Bridge Statistics for Hallsburg, Texas (TX)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 41Number of bridges
  • 315ft / 95.6mTotal length
  • $16,901,000Total costs
  • 135,969Total average daily traffic
  • 23,743Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Hallsburg
  • No street view available for this location

New bridges in Hallsburg, TX - historical statistics
  • New bridges - historical statistics
  • 191930-1939
  • 21950-1959
  • 21960-1969
  • 101970-1979
  • 21990-1999
  • 52000-2009
  • 12010-2019
Reconstructed bridges in Hallsburg, TX - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31950-1959
  • 11960-1969
  • 01970-1979
  • 01980-1989
  • 01990-1999
  • 102000-2009
Average Bridge Daily Traffic in Hallsburg, TX
Average Bridge Truck Traffic in Hallsburg, TX
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Very good
  • 75.0%Good
  • 15.0%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 65.0%Good
  • 35.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.0%Very good
  • 35.0%Good
  • 50.0%Satisfactory
  • 5.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.1%Very good
  • 38.5%Good
  • 41.0%Satisfactory
  • 12.8%Fair
  • 2.6%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 45.0%Good
  • 35.0%Satisfactory
  • 15.0%Fair
  • 5.0%Poor
Find on map >>   Show street view

Structure Number: 91610004901008,  Location: 3.3 MI SE OF LP 340 (Lat: 31.529278,  Lng: -97.016308),  Route carried "on" structure: State highway 6,  Year Built: 1933,  Year Reconstructed: 1956,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 9,730 (year 2017),  Truck Traffic: 18%,  Average Future Daily Traffic: 11,870 (year 2037),  Features Intersected: SHAW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 57.745,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $600,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610004901046,  Location: 2.2 MI NW OF FM 1860 (Lat: 31.502367,  Lng: -96.941658),  Route carried "on" structure: State highway 6,  Year Built: 1936,  Year Reconstructed: 1956,  Status: Open,  Structure Length: 3.15m (10.33ft),  Average Daily Traffic: 5,830 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 8,530 (year 2037),  Design Load: H 15,  Features Intersected: MANOS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 65.769,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $600,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9161000490111,  Location: 2.6 MI SE OF LP 340 (Lat: 31.534317,  Lng: -97.027047),  Route carried "on" structure: State highway 6,  Year Built: 1971,  Status: Open,  Structure Length: 13.87m (45.51ft),  Average Daily Traffic: 9,730 (year 2017),  Truck Traffic: 18%,  Average Future Daily Traffic: 11,870 (year 2037),  Design Load: HS 20,  Features Intersected: TEHUACANA CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.446,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 15,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.34m (56.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,700,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $2,600,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610004901111,  Location: 3.3 MI SE OF LP 340 (Lat: 31.529156,  Lng: -97.016758),  Route carried "on" structure: State highway 6,  Year Built: 1971,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 9,729 (year 2017),  Truck Traffic: 18%,  Average Future Daily Traffic: 11,870 (year 2037),  Design Load: HS 20,  Features Intersected: SHAW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 57.750,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $600,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610004901112,  Location: 3.90 MI SE INT LP 340 (Lat: 31.523856,  Lng: -97.009592),  Route carried "on" structure: State highway 6,  Year Built: 1971,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 15,323 (year 2020),  Truck Traffic: 32%,  Average Future Daily Traffic: 22,910 (year 2033),  Design Load: HS 20,  Features Intersected: TRIB SHAW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 58.669,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 25.3m (83.0ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $400,000
Find on map >>   Show street view

Structure Number: 91610004901113,  Location: 8.8 MI SE OF LOOP 340 (Lat: 31.515819,  Lng: -96.957131),  Route carried "on" structure: State highway 6,  Year Built: 1971,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 4,822 (year 2020),  Truck Traffic: 22%,  Average Future Daily Traffic: 8,530 (year 2037),  Design Load: HS 20,  Features Intersected: SH 164 EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 63.611,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.14m (29.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $900,000,  Roadway Improvement Cost: $300,000,  Total Project Cost: $1,400,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610004901148,  Location: 2.20 MI NW OF FM 1860 (Lat: 31.502667,  Lng: -96.941411),  Route carried "on" structure: State highway 6,  Year Built: 2002,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 5,902 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 8,530 (year 2037),  Design Load: HS 20,  Features Intersected: MANOS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 65.785,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610004901161,  Location: 2.6 MI SE OF LP 340 (Lat: 31.534350,  Lng: -97.026219),  Route carried "on" structure: State highway 6,  Year Built: 2004,  Status: Open,  Structure Length: 14.17m (46.49ft),  Average Daily Traffic: 9,729 (year 2017),  Truck Traffic: 18%,  Average Future Daily Traffic: 11,870 (year 2037),  Design Load: HS 20,  Features Intersected: TEHUACANA CREEK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.432,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 91610005601003,  Location: 1.7 Mi E of SH 31 (Lat: 31.631744,  Lng: -96.999742),  Route carried "on" structure: US 84,  Year Built: 1931,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 6,718 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 8,830 (year 2037),  Design Load: H 15,  Features Intersected: Branch of Williams Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.882,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.5m (4.9ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 25.9m (85.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $400,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610005601004,  Location: 2.4 Mi E of SH 31 (Lat: 31.633242,  Lng: -96.988736),  Route carried "on" structure: US 84,  Year Built: 1931,  Year Reconstructed: 1955,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 6,718 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 9,130 (year 2033),  Features Intersected: Hog Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.932,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $500,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610005601005,  Location: 4.0 Mi E of SH 31 (Lat: 31.636658,  Lng: -96.961994),  Route carried "on" structure: US 84,  Year Built: 1931,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 5,093 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 6,300 (year 2037),  Design Load: H 15,  Features Intersected: Trib of Williams Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.505,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.5m (4.9ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 26.2m (86.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $400,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610005601006,  Location: 4.1 Mi E of SH 31 (Lat: 31.636825,  Lng: -96.960722),  Route carried "on" structure: US 84,  Year Built: 1931,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 5,093 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 6,720 (year 2033),  Design Load: H 15,  Features Intersected: Trib of Williams Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.616,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 26.2m (86.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $400,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610005601007,  Location: 4.3 Mi E of SH 31 (Lat: 31.637453,  Lng: -96.955892),  Route carried "on" structure: US 84,  Year Built: 1931,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 5,093 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 6,300 (year 2037),  Design Load: H 15,  Features Intersected: Trib of Williams Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.086,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 26.3m (86.3ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $400,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610005601008,  Location: 4.4 Mi E of SH 31 (Lat: 31.637614,  Lng: -96.954919),  Route carried "on" structure: US 84,  Year Built: 1931,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 5,093 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 6,720 (year 2033),  Design Load: H 15,  Features Intersected: Trib of Williams Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.178,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 26.3m (86.3ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $400,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610005601009,  Location: 4.9 Mi E of SH 31 (Lat: 31.638386,  Lng: -96.946775),  Route carried "on" structure: US 84,  Year Built: 1931,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 5,093 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 6,300 (year 2037),  Design Load: H 15,  Features Intersected: Trib of Williams Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.955,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 26.1m (85.6ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $400,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9161000560101,  Location: 5.0 Mi E of SH 31 (Lat: 31.638453,  Lng: -96.945353),  Route carried "on" structure: US 84,  Year Built: 1931,  Year Reconstructed: 1968,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 5,093 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 6,720 (year 2033),  Features Intersected: Williams Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.071,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.49m (18.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $600,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $900,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610005601011,  Location: 5.1 Mi E of SH 31 (Lat: 31.638589,  Lng: -96.943664),  Route carried "on" structure: US 84,  Year Built: 1933,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 5,093 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 6,720 (year 2033),  Design Load: H 15,  Features Intersected: Williams Creek Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.253,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 26.4m (86.6ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $500,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610005601012,  Location: 6.6 Mi E of SH 31 (Lat: 31.640036,  Lng: -96.919975),  Route carried "on" structure: US 84,  Year Built: 1933,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 5,093 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 6,720 (year 2033),  Design Load: H 15,  Features Intersected: Br of Williams Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.508,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 25.9m (85.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $500,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610083104013,  Location: 2.6 Mi SW of SH 6 (Lat: 31.495433,  Lng: -97.008406),  Route carried "on" structure: State highway 1860,  Year Built: 1956,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 339 (year 2020),  Truck Traffic: 29%,  Average Future Daily Traffic: 510 (year 2037),  Design Load: H 20,  Features Intersected: Tributary Brazos River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.389,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $400,000
Find on map >>   Show street view

Structure Number: 91610119201006,  Location: 3.6 MI SE OF SH 31 (Lat: 31.664339,  Lng: -96.906475),  Route carried "on" structure: State highway 939,  Year Built: 1958,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 538 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 950 (year 2037),  Features Intersected: SALT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.845,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $400,000
Find on map >>   Show street view

Structure Number: 91610119201008,  Location: 3.50 MI SE OF US 84 (Lat: 31.597556,  Lng: -96.862228),  Route carried "on" structure: State highway 939,  Year Built: 1993,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 873 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 870 (year 2037),  Design Load: HS 20,  Features Intersected: BIG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.352,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $600,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610119201009,  Location: 1.55 MI SE OF US 84 (Lat: 31.621706,  Lng: -96.878775),  Route carried "on" structure: State highway 939,  Year Built: 1993,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 873 (year 2020),  Truck Traffic: 19%,  Average Future Daily Traffic: 870 (year 2037),  Design Load: HS 20,  Features Intersected: TRADING HOUSE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.248,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $600,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610303201001,  Location: 0.5 MI W OF FM 939 (Lat: 31.587781,  Lng: -96.865539),  Route carried "on" structure: State highway 2957,  Year Built: 1969,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 610 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 440 (year 2033),  Design Load: HS 20,  Features Intersected: BIG CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.448,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $400,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610333101002,  Location: 0.6 MI E OF SH 6 (Lat: 31.526106,  Lng: -96.981661),  Route carried "on" structure: State highway 3222,  Year Built: 2004,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 726 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,280 (year 2030),  Design Load: HS 20,  Features Intersected: SHAW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.520,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 25.6m (84.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610AA0586001,  Location: 1.65 MI NW OF FM 2491 (Lat: 31.608694,  Lng: -97.000525),  Route carried "on" structure: County highway 222,  Year Built: 1970,  Status: Posted for load,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 103 (year 2020),  Average Future Daily Traffic: 150 (year 2032),  Features Intersected: WILLIAMS CREEK #2046,  Facility Carried by Structure: DOUBLE EE RANCH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.724,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $334,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $418,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 91610AA0588001,  Location: 0.45 MI NE OF US 84 (Lat: 31.642081,  Lng: -96.935536),  Route carried "on" structure: County highway 2090,  Year Built: 2001,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 100 (year 2020),  Average Future Daily Traffic: 80 (year 2036),  Features Intersected: WILLIAMS CRK BR #1039,  Facility Carried by Structure: RUDY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.621,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 91610AA0590001,  Location: 1.00 MI SW OF FM 939 (Lat: 31.603286,  Lng: -96.886781),  Route carried "on" structure: County highway 213,  Year Built: 2001,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 100 (year 2020),  Average Future Daily Traffic: 60 (year 2036),  Features Intersected: TRADINGHS CRK TRIB #2033,  Facility Carried by Structure: OLD SAWMILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.621,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 91610AA0591002,  Location: 0.60 MI NW OF FM 2957 (Lat: 31.591769,  Lng: -96.878383),  Route carried "on" structure: County highway 248,  Year Built: 1935,  Status: Posted for load,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 100 (year 2020),  Average Future Daily Traffic: 60 (year 2036),  Features Intersected: BIG CRK TRIB #2032,  Facility Carried by Structure: VERNAL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.058,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Channel: Fair,  Culverts: Poor,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $167,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $208,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 91610AA0596001,  Location: 0.15 MI NW OF US 84 (Lat: 31.640747,  Lng: -96.943136),  Route carried "on" structure: County highway ,  Year Built: 1968,  Year Reconstructed: 2012,  Status: Posted for load,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 473 (year 2020),  Average Future Daily Traffic: 800 (year 2036),  Features Intersected: WILLIAMS CRK #1038,  Facility Carried by Structure: VICHA RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.575,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $251,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $313,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610AA0607001,  Location: 1.65 MI W OF FM 939 (Lat: 31.663789,  Lng: -96.936656),  Route carried "on" structure: County highway 209,  Year Built: 1972,  Status: Posted for load,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 100 (year 2020),  Average Future Daily Traffic: 300 (year 2036),  Features Intersected: WILLIAMS CRK #1037,  Facility Carried by Structure: HURST RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.460,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $167,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $208,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610AA0616001,  Location: 0.45 MI S OF US 84 (Lat: 31.629172,  Lng: -96.969639),  Route carried "on" structure: County highway 230,  Year Built: 1974,  Status: Posted for load,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 100 (year 2020),  Average Future Daily Traffic: 70 (year 2036),  Features Intersected: WILLIAMS CRK #2044,  Facility Carried by Structure: FRAZIER LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.724,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $334,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $418,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 91610AA0653001,  Location: 0.50 MI SE OF SH 164 (Lat: 31.514547,  Lng: -96.926747),  Route carried "on" structure: County highway 224,  Year Built: 1974,  Status: Posted for load,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 100 (year 2020),  Average Future Daily Traffic: 150 (year 2036),  Features Intersected: MANOS CRK TRIB #1040,  Facility Carried by Structure: AYCOCK LN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $375,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610AA0710001,  Location: 0.60 MI N OF SH 6 (Lat: 31.529344,  Lng: -96.994786),  Route carried "on" structure: County highway 216,  Year Built: 1970,  Status: Posted for load,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 522 (year 2020),  Average Future Daily Traffic: 395 (year 2036),  Features Intersected: SHAW CRK #2018,  Facility Carried by Structure: HARRISON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.506,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Poor,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $251,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $313,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610AA0841001,  Location: 0.15 MI E OF FM 2491 (Lat: 31.590017,  Lng: -96.983928),  Route carried "on" structure: County highway 211,  Year Built: 1935,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 110 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 180 (year 2036),  Features Intersected: TRDINGHSE CRK TRIB #2041,  Facility Carried by Structure: ELK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $167,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $208,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 91610AA0841002,  Location: 1.00 MI E OF FM 2491 (Lat: 31.596644,  Lng: -96.971997),  Route carried "on" structure: County highway 211,  Year Built: 1935,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 110 (year 2020),  Average Future Daily Traffic: 180 (year 2036),  Features Intersected: TRDINGHSE CRK TRIB #2042,  Facility Carried by Structure: ELK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 5.7m (18.7ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $167,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $208,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 91610AA0841003,  Location: 1.40 MI E OF FM 2491 (Lat: 31.599008,  Lng: -96.966942),  Route carried "on" structure: County highway 211,  Year Built: 1935,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 110 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 180 (year 2036),  Features Intersected: TRDINGHSE CRK TRIB #2043,  Facility Carried by Structure: ELK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.253,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $167,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $208,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 91610AA0841004,  Location: 2.15 MI E OF FM 2491 (Lat: 31.604403,  Lng: -96.955269),  Route carried "on" structure: County highway 211,  Year Built: 1935,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 110 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 180 (year 2036),  Features Intersected: TRADINGHS CRK TRIB #2037,  Facility Carried by Structure: ELK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.460,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 5.5m (18.0ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $167,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $208,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610AA0841005,  Location: 3.30 MI E OF FM 2491 (Lat: 31.613583,  Lng: -96.937867),  Route carried "on" structure: County highway 211,  Year Built: 1935,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 109 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 180 (year 2036),  Features Intersected: DRAW #2036,  Facility Carried by Structure: ELK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.311,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $167,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $208,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610AA0841006,  Location: 3.70 MI E OF FM 2491 (Lat: 31.616928,  Lng: -96.935439),  Route carried "on" structure: County highway 211,  Year Built: 1935,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 109 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 390 (year 2036),  Features Intersected: TRADINGHS CRK TRIB #2035,  Facility Carried by Structure: ELK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.955,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $167,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $208,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 91610AA2272001,  Location: 0.20 MI NW OF FM 1860 (Lat: 31.521944,  Lng: -97.021919),  Route carried "on" structure: County highway 204,  Year Built: 2011,  Status: Open,  Structure Length: 1.95m (6.40ft),  Average Daily Traffic: 123 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 100 (year 2036),  Design Load: HL 93,  Features Intersected: SHAW CRK #1025,  Facility Carried by Structure: OLD MARLIN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.058,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Concrete Cast-file-Place