Number of bridges: 48
Total length: 495 meters (1,624ft)
Total costs: $55,551,000
Total average daily traffic: 948,312
Total average daily truck traffic: 154,208
National Bridge Inventory (NBI) Registered Bridges for Ogden

New bridges - Historical Statistics

  • 1910-1919: 1
  • 1920-1929: 0
  • 1930-1939: 1
  • 1940-1949: 0
  • 1950-1959: 3
  • 1960-1969: 21
  • 1970-1979: 7
  • 1980-1989: 2
  • 1990-1999: 5
  • 2000-2009: 8

Reconstructed bridges - Historical Statistics

  • 1960-1969: 1
  • 1970-1979: 1

Average Daily Traffic

Average Truck Traffic (%)

Bridge Condition - Deck

Bridge Condition - Superstructure

Bridge Condition - Substructure

Bridge Condition - Channel

Find on map >>

Structure Number: 57006C,  Location: 3000 SO.PENN. AVE.,OGDEN (Lat: 41.210444,  Lng: -112.006667),  Route carried "on" structure: City street ,  Year Built: 1990,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 6,955 (year 2003),  Truck Traffic: 20%,  Average Future Daily Traffic: 8,450 (year 2023),  Design Load: HS 20,  Features Intersected: UNION PACIFIC RAILROAD,  Facility Carried by Structure: PENNSYLVANIA AVE.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.30m (17.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $491,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $810,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 57024F,  Location: PARKER DRIVE SW. of OGDEN (Lat: 41.200861,  Lng: -111.992111),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 5,000 (year 2003),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,075 (year 2023),  Design Load: H 20,  Features Intersected: WEBER RIVER,  Facility Carried by Structure: PARKER DRIVE-OGDEN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.70m (15.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $389,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $642,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 57025C,  Location: 1800 SO.GRANT AVE.,OGDEN (Lat: 41.233111,  Lng: -111.973056),  Route carried "on" structure: City street ,  Year Built: 1931,  Year Reconstructed: 1971,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 3,553 (year 2003),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,317 (year 2023),  Features Intersected: OGDEN RIVER,  Facility Carried by Structure: GRANT AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 20.3m (66.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $457,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $755,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 57026F,  Location: 1800 SO.LINCOLN AVE.OGDEN (Lat: 41.234389,  Lng: -111.975694),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 3,960 (year 2003),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,811 (year 2023),  Features Intersected: OGDEN RIVER,  Facility Carried by Structure: LINCOLN AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.3m (69.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 16.4m (53.8ft),  Out-to-Out Width: 20.5m (67.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $407,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $672,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 57027F,  Location: 2350 SO. 400 WEST, OGDEN (Lat: 41.223333,  Lng: -111.988333),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 400 (year 2003),  Truck Traffic: 50%,  Average Future Daily Traffic: 486 (year 2023),  Design Load: HS 20,  Features Intersected: WEBER RIVER,  Facility Carried by Structure: 2350 SOUTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.60m (15.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $325,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $537,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 57028D,  Location: 1800 SO.GRAMERCY AV.OGDEN (Lat: 41.236111,  Lng: -111.957722),  Route carried "on" structure: City street ,  Year Built: 1915,  Status: Posted for load,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 825 (year 2003),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,002 (year 2023),  Features Intersected: OGDEN RIVER,  Facility Carried by Structure: GRAMERCY AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 27.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $203,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $335,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 57029F,  Location: 1700 MONROE BLVD., OGDEN (Lat: 41.235833,  Lng: -111.954444),  Route carried "on" structure: City street ,  Year Built: 1984,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 13,143 (year 2003),  Truck Traffic: 4%,  Average Future Daily Traffic: 15,969 (year 2023),  Design Load: HS 20,  Features Intersected: OGDEN RIVER,  Facility Carried by Structure: MONROE BOULEVARD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 5 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.1m (138.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 23.8m (78.1ft),  Out-to-Out Width: 29.4m (96.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.40m (17.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $1,032,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $1,703,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 57030F,  Location: MOUTH OGDEN CYN. in OGDEN (Lat: 41.236472,  Lng: -111.929083),  Route carried "on" structure: City street ,  Year Built: 1982,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 2,000 (year 2002),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,430 (year 2022),  Design Load: HS 20,  Features Intersected: OGDEN RIVER,  Facility Carried by Structure: VALLEY DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2006,  Bridge Improvement Cost: $311,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $513,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: C 286,  Location: 18TH ST & WALL AVE OGDEN (Lat: 41.234028,  Lng: -111.978442),  Route carried "on" structure: State highway 204,  Year Built: 1954,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 22,878 (year 2002),  Truck Traffic: 2%,  Average Future Daily Traffic: 27,797 (year 2022),  Design Load: HS 20,  Features Intersected: OGDEN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.618,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.7m (48.2ft),  Out-to-Out Width: 18.4m (60.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.30m (17.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $726,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $1,199,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: C 613,  Location: 0.5 MI.E.WILSON LANE INT. (Lat: 41.238250,  Lng: -112.000247),  Route carried "on" structure: State highway 104,  Year Built: 1976,  Status: Open,  Structure Length: 8.11m (26.61ft),  Average Daily Traffic: 14,325 (year 2002),  Truck Traffic: 11%,  Average Future Daily Traffic: 17,405 (year 2022),  Design Load: HS 20,  Features Intersected: WEBER RIVER & CO. ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.131,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 21 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.9m (130.9ft),  Curb-To-Curb Width: 25.1m (82.3ft),  Out-to-Out Width: 26.3m (86.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.10m (29.86ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Critical Feature Inspection Date: October 2007,  Bridge Improvement Cost: $1,545,000,  Roadway Improvement Cost: $155,000,  Total Project Cost: $2,550,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>

Structure Number: C 655,  Location: 24TH ST & WALL AVE OGDEN (Lat: 41.222917,  Lng: -111.989028),  Route carried "on" structure: State highway 53,  Year Built: 1970,  Year Reconstructed: 1976,  Status: Open,  Structure Length: 94.24m (309.19ft),  Average Daily Traffic: 16,055 (year 2002),  Truck Traffic: 6%,  Average Future Daily Traffic: 19,507 (year 2022),  Design Load: HS 20,  Features Intersected: SR-204,WEBER RIVER,RR-YD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 28,  Number Of Approach Spans: 11,  Length of Maximum Span: 46.6m (152.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 94.20m (309.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Bridge Improvement Cost: $8,584,000,  Roadway Improvement Cost: $858,000,  Total Project Cost: $14,163,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>

Structure Number: C 778,  Location: 20TH.ST & WASH.BLVD.OGDEN (Lat: 41.233667,  Lng: -111.969969),  Route carried "on" structure: US 89,  Year Built: 1992,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 26,960 (year 2002),  Truck Traffic: 2%,  Average Future Daily Traffic: 32,756 (year 2022),  Design Load: HS 20,  Features Intersected: OGDEN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 568.066,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 21 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 30.5m (100.1ft),  Out-to-Out Width: 35.6m (116.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $840,000,  Roadway Improvement Cost: $84,000,  Total Project Cost: $1,386,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: C 802,  Location: BETWEEN RIVERDALE & OGDEN (Lat: 41.180944,  Lng: -111.992972),  Route carried "on" structure: State highway 26,  Year Built: 1999,  Status: Open,  Structure Length: 6.07m (19.91ft),  Average Daily Traffic: 48,540 (year 2002),  Truck Traffic: 2%,  Average Future Daily Traffic: 58,976 (year 2022),  Design Load: HS 20,  Features Intersected: WEBER RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.154,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.2m (92.5ft),  Skew: 33 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 58.9m (193.2ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 28.5m (93.5ft),  Out-to-Out Width: 34.5m (113.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.10m (23.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $1,582,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $2,610,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: C 912,  Location: 0.2 MI.SO.JCT.with SR-39 (Lat: 41.240694,  Lng: -112.025194),  Route carried "on" structure: State highway 126,  Year Built: 2003,  Status: Open,  Structure Length: 6.50m (21.33ft),  Average Daily Traffic: 6,805 (year 2002),  Truck Traffic: 2%,  Average Future Daily Traffic: 8,268 (year 2022),  Design Load: HS 20,  Features Intersected: WEBER RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.735,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 25.8m (84.6ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 63.0m (206.7ft),  Curb or Sidewalk Widths: Left: 2.2m (7.2ft),  Right: 2.2m (7.2ft),  Curb-To-Curb Width: 27.0m (88.6ft),  Out-to-Out Width: 32.4m (106.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: C 913,  Location: SOUTH of JCT. with SR-39 (Lat: 41.243917,  Lng: -112.025056),  Route carried "on" structure: State highway 126,  Year Built: 2003,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 6,805 (year 2002),  Truck Traffic: 2%,  Average Future Daily Traffic: 8,268 (year 2022),  Design Load: HS 20,  Features Intersected: UNION PACIFIC RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.025,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 25.8m (84.6ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb or Sidewalk Widths: Left: 2.2m (7.2ft),  Right: 2.2m (7.2ft),  Curb-To-Curb Width: 27.0m (88.6ft),  Out-to-Out Width: 32.4m (106.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: E1456,  Location: 0.4 NO.of 20th ST.INTCHG. (Lat: 41.233667,  Lng: -112.011833),  Route carried "on" structure: Interstate 15,  Year Built: 1968,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 87,862 (year 2002),  Truck Traffic: 26%,  Average Future Daily Traffic: 106,752 (year 2022),  Design Load: HS 20,  Features Intersected: LAYTON PUMP INTAKE CHAN.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 553.953,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.9m (107.9ft),  Skew: 23 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $317,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $524,000 ( Estimate for 2001)
Find on map >>

Structure Number: F 17,  Location: HARRISON BLVD.NR.CYN. DR. (Lat: 41.236611,  Lng: -111.946111),  Route carried "on" structure: State highway 203,  Year Built: 1967,  Status: Open,  Structure Length: 4.24m (13.91ft),  Average Daily Traffic: 24,535 (year 2002),  Truck Traffic: 2%,  Average Future Daily Traffic: 29,810 (year 2022),  Design Load: HS 20,  Features Intersected: OGDEN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.286,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 21 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 23.2m (76.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.20m (17.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $780,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $1,287,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>

Structure Number: 1C 569,  Location: Wilson Ln Intch (21st St) (Lat: 41.228500,  Lng: -112.012111),  Route carried "on" structure: Interstate 15,  Year Built: 1968,  Status: Open,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 42,023 (year 2002),  Truck Traffic: 26%,  Average Future Daily Traffic: 51,058 (year 2022),  Design Load: HS 20,  Features Intersected: SR-104
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 553.375,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.4m (103.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.40m (17.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $493,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $813,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 1F 85,  Location: NORTH OF 31ST ST. INTCHG. (Lat: 41.210389,  Lng: -111.997167),  Route carried "on" structure: Interstate 15,  Year Built: 1968,  Status: Open,  Structure Length: 5.36m (17.59ft),  Average Daily Traffic: 46,090 (year 2002),  Truck Traffic: 26%,  Average Future Daily Traffic: 55,999 (year 2022),  Design Load: HS 20,  Features Intersected: UNION PACIFIC RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 550.929,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $733,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $1,209,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 1F 118,  Location: 24TH ST. INTCHG. IN OGDEN (Lat: 41.219444,  Lng: -112.004583),  Route carried "on" structure: Interstate 15,  Year Built: 1969,  Status: Open,  Structure Length: 7.22m (23.69ft),  Average Daily Traffic: 37,825 (year 2002),  Truck Traffic: 26%,  Average Future Daily Traffic: 45,957 (year 2022),  Design Load: HS 20,  Features Intersected: SR-53 & UPRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 552.111,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.30m (27.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $751,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $1,239,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 1F 139,  Location: 0.5 Mi. North 24th Street (Lat: 41.222167,  Lng: -112.009500),  Route carried "on" structure: Interstate 15,  Year Built: 1968,  Status: Open,  Structure Length: 4.24m (13.91ft),  Average Daily Traffic: 37,825 (year 2002),  Truck Traffic: 26%,  Average Future Daily Traffic: 45,957 (year 2022),  Design Load: HS 20,  Features Intersected: UNION PACIFIC RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 552.628,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 11.5m (37.7ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.20m (17.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $475,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $785,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 2C 31,  Location: 0.2 MI E.of 31st ST.INT. (Lat: 41.205778,  Lng: -111.991194),  Route carried "on" structure: State highway 79,  Year Built: 1959,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 11,460 (year 2002),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,924 (year 2022),  Design Load: HS 20,  Features Intersected: WEBER RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.105,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.40m (14.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $501,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $827,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 2C 314,  Location: 0.5 MI.E.31st ST.INTCHG. (Lat: 41.206722,  Lng: -111.985222),  Route carried "on" structure: State highway 79,  Year Built: 1960,  Status: Open,  Structure Length: 12.56m (41.21ft),  Average Daily Traffic: 11,460 (year 2002),  Truck Traffic: 4%,  Average Future Daily Traffic: 13,924 (year 2022),  Design Load: HS 20,  Features Intersected: UNION PACIFIC RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.636,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 13 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.40m (43.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,221,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $2,015,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 2C 615,  Location: 1.2 MI.E.OF WILSON LN.INT (Lat: 41.241083,  Lng: -111.992250),  Route carried "on" structure: State highway 104,  Year Built: 1976,  Status: Open,  Structure Length: 22.25m (73.00ft),  Average Daily Traffic: 16,720 (year 2002),  Truck Traffic: 11%,  Average Future Daily Traffic: 20,315 (year 2022),  Design Load: HS 20,  Features Intersected: UNION PACIFIC RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.202,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 61.0m (200.1ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 22.40m (73.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,950,000,  Roadway Improvement Cost: $195,000,  Total Project Cost: $3,218,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 2C 801,  Location: BETWEEN RIVERDALE & OGDEN (Lat: 41.181778,  Lng: -111.991358),  Route carried "on" structure: State highway 26,  Year Built: 2000,  Status: Open,  Structure Length: 16.72m (54.86ft),  Average Daily Traffic: 24,270 (year 2002),  Truck Traffic: 2%,  Average Future Daily Traffic: 29,488 (year 2022),  Design Load: HS 20,  Features Intersected: UPRR & OGDEN CITY STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.379,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 33 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 75.3m (247.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 14.2m (46.6ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.50m (57.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $2,001,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $3,302,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 2C 905,  Location: 0.7 MI.E. of 31St.INTCHG. (Lat: 41.207944,  Lng: -111.981497),  Route carried "on" structure: State highway 79,  Year Built: 2003,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 8,805 (year 2002),  Truck Traffic: 4%,  Average Future Daily Traffic: 10,698 (year 2022),  Design Load: HS 20,  Features Intersected: REEVES AVENUE
Minimum Vertical Clearance: 99.90m (327.76ft),  Kilometerpoint: 3.894,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.8m (48.6ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.6m (110.2ft),  Curb-To-Curb Width: 16.4m (53.8ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: 3C 569,  Location: Wilson Ln Intch (21st St) (Lat: 41.245833,  Lng: -112.012608),  Route carried "on" structure: Interstate 15,  Year Built: 1968,  Status: Open,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 37,825 (year 2002),  Truck Traffic: 26%,  Average Future Daily Traffic: 45,957 (year 2022),  Design Load: HS 20,  Features Intersected: SR-104
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 553.426,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.4m (103.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.40m (17.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $493,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $813,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 3F 85,  Location: NORTH OF 31ST ST. INTCHG. (Lat: 41.210833,  Lng: -111.998083),  Route carried "on" structure: Interstate 15,  Year Built: 1968,  Status: Open,  Structure Length: 5.36m (17.59ft),  Average Daily Traffic: 46,090 (year 2002),  Truck Traffic: 26%,  Average Future Daily Traffic: 55,999 (year 2022),  Design Load: HS 20,  Features Intersected: UNION PACIFIC RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 550.827,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $582,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $960,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 3F 118,  Location: 24TH ST. INTCHG. IN OGDEN (Lat: 41.219611,  Lng: -112.005611),  Route carried "on" structure: Interstate 15,  Year Built: 1969,  Status: Open,  Structure Length: 7.22m (23.69ft),  Average Daily Traffic: 37,825 (year 2002),  Truck Traffic: 26%,  Average Future Daily Traffic: 45,957 (year 2022),  Design Load: HS 20,  Features Intersected: SR-53 & UPRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 552.189,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.30m (27.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $751,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $1,239,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 3F 139,  Location: 0.5 Mi. North 24th Street (Lat: 41.222167,  Lng: -112.010167),  Route carried "on" structure: Interstate 15,  Year Built: 1968,  Status: Open,  Structure Length: 4.24m (13.91ft),  Average Daily Traffic: 37,825 (year 2002),  Truck Traffic: 26%,  Average Future Daily Traffic: 45,957 (year 2022),  Design Load: HS 20,  Features Intersected: UNION PACIFIC RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 552.675,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.9m (48.9ft),  Curb-To-Curb Width: 11.5m (37.7ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.20m (17.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $475,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $785,000 ( Estimate for 2001),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 4C 31,  Location: .2 MI.EAST of 31st ST.INT (Lat: 41.205722,  Lng: -111.990472),  Route carried "on" structure: State highway 79,  Year Built: 1959,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 11,460 (year 2002),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,924 (year 2022),  Design Load: HS 20,  Features Intersected: WEBER RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.107,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.40m (14.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2007,  Bridge Improvement Cost: $501,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $827,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 4C 314,  Location: .5 Mi.E.of31st.St.Intchg. (Lat: 41.207528,  Lng: -111.983719),  Route carried "on" structure: State highway 79,  Year Built: 1960,  Status: Open,  Structure Length: 12.56m (41.21ft),  Average Daily Traffic: 22,920 (year 2002),  Truck Traffic: 4%,  Average Future Daily Traffic: 27,848 (year 2022),  Design Load: HS 20,  Features Intersected: UNION PACIFIC RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.638,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 13 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.40m (43.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Bridge Improvement Cost: $1,221,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $2,015,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 4C 614,  Location: 1.2 MI.E.OF WILSON LN.INT (Lat: 41.231111,  Lng: -111.988719),  Route carried "on" structure: State highway 104,  Year Built: 1976,  Status: Open,  Structure Length: 15.33m (50.30ft),  Average Daily Traffic: 16,945 (year 2002),  Truck Traffic: 11%,  Average Future Daily Traffic: 20,588 (year 2022),  Design Load: HS 20,  Features Intersected: UNION PACIFIC RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.730,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 67.1m (220.1ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.10m (52.82ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2007,  Critical Feature Inspection Date: September 2007,  Bridge Improvement Cost: $1,403,000,  Roadway Improvement Cost: $140,000,  Total Project Cost: $2,315,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>

Structure Number: 4C 801,  Location: BETWEEN RIVERDALE & ODGEN (Lat: 41.183194,  Lng: -111.989667),  Route carried "on" structure: State highway 26,  Year Built: 1999,  Status: Open,  Structure Length: 17.82m (58.46ft),  Average Daily Traffic: 24,270 (year 2002),  Truck Traffic: 2%,  Average Future Daily Traffic: 29,488 (year 2022),  Design Load: HS 20,  Features Intersected: UPRR & OGDEN CITY STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.385,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 33 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 80.3m (263.5ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 0.0m,  Curb-To-Curb Width: 14.2m (46.6ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.50m (60.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Bridge Improvement Cost: $2,123,000,  Roadway Improvement Cost: $212,000,  Total Project Cost: $3,503,000 ( Estimate for 2000),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>

Structure Number: 4C 904,  Location: W. OF WALL AVE.on 31st ST (Lat: 41.208056,  Lng: -111.981389),  Route carried "on" structure: State highway 79,  Year Built: 2003,  Status: Open,  Structure Length: 4.64m (15.22ft),  Average Daily Traffic: 9,830 (year 2002),  Truck Traffic: 10%,  Average Future Daily Traffic: 11,943 (year 2022),  Design Load: HS 20,  Features Intersected: 31st STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.894,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.5m (44.3ft),  Skew: 12 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 44.6m (146.3ft),  Curb-To-Curb Width: 13.8m (45.3ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2007,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>

Structure Number: C 458,  Location: 31ST STREET INT. OGDEN (Lat: 41.202472,  Lng: -111.994472),  Route carried "under" structure: Interstate 15,  Year Built: 1967,  Structure Length: 8.41m (27.59ft),  Average Daily Traffic: 92,180 (year 2002),  Truck Traffic: 26%,  Features Intersected: I-15 (SR-15) NBL & SBL,  Facility Carried by Structure: UPRR HILL AFB BR.
Minimum Vertical Clearance: 6.55m (21.49ft),  Kilometerpoint: 550.043,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>

Structure Number: C 485,  Location: 31st ST.INT.SB.ON-RAMP (Lat: 41.202056,  Lng: -111.995333),  Route carried "under" structure: Ramp Interstate 15,  Year Built: 1967,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 1,290 (year 2002),  Truck Traffic: 26%,  Features Intersected: I-15 (SR-15) SBL,  Facility Carried by Structure: UPRR HILL AFB BR.
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 549.722,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 12.8m (42.0ft)

Find on map >>

Structure Number: C 486,  Location: 31st ST.INT.NB.OFF-RAMP (Lat: 41.203583,  Lng: -111.992053),  Route carried "under" structure: Ramp Interstate 15,  Year Built: 1966,  Structure Length: 4.24m (13.91ft),  Average Daily Traffic: 10,000 (year 2002),  Truck Traffic: 26%,  Features Intersected: I-15 (SR-15) NBL,  Facility Carried by Structure: UPRR HILL AFB. BR.
Minimum Vertical Clearance: 0.57m (1.87ft),  Kilometerpoint: 550.365,  Lanes under structure: 1,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>

Structure Number: C 613,  Location: 0.5 MI.E.WILSON LANE INT. (Lat: 41.238250,  Lng: -112.000247),  Route carried "under" structure: County highway ,  Year Built: 1976,  Structure Length: 8.11m (26.61ft),  Average Daily Traffic: 250 (year 2002),  Truck Traffic: 10%,  Features Intersected: WEBER RIVER & CO. ROAD,  Facility Carried by Structure: SR-104, 20TH ST
Minimum Vertical Clearance: 7.01m (23.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>

Structure Number: C 655,  Location: 24TH ST & WALL AVE OGDEN (Lat: 41.222917,  Lng: -111.989028),  Route carried "under" structure: State highway 204,  Year Built: 1970,  Structure Length: 94.24m (309.19ft),  Average Daily Traffic: 27,700 (year 2002),  Truck Traffic: 2%,  Features Intersected: SR-204,WEBER RIVER,RR-YD,  Facility Carried by Structure: SR-53 24TH ST VIA.
Minimum Vertical Clearance: 6.53m (21.42ft),  Kilometerpoint: 3.347,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>

Structure Number: 1C 569,  Location: Wilson Ln Intch (21st St) (Lat: 41.228500,  Lng: -112.012111),  Route carried "under" structure: State highway 104,  Year Built: 1968,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 6,665 (year 2002),  Truck Traffic: 11%,  Features Intersected: SR-104,  Facility Carried by Structure: I-15 (SR-15) NBL
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 0.111,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>

Structure Number: 1F 118,  Location: 24TH ST. INTCHG. IN OGDEN (Lat: 41.219444,  Lng: -112.004583),  Route carried "under" structure: State highway 53,  Year Built: 1969,  Structure Length: 7.22m (23.69ft),  Average Daily Traffic: 11,200 (year 2002),  Truck Traffic: 6%,  Features Intersected: SR-53 & UPRR,  Facility Carried by Structure: I-15 (SR-15) NBL
Minimum Vertical Clearance: 7.54m (24.74ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>

Structure Number: 2C 801,  Location: BETWEEN RIVERDALE & OGDEN (Lat: 41.181778,  Lng: -111.991358),  Route carried "under" structure: City street ,  Year Built: 2000,  Structure Length: 16.72m (54.86ft),  Average Daily Traffic: 220 (year 2002),  Truck Traffic: 5%,  Features Intersected: UPRR & OGDEN CITY STREET,  Facility Carried by Structure: SR-26,RIVERDALE RD
Minimum Vertical Clearance: 7.18m (23.56ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 75.3m (247.0ft)

Find on map >>

Structure Number: 2C 905,  Location: 0.7 MI.E. of 31St.INTCHG. (Lat: 41.207944,  Lng: -111.981497),  Route carried "under" structure: City street ,  Year Built: 2003,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 525 (year 2002),  Truck Traffic: 10%,  Features Intersected: REEVES AVENUE,  Facility Carried by Structure: SR-79,EASTBOUND
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.6m (110.2ft)

Find on map >>

Structure Number: 3C 569,  Location: Wilson Ln Intch (21st St) (Lat: 41.245833,  Lng: -112.012608),  Route carried "under" structure: State highway 104,  Year Built: 1968,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 14,693 (year 2002),  Truck Traffic: 11%,  Features Intersected: SR-104,  Facility Carried by Structure: I-15 (SR-15) SBL
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 1.078,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>

Structure Number: 3F 118,  Location: 24TH ST. INTCHG. IN OGDEN (Lat: 41.219611,  Lng: -112.005611),  Route carried "under" structure: State highway 53,  Year Built: 1969,  Structure Length: 7.22m (23.69ft),  Average Daily Traffic: 11,200 (year 2002),  Truck Traffic: 6%,  Features Intersected: SR-53 & UPRR,  Facility Carried by Structure: I-15 (SR-15) SBL
Minimum Vertical Clearance: 7.54m (24.74ft),  Kilometerpoint: 0.008,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>

Structure Number: 4C 801,  Location: BETWEEN RIVERDALE & ODGEN (Lat: 41.183194,  Lng: -111.989667),  Route carried "under" structure: City street ,  Year Built: 1999,  Structure Length: 17.82m (58.46ft),  Average Daily Traffic: 220 (year 2002),  Truck Traffic: 5%,  Features Intersected: UPRR & OGDEN CITY STREET,  Facility Carried by Structure: SR-26,RIVERDALE RD
Minimum Vertical Clearance: 7.18m (23.56ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 80.3m (263.5ft)

Find on map >>

Structure Number: 4C 904,  Location: W. OF WALL AVE.on 31st ST (Lat: 41.208056,  Lng: -111.981389),  Route carried "under" structure: City street ,  Year Built: 2003,  Structure Length: 4.64m (15.22ft),  Average Daily Traffic: 100 (year 2002),  Truck Traffic: 1%,  Features Intersected: 31st STREET,  Facility Carried by Structure: SR-79 WB
Minimum Vertical Clearance: 6.46m (21.19ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.6m (146.3ft)

Discuss this city on our hugely popular Utah forum

Back to: Ogden, UT, Utah, All US cities.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2009 Advameg, Inc.