Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Eastman, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 167ft / 50.7mTotal length
  • $9,833,000Total costs
  • 32,270Total average daily traffic
  • 2,143Total average daily truck traffic
  • 48,405Total future (year 2032) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Eastman
  • No street view available for this location

New bridges in Eastman, GA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 21940-1949
  • 21950-1959
  • 21960-1969
  • 21970-1979
  • 61990-1999
  • 12000-2009
Reconstructed bridges in Eastman, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 11990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Eastman, GA
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 85.7%Good
  • 14.3%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 56.3%Very good
  • 37.5%Good
  • 6.3%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 77.8%Good
  • 22.2%Satisfactory
Find on map >>   Show street view

Structure Number: 910001,  Location: 2 MI W OF EASTMAN (Lat: 32.197478,  Lng: -83.216008),  Route carried "on" structure: US 341,  Year Built: 1959,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 3,750 (year 2012),  Truck Traffic: 13%,  Average Future Daily Traffic: 5,625 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SUGAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 32.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2021,  Underwater Inspection Date: January 2021,  Bridge Improvement Cost: $328,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $492,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 910002,  Location: IN EASTMAN CITY LIMITS (Lat: 32.196597,  Lng: -83.196169),  Route carried "on" structure: Business US 341,  Year Built: 1959,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 2,970 (year 2012),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,455 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SUGAR CREEK TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 910008,  Location: 5.1 MI E OF EASTMAN (Lat: 32.208311,  Lng: -83.092558),  Route carried "on" structure: State highway 46,  Year Built: 1939,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,060 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,590 (year 2032),  Design Load: H 15,  Features Intersected: LITTLE CREEK TRIB,  Facility Carried by Structure: EASTMAN-SOPERTON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 44.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 910019,  Location: 6 MI NE OF EASTMAN (Lat: 32.270417,  Lng: -83.121633),  Route carried "on" structure: State highway 117,  Year Built: 1942,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,520 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,280 (year 2032),  Design Load: H 15,  Features Intersected: GUM SWAMP CREEK TRIB,  Facility Carried by Structure: EASTMAN DUBLIN HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.843,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 41.27m (135.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $188,000
Find on map >>   Show street view

Structure Number: 910033,  Location: 2.9 MI N OF EASTMAN (Lat: 32.241389,  Lng: -83.178158),  Route carried "on" structure: County highway 653,  Year Built: 1948,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 1,350 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,025 (year 2032),  Design Load: H 15,  Features Intersected: CROOKED BRANCH,  Facility Carried by Structure: CHESTER-EASTMAN HY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $254,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $381,000
Find on map >>   Show street view

Structure Number: 910038,  Location: 2.4 MI E OF EASTMAN (Lat: 32.204778,  Lng: -83.136928),  Route carried "on" structure: State highway 46,  Year Built: 1992,  Status: Open,  Structure Length: 9.27m (30.41ft),  Average Daily Traffic: 4,150 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,225 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: GUM SWAMP CREEK,  Facility Carried by Structure: EASTMAN-SOPERTON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.437,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2021,  Underwater Inspection Date: January 2021,  Bridge Improvement Cost: $1,188,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $1,782,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 910039,  Location: 3.2 MI N OF EASTMAN (Lat: 32.237519,  Lng: -83.148519),  Route carried "on" structure: State highway 117,  Year Built: 1993,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 2,650 (year 2012),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,975 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CROOKED BRANCH,  Facility Carried by Structure: EASTMAN DUBLIN HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.015,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Inventory Rating: 66.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $168,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $252,000
Find on map >>   Show street view

Structure Number: 91004,  Location: 4.5 MI NE OF EASTMAN (Lat: 32.254639,  Lng: -83.140139),  Route carried "on" structure: State highway 117,  Year Built: 1993,  Status: Open,  Structure Length: 9.75m (31.99ft),  Average Daily Traffic: 2,650 (year 2012),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,975 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: GUM SWAMP CREEK,  Facility Carried by Structure: EASTMAN DUBLIN HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.624,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2021,  Underwater Inspection Date: January 2021,  Bridge Improvement Cost: $1,250,000,  Roadway Improvement Cost: $125,000,  Total Project Cost: $1,875,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 910041,  Location: 2 MI W OF EASTMAN (Lat: 32.197669,  Lng: -83.215997),  Route carried "on" structure: US 341,  Year Built: 1993,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 3,750 (year 2012),  Truck Traffic: 13%,  Average Future Daily Traffic: 5,625 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SUGAR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2021,  Underwater Inspection Date: January 2021,  Bridge Improvement Cost: $328,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $492,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 910043,  Location: 1 MI SW OF EASTMAN (Lat: 32.183894,  Lng: -83.197111),  Route carried "on" structure: US 341,  Year Built: 1994,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 3,000 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,500 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SUGAR CREEK TRIB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2021,  Underwater Inspection Date: January 2021,  Bridge Improvement Cost: $163,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $245,000
Find on map >>   Show street view

Structure Number: 915006,  Location: 4 MI SE OF EASTMAN (Lat: 32.145897,  Lng: -83.149761),  Route carried "on" structure: County highway 49,  Year Built: 1970,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: SUGAR CREEK,  Facility Carried by Structure: HARRY HARGROVE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 47.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.48m (31.10ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2021,  Underwater Inspection Date: January 2021,  Bridge Improvement Cost: $391,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $586,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 91501,  Location: 3.3 MI N OF EASTMAN (Lat: 32.247153,  Lng: -83.182267),  Route carried "on" structure: County highway 139,  Year Built: 1974,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: CROOKED BRANCH,  Facility Carried by Structure: BEN GIDDENS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $152,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $229,000
Find on map >>   Show street view

Structure Number: 915014,  Location: 5 MI E OF EASTMAN (Lat: 32.207819,  Lng: -83.092819),  Route carried "on" structure: County highway 200,  Year Built: 1960,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: LITTLE CREEK TRIB,  Facility Carried by Structure: REEDY BRANCH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 915018,  Location: 5.4 MI E OF EASTMAN (Lat: 32.174789,  Lng: -83.088789),  Route carried "on" structure: County highway 346,  Year Built: 1966,  Status: Posted for load,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: GUM SWAMP CREEK,  Facility Carried by Structure: W.P.A. ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $821,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $1,231,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 91502,  Location: 1.8 MI S OF EASTMAN (Lat: 32.182958,  Lng: -83.203019),  Route carried "on" structure: County highway 357,  Year Built: 1994,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 490 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 735 (year 2032),  Design Load: H 15,  Features Intersected: SUGAR CREEK,  Facility Carried by Structure: 9TH AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.484,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $164,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $246,000
Find on map >>   Show street view

Structure Number: 915022,  Location: 1.8 MI S OF EASTMAN (Lat: 32.171922,  Lng: -83.181617),  Route carried "on" structure: State highway 87,  Year Built: 2007,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 2,970 (year 2012),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,455 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SUGAR CREEK,  Facility Carried by Structure: EASTMAN-RHINE HWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.531,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $938,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,407,000,  Deck Structure Type: Concrete Cast-file-Place
Discuss Eastman, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.