Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Fayette, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 45Number of bridges
  • 456ft / 139mTotal length
  • $48,641,000Total costs
  • 109,445Total average daily traffic
  • 4,859Total average daily truck traffic
  • 139,870Total future (year 2030) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Fayette
  • No street view available for this location

New bridges in Fayette, AL - historical statistics
  • New bridges - historical statistics
  • 51920-1929
  • 21930-1939
  • 21940-1949
  • 111950-1959
  • 31960-1969
  • 41970-1979
  • 71980-1989
  • 71990-1999
  • 42000-2009
Reconstructed bridges in Fayette, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41960-1969
  • 01970-1979
  • 11980-1989
  • 11990-1999
Average Bridge Daily Traffic in Fayette, AL
Average Bridge Truck Traffic in Fayette, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.7%Very good
  • 33.3%Good
  • 36.7%Satisfactory
  • 23.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.0%Very good
  • 16.7%Good
  • 53.3%Satisfactory
  • 20.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.0%Very good
  • 43.3%Good
  • 30.0%Satisfactory
  • 16.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.3%Very good
  • 48.8%Good
  • 37.2%Satisfactory
  • 11.6%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 40.0%Good
  • 46.7%Satisfactory
  • 13.3%Fair
Find on map >>   Show street view

Structure Number: 19025,  Location: 5 MI NW OF FAYETTE (Lat: 33.758850,  Lng: -87.856475),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 66 (year 2003),  Average Future Daily Traffic: 105 (year 2030),  Design Load: HS 20,  Features Intersected: LUXAPALLILA CREEK RELIEF,  Facility Carried by Structure: HOLLINGSWORTH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 71.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $363,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $399,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 19369,  Location: 5.5 MILES NW OF FAYETTE (Lat: 33.761675,  Lng: -87.861369),  Route carried "on" structure: County highway ,  Year Built: 2004,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 115 (year 2006),  Average Future Daily Traffic: 95 (year 2030),  Design Load: HS 20,  Features Intersected: LUXAPALLILA CREEK,  Facility Carried by Structure: HOLINGSWORTH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Toll: Toll bridge is a segment,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 55.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.05m (19.85ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,244,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $1,368,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1937,  Location: 1.5 MI NW OF BOBO (Lat: 33.889531,  Lng: -87.840131),  Route carried "on" structure: County highway ,  Year Built: 2004,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 100 (year 2007),  Average Future Daily Traffic: 120 (year 2033),  Design Load: HS 20,  Features Intersected: LUXAPALLILA CREEK,  Facility Carried by Structure: BOBO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 55.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.05m (19.85ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,244,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $1,368,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 20239,  Location: 4 MI. NW OF FAYETTE (Lat: 33.713144,  Lng: -87.890064),  Route carried "on" structure: County highway 23,  Year Built: 1960,  Status: Open,  Structure Length: 0.78m (2.56ft),  Average Daily Traffic: 150 (year 2009),  Truck Traffic: 8%,  Average Future Daily Traffic: 105 (year 2030),  Design Load: H 15,  Features Intersected: LUXPALLILA TRIBUTARY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.184,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 54.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.43m (4.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $247,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $272,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20241,  Location: 2.5 MI. W OF FAYETTE (Lat: 33.696214,  Lng: -87.872197),  Route carried "on" structure: County highway 21,  Year Built: 1960,  Status: Open,  Structure Length: 1.00m (3.28ft),  Average Daily Traffic: 418 (year 2009),  Truck Traffic: 5%,  Average Future Daily Traffic: 430 (year 2030),  Design Load: H 15,  Features Intersected: LUXPALLILA TRIBUTARY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 67.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $385,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $424,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 20244,  Location: 6 MI. NE OF FAYETTE (Lat: 33.745286,  Lng: -87.759489),  Route carried "on" structure: County highway 53,  Year Built: 1955,  Status: Open,  Structure Length: 1.18m (3.87ft),  Average Daily Traffic: 386 (year 2009),  Truck Traffic: 5%,  Average Future Daily Traffic: 402 (year 2030),  Design Load: H 15,  Features Intersected: HARRIS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.690,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 48.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $418,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $460,000 ( Estimate for 2022)
Discuss Fayette, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.