![]() |
Bridge Statistics for Etna, Pennsylvania (PA) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Etna, PA, Pennsylvania, Pennsylvania forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 39 Total length: 731 meters (2,398ft) Total costs: $10,697,000 Total average daily traffic: 408,789 Total average daily truck traffic: 19,411 National Bridge Inventory (NBI) Registered Bridges for Etna
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Find on map >>
Structure Number: 2000801802416, Location: NORTH OF 62ND ST.BRIDGE (Lat: 40.494889, Lng: -79.939639), Route carried "on" structure: State highway 8, Year Built: 1960, Year Reconstructed: 1985, Status: Open, Structure Length: 23.53m (77.20ft), Average Daily Traffic: 12,882 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 17,000 (year 2025), Design Load: H 15, Features Intersected: RT.28,RAILROAD,LOCAL ST., Facility Carried by Structure: 62ND ST BR NB RAMP Minimum Vertical Clearance: 4.60m (15.09ft), Kilometerpoint: 10.636, Lanes on structure: 1, Lanes under structure: 20, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 5.8m (19.0ft), Skew: 9 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 11, Length of Maximum Span: 26.8m (87.9ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 6.0m (19.7ft), Out-to-Out Width: 7.1m (23.3ft) Condition: Deck: Good, Superstructure: Good, Substructure: Fair, Operating Rating: 55.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 23.93m (78.51ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $102,000, Roadway Improvement Cost: $299,000, Total Project Cost: $1,372,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 2000801812418, Location: JUST NORTH OF 62ND ST.BR. (Lat: 40.494806, Lng: -79.939817), Route carried "on" structure: Ramp State highway 8, Year Built: 1960, Year Reconstructed: 1985, Status: Open, Structure Length: 21.28m (69.82ft), Average Daily Traffic: 13,158 (year 2007), Truck Traffic: 5%, Average Future Daily Traffic: 20,000 (year 2025), Design Load: H 15, Features Intersected: 70 PAR 72 LOCAL RR, Facility Carried by Structure: 62ND ST BR APPR Minimum Vertical Clearance: 4.45m (14.60ft), Kilometerpoint: 10.636, Lanes on structure: 1, Lanes under structure: 21, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 6.4m (21.0ft), Skew: 9 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 11, Length of Maximum Span: 25.9m (85.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 7.5m (24.6ft) Condition: Deck: Good, Superstructure: Good, Substructure: Fair, Operating Rating: 55.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 21.79m (71.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $77,000, Roadway Improvement Cost: $226,000, Total Project Cost: $1,037,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 2002801211214, Location: ETNA OVER LR 70-BUTLER ST (Lat: 40.492167, Lng: -79.950414), Route carried "on" structure: State highway 28, Year Built: 1960, Year Reconstructed: 2005, Status: Open, Structure Length: 11.95m (39.21ft), Average Daily Traffic: 32,174 (year 2007), Truck Traffic: 7%, Average Future Daily Traffic: 35,000 (year 2026), Design Load: H 15, Features Intersected: LR 70-BUTLER ST. Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 6.199, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 9 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 36.6m (120.1ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 13.3m (43.6ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 68.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Better than present minimum criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 2002801300675, Location: ETNA BORO OVER B&O RR. (Lat: 40.493861, Lng: -79.944125), Route carried "on" structure: State highway 28, Year Built: 1960, Status: Open, Structure Length: 12.22m (40.09ft), Average Daily Traffic: 62,087 (year 2007), Truck Traffic: 7%, Average Future Daily Traffic: 74,000 (year 2020), Design Load: H 15, Features Intersected: CSX RAILROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 6.896, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 20.7m (67.9ft), Skew: 29 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 1, Length of Maximum Span: 33.2m (108.9ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 0.6m (2.0ft), Curb-To-Curb Width: 15.8m (51.8ft), Out-to-Out Width: 17.8m (58.4ft) Condition: Deck: Poor, Superstructure: Fair, Substructure: Poor, Operating Rating: 39.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 23.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 12.22m (40.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $149,000, Roadway Improvement Cost: $439,000, Total Project Cost: $2,012,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 20028014, Location: ETNA INTERCHANGE NB (Lat: 40.495111, Lng: -79.940758), Route carried "on" structure: State highway 28, Year Built: 1960, Status: Open, Structure Length: 26.70m (87.60ft), Average Daily Traffic: 24,531 (year 2008), Truck Traffic: 6%, Average Future Daily Traffic: 32,000 (year 2025), Design Load: H 15, Features Intersected: RT.8 NB-SB,N.MAIN,RR SP., Facility Carried by Structure: ETNA BP Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 7.419, Lanes on structure: 1, Lanes under structure: 24, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 8.2m (26.9ft), Skew: 9 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 10, Length of Maximum Span: 36.0m (118.1ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 0.6m (2.0ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 9.4m (30.8ft) Condition: Deck: Poor, Superstructure: Poor, Substructure: Poor, Channel: Very good, Operating Rating: 51.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 30.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 26.70m (87.60ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Bridge Improvement Cost: $74,000, Roadway Improvement Cost: $217,000, Total Project Cost: $994,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 200280141, Location: ETNA INTERCHANGE SB (Lat: 40.495139, Lng: -79.941347), Route carried "on" structure: State highway 28, Year Built: 1960, Year Reconstructed: 2001, Status: Open, Structure Length: 31.88m (104.59ft), Average Daily Traffic: 25,895 (year 2008), Truck Traffic: 5%, Average Future Daily Traffic: 25,000 (year 2022), Design Load: H 15, Features Intersected: RT 8 NB/SB, RT 8 RMPS Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 7.395, Lanes on structure: 1, Lanes under structure: 48, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 9.8m (32.2ft), Skew: 9 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 11, Number Of Approach Spans: 1, Length of Maximum Span: 31.1m (102.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 9.8m (32.2ft), Out-to-Out Width: 10.6m (34.8ft) Condition: Deck: Satisfactory, Superstructure: Very good, Substructure: Good, Channel: Very good, Operating Rating: 74.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 44.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 210010040108, Location: AT ETNA INTERCHANGE (Lat: 40.496000, Lng: -79.940578), Route carried "on" structure: State highway , Year Built: 1955, Status: Open, Structure Length: 2.71m (8.89ft), Average Daily Traffic: 9,736 (year 2007), Truck Traffic: 2%, Average Future Daily Traffic: 75,000 (year 2022), Design Load: H 15, Features Intersected: PINE CREEK, Facility Carried by Structure: BRIDGE ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.703, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 10.4m (34.1ft), Skew: 9 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Length of Maximum Span: 13.1m (43.0ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 1.8m (5.9ft), Curb-To-Curb Width: 10.3m (33.8ft), Out-to-Out Width: 14.8m (48.6ft) Condition: Deck: Poor, Superstructure: Satisfactory, Substructure: Fair, Channel: Satisfactory, Operating Rating: 77.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 46.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.71m (8.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $37,000, Roadway Improvement Cost: $108,000, Total Project Cost: $495,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 2401700050194, Location: 200' W of rte 8 millvale (Lat: 40.505556, Lng: -79.950000), Route carried "on" structure: State highway , Year Built: 2007, Status: Open, Structure Length: 1.86m (6.10ft), Average Daily Traffic: 4,648 (year 2008), Truck Traffic: 5%, Design Load: H 15, Features Intersected: Pine Creek, Facility Carried by Structure: Grant Ave Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 13.3m (43.6ft), Skew: 9 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 16.8m (55.1ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.8m (5.9ft), Curb-To-Curb Width: 13.3m (43.6ft), Out-to-Out Width: 13.4m (44.0ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Very good, Channel: Very good, Operating Rating: 91.6 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR), Inventory Rating: 70.8 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR), Structural Evaluation: Equal to present desirable criteria, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Better than present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: June 2007, Bridge Improvement Cost: $-1,000, Roadway Improvement Cost: $-1,000, Total Project Cost: $-1,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 2401900041838, Location: AT PANTONES AUTOPARTS (Lat: 40.501250, Lng: -79.944658), Route carried "on" structure: State highway , Year Built: 1927, Year Reconstructed: 1978, Status: Open, Structure Length: 2.62m (8.60ft), Average Daily Traffic: 14,037 (year 2008), Truck Traffic: 5%, Average Future Daily Traffic: 16,000 (year 2025), Design Load: H 15, Features Intersected: PINE CREEK, Facility Carried by Structure: BUTLER ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 3, Owner: State Highway Agency, Approaching Roadway Width: 12.2m (40.0ft), Skew: 3 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Number Of Spans In Main Unit: 2, Length of Maximum Span: 12.5m (41.0ft), Curb or Sidewalk Widths: Left: 2.7m (8.9ft), Right: 2.7m (8.9ft), Curb-To-Curb Width: 12.2m (40.0ft), Out-to-Out Width: 19.3m (63.3ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Fair, Channel: Satisfactory, Inventory Rating: 49.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $8,000, Roadway Improvement Cost: $25,000, Total Project Cost: $109,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 2401900101001, Location: 150' S.E. OF SR 4017 (Lat: 40.502972, Lng: -79.948525), Route carried "on" structure: State highway , Year Built: 1979, Status: Open, Structure Length: 2.10m (6.89ft), Average Daily Traffic: 11,448 (year 2008), Truck Traffic: 5%, Average Future Daily Traffic: 26,500 (year 2026), Design Load: H 15, Features Intersected: PINE CREEK, Facility Carried by Structure: CRESENT AV Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.658, Lanes on structure: 2, Owner: State Highway Agency, Approaching Roadway Width: 9.8m (32.2ft), Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 18.6m (61.0ft), Curb or Sidewalk Widths: Left: 2.1m (6.9ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 8.5m (27.9ft), Out-to-Out Width: 11.9m (39.0ft) Condition: Deck: Good, Superstructure: Good, Substructure: Fair, Channel: Satisfactory, Inventory Rating: 52.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $13,000, Roadway Improvement Cost: $41,000, Total Project Cost: $179,000, Deck Structure Type: Other, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 2743000001001, Location: 430001 GREELEY ST. BRIDGE (Lat: 40.500000, Lng: -79.945000), Route carried "on" structure: City street , Year Built: 1985, Status: Posted for load, Structure Length: 1.10m (3.61ft), Average Daily Traffic: 250 (year 2006), Truck Traffic: 5%, Average Future Daily Traffic: 270 (year 2026), Design Load: H 15, Features Intersected: LITTLE PINE CREEK WEST, Facility Carried by Structure: GREELEY ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 3.7m (12.1ft), Skew: 2 degrees, Material/Design: Prestressed concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 10.4m (34.1ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 5.4m (17.7ft), Out-to-Out Width: 6.2m (20.3ft) Condition: Deck: Fair, Superstructure: Critical, Substructure: Good, Channel: Very good, Operating Rating: 13.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Structural Evaluation: High priority of replacement, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 1.10m (3.61ft), Designated Inspection Frequency: Every 12 months, Inspection Date: April 2008, Bridge Improvement Cost: $3,000, Roadway Improvement Cost: $25,000, Total Project Cost: $43,000, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 2743000001002, Location: 430002 DEWEY ST BRIDGE (Lat: 40.503333, Lng: -79.954667), Route carried "on" structure: City street , Year Built: 1981, Status: Posted for load, Structure Length: 1.31m (4.30ft), Average Daily Traffic: 500 (year 2006), Truck Traffic: 5%, Average Future Daily Traffic: 550 (year 2026), Design Load: H 15, Features Intersected: LITTLE PINE CREEK, Facility Carried by Structure: DEWEY ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Skew: 4 degrees, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.5m (41.0ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 2.3m (7.5ft), Curb-To-Curb Width: 8.0m (26.2ft), Out-to-Out Width: 12.1m (39.7ft) Condition: Deck: Satisfactory, Superstructure: Fair, Substructure: Fair, Channel: Good, Operating Rating: 10.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 6.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of replacement, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 1.31m (4.30ft), Designated Inspection Frequency: Every 12 months, Inspection Date: April 2008, Bridge Improvement Cost: $29,000, Roadway Improvement Cost: $85,000, Total Project Cost: $389,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 2743000001004, Location: 430004 HAFNER ST BRIDGE (Lat: 40.494139, Lng: -79.941722), Route carried "on" structure: City street , Year Built: 1955, Status: Open, Structure Length: 3.35m (10.99ft), Average Daily Traffic: 100 (year 2005), Truck Traffic: 5%, Average Future Daily Traffic: 100 (year 2025), Design Load: H 15, Features Intersected: PINE CREEK, Facility Carried by Structure: HAFNER ST Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 32.6m (107.0ft), Curb-To-Curb Width: 6.1m (20.0ft), Out-to-Out Width: 6.7m (22.0ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 67.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 3.40m (11.15ft), Designated Inspection Frequency: Every 24 months, Underwater Inspection Frequency: Every 24 months, Inspection Date: July 2007, Underwater Inspection Date: July 2003, Bridge Improvement Cost: $10,000, Roadway Improvement Cost: $28,000, Total Project Cost: $129,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 280420250052, Location: N.B.OFF RP.@ SHARPSBURG (Lat: 40.493333, Lng: -79.936667), Route carried "on" structure: Ramp State highway , Year Built: 1957, Status: Open, Structure Length: 4.27m (14.01ft), Average Daily Traffic: 3,059 (year 2008), Truck Traffic: 7%, Average Future Daily Traffic: 3,300 (year 2025), Design Load: H 15, Features Intersected: PINE CREEK, Facility Carried by Structure: RAMP T RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: State Highway Agency, Approaching Roadway Width: 5.5m (18.0ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 41.5m (136.2ft), Curb or Sidewalk Widths: Left: 0.6m (2.0ft), Right: 0.6m (2.0ft), Curb-To-Curb Width: 5.5m (18.0ft), Out-to-Out Width: 7.6m (24.9ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Poor, Channel: Good, Inventory Rating: 56.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: Meets minimum limits, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.27m (14.01ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $19,000, Roadway Improvement Cost: $56,000, Total Project Cost: $257,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 2804202600409, Location: ETNA-28 N.B. RAMP TO RT 8 (Lat: 40.491667, Lng: -79.941667), Route carried "on" structure: State highway , Year Built: 1963, Status: Open, Structure Length: 16.18m (53.08ft), Average Daily Traffic: 7,687 (year 2008), Truck Traffic: 3%, Average Future Daily Traffic: 7,450 (year 2020), Design Load: H 15, Features Intersected: RAMP, BRIDGE ST.,CSX R/R, Facility Carried by Structure: RAMP 28 NB TO 8 NB Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 15, Owner: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 9 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 2, Number Of Approach Spans: 5, Length of Maximum Span: 30.5m (100.1ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.6m (2.0ft), Curb-To-Curb Width: 4.9m (16.1ft), Out-to-Out Width: 6.7m (22.0ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Poor, Channel: Good, Operating Rating: 73.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 43.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 16.18m (53.08ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $132,000, Roadway Improvement Cost: $389,000, Total Project Cost: $1,782,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 2804205100056, Location: TR8-S.B.RAMP TO 28 (Lat: 40.491667, Lng: -79.941667), Route carried "on" structure: Ramp State highway , Year Built: 1963, Year Reconstructed: 2005, Status: Open, Structure Length: 17.22m (56.50ft), Average Daily Traffic: 8,663 (year 2008), Truck Traffic: 3%, Average Future Daily Traffic: 9,000 (year 2026), Design Load: H 15, Features Intersected: RAMP U,BRIDGE ST,CSX RR, Facility Carried by Structure: RAMP-U RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 6.4m (21.0ft), Skew: 9 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 6, Number Of Approach Spans: 1, Length of Maximum Span: 33.2m (108.9ft), Curb or Sidewalk Widths: Left: 0.1m (0.3ft), Right: 0.1m (0.3ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 7.5m (24.6ft) Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Channel: Good, Operating Rating: 11.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 66.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $141,000, Roadway Improvement Cost: $414,000, Total Project Cost: $1,899,000, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 2000801802416, Location: NORTH OF 62ND ST.BRIDGE (Lat: 40.494889, Lng: -79.939639), Route carried "under" structure: Ramp State highway , Year Built: 1960, Structure Length: 23.53m (77.20ft), Average Daily Traffic: 61 (year 2008), Truck Traffic: 7%, Features Intersected: RT.28,RAILROAD,LOCAL ST., Facility Carried by Structure: 62ND ST BR NB RAMP Minimum Vertical Clearance: 8.05m (26.41ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 5, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.8m (87.9ft) Find on map >>
Structure Number: 2000801802416, Location: NORTH OF 62ND ST.BRIDGE (Lat: 40.494889, Lng: -79.939639), Route carried "under" structure: Ramp State highway , Year Built: 1960, Structure Length: 23.53m (77.20ft), Average Daily Traffic: 61 (year 2008), Truck Traffic: 7%, Features Intersected: RT.28,RAILROAD,LOCAL ST., Facility Carried by Structure: 62ND ST BR NB RAMP Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 5, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.8m (87.9ft) Find on map >>
Structure Number: 2000801802416, Location: NORTH OF 62ND ST.BRIDGE (Lat: 40.494889, Lng: -79.939639), Route carried "under" structure: State highway , Year Built: 1960, Structure Length: 23.53m (77.20ft), Average Daily Traffic: 8,854 (year 2008), Truck Traffic: 4%, Features Intersected: RT.28,RAILROAD,LOCAL ST., Facility Carried by Structure: 62ND ST BR NB RAMP Minimum Vertical Clearance: 5.11m (16.77ft), Kilometerpoint: 0.703, Lanes on structure: 1, Lanes under structure: 5, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.8m (87.9ft) Find on map >>
Structure Number: 2000801802416, Location: NORTH OF 62ND ST.BRIDGE (Lat: 40.494889, Lng: -79.939639), Route carried "under" structure: Ramp State highway , Year Built: 1960, Structure Length: 23.53m (77.20ft), Average Daily Traffic: 7,665 (year 2008), Truck Traffic: 3%, Features Intersected: RT.28,RAILROAD,LOCAL ST., Facility Carried by Structure: 62ND ST BR NB RAMP Minimum Vertical Clearance: 5.23m (17.16ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 5, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 26.8m (87.9ft) Find on map >>
Structure Number: 2000801812418, Location: JUST NORTH OF 62ND ST.BR. (Lat: 40.494806, Lng: -79.939817), Route carried "under" structure: Ramp State highway , Year Built: 1960, Structure Length: 21.28m (69.82ft), Average Daily Traffic: 3,059 (year 2008), Truck Traffic: 7%, Features Intersected: 70 PAR 72 LOCAL RR, Facility Carried by Structure: 62ND ST BR APPR Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 7, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.9m (85.0ft) Find on map >>
Structure Number: 2000801812418, Location: JUST NORTH OF 62ND ST.BR. (Lat: 40.494806, Lng: -79.939817), Route carried "under" structure: Ramp State highway 9107, Year Built: 1960, Structure Length: 21.28m (69.82ft), Average Daily Traffic: 2,000 (year 1998), Truck Traffic: 1%, Features Intersected: 70 PAR 72 LOCAL RR, Facility Carried by Structure: 62ND ST BR APPR Minimum Vertical Clearance: 8.05m (26.41ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 7, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.9m (85.0ft) Find on map >>
Structure Number: 2000801812418, Location: JUST NORTH OF 62ND ST.BR. (Lat: 40.494806, Lng: -79.939817), Route carried "under" structure: State highway , Year Built: 1960, Structure Length: 21.28m (69.82ft), Average Daily Traffic: 9,736 (year 2007), Truck Traffic: 2%, Features Intersected: 70 PAR 72 LOCAL RR, Facility Carried by Structure: 62ND ST BR APPR Minimum Vertical Clearance: 4.75m (15.58ft), Kilometerpoint: 0.703, Lanes on structure: 1, Lanes under structure: 7, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.9m (85.0ft) Find on map >>
Structure Number: 2002801211214, Location: ETNA OVER LR 70-BUTLER ST (Lat: 40.492167, Lng: -79.950414), Route carried "under" structure: State highway , Year Built: 1960, Structure Length: 11.95m (39.21ft), Average Daily Traffic: 15,776 (year 2008), Truck Traffic: 2%, Features Intersected: LR 70-BUTLER ST., Facility Carried by Structure: SR 0028 SH Minimum Vertical Clearance: 4.47m (14.67ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.6m (120.1ft) Find on map >>
Structure Number: 20028014, Location: ETNA INTERCHANGE NB (Lat: 40.495111, Lng: -79.940758), Route carried "under" structure: Ramp State highway , Year Built: 1960, Structure Length: 26.70m (87.60ft), Average Daily Traffic: 61 (year 2008), Truck Traffic: 7%, Features Intersected: RT.8 NB-SB,N.MAIN,RR SP., Facility Carried by Structure: ETNA BP Minimum Vertical Clearance: 15.24m (50.00ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.0m (118.1ft) Find on map >>
Structure Number: 20028014, Location: ETNA INTERCHANGE NB (Lat: 40.495111, Lng: -79.940758), Route carried "under" structure: Ramp State highway 8, Year Built: 1960, Structure Length: 26.70m (87.60ft), Average Daily Traffic: 12,882 (year 2007), Truck Traffic: 5%, Features Intersected: RT.8 NB-SB,N.MAIN,RR SP., Facility Carried by Structure: ETNA BP Minimum Vertical Clearance: 4.88m (16.01ft), Kilometerpoint: 10.636, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.0m (118.1ft) Find on map >>
Structure Number: 20028014, Location: ETNA INTERCHANGE NB (Lat: 40.495111, Lng: -79.940758), Route carried "under" structure: Ramp State highway 8, Year Built: 1960, Structure Length: 26.70m (87.60ft), Average Daily Traffic: 13,158 (year 2007), Truck Traffic: 5%, Features Intersected: RT.8 NB-SB,N.MAIN,RR SP., Facility Carried by Structure: ETNA BP Minimum Vertical Clearance: 4.88m (16.01ft), Kilometerpoint: 10.636, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.0m (118.1ft) Find on map >>
Structure Number: 20028014, Location: ETNA INTERCHANGE NB (Lat: 40.495111, Lng: -79.940758), Route carried "under" structure: Ramp State highway , Year Built: 1960, Structure Length: 26.70m (87.60ft), Average Daily Traffic: 9,736 (year 2007), Truck Traffic: 2%, Features Intersected: RT.8 NB-SB,N.MAIN,RR SP., Facility Carried by Structure: ETNA BP Minimum Vertical Clearance: 0.46m (1.51ft), Kilometerpoint: 0.703, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.0m (118.1ft) Find on map >>
Structure Number: 200280141, Location: ETNA INTERCHANGE SB (Lat: 40.495139, Lng: -79.941347), Route carried "under" structure: Ramp State highway , Year Built: 1960, Structure Length: 31.88m (104.59ft), Average Daily Traffic: 61 (year 2008), Truck Traffic: 7%, Features Intersected: RT 8 NB/SB, RT 8 RMPS, Facility Carried by Structure: SR 28 SB Minimum Vertical Clearance: 4.47m (14.67ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 8, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.1m (102.0ft) Find on map >>
Structure Number: 200280141, Location: ETNA INTERCHANGE SB (Lat: 40.495139, Lng: -79.941347), Route carried "under" structure: Ramp State highway , Year Built: 1960, Structure Length: 31.88m (104.59ft), Average Daily Traffic: 7,687 (year 2008), Truck Traffic: 3%, Features Intersected: RT 8 NB/SB, RT 8 RMPS, Facility Carried by Structure: SR 28 SB Minimum Vertical Clearance: 6.35m (20.83ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 8, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.1m (102.0ft) Find on map >>
Structure Number: 200280141, Location: ETNA INTERCHANGE SB (Lat: 40.495139, Lng: -79.941347), Route carried "under" structure: Ramp State highway , Year Built: 1960, Structure Length: 31.88m (104.59ft), Average Daily Traffic: 9,736 (year 2007), Truck Traffic: 2%, Features Intersected: RT 8 NB/SB, RT 8 RMPS, Facility Carried by Structure: SR 28 SB Minimum Vertical Clearance: 14.94m (49.02ft), Kilometerpoint: 0.703, Lanes on structure: 1, Lanes under structure: 8, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.1m (102.0ft) Find on map >>
Structure Number: 200280141, Location: ETNA INTERCHANGE SB (Lat: 40.495139, Lng: -79.941347), Route carried "under" structure: Ramp State highway 8, Year Built: 1960, Structure Length: 31.88m (104.59ft), Average Daily Traffic: 13,158 (year 2007), Truck Traffic: 5%, Features Intersected: RT 8 NB/SB, RT 8 RMPS Minimum Vertical Clearance: 7.54m (24.74ft), Kilometerpoint: 10.636, Lanes on structure: 1, Lanes under structure: 8, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.1m (102.0ft) Find on map >>
Structure Number: 200280141, Location: ETNA INTERCHANGE SB (Lat: 40.495139, Lng: -79.941347), Route carried "under" structure: Ramp State highway , Year Built: 1960, Structure Length: 31.88m (104.59ft), Average Daily Traffic: 7,665 (year 2008), Truck Traffic: 3%, Features Intersected: RT 8 NB/SB, RT 8 RMPS, Facility Carried by Structure: SR 28 SB Minimum Vertical Clearance: 5.77m (18.93ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 8, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.1m (102.0ft) Find on map >>
Structure Number: 200280141, Location: ETNA INTERCHANGE SB (Lat: 40.495139, Lng: -79.941347), Route carried "under" structure: Ramp State highway 8, Year Built: 1960, Structure Length: 31.88m (104.59ft), Average Daily Traffic: 12,882 (year 2007), Truck Traffic: 5%, Features Intersected: RT 8 NB/SB, RT 8 RMPS Minimum Vertical Clearance: 5.77m (18.93ft), Kilometerpoint: 10.636, Lanes on structure: 1, Lanes under structure: 8, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 31.1m (102.0ft) Find on map >>
Structure Number: 2804202600409, Location: ETNA-28 N.B. RAMP TO RT 8 (Lat: 40.491667, Lng: -79.941667), Route carried "under" structure: Ramp State highway , Year Built: 1963, Structure Length: 16.18m (53.08ft), Average Daily Traffic: 7,665 (year 2008), Truck Traffic: 3%, Features Intersected: RAMP, BRIDGE ST.,CSX R/R, Facility Carried by Structure: RAMP 28 NB TO 8 NB Minimum Vertical Clearance: 5.41m (17.75ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 5, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft) Find on map >>
Structure Number: 2804202600409, Location: ETNA-28 N.B. RAMP TO RT 8 (Lat: 40.491667, Lng: -79.941667), Route carried "under" structure: State highway , Year Built: 1963, Structure Length: 16.18m (53.08ft), Average Daily Traffic: 9,736 (year 2007), Truck Traffic: 2%, Features Intersected: RAMP, BRIDGE ST.,CSX R/R, Facility Carried by Structure: RAMP 28 NB TO 8 NB Minimum Vertical Clearance: 8.53m (27.99ft), Kilometerpoint: 0.703, Lanes on structure: 1, Lanes under structure: 5, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft) Find on map >>
Structure Number: 2804202600409, Location: ETNA-28 N.B. RAMP TO RT 8 (Lat: 40.491667, Lng: -79.941667), Route carried "under" structure: Ramp State highway 8, Year Built: 1963, Structure Length: 16.18m (53.08ft), Average Daily Traffic: 13,158 (year 2007), Truck Traffic: 5%, Features Intersected: RAMP, BRIDGE ST.,CSX R/R Minimum Vertical Clearance: 8.53m (27.99ft), Kilometerpoint: 10.636, Lanes on structure: 1, Lanes under structure: 5, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft) Find on map >>
Structure Number: 2804205100056, Location: TR8-S.B.RAMP TO 28 (Lat: 40.491667, Lng: -79.941667), Route carried "under" structure: State highway , Year Built: 1963, Structure Length: 17.22m (56.50ft), Average Daily Traffic: 9,736 (year 2007), Truck Traffic: 2%, Features Intersected: RAMP U,BRIDGE ST,CSX RR, Facility Carried by Structure: RAMP-U RD Minimum Vertical Clearance: 2.34m (7.68ft), Kilometerpoint: 0.703, Lanes on structure: 1, Lanes under structure: 3, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 33.2m (108.9ft) Find on map >>
Structure Number: 2804205100056, Location: TR8-S.B.RAMP TO 28 (Lat: 40.491667, Lng: -79.941667), Route carried "under" structure: Ramp State highway , Year Built: 1963, Structure Length: 17.22m (56.50ft), Average Daily Traffic: 3,401 (year 2008), Truck Traffic: 7%, Features Intersected: RAMP U,BRIDGE ST,CSX RR, Facility Carried by Structure: RAMP-U RD Minimum Vertical Clearance: 4.93m (16.17ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 3, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 33.2m (108.9ft) Discuss this city on our hugely popular Pennsylvania forum Back to: Etna, PA, Pennsylvania, All US cities.
|
![]() |