Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Fort Pierce, Florida (FL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 61Number of bridges
  • 1,181ft / 360mTotal length
  • $422,000Total costs
  • 1,078,937Total average daily traffic
  • 157,048Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Fort Pierce
  • No street view available for this location

New bridges in Fort Pierce, FL - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11940-1949
  • 51950-1959
  • 141960-1969
  • 121970-1979
  • 41980-1989
  • 51990-1999
  • 122000-2009
  • 62010-2019
  • 12020-2022
Reconstructed bridges in Fort Pierce, FL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31980-1989
  • 21990-1999
  • 62000-2009
Average Bridge Daily Traffic in Fort Pierce, FL
Average Bridge Truck Traffic in Fort Pierce, FL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.7%Excellent
  • 17.1%Very good
  • 51.4%Good
  • 14.3%Satisfactory
  • 2.9%Fair
  • 8.6%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.3%Excellent
  • 25.0%Very good
  • 47.2%Good
  • 8.3%Satisfactory
  • 5.6%Fair
  • 5.6%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.6%Excellent
  • 36.1%Very good
  • 41.7%Good
  • 16.7%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.3%Excellent
  • 33.3%Very good
  • 50.0%Good
  • 6.7%Satisfactory
  • 6.7%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 44.4%Very good
  • 55.6%Good
Find on map >>   Show street view

Structure Number: 945013,  Location: 0.3 Mi N of Orange Ave. (Lat: 27.451503,  Lng: -80.330650),  Route carried "on" structure: City street ,  Year Built: 2009,  Status: Open,  Structure Length: 0.84m (2.76ft),  Average Daily Traffic: 120 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 144 (year 2042),  Design Load: HS 20,  Features Intersected: Moores Creek,  Facility Carried by Structure: 8th Street N
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.6m (31.5ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.4m (27.6ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 3.1m (10.2ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 61.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 945014,  Location: 0.3 Miles North of CR-68 (Lat: 27.451389,  Lng: -80.331722),  Route carried "on" structure: City street ,  Year Built: 2009,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,500 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,603 (year 2042),  Design Load: HL 93,  Features Intersected: Moore's Creek,  Facility Carried by Structure: North 9th Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.3m (30.5ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 48.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022
Find on map >>   Show street view

Structure Number: 945015,  Location: 0.1 Miles S. of Ave. D (Lat: 27.451389,  Lng: -80.332444),  Route carried "on" structure: City street ,  Year Built: 2009,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 500 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 521 (year 2042),  Design Load: HL 93,  Features Intersected: Moore's Creek,  Facility Carried by Structure: Dundas Court
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.5m (24.6ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 48.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022
Find on map >>   Show street view

Structure Number: 945016,  Location: 0.26 Miles North of CR-68 (Lat: 27.450944,  Lng: -80.338306),  Route carried "on" structure: City street ,  Year Built: 2009,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 1,400 (year 2022),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,256 (year 2042),  Design Load: HL 93,  Features Intersected: Moore's Creek,  Facility Carried by Structure: North 14th Street
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.5m (24.6ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 48.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022
Find on map >>   Show street view

Structure Number: 940053,  Location: FT PIERCE INTERCHANGE (Lat: 27.408350,  Lng: -80.400331),  Route carried "under" structure: State highway 91,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 37,600 (year 2021),  Truck Traffic: 19%,  Features Intersected: SR 91 TPK(FT PIERCE INT)
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 23.723,  Lanes on structure: 2,  Lanes under structure: 5,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 940055,  Location: 1.16 MI S OF CR-68 (Lat: 27.433019,  Lng: -80.418472),  Route carried "under" structure: State highway 91,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 28,700 (year 2022),  Truck Traffic: 12%,  Features Intersected: SR 91 TPK,  Facility Carried by Structure: PICOS RD 154.90
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 27.006,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 940056,  Location: 2.9 MI N OF SR-70 (Lat: 27.447558,  Lng: -80.427328),  Route carried "under" structure: State highway 91,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 28,700 (year 2022),  Truck Traffic: 12%,  Features Intersected: SR 91 TPK,  Facility Carried by Structure: CR68 ORNG AV 156.1
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 28.864,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 940057,  Location: 1.83 MILES N OF CR-68 (Lat: 27.470219,  Lng: -80.443253),  Route carried "under" structure: County highway ,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 14,350 (year 2022),  Truck Traffic: 12%,  Features Intersected: ANGLE RD & BELCHER CANAL,  Facility Carried by Structure: SR91 SB TPK 157.9
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 31.879,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 940073,  Location: 1.83 MILES N OF CR-68 (Lat: 27.470278,  Lng: -80.443044),  Route carried "under" structure: County highway ,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 14,350 (year 2022),  Truck Traffic: 12%,  Features Intersected: ANGLE RD & BELCHER CANAL,  Facility Carried by Structure: SR91 NB TPK 157.9
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 31.849,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 940096,  Location: 6.5 Mi S of SR-614 (Lat: 27.447517,  Lng: -80.394194),  Route carried "under" structure: State highway 68,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 19,800 (year 2020),  Truck Traffic: 23%,  Features Intersected: SR-68,  Facility Carried by Structure: SB I-95 (S.R. 9)
Minimum Vertical Clearance: 4.86m (15.94ft),  Kilometerpoint: 0.451,  Lanes on structure: 5,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.2m (135.2ft)

Find on map >>   Show street view

Structure Number: 940097,  Location: 2.2 Mi. N of SR70 (Lat: 27.447506,  Lng: -80.393794),  Route carried "under" structure: State highway 68,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 19,800 (year 2020),  Truck Traffic: 23%,  Features Intersected: SR-68,  Facility Carried by Structure: NB I-95 (S.R. 9)
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 0.515,  Lanes on structure: 5,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.2m (135.2ft)

Find on map >>   Show street view

Structure Number: 9401,  Location: 1mi. N of SR-70/SR-9 (Lat: 27.429208,  Lng: -80.388375),  Route carried "under" structure: Interstate 95,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 60,386 (year 2020),  Truck Traffic: 17%,  Features Intersected: SR-9 (I-95),  Facility Carried by Structure: Graham Road
Minimum Vertical Clearance: 4.91m (16.11ft),  Kilometerpoint: 26.281,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 940101,  Location: 2MI S of SR-68(Orange Av) (Lat: 27.415917,  Lng: -80.388531),  Route carried "under" structure: State highway 70,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 26,500 (year 2020),  Truck Traffic: 10%,  Features Intersected: SR-70 (Okeechobee Rd.),  Facility Carried by Structure: SB SR-9 ( I-95)
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 34.108,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.6m (80.7ft)

Find on map >>   Show street view

Structure Number: 940102,  Location: 2MI S of SR-68(Orange Av) (Lat: 27.416000,  Lng: -80.388286),  Route carried "under" structure: State highway 70,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 32,000 (year 2020),  Truck Traffic: 12%,  Features Intersected: SR-70 (Okeechobee Rd.),  Facility Carried by Structure: NB SR-9 (I-95)
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 34.149,  Lanes on structure: 6,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.6m (80.7ft)

Find on map >>   Show street view

Structure Number: 940126,  Location: 1.5 Mi. S of SR-70 (Lat: 27.395767,  Lng: -80.394456),  Route carried "under" structure: State highway 91,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 37,600 (year 2020),  Truck Traffic: 19%,  Features Intersected: SR-91 (FL TPK),  Facility Carried by Structure: SB I-95 (SR-9)
Minimum Vertical Clearance: 4.96m (16.27ft),  Kilometerpoint: 22.209,  Lanes on structure: 3,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 940127,  Location: 1.5 Mi. S of SR-70 (Lat: 27.395425,  Lng: -80.394289),  Route carried "under" structure: State highway 91,  Year Built: 1982,  Structure Length: 0. m,  Average Daily Traffic: 37,600 (year 2020),  Truck Traffic: 19%,  Features Intersected: SR-91 (FL TPK),  Facility Carried by Structure: NB I-95 (SR-9)
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 22.167,  Lanes on structure: 3,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 940134,  Location: 2.6 MILES NORTH OF SR-709 (Lat: 27.412358,  Lng: -80.402019),  Route carried "under" structure: State highway 70,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 8,600 (year 2021),  Truck Traffic: 20%,  Features Intersected: SR 70,  Facility Carried by Structure: SR 91 TPK SB 153.2
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 32.716,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: 940135,  Location: 2.6 MILES NORTH OF SR-709 (Lat: 27.412386,  Lng: -80.401839),  Route carried "under" structure: State highway 70,  Year Built: 1991,  Structure Length: 0. m,  Average Daily Traffic: 18,800 (year 2021),  Truck Traffic: 19%,  Features Intersected: SR 70,  Facility Carried by Structure: SR91 NB TPK 153.1
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 24.190,  Lanes on structure: 3,  Lanes under structure: 5,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: 940162,  Location: 0.6 mi N of CR-68 (Lat: 27.455006,  Lng: -80.398992),  Route carried "under" structure: State highway 713,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 14,100 (year 2020),  Truck Traffic: 24%,  Features Intersected: SR-713 (King Hwy),  Facility Carried by Structure: SB SR-9 (I-95)
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 4.643,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.5m (93.5ft)

Find on map >>   Show street view

Structure Number: 940163,  Location: 0.6 mi N of CR-68 (Lat: 27.454736,  Lng: -80.398997),  Route carried "under" structure: State highway 713,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 14,100 (year 2020),  Truck Traffic: 24%,  Features Intersected: SR-713 (King Hwy),  Facility Carried by Structure: NB SR-9 (I-95)
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 4.643,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.5m (93.5ft)

Discuss Fort Pierce, Florida (FL) on our hugely popular Florida forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.