Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Jupiter, Florida (FL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 53Number of bridges
  • 1,194ft / 364mTotal length
  • 1,704,393Total average daily traffic
  • 144,138Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Jupiter
  • No street view available for this location

New bridges in Jupiter, FL - historical statistics
  • New bridges - historical statistics
  • 41950-1959
  • 11970-1979
  • 311980-1989
  • 91990-1999
  • 22000-2009
  • 62010-2019
Reconstructed bridges in Jupiter, FL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 01990-1999
  • 62000-2009
Average Bridge Daily Traffic in Jupiter, FL
Average Bridge Truck Traffic in Jupiter, FL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 26.3%Very good
  • 63.2%Good
  • 7.9%Satisfactory
  • 2.6%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 47.4%Very good
  • 42.1%Good
  • 7.9%Fair
  • 2.6%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 18.4%Very good
  • 71.1%Good
  • 5.3%Satisfactory
  • 2.6%Fair
  • 2.6%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.3%Excellent
  • 17.9%Very good
  • 64.3%Good
  • 3.6%Satisfactory
Find on map >>   Show street view

Structure Number: 930374,  Location: Tpk. / SR 706 Interchange (Lat: 26.934758,  Lng: -80.153839),  Route carried "under" structure: State highway 91,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 44,700 (year 2020),  Truck Traffic: 16%,  Features Intersected: SR-91 (Fla. Turnpike),  Facility Carried by Structure: Indiantown Rd.
Minimum Vertical Clearance: 4.96m (16.27ft),  Kilometerpoint: 68.865,  Lanes on structure: 7,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.7m (117.1ft)

Find on map >>   Show street view

Structure Number: 930376,  Location: I 95 SR 706 interchange (Lat: 26.932750,  Lng: -80.151083),  Route carried "under" structure: Ramp Interstate 95,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 4,800 (year 2021),  Truck Traffic: 9%,  Features Intersected: SB I-95 To EB 706
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.124,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.4m (60.4ft)

Find on map >>   Show street view

Structure Number: 93038,  Location: I 95 SR 706 Interchange (Lat: 26.936422,  Lng: -80.148253),  Route carried "under" structure: Ramp Interstate 95,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 8,400 (year 2018),  Truck Traffic: 5%,  Features Intersected: SR 706 To NB I 95
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 0.262,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.4m (122.7ft)

Find on map >>   Show street view

Structure Number: 930382,  Location: I-95 / Donald Ross Rd (Lat: 26.883147,  Lng: -80.128603),  Route carried "under" structure: County highway ,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 15,700 (year 2021),  Truck Traffic: 5%,  Features Intersected: Donald Ross Road,  Facility Carried by Structure: SB I-95 ( SR-9 )
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 0.270,  Lanes on structure: 5,  Lanes under structure: 9,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.0m (164.0ft)

Find on map >>   Show street view

Structure Number: 930383,  Location: I-95 / Donald Ross Rd (Lat: 26.882950,  Lng: -80.127961),  Route carried "under" structure: County highway ,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 36,000 (year 2021),  Truck Traffic: 5%,  Features Intersected: Donald Ross Road,  Facility Carried by Structure: NB I-95 ( SR-9 )
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 0.322,  Lanes on structure: 5,  Lanes under structure: 9,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.0m (164.0ft)

Find on map >>   Show street view

Structure Number: 930384,  Location: Tpk. SR 706 Interchange (Lat: 26.934358,  Lng: -80.153581),  Route carried "under" structure: State highway 91,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 53,000 (year 2021),  Truck Traffic: 11%,  Features Intersected: SR-91 Fl. Tpk,  Facility Carried by Structure: EB 706 To SB I-95
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 68.832,  Lanes on structure: 1,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 57.5m (188.6ft)

Find on map >>   Show street view

Structure Number: 930385,  Location: I-95 / SR 706 interchange (Lat: 26.936800,  Lng: -80.150175),  Route carried "under" structure: Interstate 95,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 85,500 (year 2021),  Truck Traffic: 8%,  Features Intersected: I-95 (SR-9)
Minimum Vertical Clearance: 5.10m (16.73ft),  Kilometerpoint: 71.323,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.5m (126.3ft)

Find on map >>   Show street view

Structure Number: 93039,  Location: I-95 / SR 706 Interchange (Lat: 26.934539,  Lng: -80.151839),  Route carried "under" structure: Ramp Interstate 95,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 4,600 (year 2021),  Truck Traffic: 7%,  Features Intersected: SR 706 & I-95/SR706 Ramp
Minimum Vertical Clearance: 7.82m (25.66ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.3m (135.5ft)

Find on map >>   Show street view

Structure Number: 93039,  Location: I-95 / SR 706 Interchange (Lat: 26.934539,  Lng: -80.151839),  Route carried "under" structure: State highway 706,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 68,000 (year 2021),  Truck Traffic: 10%,  Features Intersected: SR 706 & I-95/SR706 Ramp
Minimum Vertical Clearance: 6.95m (22.80ft),  Kilometerpoint: 20.044,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.3m (135.5ft)

Find on map >>   Show street view

Structure Number: 930453,  Location: Indiantown Rd./ICW (Lat: 26.933806,  Lng: -80.083917),  Route carried "under" structure: Business City street ,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2021),  Truck Traffic: 4%,  Features Intersected: Intracoastal Waterway,  Facility Carried by Structure: EB SR706
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Movable - Bascule,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 930454,  Location: Indiantown Rd/ ICW (Lat: 26.933981,  Lng: -80.083936),  Route carried "under" structure: Business City street ,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2021),  Truck Traffic: 5%,  Features Intersected: Intracoastal Waterway,  Facility Carried by Structure: WB SR 706
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Movable - Bascule,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 931012,  Location: SR 91 at Jupiter Interch (Lat: 26.939292,  Lng: -80.155778),  Route carried "under" structure: State highway 91,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 42,300 (year 2021),  Truck Traffic: 19%,  Features Intersected: SR91 TPK (JUPITER INT)
Minimum Vertical Clearance: 5.24m (17.19ft),  Kilometerpoint: 69.469,  Lanes on structure: 2,  Lanes under structure: 5,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 47.9m (157.2ft)

Discuss Jupiter, Florida (FL) on our hugely popular Florida forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.