Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Greece, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 56Number of bridges
  • 344ft / 105mTotal length
  • $72,100,000Total costs
  • 853,119Total average daily traffic
  • 14,377Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Greece
  • No street view available for this location

New bridges in Greece, NY - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 41950-1959
  • 141970-1979
  • 181980-1989
  • 71990-1999
  • 82000-2009
  • 32010-2019
Reconstructed bridges in Greece, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Greece, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.0%Excellent
  • 20.0%Very good
  • 16.0%Good
  • 24.0%Satisfactory
  • 20.0%Fair
  • 16.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 7.1%Excellent
  • 25.0%Very good
  • 28.6%Good
  • 21.4%Satisfactory
  • 10.7%Fair
  • 7.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 7.1%Excellent
  • 28.6%Very good
  • 32.1%Good
  • 14.3%Satisfactory
  • 17.9%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.3%Very good
  • 33.3%Good
  • 37.5%Satisfactory
  • 12.5%Fair
  • 8.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 10.0%Excellent
  • 30.0%Very good
  • 10.0%Good
  • 20.0%Satisfactory
  • 10.0%Fair
  • 20.0%Poor
Find on map >>   Show street view

Structure Number: 10148,  Location: 0.5MI E JCT RTS 18&261 (Lat: 43.253797,  Lng: -77.742169),  Route carried "on" structure: State highway 18,  Year Built: 1931,  Status: Posted for load,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 9,471 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 11,505 (year 2040),  Features Intersected: NORTHRUP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.229,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Good,  Channel: Fair,  Operating Rating: 14.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $318,000,  Roadway Improvement Cost: $186,000,  Total Project Cost: $505,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101481,  Location: 1.6MI E JCT RTS 18&261 (Lat: 43.253333,  Lng: -77.719903),  Route carried "on" structure: State highway 18,  Year Built: 1931,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 9,471 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 11,505 (year 2040),  Features Intersected: SMITH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.031,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 16.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 16.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $284,000,  Roadway Improvement Cost: $166,000,  Total Project Cost: $450,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 103595,  Location: 3.1MI E JCT LOSP&RTE 261 (Lat: 43.280869,  Lng: -77.695369),  Route carried "on" structure: County highway ,  Year Built: 1955,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 5,151 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 6,257 (year 2040),  Design Load: HS 20,  Features Intersected: 947A947A43021177 EB, RTE,  Facility Carried by Structure: LONG POND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.985,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.1m (52.8ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 84.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.62m (11.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,623,000,  Roadway Improvement Cost: $950,000,  Total Project Cost: $2,573,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1035961,  Location: 3.5MI E JCT LOSP&RTE 261 (Lat: 43.274989,  Lng: -77.691428),  Route carried "on" structure: State highway 947A,  Year Built: 1955,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 5,769 (year 2020),  Average Future Daily Traffic: 6,017 (year 2040),  Design Load: H 20,  Features Intersected: LARKIN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.155,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 98.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $325,000,  Roadway Improvement Cost: $191,000,  Total Project Cost: $516,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1035962,  Location: 3.5MI E JCT LOSP&RTE 261 (Lat: 43.274544,  Lng: -77.692247),  Route carried "on" structure: State highway 947A,  Year Built: 1955,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 5,769 (year 2020),  Average Future Daily Traffic: 6,017 (year 2040),  Design Load: H 20,  Features Intersected: LARKIN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.155,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft)

Condition: Channel: Poor,  Culverts: Poor,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $263,000,  Roadway Improvement Cost: $154,000,  Total Project Cost: $418,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 104365,  Location: 2.2 MI N JCT RT 261 & 104 (Lat: 43.249067,  Lng: -77.751281),  Route carried "on" structure: State highway 261,  Year Built: 1993,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 7,877 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 9,568 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: NORTHRUP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.508,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.3m (33.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 79.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $274,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $434,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1062471,  Location: JCT SH 104 & ROL (Lat: 43.206764,  Lng: -77.676167),  Route carried "on" structure: US 104,  Year Built: 2005,  Status: Open,  Structure Length: 6.52m (21.39ft),  Average Daily Traffic: 17,901 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 17,985 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: 390 390 43011035 NB, RTE
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 26.967,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.5m (106.6ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.0m,  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 15.3m (50.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 51.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 39.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,206,000,  Roadway Improvement Cost: $1,292,000,  Total Project Cost: $3,498,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1062472,  Location: JCT NY 390 & RTE 104 (Lat: 43.206583,  Lng: -77.675931),  Route carried "on" structure: State highway 104,  Year Built: 2006,  Status: Open,  Structure Length: 6.52m (21.39ft),  Average Daily Traffic: 17,901 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 17,985 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: 390 390 43011035, RTE 39
Minimum Vertical Clearance: 4.43m (14.53ft),  Kilometerpoint: 26.967,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.5m (106.6ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,237,000,  Roadway Improvement Cost: $1,310,000,  Total Project Cost: $3,547,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 106248,  Location: JCT104WB+ROL RAMP SB (Lat: 43.206731,  Lng: -77.675900),  Route carried "on" structure: Ramp US 104,  Year Built: 1971,  Status: Open,  Structure Length: 11.13m (36.52ft),  Average Daily Traffic: 7,783 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 8,118 (year 2040),  Design Load: HS 20,  Features Intersected: 104 104 43031168 WB, 390
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.257,  Lanes on structure: 1,  Lanes under structure: 11,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.4m (99.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 90.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 11.12m (36.48ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Critical Feature Inspection Date: November 2021,  Bridge Improvement Cost: $2,414,000,  Roadway Improvement Cost: $1,414,000,  Total Project Cost: $3,828,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1062491,  Location: 0.6MI S JCT ROL SB+104 (Lat: 43.198247,  Lng: -77.680244),  Route carried "on" structure: State highway 390,  Year Built: 1971,  Status: Open,  Structure Length: 6.43m (21.10ft),  Average Daily Traffic: 40,981 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 42,747 (year 2040),  Design Load: HS 20,  Features Intersected: LATONA RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.682,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.43m (21.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,705,000,  Roadway Improvement Cost: $1,584,000,  Total Project Cost: $4,289,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1062492,  Location: 0.6MI S JCT ROL NB+104 (Lat: 43.197911,  Lng: -77.680236),  Route carried "on" structure: State highway 390,  Year Built: 1971,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 40,981 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 42,747 (year 2040),  Design Load: HS 20,  Features Intersected: LATONA RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.682,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.46m (21.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,680,000,  Roadway Improvement Cost: $1,569,000,  Total Project Cost: $4,249,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1062501,  Location: 0.8MI S JCT ROL SB+104 (Lat: 43.195833,  Lng: -77.682258),  Route carried "on" structure: State highway 390,  Year Built: 1971,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 40,981 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 42,747 (year 2040),  Design Load: HS 20,  Features Intersected: WEILAND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.425,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.7m (123.7ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,933,000,  Roadway Improvement Cost: $1,132,000,  Total Project Cost: $3,065,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1062502,  Location: 0.8MI S JCT ROL NB+104 (Lat: 43.195853,  Lng: -77.681939),  Route carried "on" structure: State highway 390,  Year Built: 1971,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 40,981 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 42,747 (year 2040),  Design Load: HS 20,  Features Intersected: WEILAND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.425,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.7m (123.7ft),  Curb-To-Curb Width: 17.5m (57.4ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,090,000,  Roadway Improvement Cost: $1,224,000,  Total Project Cost: $3,313,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 106379,  Location: JCT NB ROL + WB 104 (Lat: 43.206933,  Lng: -77.674383),  Route carried "on" structure: Ramp US 104,  Year Built: 1971,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 5.43m (17.81ft),  Average Daily Traffic: 7,783 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 8,118 (year 2040),  Design Load: HS 20,  Features Intersected: RAMPS GB AND GC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.145,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.2m (82.7ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Very good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.42m (17.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,329,000,  Roadway Improvement Cost: $778,000,  Total Project Cost: $2,107,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1071961,  Location: 1.2 MI N JCT SH390 &SH104 (Lat: 43.223678,  Lng: -77.674900),  Route carried "on" structure: State highway 390,  Year Built: 1983,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 22,337 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 23,299 (year 2040),  Design Load: HS 20,  Features Intersected: MAIDEN LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.643,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.4m (112.9ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.59m (11.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,747,000,  Roadway Improvement Cost: $1,023,000,  Total Project Cost: $2,770,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1071962,  Location: 1.2 MI N JCT SH390 &SH104 (Lat: 43.223681,  Lng: -77.674625),  Route carried "on" structure: State highway 390,  Year Built: 1983,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 22,337 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 23,299 (year 2040),  Design Load: HS 20,  Features Intersected: MAIDEN LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.643,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.4m (112.9ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.59m (11.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,721,000,  Roadway Improvement Cost: $1,008,000,  Total Project Cost: $2,728,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107237,  Location: 2.2MI N JCT RTS 104&390 (Lat: 43.238344,  Lng: -77.671239),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 6.37m (20.90ft),  Average Daily Traffic: 5,877 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 7,271 (year 2040),  Design Load: HS 20,  Features Intersected: 390 390 43011057 NB, RTE,  Facility Carried by Structure: ENGLISH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.036,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.0m (101.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.37m (20.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,976,000,  Roadway Improvement Cost: $1,743,000,  Total Project Cost: $4,718,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107238,  Location: JCT OF RTS 18&390 ROL (Lat: 43.252883,  Lng: -77.667925),  Route carried "on" structure: State highway 18,  Year Built: 1983,  Status: Open,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 13,103 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 15,917 (year 2040),  Design Load: HS 20,  Features Intersected: 390 390 43011067 NB, RTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.263,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 23.1m (75.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 25.6m (84.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 42.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.75m (15.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,635,000,  Roadway Improvement Cost: $2,129,000,  Total Project Cost: $5,763,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1072391,  Location: 0.6MI NORTH JCT RTS18&390 (Lat: 43.260897,  Lng: -77.667581),  Route carried "on" structure: State highway 390,  Year Built: 1983,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 9,331 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,733 (year 2040),  Design Load: HS 20,  Features Intersected: ROUND POND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.858,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.7m (77.8ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 0.0m,  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.49m (8.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,301,000,  Roadway Improvement Cost: $762,000,  Total Project Cost: $2,062,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1072392,  Location: 0.6MI NORTH JCT RTS18&390 (Lat: 43.260922,  Lng: -77.667267),  Route carried "on" structure: State highway 390,  Year Built: 1983,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 9,331 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,733 (year 2040),  Design Load: HS 20,  Features Intersected: ROUND POND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.858,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.7m (77.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.49m (8.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,014,000,  Roadway Improvement Cost: $594,000,  Total Project Cost: $1,608,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107242,  Location: 1.7MI NO JCT RTS 104&390 (Lat: 43.231072,  Lng: -77.672336),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 5.82m (19.09ft),  Average Daily Traffic: 11,409 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,859 (year 2040),  Design Load: HS 20,  Features Intersected: 390 SB, RTE 390,  Facility Carried by Structure: VINTAGE LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.963,  Lanes on structure: 5,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.6m (97.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.82m (19.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $3,701,000,  Roadway Improvement Cost: $2,167,000,  Total Project Cost: $5,868,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107744,  Location: 2.2 MI W JCT RTS 390 & 18 (Lat: 43.253164,  Lng: -77.709533),  Route carried "on" structure: State highway 18,  Year Built: 1999,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 9,471 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 11,505 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: LARKIN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.884,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $577,000,  Roadway Improvement Cost: $338,000,  Total Project Cost: $915,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 107745,  Location: 0.9 MI W JCT RTS 390 & 18 (Lat: 43.252956,  Lng: -77.686153),  Route carried "on" structure: State highway 18,  Year Built: 1998,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 25,147 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 30,548 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: ROUND POND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.783,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 21.4m (70.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 77.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $636,000,  Roadway Improvement Cost: $373,000,  Total Project Cost: $1,009,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 107908,  Location: 0.04M N of MAIDEN LANE (Lat: 43.224119,  Lng: -77.674547),  Route carried "on" structure: State highway 390,  Year Built: 1983,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 44,674 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 46,599 (year 2040),  Features Intersected: PADDY HILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.691,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Poor,  Operating Rating: 73.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 13.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $252,000,  Roadway Improvement Cost: $148,000,  Total Project Cost: $399,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 221109,  Location: 1 MI NORTH OF GREECE (Lat: 43.223669,  Lng: -77.695603),  Route carried "on" structure: Other road ,  Year Built: 2019,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 8,047 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 9,775 (year 2040),  Design Load: HL 93,  Features Intersected: ROUND POND CREEK,  Facility Carried by Structure: MAIDEN LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.689,  Lanes on structure: 5,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 25.4m (83.3ft)

Condition: Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 79.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,021,000,  Roadway Improvement Cost: $598,000,  Total Project Cost: $1,620,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221112,  Location: 1.2 MI SW OF GREECE (Lat: 43.197786,  Lng: -77.710733),  Route carried "on" structure: Other road ,  Year Built: 2017,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 5,031 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 7,043 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: ROUND POND CREEK,  Facility Carried by Structure: STRAUB ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.772,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Channel: Good,  Culverts: Excellent,  Operating Rating: 77.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $176,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $279,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 225786,  Location: 2.5 MI E OF NORTH GREECE (Lat: 43.254792,  Lng: -77.682572),  Route carried "on" structure: Other road ,  Year Built: 1975,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 431 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 603 (year 2037),  Features Intersected: ROUND POND CREEK,  Facility Carried by Structure: WYE BRIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $463,000,  Roadway Improvement Cost: $271,000,  Total Project Cost: $734,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226824,  Location: 1.2 MI W OF I390-RT18 INT (Lat: 43.251469,  Lng: -77.689311),  Route carried "on" structure: Other road ,  Year Built: 1980,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 629 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 881 (year 2037),  Design Load: H 20,  Features Intersected: ROUND POND CREEK,  Facility Carried by Structure: WILLOWOOD DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.885,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.0m (19.7ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Poor,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $457,000,  Roadway Improvement Cost: $268,000,  Total Project Cost: $724,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331708,  Location: 0.8 MI N INT SH18 & CR134 (Lat: 43.262408,  Lng: -77.665306),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 4,213 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 5,212 (year 2040),  Features Intersected: ROUND POND CREEK,  Facility Carried by Structure: ISLAND COTTAGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.046,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 79.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $273,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $433,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 33175,  Location: 1 MI N OF N GREECE (Lat: 43.266403,  Lng: -77.732356),  Route carried "on" structure: County highway ,  Year Built: 2004,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 2,767 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,423 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: NORTHRUP CREEK,  Facility Carried by Structure: NORTH GREECE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.825,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 19.2m (63.0ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 80.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $609,000,  Roadway Improvement Cost: $357,000,  Total Project Cost: $965,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331754,  Location: 3 MI E OF N GREECE (Lat: 43.258844,  Lng: -77.677625),  Route carried "on" structure: County highway ,  Year Built: 2012,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,228 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,719 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: ROUND POND CREEK,  Facility Carried by Structure: KIRK ROAD CR 262
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.625,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 80.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $507,000,  Roadway Improvement Cost: $297,000,  Total Project Cost: $804,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331758,  Location: .1 MI N CR136 & JANES RD (Lat: 43.268928,  Lng: -77.696250),  Route carried "on" structure: County highway ,  Year Built: 2000,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 6,444 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 7,828 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: LARKIN CREEK,  Facility Carried by Structure: LONG POND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.601,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 2.6m (8.5ft),  Right: 0.0m,  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 15.9m (52.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $470,000,  Roadway Improvement Cost: $275,000,  Total Project Cost: $745,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 331759,  Location: 2 MI N OF N GREECE (Lat: 43.281642,  Lng: -77.714719),  Route carried "on" structure: County highway ,  Year Built: 1999,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 6,227 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 7,704 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: NORTHRUP CREEK,  Facility Carried by Structure: COUNTY ROAD 14
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.138,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.1m (75.8ft),  Curb or Sidewalk Widths: Left: 2.2m (7.2ft),  Right: 0.0m,  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,014,000,  Roadway Improvement Cost: $594,000,  Total Project Cost: $1,607,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 3367,  Location: 1.7MI.NORTH OF RTE. 104 (Lat: 43.231167,  Lng: -77.695556),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 11,409 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,859 (year 2040),  Design Load: HS 20,  Features Intersected: ROUND POND CREEK,  Facility Carried by Structure: VINTAGE LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 5,  Owner: County Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.0m (32.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 79.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $362,000,  Roadway Improvement Cost: $212,000,  Total Project Cost: $575,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 336806,  Location: 1.2 MI NORTH OF GREECE (Lat: 43.243581,  Lng: -77.696572),  Route carried "on" structure: County highway ,  Year Built: 1980,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 25,012 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 30,384 (year 2040),  Features Intersected: Round Pond Creek,  Facility Carried by Structure: LONG POND ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.833,  Lanes on structure: 5,  Owner: County Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.6m (11.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 16.8m (55.1ft),  Out-to-Out Width: 44.5m (146.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 85.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 65.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $632,000,  Roadway Improvement Cost: $370,000,  Total Project Cost: $1,003,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 336808,  Location: 0.17 MI NE RT104-386 JCTN (Lat: 43.217903,  Lng: -77.733694),  Route carried "on" structure: County highway ,  Year Built: 1991,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 9,783 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 11,884 (year 2040),  Features Intersected: LARKIN CREEK,  Facility Carried by Structure: N. GREECE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.451,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.7m (8.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 74.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $153,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $243,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 337005,  Location: .8 MI E OF N.GREECE ROAD (Lat: 43.238842,  Lng: -77.720300),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 5,877 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 7,271 (year 2040),  Features Intersected: LARKIN CREEK,  Facility Carried by Structure: ENGLISH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.062,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $603,000,  Roadway Improvement Cost: $353,000,  Total Project Cost: $957,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 337006,  Location: .8 MI E OF N GREECE ROAD (Lat: 43.231481,  Lng: -77.721028),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 5,121 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,220 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: LARKIN CREEK,  Facility Carried by Structure: MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.526,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 10.2m (33.5ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 80.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $492,000,  Roadway Improvement Cost: $288,000,  Total Project Cost: $779,000 ( Estimate for 2021)
Discuss Greece, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.