Bridge Statistics for Lake Buena Vista, Florida (FL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- New bridges - historical statistics
- 31970-1979
- 311980-1989
- 291990-1999
- 152000-2009
- 502010-2019
- 12020-2022
- Bridge Condition - Deck
- 3.1%Excellent
- 28.1%Very good
- 57.8%Good
- 7.8%Satisfactory
- 3.1%Fair
- Bridge Condition - Superstructure
- 15.6%Excellent
- 39.1%Very good
- 40.6%Good
- 1.6%Satisfactory
- 3.1%Fair
- Bridge Condition - Substructure
- 6.3%Excellent
- 28.1%Very good
- 64.1%Good
- 1.6%Satisfactory
- Bridge Condition - Channel
- 18.2%Excellent
- 50.0%Very good
- 4.5%Good
- 22.7%Satisfactory
- 4.5%Fair
- Bridge Condition - Culverts
- 25.0%Very good
- 25.0%Good
- 50.0%Satisfactory
Find on map >> Show street view
Structure Number: 756046, Location: Reedy Creek Imp District (Lat: 28.367472, Lng: -81.519083), Route carried "under" structure: City street , Year Built: 2015, Structure Length: 0. m, Average Daily Traffic: 53,000 (year 2015), Truck Traffic: 8%, Features Intersected: Buena Vista Drive, Facility Carried by Structure: Pedestrian Walkway
Minimum Vertical Clearance: 6.61m (21.69ft), Kilometerpoint: 7.178, Lanes under structure: 5, Material/Design: Steel, Design/Construction: Truss - Thru, Length of Maximum Span: 76.5m (251.0ft)
Structure Number: 756046, Location: Reedy Creek Imp District (Lat: 28.367472, Lng: -81.519083), Route carried "under" structure: City street , Year Built: 2015, Structure Length: 0. m, Average Daily Traffic: 53,000 (year 2015), Truck Traffic: 8%, Features Intersected: Buena Vista Drive, Facility Carried by Structure: Pedestrian Walkway
Minimum Vertical Clearance: 6.61m (21.69ft), Kilometerpoint: 7.178, Lanes under structure: 5, Material/Design: Steel, Design/Construction: Truss - Thru, Length of Maximum Span: 76.5m (251.0ft)
Find on map >> Show street view
Structure Number: 756047, Location: Reedy Creek Imp District (Lat: 28.373333, Lng: -81.512861), Route carried "under" structure: City street , Year Built: 2015, Structure Length: 0. m, Average Daily Traffic: 53,000 (year 2015), Truck Traffic: 8%, Features Intersected: Hotel Plaza Boulevard, Facility Carried by Structure: Pedestrian Walkway
Minimum Vertical Clearance: 6.48m (21.26ft), Kilometerpoint: 0.000, Lanes under structure: 5, Material/Design: Steel, Design/Construction: Truss - Thru, Length of Maximum Span: 47.9m (157.2ft)
Structure Number: 756047, Location: Reedy Creek Imp District (Lat: 28.373333, Lng: -81.512861), Route carried "under" structure: City street , Year Built: 2015, Structure Length: 0. m, Average Daily Traffic: 53,000 (year 2015), Truck Traffic: 8%, Features Intersected: Hotel Plaza Boulevard, Facility Carried by Structure: Pedestrian Walkway
Minimum Vertical Clearance: 6.48m (21.26ft), Kilometerpoint: 0.000, Lanes under structure: 5, Material/Design: Steel, Design/Construction: Truss - Thru, Length of Maximum Span: 47.9m (157.2ft)
Find on map >> Show street view
Structure Number: 756048, Location: Reedy Creek Imp District (Lat: 28.373333, Lng: -81.513417), Route carried "under" structure: City street , Year Built: 2015, Structure Length: 0. m, Average Daily Traffic: 53,000 (year 2015), Truck Traffic: 8%, Features Intersected: Buena Vista Drive North, Facility Carried by Structure: Pedestrian Walkway
Minimum Vertical Clearance: 6.34m (20.80ft), Kilometerpoint: 8.192, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Truss - Thru, Length of Maximum Span: 47.8m (156.8ft)
Structure Number: 756048, Location: Reedy Creek Imp District (Lat: 28.373333, Lng: -81.513417), Route carried "under" structure: City street , Year Built: 2015, Structure Length: 0. m, Average Daily Traffic: 53,000 (year 2015), Truck Traffic: 8%, Features Intersected: Buena Vista Drive North, Facility Carried by Structure: Pedestrian Walkway
Minimum Vertical Clearance: 6.34m (20.80ft), Kilometerpoint: 8.192, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Truss - Thru, Length of Maximum Span: 47.8m (156.8ft)
Find on map >> Show street view
Structure Number: 756049, Location: Reedy Creek Imp. District (Lat: 28.394589, Lng: -81.572281), Route carried "under" structure: Ramp City street , Year Built: 2019, Structure Length: 0. m, Average Daily Traffic: 12,600 (year 2018), Truck Traffic: 3%, Features Intersected: Vista Blvd Ramps B1 & B2, Facility Carried by Structure: World Drive NB
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 53.9m (176.8ft)
Structure Number: 756049, Location: Reedy Creek Imp. District (Lat: 28.394589, Lng: -81.572281), Route carried "under" structure: Ramp City street , Year Built: 2019, Structure Length: 0. m, Average Daily Traffic: 12,600 (year 2018), Truck Traffic: 3%, Features Intersected: Vista Blvd Ramps B1 & B2, Facility Carried by Structure: World Drive NB
Minimum Vertical Clearance: 5.00m (16.40ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 53.9m (176.8ft)
Find on map >> Show street view
Structure Number: 756049, Location: Reedy Creek Imp. District (Lat: 28.394589, Lng: -81.572281), Route carried "under" structure: Ramp City street , Year Built: 2019, Structure Length: 0. m, Average Daily Traffic: 7,700 (year 2018), Truck Traffic: 10%, Features Intersected: Vista Blvd Ramps B1 & B2, Facility Carried by Structure: World Drive NB
Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 53.9m (176.8ft)
Structure Number: 756049, Location: Reedy Creek Imp. District (Lat: 28.394589, Lng: -81.572281), Route carried "under" structure: Ramp City street , Year Built: 2019, Structure Length: 0. m, Average Daily Traffic: 7,700 (year 2018), Truck Traffic: 10%, Features Intersected: Vista Blvd Ramps B1 & B2, Facility Carried by Structure: World Drive NB
Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 53.9m (176.8ft)
Find on map >> Show street view
Structure Number: 756049, Location: Reedy Creek Imp. District (Lat: 28.394589, Lng: -81.572281), Route carried "under" structure: Ramp City street , Year Built: 2019, Structure Length: 0. m, Average Daily Traffic: 2,900 (year 2018), Truck Traffic: 10%, Features Intersected: Vista Blvd Ramps B1 & B2, Facility Carried by Structure: World Drive NB
Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 53.9m (176.8ft)
Structure Number: 756049, Location: Reedy Creek Imp. District (Lat: 28.394589, Lng: -81.572281), Route carried "under" structure: Ramp City street , Year Built: 2019, Structure Length: 0. m, Average Daily Traffic: 2,900 (year 2018), Truck Traffic: 10%, Features Intersected: Vista Blvd Ramps B1 & B2, Facility Carried by Structure: World Drive NB
Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 53.9m (176.8ft)
Find on map >> Show street view
Structure Number: 75605, Location: Reedy Creek Imp. District (Lat: 28.394669, Lng: -81.572519), Route carried "under" structure: Ramp City street , Year Built: 2019, Structure Length: 0. m, Average Daily Traffic: 12,600 (year 2018), Truck Traffic: 3%, Features Intersected: Vista Blvd Ramps B1 & B2, Facility Carried by Structure: World Drive SB
Minimum Vertical Clearance: 5.39m (17.68ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 40.3m (132.2ft)
Structure Number: 75605, Location: Reedy Creek Imp. District (Lat: 28.394669, Lng: -81.572519), Route carried "under" structure: Ramp City street , Year Built: 2019, Structure Length: 0. m, Average Daily Traffic: 12,600 (year 2018), Truck Traffic: 3%, Features Intersected: Vista Blvd Ramps B1 & B2, Facility Carried by Structure: World Drive SB
Minimum Vertical Clearance: 5.39m (17.68ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 40.3m (132.2ft)
Find on map >> Show street view
Structure Number: 75605, Location: Reedy Creek Imp. District (Lat: 28.394669, Lng: -81.572519), Route carried "under" structure: Ramp City street , Year Built: 2019, Structure Length: 0. m, Average Daily Traffic: 2,900 (year 2018), Truck Traffic: 10%, Features Intersected: Vista Blvd Ramps B1 & B2, Facility Carried by Structure: World Drive SB
Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 40.3m (132.2ft)
Structure Number: 75605, Location: Reedy Creek Imp. District (Lat: 28.394669, Lng: -81.572519), Route carried "under" structure: Ramp City street , Year Built: 2019, Structure Length: 0. m, Average Daily Traffic: 2,900 (year 2018), Truck Traffic: 10%, Features Intersected: Vista Blvd Ramps B1 & B2, Facility Carried by Structure: World Drive SB
Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 40.3m (132.2ft)
Find on map >> Show street view
Structure Number: 75605, Location: Reedy Creek Imp. District (Lat: 28.394669, Lng: -81.572519), Route carried "under" structure: Ramp City street , Year Built: 2019, Structure Length: 0. m, Average Daily Traffic: 7,700 (year 2018), Truck Traffic: 10%, Features Intersected: Vista Blvd Ramps B1 & B2, Facility Carried by Structure: World Drive SB
Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 40.3m (132.2ft)
Structure Number: 75605, Location: Reedy Creek Imp. District (Lat: 28.394669, Lng: -81.572519), Route carried "under" structure: Ramp City street , Year Built: 2019, Structure Length: 0. m, Average Daily Traffic: 7,700 (year 2018), Truck Traffic: 10%, Features Intersected: Vista Blvd Ramps B1 & B2, Facility Carried by Structure: World Drive SB
Minimum Vertical Clearance: 5.54m (18.18ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 40.3m (132.2ft)
Find on map >> Show street view
Structure Number: 756051, Location: Reedy Creek Imp. District (Lat: 28.393147, Lng: -81.572350), Route carried "under" structure: City street , Year Built: 2019, Structure Length: 0. m, Average Daily Traffic: 66,000 (year 2018), Truck Traffic: 10%, Features Intersected: Floridian Way, Facility Carried by Structure: World Drive SB
Minimum Vertical Clearance: 5.24m (17.19ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 48.4m (158.8ft)
Structure Number: 756051, Location: Reedy Creek Imp. District (Lat: 28.393147, Lng: -81.572350), Route carried "under" structure: City street , Year Built: 2019, Structure Length: 0. m, Average Daily Traffic: 66,000 (year 2018), Truck Traffic: 10%, Features Intersected: Floridian Way, Facility Carried by Structure: World Drive SB
Minimum Vertical Clearance: 5.24m (17.19ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 48.4m (158.8ft)
Find on map >> Show street view
Structure Number: 756051, Location: Reedy Creek Imp. District (Lat: 28.393147, Lng: -81.572350), Route carried "under" structure: Ramp City street , Year Built: 2019, Structure Length: 0. m, Average Daily Traffic: 1,800 (year 2018), Truck Traffic: 3%, Features Intersected: Floridian Way, Facility Carried by Structure: World Drive SB
Minimum Vertical Clearance: 5.27m (17.29ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 48.4m (158.8ft)
Structure Number: 756051, Location: Reedy Creek Imp. District (Lat: 28.393147, Lng: -81.572350), Route carried "under" structure: Ramp City street , Year Built: 2019, Structure Length: 0. m, Average Daily Traffic: 1,800 (year 2018), Truck Traffic: 3%, Features Intersected: Floridian Way, Facility Carried by Structure: World Drive SB
Minimum Vertical Clearance: 5.27m (17.29ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 48.4m (158.8ft)
Find on map >> Show street view
Structure Number: 756052, Location: Reedy Creek Imp District (Lat: 28.348019, Lng: -81.552458), Route carried "under" structure: City street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 18,100 (year 2018), Truck Traffic: 20%, Features Intersected: Victory Way, Facility Carried by Structure: Osceola Parkway
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 7, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 74.1m (243.1ft)
Structure Number: 756052, Location: Reedy Creek Imp District (Lat: 28.348019, Lng: -81.552458), Route carried "under" structure: City street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 18,100 (year 2018), Truck Traffic: 20%, Features Intersected: Victory Way, Facility Carried by Structure: Osceola Parkway
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 7, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 74.1m (243.1ft)
Find on map >> Show street view
Structure Number: 756053, Location: Reedy Creek Imp District (Lat: 28.347817, Lng: -81.552564), Route carried "under" structure: City street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 18,100 (year 2018), Truck Traffic: 20%, Features Intersected: Victory Way, Facility Carried by Structure: Osceola Parkway
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 7, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 74.3m (243.8ft)
Structure Number: 756053, Location: Reedy Creek Imp District (Lat: 28.347817, Lng: -81.552564), Route carried "under" structure: City street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 18,100 (year 2018), Truck Traffic: 20%, Features Intersected: Victory Way, Facility Carried by Structure: Osceola Parkway
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 7, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 74.3m (243.8ft)
Find on map >> Show street view
Structure Number: 756054, Location: Reedy Creek Imp District (Lat: 28.349617, Lng: -81.551625), Route carried "under" structure: City street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 18,100 (year 2018), Truck Traffic: 20%, Features Intersected: Victory Way, Facility Carried by Structure: RAMP C1
Minimum Vertical Clearance: 5.64m (18.50ft), Kilometerpoint: 0.209, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.0m (91.9ft)
Structure Number: 756054, Location: Reedy Creek Imp District (Lat: 28.349617, Lng: -81.551625), Route carried "under" structure: City street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 18,100 (year 2018), Truck Traffic: 20%, Features Intersected: Victory Way, Facility Carried by Structure: RAMP C1
Minimum Vertical Clearance: 5.64m (18.50ft), Kilometerpoint: 0.209, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.0m (91.9ft)
Find on map >> Show street view
Structure Number: 756055, Location: Reedy Creek Imp District (Lat: 28.349392, Lng: -81.551681), Route carried "under" structure: City street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 18,100 (year 2018), Truck Traffic: 20%, Features Intersected: Victory Way, Facility Carried by Structure: RAMP C2
Minimum Vertical Clearance: 5.49m (18.01ft), Kilometerpoint: 0.209, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.0m (91.9ft)
Structure Number: 756055, Location: Reedy Creek Imp District (Lat: 28.349392, Lng: -81.551681), Route carried "under" structure: City street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 18,100 (year 2018), Truck Traffic: 20%, Features Intersected: Victory Way, Facility Carried by Structure: RAMP C2
Minimum Vertical Clearance: 5.49m (18.01ft), Kilometerpoint: 0.209, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 28.0m (91.9ft)
Find on map >> Show street view
Structure Number: 756056, Location: Reedy Creek Imp District (Lat: 28.347197, Lng: -81.550403), Route carried "under" structure: City street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 45,700 (year 2018), Truck Traffic: 10%, Features Intersected: Osceola Parkway, Facility Carried by Structure: RAMP C1
Minimum Vertical Clearance: 5.27m (17.29ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 51.4m (168.6ft)
Structure Number: 756056, Location: Reedy Creek Imp District (Lat: 28.347197, Lng: -81.550403), Route carried "under" structure: City street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 45,700 (year 2018), Truck Traffic: 10%, Features Intersected: Osceola Parkway, Facility Carried by Structure: RAMP C1
Minimum Vertical Clearance: 5.27m (17.29ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 51.4m (168.6ft)
Find on map >> Show street view
Structure Number: 756056, Location: Reedy Creek Imp District (Lat: 28.347197, Lng: -81.550403), Route carried "under" structure: Ramp City street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 4,500 (year 2018), Truck Traffic: 4%, Features Intersected: Osceola Parkway, Facility Carried by Structure: RAMP C1
Minimum Vertical Clearance: 5.27m (17.29ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 3, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 51.4m (168.6ft)
Structure Number: 756056, Location: Reedy Creek Imp District (Lat: 28.347197, Lng: -81.550403), Route carried "under" structure: Ramp City street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 4,500 (year 2018), Truck Traffic: 4%, Features Intersected: Osceola Parkway, Facility Carried by Structure: RAMP C1
Minimum Vertical Clearance: 5.27m (17.29ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 3, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 51.4m (168.6ft)
Find on map >> Show street view
Structure Number: 756056, Location: Reedy Creek Imp District (Lat: 28.347197, Lng: -81.550403), Route carried "under" structure: Ramp City street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 4,500 (year 2018), Truck Traffic: 4%, Features Intersected: Osceola Parkway, Facility Carried by Structure: RAMP C1
Minimum Vertical Clearance: 5.27m (17.29ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 51.4m (168.6ft)
Structure Number: 756056, Location: Reedy Creek Imp District (Lat: 28.347197, Lng: -81.550403), Route carried "under" structure: Ramp City street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 4,500 (year 2018), Truck Traffic: 4%, Features Intersected: Osceola Parkway, Facility Carried by Structure: RAMP C1
Minimum Vertical Clearance: 5.27m (17.29ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 51.4m (168.6ft)
Find on map >> Show street view
Structure Number: 756057, Location: Reedy Creek Imp District (Lat: 28.347325, Lng: -81.550514), Route carried "under" structure: City street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 45,700 (year 2018), Truck Traffic: 10%, Features Intersected: Osceola Parkway, Facility Carried by Structure: RAMP C2
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 52.3m (171.6ft)
Structure Number: 756057, Location: Reedy Creek Imp District (Lat: 28.347325, Lng: -81.550514), Route carried "under" structure: City street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 45,700 (year 2018), Truck Traffic: 10%, Features Intersected: Osceola Parkway, Facility Carried by Structure: RAMP C2
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 52.3m (171.6ft)
Find on map >> Show street view
Structure Number: 756057, Location: Reedy Creek Imp District (Lat: 28.347325, Lng: -81.550514), Route carried "under" structure: Ramp City street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 4,500 (year 2018), Truck Traffic: 4%, Features Intersected: Osceola Parkway, Facility Carried by Structure: RAMP C2
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 52.3m (171.6ft)
Structure Number: 756057, Location: Reedy Creek Imp District (Lat: 28.347325, Lng: -81.550514), Route carried "under" structure: Ramp City street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 4,500 (year 2018), Truck Traffic: 4%, Features Intersected: Osceola Parkway, Facility Carried by Structure: RAMP C2
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 52.3m (171.6ft)
Find on map >> Show street view
Structure Number: 756057, Location: Reedy Creek Imp District (Lat: 28.347325, Lng: -81.550514), Route carried "under" structure: Ramp City street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 4,400 (year 2018), Truck Traffic: 10%, Features Intersected: Osceola Parkway, Facility Carried by Structure: RAMP C2
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 52.3m (171.6ft)
Structure Number: 756057, Location: Reedy Creek Imp District (Lat: 28.347325, Lng: -81.550514), Route carried "under" structure: Ramp City street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 4,400 (year 2018), Truck Traffic: 10%, Features Intersected: Osceola Parkway, Facility Carried by Structure: RAMP C2
Minimum Vertical Clearance: 5.16m (16.93ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 52.3m (171.6ft)
Find on map >> Show street view
Structure Number: 756058, Location: Reedy Creek Imp District (Lat: 28.347431, Lng: -81.552136), Route carried "under" structure: Ramp City street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 4,400 (year 2018), Truck Traffic: 10%, Features Intersected: RAMP C3, Facility Carried by Structure: RAMP C2
Minimum Vertical Clearance: 5.46m (17.91ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 56.4m (185.0ft)
Structure Number: 756058, Location: Reedy Creek Imp District (Lat: 28.347431, Lng: -81.552136), Route carried "under" structure: Ramp City street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 4,400 (year 2018), Truck Traffic: 10%, Features Intersected: RAMP C3, Facility Carried by Structure: RAMP C2
Minimum Vertical Clearance: 5.46m (17.91ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 56.4m (185.0ft)
Find on map >> Show street view
Structure Number: 756059, Location: Reedy Creek Imp District (Lat: 28.345975, Lng: -81.553103), Route carried "under" structure: City street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 10,500 (year 2018), Truck Traffic: 10%, Features Intersected: Victory Way, Facility Carried by Structure: RAMP G1
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 1.239, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 53.6m (175.9ft)
Structure Number: 756059, Location: Reedy Creek Imp District (Lat: 28.345975, Lng: -81.553103), Route carried "under" structure: City street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 10,500 (year 2018), Truck Traffic: 10%, Features Intersected: Victory Way, Facility Carried by Structure: RAMP G1
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 1.239, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 53.6m (175.9ft)
Find on map >> Show street view
Structure Number: 756062, Location: Reedy Creek Imp District (Lat: 28.370250, Lng: -81.513789), Route carried "under" structure: City street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 53,000 (year 2015), Truck Traffic: 8%, Features Intersected: Buena Vista Dr, Facility Carried by Structure: Pedestrian Walkway
Minimum Vertical Clearance: 8.34m (27.36ft), Kilometerpoint: 7.805, Lanes under structure: 9, Material/Design: Steel, Design/Construction: Truss - Thru, Length of Maximum Span: 74.0m (242.8ft)
Structure Number: 756062, Location: Reedy Creek Imp District (Lat: 28.370250, Lng: -81.513789), Route carried "under" structure: City street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 53,000 (year 2015), Truck Traffic: 8%, Features Intersected: Buena Vista Dr, Facility Carried by Structure: Pedestrian Walkway
Minimum Vertical Clearance: 8.34m (27.36ft), Kilometerpoint: 7.805, Lanes under structure: 9, Material/Design: Steel, Design/Construction: Truss - Thru, Length of Maximum Span: 74.0m (242.8ft)
Find on map >> Show street view
Structure Number: 756063, Location: Reedy Creek Imp District (Lat: 28.369867, Lng: -81.513619), Route carried "under" structure: ServiceCity street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 1,825 (year 2018), Features Intersected: Parking Garage Exit Road, Facility Carried by Structure: Pedestrian Bridge
Minimum Vertical Clearance: 8.29m (27.20ft), Kilometerpoint: 0.000, Lanes under structure: 3, Material/Design: Steel, Design/Construction: Truss - Thru, Length of Maximum Span: 44.9m (147.3ft)
Structure Number: 756063, Location: Reedy Creek Imp District (Lat: 28.369867, Lng: -81.513619), Route carried "under" structure: ServiceCity street , Year Built: 2018, Structure Length: 0. m, Average Daily Traffic: 1,825 (year 2018), Features Intersected: Parking Garage Exit Road, Facility Carried by Structure: Pedestrian Bridge
Minimum Vertical Clearance: 8.29m (27.20ft), Kilometerpoint: 0.000, Lanes under structure: 3, Material/Design: Steel, Design/Construction: Truss - Thru, Length of Maximum Span: 44.9m (147.3ft)
Find on map >> Show street view
Structure Number: 756703, Location: Epcot Exit R-Entrance Rd (Lat: 28.381486, Lng: -81.553081), Route carried "under" structure: City street , Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 10,001 (year 2021), Truck Traffic: 5%, Features Intersected: Epcot Parking Access, Facility Carried by Structure: Epcot Center Dr
Minimum Vertical Clearance: 4.66m (15.29ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.1m (88.9ft)
Structure Number: 756703, Location: Epcot Exit R-Entrance Rd (Lat: 28.381486, Lng: -81.553081), Route carried "under" structure: City street , Year Built: 1980, Structure Length: 0. m, Average Daily Traffic: 10,001 (year 2021), Truck Traffic: 5%, Features Intersected: Epcot Parking Access, Facility Carried by Structure: Epcot Center Dr
Minimum Vertical Clearance: 4.66m (15.29ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 27.1m (88.9ft)