (year 2020),  Truck Traffic: 5%,  Features Intersected: Ramp J2,  Facility Carried by Structure: I-95 SB
Minimum Vertical Clearance: 7.41m (24.31ft),  Kilometerpoint: 0.192,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 790253,  Location: I-95NB over I-95SB OnRamp (Lat: 29.173528,  Lng: -81.085333),  Route carried "under" structure: Ramp US 92,  Year Built: 2017,  Structure Length: 0. m,  Average Daily Traffic: 6,100 (year 2020),  Truck Traffic: 18%,  Features Intersected: Ramp J2,  Facility Carried by Structure: I-95 NB
Minimum Vertical Clearance: 7.44m (24.41ft),  Kilometerpoint: 0.169,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 794097,  Location: 0.5 mile South of US-92 (Lat: 29.190972,  Lng: -81.049139),  Route carried "under" structure: State highway 483,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 32,000 (year 2020),  Truck Traffic: 5%,  Features Intersected: Clyde Morris Blvd.,  Facility Carried by Structure: Pedestrian Ovrpass
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 2.620,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 219.5m (720.1ft)

Find on map >>   Show street view

Structure Number: 794187,  Location: Ocean Walk Ped Br - AIA (Lat: 29.231111,  Lng: -81.010833),  Route carried "under" structure: State highway A1A,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 26,000 (year 2020),  Truck Traffic: 6%,  Features Intersected: SR-A1A,  Facility Carried by Structure: Pedestrian Bridge
Minimum Vertical Clearance: 5.55m (18.21ft),  Kilometerpoint: 3.376,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 794189,  Location: 2.0 MI N of US-92 on I-95 (Lat: 29.197983,  Lng: -81.095794),  Route carried "under" structure: Interstate 5,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 74,500 (year 2020),  Truck Traffic: 18%,  Features Intersected: I-95,  Facility Carried by Structure: Dunn Avenue
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 50.043,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.5m (123.0ft)

Find on map >>   Show street view

Structure Number: 794189,  Location: 2.0 MI N of US-92 on I-95 (Lat: 29.197983,  Lng: -81.095794),  Route carried "under" structure: County highway ,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 9,900 (year 2020),  Truck Traffic: 9%,  Features Intersected: I-95,  Facility Carried by Structure: Dunn Avenue
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 3.508,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.5m (123.0ft)

Find on map >>   Show street view

Structure Number: 79509,  Location: 500ft W of Indust Pkwy (Lat: 29.191083,  Lng: -81.072028),  Route carried "under" structure: US 92,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 43,760 (year 2020),  Truck Traffic: 5%,  Features Intersected: US-92 Int Spdwy Bl,  Facility Carried by Structure: Pedestrian Overpas
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 28.147,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 64.0m (210.0ft)

Find on map >>   Show street view

Structure Number: 795091,  Location: 750' W Bill France Blvd (Lat: 29.192214,  Lng: -81.069042),  Route carried "under" structure: ServiceOther road ,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 20 (year 2018),  Features Intersected: US-92 Int Speedway Blvd,  Facility Carried by Structure: Pedestrian Overpas
Minimum Vertical Clearance: 5.70m (18.70ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 55.5m (182.1ft)

Find on map >>   Show street view

Structure Number: 795091,  Location: 750' W Bill France Blvd (Lat: 29.192214,  Lng: -81.069042),  Route carried "under" structure: US 92,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 45,000 (year 2020),  Truck Traffic: 6%,  Features Intersected: US-92 Int Speedway Blvd,  Facility Carried by Structure: Pedestrian Overpas
Minimum Vertical Clearance: 5.82m (19.09ft),  Kilometerpoint: 28.469,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 55.5m (182.1ft)

Discuss Daytona Beach, Florida (FL) on our hugely popular Florida forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.