Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Geddes, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 56Number of bridges
  • 1,109ft / 338mTotal length
  • $196,404,000Total costs
  • 752,729Total average daily traffic
  • 45,938Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Geddes
  • No street view available for this location

New bridges in Geddes, NY - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 151950-1959
  • 41960-1969
  • 291970-1979
  • 61980-1989
  • 12020-2022
Reconstructed bridges in Geddes, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41980-1989
  • 11990-1999
  • 12000-2009
  • 32010-2019
  • 12020-2022
Average Bridge Daily Traffic in Geddes, NY
Average Bridge Truck Traffic in Geddes, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.9%Excellent
  • 9.7%Very good
  • 16.1%Good
  • 29.0%Satisfactory
  • 25.8%Fair
  • 3.2%Poor
  • 3.2%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.5%Excellent
  • 6.5%Very good
  • 29.0%Good
  • 35.5%Satisfactory
  • 16.1%Fair
  • 3.2%Poor
  • 3.2%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.2%Excellent
  • 25.8%Good
  • 41.9%Satisfactory
  • 16.1%Fair
  • 9.7%Poor
  • 3.2%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 30.0%Very good
  • 50.0%Good
  • 20.0%Satisfactory
Find on map >>   Show street view

Structure Number: 1026099,  Location: JCT I90 & I690 (Lat: 43.111475,  Lng: -76.264433),  Route carried "on" structure: State highway 690,  Year Built: 1954,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 8.47m (27.79ft),  Average Daily Traffic: 32,867 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 47,410 (year 2040),  Design Load: HS 20,  Features Intersected: 90IX, RTE I90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.140,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 24 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 27.8m (91.2ft),  Out-to-Out Width: 28.9m (94.8ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.47m (27.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $4,887,000,  Roadway Improvement Cost: $2,862,000,  Total Project Cost: $7,749,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 104517,  Location: IN SOLVAY (Lat: 43.068639,  Lng: -76.217042),  Route carried "on" structure: State highway 297,  Year Built: 1977,  Status: Open,  Structure Length: 12.65m (41.50ft),  Average Daily Traffic: 5,960 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,374 (year 2040),  Design Load: HS 20,  Features Intersected: CSX TRANS/ AMTRAK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.105,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 35.0m (114.8ft),  Curb or Sidewalk Widths: Left: 4.9m (16.1ft),  Right: 0.0m,  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 92.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.64m (41.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,919,000,  Roadway Improvement Cost: $2,295,000,  Total Project Cost: $6,214,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1049529,  Location: .6 MI SE JCT I90 & I690 (Lat: 43.106528,  Lng: -76.250744),  Route carried "on" structure: Interstate 690,  Year Built: 1954,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 6.61m (21.69ft),  Average Daily Traffic: 32,987 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 47,583 (year 2040),  Design Load: HS 20,  Features Intersected: CSX TRANSPRTATION
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.459,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.7m (113.8ft),  Skew: 24 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 33.9m (111.2ft),  Out-to-Out Width: 35.6m (116.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.61m (21.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $5,276,000,  Roadway Improvement Cost: $3,090,000,  Total Project Cost: $8,365,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104954,  Location: .7 MI SE JCT I690 & I90 (Lat: 43.106119,  Lng: -76.247553),  Route carried "on" structure: Interstate 690,  Year Built: 1959,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 32,987 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 47,583 (year 2040),  Design Load: H 20,  Features Intersected: PARK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.717,  Lanes on structure: 7,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.7m (31.8ft),  Curb-To-Curb Width: 41.8m (137.1ft),  Out-to-Out Width: 47.2m (154.9ft)

Condition: Culverts: Fair,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 27.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $3,469,000,  Roadway Improvement Cost: $2,032,000,  Total Project Cost: $5,501,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104958,  Location: .6 MI NW JCT I690 & SH297 (Lat: 43.079244,  Lng: -76.222125),  Route carried "on" structure: Ramp Interstate ,  Year Built: 1959,  Status: Open,  Structure Length: 4.85m (15.91ft),  Average Daily Traffic: 50 (year 2009),  Truck Traffic: 10%,  Average Future Daily Traffic: 70 (year 2029),  Design Load: H 20,  Features Intersected: ACCESS TO PARKING,  Facility Carried by Structure: RAMP R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 19.4m (63.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.84m (15.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,919,000,  Roadway Improvement Cost: $1,124,000,  Total Project Cost: $3,042,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10496,  Location: .2 MI NW JCT I690 & SH297 (Lat: 43.075539,  Lng: -76.216631),  Route carried "on" structure: Ramp Other road ,  Year Built: 1959,  Status: Open,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 50 (year 2009),  Truck Traffic: 10%,  Average Future Daily Traffic: 70 (year 2029),  Design Load: H 20,  Features Intersected: STATE FAIR PARKNG,  Facility Carried by Structure: RAMP N
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 19.4m (63.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.96m (16.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,940,000,  Roadway Improvement Cost: $1,136,000,  Total Project Cost: $3,077,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1061731,  Location: EXIT 4 OF I690 (Lat: 43.112794,  Lng: -76.267378),  Route carried "on" structure: Interstate 690,  Year Built: 1971,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 3.20m (10.50ft),  Average Daily Traffic: 11,439 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 16,500 (year 2040),  Design Load: HS 20,  Features Intersected: JN GLN RMP E-CR81
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.915,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.0m (101.7ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,102,000,  Roadway Improvement Cost: $645,000,  Total Project Cost: $1,747,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1061732,  Location: .1 MI NW JCT I690 NB & I9 (Lat: 43.112878,  Lng: -76.267258),  Route carried "on" structure: State highway 690,  Year Built: 1971,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 3.26m (10.70ft),  Average Daily Traffic: 15,408 (year 2002),  Truck Traffic: 13%,  Design Load: HS 20,  Features Intersected: JOHN GLENN RAMP E
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.915,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.7m (100.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.26m (10.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,325,000,  Roadway Improvement Cost: $776,000,  Total Project Cost: $2,101,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107289,  Location: IN GEDDES-ONON LAKE CO PK (Lat: 43.107117,  Lng: -76.251472),  Route carried "on" structure: Ramp Interstate ,  Year Built: 1987,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 1,358 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,958 (year 2040),  Design Load: HS 20,  Features Intersected: CSX TRANSPRTATION,  Facility Carried by Structure: I690 WB OFF RAMP T
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.6m (116.8ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Inventory Rating: 70.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $908,000,  Roadway Improvement Cost: $531,000,  Total Project Cost: $1,439,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10729,  Location: IN GEDDES-ONON LAKE CO PK (Lat: 43.105783,  Lng: -76.249847),  Route carried "on" structure: Ramp Interstate ,  Year Built: 1987,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 1,302 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,878 (year 2040),  Design Load: HS 20,  Features Intersected: CSX TRANSPRTATION,  Facility Carried by Structure: FROM STATE FAIR BL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 38.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $333,000,  Roadway Improvement Cost: $195,000,  Total Project Cost: $528,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 107291,  Location: 0.6 mi E I90 & I690 (Lat: 43.106839,  Lng: -76.253606),  Route carried "on" structure: Interstate 690,  Year Built: 1987,  Status: Open,  Structure Length: 4.85m (15.91ft),  Average Daily Traffic: 32,867 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 47,410 (year 2040),  Design Load: HS 20,  Features Intersected: CR80 ST FAIR BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.218,  Lanes on structure: 7,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 38.1m (125.0ft),  Skew: 26 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 46.9m (153.9ft),  Curb-To-Curb Width: 38.1m (125.0ft),  Out-to-Out Width: 39.0m (128.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.84m (15.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $5,904,000,  Roadway Improvement Cost: $3,457,000,  Total Project Cost: $9,361,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107315,  Location: 0.3MI E INTRCH 39 OVR 90I (Lat: 43.111489,  Lng: -76.265386),  Route carried "on" structure: Ramp Interstate ,  Year Built: 1987,  Status: Open,  Structure Length: 7.80m (25.59ft),  Average Daily Traffic: 6,842 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,869 (year 2040),  Design Load: HS 20,  Features Intersected: 90IX WB, RTE I90,  Facility Carried by Structure: FR.RTE 48 TO 690I
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.708,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.80m (25.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,142,000,  Roadway Improvement Cost: $1,254,000,  Total Project Cost: $3,396,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107799,  Location: 0,3 MI SE JCT RT 690I+695 (Lat: 43.081706,  Lng: -76.223058),  Route carried "on" structure: Ramp Other road ,  Year Built: 2020,  Status: Open,  Structure Length: 7.74m (25.39ft),  Truck Traffic: 14%,  Design Load: HL 93,  Features Intersected: I690 WB, I690 EB,  Facility Carried by Structure: I690 EB RAMP
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.097,  Lanes on structure: 1,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.7m (127.0ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 0.0m,  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.74m (25.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,977,000,  Roadway Improvement Cost: $1,158,000,  Total Project Cost: $3,135,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 109328,  Location: RAMP-RTE 5 CONN. TO I-690 (Lat: 43.080639,  Lng: -76.225847),  Route carried "on" structure: Ramp State highway ,  Year Built: 1975,  Status: Open,  Structure Length: 62.64m (205.51ft),  Average Daily Traffic: 5,262 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 7,590 (year 2040),  Design Load: HS 20,  Features Intersected: 695 695 3301 1018 NB, ST,  Facility Carried by Structure: RAMP TO I-690 WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.531,  Lanes on structure: 1,  Lanes under structure: 11,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 14,  Length of Maximum Span: 53.0m (173.9ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 62.63m (205.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $11,706,000,  Roadway Improvement Cost: $6,855,000,  Total Project Cost: $18,561,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 109328A,  Location: STATE FAIR BLVD TO I690WB (Lat: 43.082350,  Lng: -76.225736),  Route carried "on" structure: Ramp State highway ,  Year Built: 1975,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 799 (year 2017),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,152 (year 2040),  Design Load: HS 20,  Features Intersected: NINE MILE CREEK,  Facility Carried by Structure: RAMP T
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 87.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.53m (27.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,388,000,  Roadway Improvement Cost: $813,000,  Total Project Cost: $2,201,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 109329,  Location: S RAMP TO RTE 5 CONN. SB (Lat: 43.081431,  Lng: -76.226353),  Route carried "on" structure: Ramp State highway 930T,  Year Built: 1975,  Status: Open,  Structure Length: 20.39m (66.90ft),  Average Daily Traffic: 4,913 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,087 (year 2040),  Design Load: HS 20,  Features Intersected: COUNTY ROAD 80, NINE MIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.434,  Lanes on structure: 1,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 43.2m (141.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 20.39m (66.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $4,266,000,  Roadway Improvement Cost: $2,498,000,  Total Project Cost: $6,763,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 109331,  Location: I690 WB TO SH 5 CONN SB (Lat: 43.080894,  Lng: -76.220722),  Route carried "on" structure: Spur State highway 695,  Year Built: 1975,  Status: Open,  Structure Length: 46.94m (154.00ft),  Average Daily Traffic: 12,255 (year 2011),  Truck Traffic: 14%,  Average Future Daily Traffic: 17,677 (year 2040),  Design Load: HS 20,  Features Intersected: 690I690I33011018, State
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.512,  Lanes on structure: 2,  Lanes under structure: 10,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 13,  Length of Maximum Span: 51.2m (168.0ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 46.93m (153.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $11,740,000,  Roadway Improvement Cost: $6,875,000,  Total Project Cost: $18,615,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 109331A,  Location: 2.3 MI SE EXIT 39 OF I90 (Lat: 43.079931,  Lng: -76.224600),  Route carried "on" structure: Ramp State highway 931B,  Year Built: 1975,  Status: Open,  Structure Length: 9.78m (32.09ft),  Average Daily Traffic: 4,395 (year 2010),  Truck Traffic: 14%,  Average Future Daily Traffic: 6,339 (year 2040),  Design Load: HS 20,  Features Intersected: RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.370,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.78m (32.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,595,000,  Roadway Improvement Cost: $934,000,  Total Project Cost: $2,529,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 109332,  Location: SH 5 CONN TO I690 EB (Lat: 43.079681,  Lng: -76.224553),  Route carried "on" structure: Spur State highway 695,  Year Built: 1975,  Status: Open,  Structure Length: 17.01m (55.81ft),  Truck Traffic: 7%,  Design Load: HS 20,  Features Intersected: CR 80, CSX RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.282,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 39.0m (128.0ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.00m (55.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $4,384,000,  Roadway Improvement Cost: $2,568,000,  Total Project Cost: $6,952,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1093331,  Location: I-690 WB + NINE MI CREEK (Lat: 43.082814,  Lng: -76.225200),  Route carried "on" structure: Spur Interstate 690,  Year Built: 1975,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 25,881 (year 2009),  Truck Traffic: 11%,  Design Load: HS 20,  Features Intersected: NINE MILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.935,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,501,000,  Roadway Improvement Cost: $879,000,  Total Project Cost: $2,380,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1093332,  Location: I-690 EB + NINE MI CREEK (Lat: 43.082594,  Lng: -76.225450),  Route carried "on" structure: Spur Interstate 690,  Year Built: 1975,  Status: Open,  Structure Length: 2.80m (9.19ft),  Truck Traffic: 11%,  Design Load: HS 20,  Features Intersected: NINE MILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.935,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,569,000,  Roadway Improvement Cost: $919,000,  Total Project Cost: $2,487,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1093351,  Location: JCT OF I690 WB & SH 297 (Lat: 43.072433,  Lng: -76.207658),  Route carried "on" structure: Interstate 690,  Year Built: 1975,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 38,721 (year 2005),  Truck Traffic: 13%,  Design Load: HS 20,  Features Intersected: RAMP TO CR 80
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.753,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.7m (123.7ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,045,000,  Roadway Improvement Cost: $1,198,000,  Total Project Cost: $3,243,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1093352,  Location: JCT OF I690 EB & SH 297 (Lat: 43.072339,  Lng: -76.207956),  Route carried "on" structure: Interstate 690,  Year Built: 1975,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 25,816 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 37,239 (year 2040),  Design Load: HS 20,  Features Intersected: RAMP TO CR 80
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.753,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.7m (123.7ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,046,000,  Roadway Improvement Cost: $1,198,000,  Total Project Cost: $3,245,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 109336,  Location: OFF RAMP-690EB+NINE MI CR (Lat: 43.078261,  Lng: -76.227683),  Route carried "on" structure: Ramp Other road ,  Year Built: 1975,  Status: Open,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 114 (year 2011),  Truck Traffic: 4%,  Average Future Daily Traffic: 160 (year 2031),  Design Load: HS 20,  Features Intersected: NINE MILE CREEK,  Facility Carried by Structure: ROADWAY SO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.86m (9.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $881,000,  Roadway Improvement Cost: $516,000,  Total Project Cost: $1,397,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1093389,  Location: JCT SH 695 & CSX RR M.LIN (Lat: 43.072489,  Lng: -76.232544),  Route carried "on" structure: Spur State highway 695,  Year Built: 1975,  Status: Open,  Structure Length: 24.75m (81.20ft),  Average Daily Traffic: 38,213 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 49,783 (year 2040),  Design Load: HS 20,  Features Intersected: CSX RR / AMTRAK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.204,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 36.3m (119.1ft),  Skew: 31 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 53.3m (174.9ft),  Curb-To-Curb Width: 36.3m (119.1ft),  Out-to-Out Width: 37.2m (122.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 24.74m (81.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $17,852,000,  Roadway Improvement Cost: $10,454,000,  Total Project Cost: $28,307,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 30933,  Location: 3MI SE OF EXIT 39 OF I-90 (Lat: 43.080817,  Lng: -76.226650),  Route carried "on" structure: County highway 931,  Year Built: 1974,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 5,046 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,243 (year 2040),  Design Load: HS 20,  Features Intersected: NINE MILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 20.6m (67.6ft),  Out-to-Out Width: 21.5m (70.5ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 69.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,616,000,  Roadway Improvement Cost: $946,000,  Total Project Cost: $2,562,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 335822,  Location: 1.1 MI SE STATE FAIR GRDS (Lat: 43.063886,  Lng: -76.199353),  Route carried "on" structure: County highway ,  Year Built: 1971,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 16.37m (53.71ft),  Average Daily Traffic: 2,976 (year 2020),  Truck Traffic: 18%,  Average Future Daily Traffic: 3,682 (year 2040),  Design Load: HL 93,  Features Intersected: CSX/AMTRAK - Second Cros,  Facility Carried by Structure: WILLIS AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 37.7m (123.7ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.36m (53.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,421,000,  Roadway Improvement Cost: $2,003,000,  Total Project Cost: $5,424,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 4433071,  Location: J.GLENN BLVD WB+ONON LAKE (Lat: 43.121097,  Lng: -76.250117),  Route carried "on" structure: County highway ,  Year Built: 1969,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 9.17m (30.09ft),  Average Daily Traffic: 8,426 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,977 (year 2040),  Design Load: HS 20,  Features Intersected: ONON LAKE OUTLET, PARKRO,  Facility Carried by Structure: CR-81 JOHN GLENN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.931,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 33.5m (109.9ft)),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 41.4m (135.8ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Excellent,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.17m (30.09ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Underwater Inspection Date: June 2018,  Bridge Improvement Cost: $2,090,000,  Roadway Improvement Cost: $1,224,000,  Total Project Cost: $3,314,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 4433072,  Location: J.GLENN BLVD EB+ONON LAKE (Lat: 43.120922,  Lng: -76.249956),  Route carried "on" structure: County highway ,  Year Built: 1969,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 9.17m (30.09ft),  Average Daily Traffic: 8,426 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,977 (year 2040),  Design Load: HS 20,  Features Intersected: ONONDAGA LAKE OUTLET, PA,  Facility Carried by Structure: CR81 JOHN GLENN BL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.931,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 34.7m (113.8ft)),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 41.4m (135.8ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Excellent,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.17m (30.09ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: November 2017,  Bridge Improvement Cost: $2,090,000,  Roadway Improvement Cost: $1,224,000,  Total Project Cost: $3,314,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 443308,  Location: .1 MI N JCT I90+ONON LAKE (Lat: 43.117275,  Lng: -76.244403),  Route carried "on" structure: Alternate County highway ,  Year Built: 1915,  Year Reconstructed: 1999,  Status: Posted for load,  Structure Length: 7.53m (24.70ft),  Average Daily Traffic: 2,313 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,861 (year 2040),  Features Intersected: ONON LAKE OUTLET, ONON P,  Facility Carried by Structure: LONG BRANCH ROAD
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 1.400,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Navigation Control: Yes ( Vertical Clearance: 999.9m (3,280.5ft), Horizontal Clearance: 35.0m (114.8ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 36.5m (119.8ft),  Curb or Sidewalk Widths: Left: 1.3m (4.3ft),  Right: 1.3m (4.3ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 20.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 7.52m (24.67ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Underwater Inspection Date: July 2020,  Bridge Improvement Cost: $5,003,000,  Roadway Improvement Cost: $2,930,000,  Total Project Cost: $7,933,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 4433099,  Location: 90IX over Onondaga Outlet (Lat: 43.116100,  Lng: -76.243975),  Route carried "on" structure: Interstate 90,  Year Built: 1954,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 13.87m (45.51ft),  Average Daily Traffic: 26,036 (year 2020),  Truck Traffic: 27%,  Average Future Daily Traffic: 37,556 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: East Bike Path, West Bik
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.528,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 33.5m (109.9ft),  Skew: 22 degrees,  Navigation Control: Yes ( Vertical Clearance: 5.5m (18.0ft), Horizontal Clearance: 51.8m (169.9ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 60.9m (199.8ft),  Curb-To-Curb Width: 33.5m (109.9ft),  Out-to-Out Width: 34.4m (112.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.86m (45.47ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $9,534,000,  Roadway Improvement Cost: $5,583,000,  Total Project Cost: $15,117,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 5510229,  Location: .5 MI E EXIT 39 ON I90 (Lat: 43.112392,  Lng: -76.260383),  Route carried "on" structure: Interstate 90,  Year Built: 1954,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 26,036 (year 2020),  Truck Traffic: 27%,  Average Future Daily Traffic: 37,556 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CSX TRANSPORTATIO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.145,  Lanes on structure: 4,  Base Highway Network: Yes,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 25.3m (83.0ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 32.5m (106.6ft),  Out-to-Out Width: 34.5m (113.2ft)

Condition: Deck: Serious,  Superstructure: Serious,  Substructure: Serious,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $4,040,000,  Roadway Improvement Cost: $2,366,000,  Total Project Cost: $6,405,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1026099,  Location: JCT I90 & I690 (Lat: 43.111475,  Lng: -76.264433),  Route carried "under" structure: Interstate 90,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 8,300 (year 1975),  Features Intersected: 90IX, RTE I90
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 142.187,  Lanes on structure: 5,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 104954,  Location: .7 MI SE JCT I690 & I90 (Lat: 43.106119,  Lng: -76.247553),  Route carried "under" structure: Other road ,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 1 (year 2021),  Features Intersected: PARK ROAD,  Facility Carried by Structure: RTE I690
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Culvert,  Length of Maximum Span: 9.7m (31.8ft)

Find on map >>   Show street view

Structure Number: 104955,  Location: 1.1 MI SE JCT RTS690I+90I (Lat: 43.100867,  Lng: -76.242650),  Route carried "under" structure: Interstate 690,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 30,618 (year 2002),  Features Intersected: 690I690I33011008 WB, RTE,  Facility Carried by Structure: PEDESTRIAN WALK
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 1.191,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 17.6m (57.7ft)

Find on map >>   Show street view

Structure Number: 104955,  Location: 1.1 MI SE JCT RTS690I+90I (Lat: 43.100867,  Lng: -76.242650),  Route carried "under" structure: Interstate ,  Year Built: 1959,  Structure Length: 0. m,  Features Intersected: 690I690I33011008 WB, RTE,  Facility Carried by Structure: PEDESTRIAN WALK
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 1.191,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 17.6m (57.7ft)

Find on map >>   Show street view

Structure Number: 104956,  Location: 1.8 MI SE JCT RTS690I+90I (Lat: 43.092769,  Lng: -76.234494),  Route carried "under" structure: Interstate 690,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 45,185 (year 2002),  Features Intersected: 690I690I33011015, RTE I6,  Facility Carried by Structure: PEDESTRIAN WALK
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 2.317,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 17.9m (58.7ft)

Find on map >>   Show street view

Structure Number: 104956,  Location: 1.8 MI SE JCT RTS690I+90I (Lat: 43.092769,  Lng: -76.234494),  Route carried "under" structure: Interstate ,  Year Built: 1959,  Structure Length: 0. m,  Features Intersected: 690I690I33011015, RTE I6,  Facility Carried by Structure: PEDESTRIAN WALK
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 2.317,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 17.9m (58.7ft)

Find on map >>   Show street view

Structure Number: 104958,  Location: .6 MI NW JCT I690 & SH297 (Lat: 43.079244,  Lng: -76.222125),  Route carried "under" structure: Other road ,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 14,500 (year 1971),  Features Intersected: ACCESS TO PARKING,  Facility Carried by Structure: RAMP R
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 10496,  Location: .2 MI NW JCT I690 & SH297 (Lat: 43.075539,  Lng: -76.216631),  Route carried "under" structure: Other road ,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 50,978 (year 1986),  Features Intersected: STATE FAIR PARKNG,  Facility Carried by Structure: RAMP N
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 1061731,  Location: EXIT 4 OF I690 (Lat: 43.112794,  Lng: -76.267378),  Route carried "under" structure: Ramp County highway ,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 3,550 (year 1975),  Features Intersected: JN GLN RMP E-CR81,  Facility Carried by Structure: RTE I690
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 12.872,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.0m (101.7ft)

Find on map >>   Show street view

Structure Number: 1061732,  Location: .1 MI NW JCT I690 NB & I9 (Lat: 43.112878,  Lng: -76.267258),  Route carried "under" structure: Ramp County highway ,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 3,550 (year 1975),  Features Intersected: JOHN GLENN RAMP E,  Facility Carried by Structure: RTE I690
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 12.872,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.7m (100.7ft)

Find on map >>   Show street view

Structure Number: 107291,  Location: 0.6 mi E I90 & I690 (Lat: 43.106839,  Lng: -76.253606),  Route carried "under" structure: County highway ,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 1 (year 2021),  Features Intersected: CR80 ST FAIR BLVD,  Facility Carried by Structure: RTE I690
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 7,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.9m (153.9ft)

Find on map >>   Show street view

Structure Number: 107315,  Location: 0.3MI E INTRCH 39 OVR 90I (Lat: 43.111489,  Lng: -76.265386),  Route carried "under" structure: Interstate 90,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 7,450 (year 1975),  Features Intersected: 90IX WB, RTE I90
Minimum Vertical Clearance: 5.74m (18.83ft),  Kilometerpoint: 464.036,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.1m (125.0ft)

Discuss Geddes, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.