Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Mission, Texas (TX)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 59Number of bridges
  • 2,657ft / 810mTotal length
  • $40,000Total costs
  • 679,891Total average daily traffic
  • 44,989Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Mission
  • No street view available for this location

New bridges in Mission, TX - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 21960-1969
  • 21970-1979
  • 41980-1989
  • 111990-1999
  • 222000-2009
  • 172010-2019
Reconstructed bridges in Mission, TX - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21990-1999
  • 52000-2009
Average Bridge Daily Traffic in Mission, TX
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 2.7%Excellent
  • 10.8%Very good
  • 62.2%Good
  • 21.6%Satisfactory
  • 2.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 2.7%Excellent
  • 45.9%Very good
  • 29.7%Good
  • 18.9%Satisfactory
  • 2.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 2.7%Excellent
  • 5.4%Very good
  • 64.9%Good
  • 21.6%Satisfactory
  • 5.4%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 40.0%Good
  • 56.0%Satisfactory
  • 4.0%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 60.0%Good
  • 40.0%Satisfactory
Find on map >>   Show street view

Structure Number: 211090M04423001,  Location: 0.7 MI W OF SHARY RD (Lat: 26.184903,  Lng: -98.301933),  Route carried "on" structure: City street ,  Year Built: 1980,  Status: Posted for load,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 1,320 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 500 (year 2031),  Features Intersected: DRAINAGE DITCH,  Facility Carried by Structure: RIO GRANDE DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 211090003902163,  Location: 0.50 MI S OF IH 2 (Lat: 26.191047,  Lng: -98.313150),  Route carried "under" structure: City street ,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 2010),  Truck Traffic: 15%,  Features Intersected: TRINITY ST,  Facility Carried by Structure: FM 396 NB
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 211090003902164,  Location: 0.50 MI S OF US 83 (Lat: 26.191897,  Lng: -98.313347),  Route carried "under" structure: City street ,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 2010),  Truck Traffic: 15%,  Features Intersected: TRINITY ST,  Facility Carried by Structure: FM 396 SB
Minimum Vertical Clearance: 5.23m (17.16ft),  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 211090003917174,  Location: 1.20 MI NW OF FM 1016 (Lat: 26.209958,  Lng: -98.342994),  Route carried "under" structure: US 83,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 54,970 (year 2011),  Truck Traffic: 9%,  Features Intersected: US 83,  Facility Carried by Structure: LOS EBANOS RD
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 26.723,  Lanes on structure: 2,  Lanes under structure: 12,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: 211090003917321,  Location: 1.00 MI W OF FM 396 (Lat: 26.201144,  Lng: -98.328728),  Route carried "under" structure: State highway 1016,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 12,700 (year 2009),  Truck Traffic: 3%,  Features Intersected: FM 1016 & UP RR,  Facility Carried by Structure: US 83 EB
Minimum Vertical Clearance: 7.47m (24.51ft),  Kilometerpoint: 1.603,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: 211090003917322,  Location: 1.00 MI W OF FM 396 (Lat: 26.201386,  Lng: -98.327969),  Route carried "under" structure: State highway 1016,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 12,700 (year 2009),  Truck Traffic: 3%,  Features Intersected: FM 1016 & UP RR,  Facility Carried by Structure: US 83 WB
Minimum Vertical Clearance: 7.60m (24.93ft),  Kilometerpoint: 1.616,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: 211090003917323,  Location: 1.50 MI W OF SP 487 (Lat: 26.195733,  Lng: -98.288717),  Route carried "under" structure: State highway 494,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 17,300 (year 2009),  Truck Traffic: 4%,  Features Intersected: FM 494 (SHARY RD),  Facility Carried by Structure: US 83 EB
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 29.622,  Lanes on structure: 4,  Lanes under structure: 10,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: 211090003917324,  Location: 1.50 MI W OF SP 487 (Lat: 26.195978,  Lng: -98.288044),  Route carried "under" structure: State highway 494,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 17,300 (year 2009),  Truck Traffic: 4%,  Features Intersected: FM 494 (SHARY RD),  Facility Carried by Structure: US 83 WB
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 29.601,  Lanes on structure: 4,  Lanes under structure: 10,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: 211090003917428,  Location: 1.00 MI E OF SH 107 (Lat: 26.199050,  Lng: -98.312750),  Route carried "under" structure: State highway 396,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 19,200 (year 2009),  Truck Traffic: 13%,  Features Intersected: FM 396 (BRYAN RD),  Facility Carried by Structure: US 83 EB
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 1.645,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: 211090003917429,  Location: 1.00 MI E OF SH 107 (Lat: 26.199017,  Lng: -98.311450),  Route carried "under" structure: State highway 396,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 19,200 (year 2009),  Truck Traffic: 13%,  Features Intersected: FM 396 (BRYAN RD),  Facility Carried by Structure: US 83 WB
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 1.645,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: 211090003917436,  Location: 1.8 MI NW of FM 1016 (Lat: 26.216175,  Lng: -98.348350),  Route carried "under" structure: State highway 83,  Year Built: 2017,  Structure Length: 0. m,  Features Intersected: BUS 83 & RR
Minimum Vertical Clearance: 7.01m (23.00ft),  Lanes on structure: 3,  Lanes under structure: 12,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 211090003917437,  Location: 1.8 MI NW OF FM 1016 (Lat: 26.217086,  Lng: -98.349542),  Route carried "under" structure: State highway 83,  Year Built: 2017,  Structure Length: 0. m,  Features Intersected: BUS 83 & RR
Minimum Vertical Clearance: 7.01m (23.00ft),  Lanes on structure: 3,  Lanes under structure: 12,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 211090309702159,  Location: 3.58 MI SE OF US 83 (Lat: 26.154739,  Lng: -98.311967),  Route carried "under" structure: County highway ,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2010),  Truck Traffic: 3%,  Features Intersected: UPRR & OLD MILITARY HWY,  Facility Carried by Structure: FM 396 NB/BRYAN RD
Minimum Vertical Clearance: 6.99m (22.93ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 21109030970216,  Location: 3.58 MI SE OF US 83 (Lat: 26.153647,  Lng: -98.312103),  Route carried "under" structure: County highway ,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2010),  Truck Traffic: 3%,  Features Intersected: UPRR & OLD MILITARY HWY,  Facility Carried by Structure: FM 396 SB/BRYAN RD
Minimum Vertical Clearance: 7.04m (23.10ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 211090309702161,  Location: 3.49 MI SE OF US 83 (Lat: 26.157828,  Lng: -98.311264),  Route carried "under" structure: State highway 1016,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 2,500 (year 2010),  Truck Traffic: 10%,  Features Intersected: FM 1016,  Facility Carried by Structure: FM 396 NB
Minimum Vertical Clearance: 5.92m (19.42ft),  Kilometerpoint: 24.124,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.8m (133.9ft)

Find on map >>   Show street view

Structure Number: 211090309702162,  Location: 3.49 MI SE OF US 83 (Lat: 26.158711,  Lng: -98.311447),  Route carried "under" structure: State highway 1016,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 2,500 (year 2010),  Truck Traffic: 10%,  Features Intersected: FM 1016,  Facility Carried by Structure: FM 396 SB
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 24.100,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.8m (133.9ft)

Find on map >>   Show street view

Structure Number: 211090309702163,  Location: 0.4 MI S OF US 83 (Lat: 26.191100,  Lng: -98.313217),  Route carried "under" structure: City street ,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 300 (year 2012),  Truck Traffic: 1%,  Features Intersected: TRINITY RD,  Facility Carried by Structure: FM 396 NB
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 211090309702164,  Location: 0.4 MI S OF US 83 (Lat: 26.191967,  Lng: -98.313333),  Route carried "under" structure: City street ,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 300 (year 2012),  Truck Traffic: 1%,  Features Intersected: TRINITY RD,  Facility Carried by Structure: FM 396 SB
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Discuss Mission, Texas (TX) on our hugely popular Texas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.