![]() |
Bridge Statistics for Orangetown, New York (NY) - Condition, Traffic, Stress, Structural Evaluation, Project CostsBack to: Orangetown, NY, New York, New York forum, All US cities. National Bridge Inventory (NBI) Statistics Number of bridges: 80 Total length: 246 meters (807ft) Total costs: $91,487,000 Total average daily traffic: 1,439,598 Total average daily truck traffic: 86,578 National Bridge Inventory (NBI) Registered Bridges for Orangetown
Bridge Condition - Deck Bridge Condition - Superstructure Bridge Condition - Substructure Bridge Condition - Channel Bridge Condition - Culverts Find on map >>
Structure Number: 104534, Location: 1 MI S JCT SH 303 & PIP (Lat: 41.021539, Lng: -73.942386), Route carried "on" structure: State highway 303, Year Built: 1932, Status: Open, Structure Length: 1.64m (5.38ft), Average Daily Traffic: 22,218 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 31,105 (year 2026), Features Intersected: WASHINGTN ST-CR 8 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.636, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.2m (49.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 15.8m (51.8ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 13.4m (44.0ft), Out-to-Out Width: 16.9m (55.4ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 69.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 41.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 1.64m (5.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Bridge Improvement Cost: $617,000, Roadway Improvement Cost: $367,000, Total Project Cost: $984,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 104535, Location: 0.4 MI S JCT SH 303 & PIP (Lat: 41.030567, Lng: -73.944417), Route carried "on" structure: State highway 303, Year Built: 1932, Status: Open, Structure Length: 0.70m (2.30ft), Average Daily Traffic: 22,218 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 31,105 (year 2026), Design Load: H 20, Features Intersected: SPARKILL CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.249, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Skew: 2 degrees, Material/Design: Concrete continuous, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft) Condition: Channel: Fair, Culverts: Satisfactory, Operating Rating: 72.1 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 0.70m (2.30ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $236,000, Roadway Improvement Cost: $140,000, Total Project Cost: $376,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 104536, Location: JCT RTE 303+PIP (Lat: 41.035833, Lng: -73.946047), Route carried "on" structure: State highway 303, Year Built: 1958, Status: Open, Structure Length: 5.60m (18.37ft), Average Daily Traffic: 22,218 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 31,105 (year 2026), Design Load: H 20, Features Intersected: RTE 987C Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.225, Lanes on structure: 4, Lanes under structure: 4, Base Highway Network: Yes, Owner: State Park, Forest, or Reservation Agency, Maintenance Responsibility: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Skew: 4 degrees, Material/Design: Concrete continuous, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 20.7m (67.9ft), Curb or Sidewalk Widths: Left: 2.4m (7.9ft), Right: 2.4m (7.9ft), Curb-To-Curb Width: 12.1m (39.7ft), Out-to-Out Width: 17.9m (58.7ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 59.4 metric tons, Inventory Rating: 23.2 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.60m (18.37ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $2,225,000, Roadway Improvement Cost: $1,292,000, Total Project Cost: $3,517,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 104537, Location: 0.7 MI N JCT RTE 303+PIP (Lat: 41.045869, Lng: -73.945256), Route carried "on" structure: State highway 303, Year Built: 1932, Status: Open, Structure Length: 0.88m (2.89ft), Average Daily Traffic: 23,468 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 32,855 (year 2027), Design Load: HS 20, Features Intersected: SPARKILL CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.472, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 16.7m (54.8ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.7m (22.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 15.9m (52.2ft), Out-to-Out Width: 16.9m (55.4ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Fair, Operating Rating: 65.3 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 0.88m (2.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $2,225,000, Roadway Improvement Cost: $1,292,000, Total Project Cost: $3,517,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 104538, Location: 1.1 MI N JCT RTE 303+PIP (Lat: 41.051289, Lng: -73.945883), Route carried "on" structure: State highway 303, Year Built: 1932, Status: Open, Structure Length: 0.76m (2.49ft), Average Daily Traffic: 22,484 (year 2005), Truck Traffic: 6%, Average Future Daily Traffic: 31,478 (year 2025), Design Load: HS 20, Features Intersected: SPARKILL CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.451, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 15.2m (49.9ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.4m (21.0ft), Curb or Sidewalk Widths: Left: 0.2m (0.7ft), Right: 0.2m (0.7ft), Curb-To-Curb Width: 15.6m (51.2ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Fair, Operating Rating: 64.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 39.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 0.76m (2.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Bridge Improvement Cost: $2,225,000, Roadway Improvement Cost: $1,292,000, Total Project Cost: $3,517,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 104618, Location: JCT RTS 340+PIP (Lat: 41.017711, Lng: -73.928806), Route carried "on" structure: State highway 340, Year Built: 1954, Status: Open, Structure Length: 2.25m (7.38ft), Average Daily Traffic: 3,516 (year 2002), Truck Traffic: 6%, Average Future Daily Traffic: 4,922 (year 2022), Design Load: H 20, Features Intersected: 987C 987C85011010 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.163, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Park, Forest, or Reservation Agency, Maintenance Responsibility: State Highway Agency, Approaching Roadway Width: 10.3m (33.8ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 20.7m (67.9ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 14.6m (47.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 59.4 metric tons, Inventory Rating: 23.2 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.25m (7.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $728,000, Roadway Improvement Cost: $433,000, Total Project Cost: $1,161,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1068529, Location: 0.8 MI S JCT PIP+RTE 340 (Lat: 41.007331, Lng: -73.921492), Route carried "on" structure: State lands road 987C, Year Built: 1954, Year Reconstructed: 2001, Status: Open, Structure Length: 1.76m (5.77ft), Average Daily Traffic: 49,681 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 69,553 (year 2026), Design Load: H 20, Features Intersected: CR 33-CLOSTER RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.127, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Park, Forest, or Reservation Agency, Maintenance Responsibility: State Highway Agency, Approaching Roadway Width: 27.1m (88.9ft), Skew: 30 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 14.0m (45.9ft), Curb-To-Curb Width: 18.7m (61.4ft), Out-to-Out Width: 27.0m (88.6ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 57.7 metric tons, Inventory Rating: 23.8 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.76m (5.77ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $1,057,000, Roadway Improvement Cost: $629,000, Total Project Cost: $1,686,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 106853, Location: .5 MI S JCT PIP & SH 340 (Lat: 41.012008, Lng: -73.923700), Route carried "on" structure: City street , Year Built: 1954, Year Reconstructed: 2001, Status: Open, Structure Length: 5.33m (17.49ft), Average Daily Traffic: 1,200 (year 1981), Truck Traffic: 6%, Average Future Daily Traffic: 1,680 (year 2001), Design Load: H 20, Features Intersected: RTE 987C, Facility Carried by Structure: OAK TREE ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Park, Forest, or Reservation Agency, Maintenance Responsibility: State Highway Agency, Approaching Roadway Width: 10.9m (35.8ft), Skew: 5 degrees, Material/Design: Concrete continuous, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 23.4m (76.8ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 9.9m (32.5ft), Out-to-Out Width: 14.3m (46.9ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 61.8 metric tons, Inventory Rating: 24.1 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 5.33m (17.49ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Bridge Improvement Cost: $1,686,000, Roadway Improvement Cost: $1,003,000, Total Project Cost: $2,689,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1068549, Location: .2 MI NW JCT PIP & SH 340 (Lat: 41.019772, Lng: -73.931375), Route carried "on" structure: Other road 987C, Year Built: 1954, Status: Open, Structure Length: 0.73m (2.40ft), Average Daily Traffic: 49,761 (year 2002), Truck Traffic: 6%, Average Future Daily Traffic: 64,744 (year 2022), Design Load: H 20, Features Intersected: LOWER SPARKILL CK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 162.831, Lanes on structure: 4, Owner: State Park, Forest, or Reservation Agency, Maintenance Responsibility: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 6.7m (22.0ft) Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 74.5 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.73m (2.40ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Bridge Improvement Cost: $246,000, Roadway Improvement Cost: $146,000, Total Project Cost: $392,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1068559, Location: .4 MI N JCT PIP & SH 340 (Lat: 41.021650, Lng: -73.933939), Route carried "on" structure: State lands road 987C, Year Built: 1954, Year Reconstructed: 2001, Status: Open, Structure Length: 3.38m (11.09ft), Average Daily Traffic: 49,681 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 69,553 (year 2026), Features Intersected: RECREATION TRAIL Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.119, Lanes on structure: 4, Base Highway Network: Yes, Owner: State Park, Forest, or Reservation Agency, Maintenance Responsibility: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Skew: 20 degrees, Material/Design: Concrete continuous, Design/Construction: Slab, Number Of Spans In Main Unit: 3, Length of Maximum Span: 13.7m (44.9ft), Curb-To-Curb Width: 20.6m (67.6ft), Out-to-Out Width: 28.7m (94.2ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 56.3 metric tons, Inventory Rating: 23.9 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.38m (11.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Bridge Improvement Cost: $2,143,000, Roadway Improvement Cost: $1,244,000, Total Project Cost: $3,387,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 106856, Location: 0.5 MI N JCT PIP+RTE 340 (Lat: 41.023186, Lng: -73.935411), Route carried "on" structure: County highway , Year Built: 1954, Status: Open, Structure Length: 3.93m (12.89ft), Average Daily Traffic: 1,200 (year 1981), Truck Traffic: 6%, Average Future Daily Traffic: 1,680 (year 2001), Features Intersected: RTE 987C, Facility Carried by Structure: WASHINGTON STREET Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Park, Forest, or Reservation Agency, Maintenance Responsibility: State Highway Agency, Approaching Roadway Width: 8.2m (26.9ft), Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 2, Length of Maximum Span: 16.1m (52.8ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 14.3m (46.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 56.2 metric tons, Inventory Rating: 22.7 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 3.93m (12.89ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Bridge Improvement Cost: $1,243,000, Roadway Improvement Cost: $740,000, Total Project Cost: $1,983,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 106857, Location: 1.1 MI N JCT PIP+RTE 340 (Lat: 41.030556, Lng: -73.940433), Route carried "on" structure: City street , Year Built: 1954, Status: Open, Structure Length: 2.31m (7.58ft), Average Daily Traffic: 1,200 (year 1981), Truck Traffic: 6%, Average Future Daily Traffic: 1,680 (year 2001), Design Load: H 20, Features Intersected: RTE 987C, Facility Carried by Structure: KINGS HIGHWAY Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Owner: State Park, Forest, or Reservation Agency, Maintenance Responsibility: State Highway Agency, Approaching Roadway Width: 10.3m (33.8ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 19.5m (64.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 10.5m (34.4ft), Out-to-Out Width: 14.3m (46.9ft) Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 58.0 metric tons, Inventory Rating: 22.8 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 2.31m (7.58ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Bridge Improvement Cost: $732,000, Roadway Improvement Cost: $436,000, Total Project Cost: $1,168,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 106858, Location: 1.1 MI N JCT PIP+RTE 340 (Lat: 41.030514, Lng: -73.939694), Route carried "on" structure: City street , Year Built: 1954, Status: Open, Structure Length: 2.31m (7.58ft), Average Daily Traffic: 1,200 (year 1981), Truck Traffic: 6%, Average Future Daily Traffic: 1,680 (year 2001), Features Intersected: RTE 987C, Facility Carried by Structure: KINGS HIGHWAY Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Owner: State Park, Forest, or Reservation Agency, Maintenance Responsibility: State Highway Agency, Approaching Roadway Width: 10.3m (33.8ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 19.5m (64.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 10.3m (33.8ft), Out-to-Out Width: 14.3m (46.9ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Very good, Operating Rating: 58.0 metric tons, Inventory Rating: 22.8 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 2.31m (7.58ft), Designated Inspection Frequency: Every 24 months, Inspection Date: December 2006, Bridge Improvement Cost: $732,000, Roadway Improvement Cost: $436,000, Total Project Cost: $1,168,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1068591, Location: 1.2 MI N JCT PIP+RTE 340 (Lat: 41.032114, Lng: -73.941289), Route carried "on" structure: State lands road 987C, Year Built: 1954, Year Reconstructed: 2001, Status: Open, Structure Length: 0.97m (3.18ft), Average Daily Traffic: 24,841 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 34,777 (year 2026), Design Load: H 20, Features Intersected: UPPER SPARKILL CR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.130, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Park, Forest, or Reservation Agency, Maintenance Responsibility: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.5m (27.9ft), Curb-To-Curb Width: 11.8m (38.7ft), Out-to-Out Width: 14.7m (48.2ft) Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 68.1 metric tons, Inventory Rating: 29.3 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.97m (3.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $318,000, Roadway Improvement Cost: $189,000, Total Project Cost: $507,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1068592, Location: 1.2 MI N JCT PIP+RTE 340 (Lat: 41.032114, Lng: -73.941289), Route carried "on" structure: State lands road 987C, Year Built: 1954, Year Reconstructed: 2001, Status: Open, Structure Length: 0.97m (3.18ft), Average Daily Traffic: 24,841 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 34,777 (year 2026), Design Load: H 20, Features Intersected: UPPER SPARKILL CR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 4.130, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Park, Forest, or Reservation Agency, Maintenance Responsibility: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.5m (27.9ft), Curb-To-Curb Width: 13.1m (43.0ft), Out-to-Out Width: 14.7m (48.2ft) Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 68.1 metric tons, Inventory Rating: 29.3 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.97m (3.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $318,000, Roadway Improvement Cost: $189,000, Total Project Cost: $507,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1068609, Location: 0.2 MI N JCT PIP+RTE 303 (Lat: 41.037847, Lng: -73.949583), Route carried "on" structure: State lands road 987C, Year Built: 2001, Status: Open, Structure Length: 3.05m (10.01ft), Average Daily Traffic: 55,960 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 78,344 (year 2026), Design Load: HS 25, Features Intersected: CSX TRANSPRTATION Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.617, Lanes on structure: 6, Base Highway Network: Yes, Owner: State Park, Forest, or Reservation Agency, Maintenance Responsibility: State Highway Agency, Approaching Roadway Width: 27.6m (90.6ft), Skew: 13 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 30.5m (100.1ft), Curb-To-Curb Width: 33.3m (109.3ft), Out-to-Out Width: 34.8m (114.2ft) Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 62.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 42.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.05m (10.01ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $318,000, Roadway Improvement Cost: $189,000, Total Project Cost: $507,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 1068619, Location: .3 MI N JCT PIP & SH 303 (Lat: 41.038517, Lng: -73.950822), Route carried "on" structure: State lands road 987C, Year Built: 1956, Year Reconstructed: 2001, Status: Open, Structure Length: 1.79m (5.87ft), Average Daily Traffic: 55,960 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 78,344 (year 2026), Design Load: H 20, Features Intersected: WESTERN HIGHWAY Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 5.623, Lanes on structure: 6, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Park, Forest, or Reservation Agency, Maintenance Responsibility: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Skew: 20 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 14.9m (48.9ft), Curb-To-Curb Width: 26.6m (87.3ft), Out-to-Out Width: 28.8m (94.5ft) Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 56.9 metric tons, Inventory Rating: 23.3 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.79m (5.87ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2006, Bridge Improvement Cost: $1,144,000, Roadway Improvement Cost: $681,000, Total Project Cost: $1,825,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 1068629, Location: 1.0 MI N JCT PIP+RTE 303 (Lat: 41.045647, Lng: -73.958597), Route carried "on" structure: County highway , Year Built: 1956, Year Reconstructed: 1973, Status: Open, Structure Length: 2.77m (9.09ft), Average Daily Traffic: 1,200 (year 1981), Truck Traffic: 6%, Average Future Daily Traffic: 1,680 (year 2001), Design Load: H 20, Features Intersected: RTE 987C, Facility Carried by Structure: ORANGEBURG ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 2, Owner: State Park, Forest, or Reservation Agency, Maintenance Responsibility: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Skew: 31 degrees, Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 22.8m (74.8ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 24.3m (79.7ft), Out-to-Out Width: 34.4m (112.9ft) Condition: Superstructure: Good, Substructure: Good, Operating Rating: 62.1 metric tons, Inventory Rating: 23.9 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.77m (9.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $2,108,000, Roadway Improvement Cost: $1,224,000, Total Project Cost: $3,332,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1068639, Location: 1.7 MI N JCT PIP+RTE 303 (Lat: 41.054606, Lng: -73.964847), Route carried "on" structure: State lands road 987C, Year Built: 1956, Year Reconstructed: 2001, Status: Open, Structure Length: 2.07m (6.79ft), Average Daily Traffic: 56,582 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 79,215 (year 2027), Design Load: H 20, Features Intersected: CONVENT RD CR 26 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 10.288, Lanes on structure: 4, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Park, Forest, or Reservation Agency, Maintenance Responsibility: State Highway Agency, Approaching Roadway Width: 10.0m (32.8ft), Skew: 23 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 16.7m (54.8ft), Curb-To-Curb Width: 25.8m (84.6ft), Out-to-Out Width: 28.0m (91.9ft) Condition: Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 55.9 metric tons, Inventory Rating: 22.5 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.07m (6.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $1,284,000, Roadway Improvement Cost: $764,000, Total Project Cost: $2,048,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 106864, Location: 2.1 MI N JCT PIP & SH 303 (Lat: 41.058667, Lng: -73.970744), Route carried "on" structure: City street , Year Built: 1956, Status: Open, Structure Length: 2.40m (7.87ft), Average Daily Traffic: 1,200 (year 1981), Truck Traffic: 6%, Average Future Daily Traffic: 1,680 (year 2001), Design Load: H 20, Features Intersected: RTE 987C, Facility Carried by Structure: VAN WYCK ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Owner: State Park, Forest, or Reservation Agency, Maintenance Responsibility: State Highway Agency, Approaching Roadway Width: 10.3m (33.8ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 20.1m (65.9ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 1.8m (5.9ft), Curb-To-Curb Width: 10.3m (33.8ft), Out-to-Out Width: 14.9m (48.9ft) Condition: Superstructure: Very good, Substructure: Very good, Operating Rating: 58.7 metric tons, Inventory Rating: 23.0 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.40m (7.87ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $795,000, Roadway Improvement Cost: $473,000, Total Project Cost: $1,268,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1068651, Location: 2.8 MI N JCT PIP+RTE 303 (Lat: 41.065842, Lng: -73.978406), Route carried "on" structure: State lands road 987C, Year Built: 1956, Year Reconstructed: 2001, Status: Open, Structure Length: 2.07m (6.79ft), Average Daily Traffic: 28,291 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 39,607 (year 2027), Design Load: HS 20, Features Intersected: HACKENSACK RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 10.288, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Park, Forest, or Reservation Agency, Maintenance Responsibility: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 18.2m (59.7ft), Curb-To-Curb Width: 14.0m (45.9ft), Out-to-Out Width: 15.4m (50.5ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Operating Rating: 85.6 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.07m (6.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $704,000, Roadway Improvement Cost: $419,000, Total Project Cost: $1,123,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 1068652, Location: 2.8 MI N JCT PIP+RTE 303 (Lat: 41.065731, Lng: -73.979014), Route carried "on" structure: State lands road 987C, Year Built: 1956, Year Reconstructed: 2001, Status: Open, Structure Length: 2.07m (6.79ft), Average Daily Traffic: 28,291 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 39,607 (year 2027), Design Load: HS 20, Features Intersected: HACKENSACK RIVER Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 10.288, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Park, Forest, or Reservation Agency, Maintenance Responsibility: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 18.2m (59.7ft), Curb-To-Curb Width: 14.0m (45.9ft), Out-to-Out Width: 15.4m (50.5ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Good, Operating Rating: 85.6 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.07m (6.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $704,000, Roadway Improvement Cost: $419,000, Total Project Cost: $1,123,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 106866, Location: 3.1 MI N JCT PIP & SH 303 (Lat: 41.069578, Lng: -73.980358), Route carried "on" structure: County highway , Year Built: 1956, Status: Open, Structure Length: 4.51m (14.80ft), Average Daily Traffic: 1,200 (year 1981), Truck Traffic: 6%, Average Future Daily Traffic: 1,680 (year 2001), Design Load: HS 20, Features Intersected: RTE 987C, Facility Carried by Structure: SICKLETOWN ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Owner: State Park, Forest, or Reservation Agency, Maintenance Responsibility: State Highway Agency, Approaching Roadway Width: 10.3m (33.8ft), Material/Design: Concrete continuous, Design/Construction: Frame, Number Of Spans In Main Unit: 2, Length of Maximum Span: 19.5m (64.0ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 10.3m (33.8ft), Out-to-Out Width: 14.6m (47.9ft) Condition: Deck: Very good, Superstructure: Good, Substructure: Very good, Operating Rating: 86.2 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.51m (14.80ft), Designated Inspection Frequency: Every 24 months, Inspection Date: Febuary 2006, Bridge Improvement Cost: $1,456,000, Roadway Improvement Cost: $867,000, Total Project Cost: $2,323,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1068679, Location: 3.2 MI N JCT PIP & SH 303 (Lat: 41.078619, Lng: -73.984958), Route carried "on" structure: State lands road 987C, Year Built: 1956, Year Reconstructed: 2001, Status: Open, Structure Length: 1.73m (5.68ft), Average Daily Traffic: 56,582 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 79,215 (year 2027), Design Load: HS 20, Features Intersected: TOWN LINE ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 10.290, Lanes on structure: 6, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Park, Forest, or Reservation Agency, Maintenance Responsibility: State Highway Agency, Approaching Roadway Width: 14.6m (47.9ft), Skew: 23 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 13.7m (44.9ft), Curb-To-Curb Width: 25.6m (84.0ft), Out-to-Out Width: 28.7m (94.2ft) Condition: Superstructure: Good, Substructure: Good, Operating Rating: 82.3 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.73m (5.68ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2006, Bridge Improvement Cost: $1,101,000, Roadway Improvement Cost: $655,000, Total Project Cost: $1,756,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 106897, Location: IN ORANGEBURG (Lat: 41.059289, Lng: -73.970736), Route carried "on" structure: City street , Year Built: 1956, Status: Open, Structure Length: 2.40m (7.87ft), Average Daily Traffic: 1,200 (year 1981), Truck Traffic: 6%, Average Future Daily Traffic: 1,680 (year 2001), Design Load: H 20, Features Intersected: RTE 987C, Facility Carried by Structure: VAN WYCK ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Owner: State Park, Forest, or Reservation Agency, Maintenance Responsibility: State Highway Agency, Approaching Roadway Width: 10.3m (33.8ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 20.1m (65.9ft), Curb or Sidewalk Widths: Left: 1.8m (5.9ft), Right: 1.8m (5.9ft), Curb-To-Curb Width: 10.3m (33.8ft), Out-to-Out Width: 14.9m (48.9ft) Condition: Deck: Very good, Superstructure: Good, Substructure: Good, Operating Rating: 58.7 metric tons, Inventory Rating: 23.0 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.40m (7.87ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $794,000, Roadway Improvement Cost: $472,000, Total Project Cost: $1,266,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1068989, Location: 1.0 MI N JCT PIP+RTE 303 (Lat: 41.045708, Lng: -73.958133), Route carried "on" structure: County highway , Year Built: 1956, Year Reconstructed: 1973, Status: Open, Structure Length: 2.77m (9.09ft), Average Daily Traffic: 19,390 (year 1979), Truck Traffic: 6%, Average Future Daily Traffic: 27,146 (year 1999), Design Load: H 20, Features Intersected: RTE 987C, Facility Carried by Structure: ORANGEBURG ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 4, Owner: State Highway Agency, Approaching Roadway Width: 26.8m (87.9ft), Skew: 31 degrees, Material/Design: Concrete, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Length of Maximum Span: 22.8m (74.8ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 23.7m (77.8ft), Out-to-Out Width: 35.3m (115.8ft) Condition: Superstructure: Good, Substructure: Good, Operating Rating: 62.1 metric tons, Inventory Rating: 23.9 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.77m (9.09ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2006, Bridge Improvement Cost: $2,164,000, Roadway Improvement Cost: $1,256,000, Total Project Cost: $3,420,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 106899, Location: JCT PIP+RTE 340 (Lat: 41.017922, Lng: -73.929039), Route carried "on" structure: State highway 340, Year Built: 1954, Status: Open, Structure Length: 2.25m (7.38ft), Average Daily Traffic: 3,516 (year 2002), Truck Traffic: 6%, Average Future Daily Traffic: 4,922 (year 2022), Design Load: H 20, Features Intersected: RTE 987C Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.163, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Park, Forest, or Reservation Agency, Maintenance Responsibility: State Highway Agency, Approaching Roadway Width: 10.3m (33.8ft), Skew: 3 degrees, Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 20.7m (67.9ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 10.3m (33.8ft), Out-to-Out Width: 14.6m (47.9ft) Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 59.4 metric tons, Inventory Rating: 23.2 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.25m (7.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2006, Bridge Improvement Cost: $728,000, Roadway Improvement Cost: $433,000, Total Project Cost: $1,161,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1091171, Location: 2.4 MI S JCT RTS 304+59 (Lat: 41.068161, Lng: -74.025811), Route carried "on" structure: State highway 304, Year Built: 1968, Status: Open, Structure Length: 5.42m (17.78ft), Average Daily Traffic: 9,378 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 13,129 (year 2026), Features Intersected: W CROOKED HILL RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.807, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 8.8m (28.9ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 20.1m (65.9ft), Curb-To-Curb Width: 9.0m (29.5ft), Out-to-Out Width: 9.9m (32.5ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Satisfactory, Inventory Rating: 59.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.42m (17.78ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $335,000, Roadway Improvement Cost: $199,000, Total Project Cost: $534,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1091172, Location: 2.4 MI S JCT RTS 304+59 (Lat: 41.068161, Lng: -74.025811), Route carried "on" structure: State highway 304, Year Built: 1968, Status: Open, Structure Length: 5.42m (17.78ft), Average Daily Traffic: 9,378 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 13,129 (year 2026), Features Intersected: W CROOKED HILL RD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.807, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 8.8m (28.9ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 20.1m (65.9ft), Curb-To-Curb Width: 9.0m (29.5ft), Out-to-Out Width: 10.0m (32.8ft) Condition: Deck: Very good, Superstructure: Good, Substructure: Good, Operating Rating: 98.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 58.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 5.42m (17.78ft), Designated Inspection Frequency: Every 24 months, Inspection Date: June 2006, Bridge Improvement Cost: $335,000, Roadway Improvement Cost: $199,000, Total Project Cost: $534,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1091181, Location: 2.3 MI S JCT SH304 & SH59 (Lat: 41.069478, Lng: -74.024794), Route carried "on" structure: State highway 304, Year Built: 1968, Status: Open, Structure Length: 7.99m (26.21ft), Average Daily Traffic: 9,378 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 13,129 (year 2026), Features Intersected: RAILROAD AVENUE, MNRR PV Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 1.923, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 21.0m (68.9ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 0.3m (1.0ft), Curb-To-Curb Width: 8.9m (29.2ft), Out-to-Out Width: 10.1m (33.1ft) Condition: Deck: Good, Superstructure: Very good, Substructure: Good, Operating Rating: 82.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 49.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.99m (26.21ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $335,000, Roadway Improvement Cost: $199,000, Total Project Cost: $534,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1091182, Location: 2.3 MI S JCT SH304 & SH59 (Lat: 41.069478, Lng: -74.024794), Route carried "on" structure: State highway 304, Year Built: 1968, Status: Open, Structure Length: 7.99m (26.21ft), Average Daily Traffic: 9,378 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 13,129 (year 2026), Features Intersected: RAILROAD AVENUE, MNRR PV Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.679, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 13.4m (44.0ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 21.0m (68.9ft), Curb or Sidewalk Widths: Left: 0.3m (1.0ft), Right: 0.3m (1.0ft), Curb-To-Curb Width: 8.9m (29.2ft), Out-to-Out Width: 10.1m (33.1ft) Condition: Deck: Very good, Superstructure: Good, Substructure: Good, Operating Rating: 83.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 50.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.99m (26.21ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2006, Bridge Improvement Cost: $335,000, Roadway Improvement Cost: $199,000, Total Project Cost: $534,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1091191, Location: 1.8 MI S JCT RTS 304+59 (Lat: 41.071006, Lng: -74.015797), Route carried "on" structure: State highway 304, Year Built: 1968, Status: Open, Structure Length: 3.90m (12.80ft), Average Daily Traffic: 9,378 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 13,129 (year 2026), Design Load: HS 20, Features Intersected: BANTING WAY Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.006, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 13.7m (44.9ft), Curb-To-Curb Width: 11.9m (39.0ft), Out-to-Out Width: 13.0m (42.7ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 90.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 54.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.90m (12.80ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $335,000, Roadway Improvement Cost: $199,000, Total Project Cost: $534,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1091192, Location: 1.8 MI S JCT RTS 304+59 (Lat: 41.071006, Lng: -74.015797), Route carried "on" structure: State highway 304, Year Built: 1968, Status: Open, Structure Length: 3.90m (12.80ft), Average Daily Traffic: 9,378 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 13,129 (year 2026), Design Load: HS 20, Features Intersected: BANTING WAY Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.006, Lanes on structure: 3, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Skew: 1 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 13.7m (44.9ft), Curb-To-Curb Width: 11.9m (39.0ft), Out-to-Out Width: 13.0m (42.7ft) Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 91.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 54.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 3.90m (12.80ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $335,000, Roadway Improvement Cost: $199,000, Total Project Cost: $534,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 10912, Location: 1.6 MI S JCT SH59 & SH304 (Lat: 41.072297, Lng: -74.013242), Route carried "on" structure: County highway , Year Built: 1968, Status: Open, Structure Length: 7.37m (24.18ft), Average Daily Traffic: 1,200 (year 1981), Truck Traffic: 6%, Average Future Daily Traffic: 1,680 (year 2001), Features Intersected: RTE 304, Facility Carried by Structure: MIDDLETOWN ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 6, Owner: State Highway Agency, Approaching Roadway Width: 19.5m (64.0ft), Skew: 23 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 4, Length of Maximum Span: 22.2m (72.8ft), Curb-To-Curb Width: 18.5m (60.7ft), Out-to-Out Width: 23.1m (75.8ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 90.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 53.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 7.37m (24.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: September 2006, Bridge Improvement Cost: $335,000, Roadway Improvement Cost: $199,000, Total Project Cost: $534,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1091211, Location: 1.0 MI S JCT RTS 304+59 (Lat: 41.079469, Lng: -74.005981), Route carried "on" structure: State highway 304, Year Built: 1968, Status: Open, Structure Length: 4.75m (15.58ft), Average Daily Traffic: 10,800 (year 2002), Truck Traffic: 6%, Average Future Daily Traffic: 15,120 (year 2022), Features Intersected: TOWN LINE RD CR42 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.966, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 17.0m (55.8ft), Curb-To-Curb Width: 9.0m (29.5ft), Out-to-Out Width: 9.9m (32.5ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 95.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 57.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.75m (15.58ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: June 2006, Critical Feature Inspection Date: June 2006, Bridge Improvement Cost: $335,000, Roadway Improvement Cost: $199,000, Total Project Cost: $534,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 1091212, Location: 1.0 MI S JCT RTS 304+59 (Lat: 41.079469, Lng: -74.005981), Route carried "on" structure: State highway 304, Year Built: 1968, Status: Open, Structure Length: 4.75m (15.58ft), Average Daily Traffic: 10,800 (year 2002), Truck Traffic: 6%, Average Future Daily Traffic: 15,120 (year 2022), Features Intersected: TOWN LINE RD CR42 Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 3.966, Lanes on structure: 2, Lanes under structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 12.1m (39.7ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 17.0m (55.8ft), Curb-To-Curb Width: 9.0m (29.5ft), Out-to-Out Width: 9.9m (32.5ft) Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 95.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 57.4 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of replacement, Underclear: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 4.75m (15.58ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: June 2006, Critical Feature Inspection Date: June 2006, Bridge Improvement Cost: $335,000, Roadway Improvement Cost: $199,000, Total Project Cost: $534,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 109155, Location: 1.5 MI S JCT SH303 &SH340 (Lat: 41.028975, Lng: -73.925314), Route carried "on" structure: State highway 340, Year Built: 2003, Status: Open, Structure Length: 0.91m (2.99ft), Average Daily Traffic: 3,516 (year 2002), Truck Traffic: 6%, Average Future Daily Traffic: 4,922 (year 2022), Design Load: HS 25, Features Intersected: SPARKILL CREEK Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 2.344, Lanes on structure: 2, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 1, Length of Maximum Span: 9.1m (29.9ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 8.6m (28.2ft), Out-to-Out Width: 15.9m (52.2ft) Condition: Channel: Very good, Culverts: Excellent, Operating Rating: 79.1 metric tons, Inventory Rating: 40.8 metric tons, Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 0.91m (2.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: July 2007, Bridge Improvement Cost: $322,000, Roadway Improvement Cost: $192,000, Total Project Cost: $514,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 222413, Location: 1.0 MI SW OF SPARKILL (Lat: 41.024339, Lng: -73.948119), Route carried "on" structure: City street , Year Built: 1931, Status: Open, Structure Length: 0.97m (3.18ft), Average Daily Traffic: 2,500 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 3,500 , Features Intersected: SPARKILL CREEK, Facility Carried by Structure: KINGS HIGHWAY Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Town or Township Highway Agency, Approaching Roadway Width: 8.2m (26.9ft), Skew: 1 degrees, Material/Design: Concrete, Design/Construction: Tee Beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 7.9m (25.9ft), Curb or Sidewalk Widths: Left: 1.3m (4.3ft), Right: 1.3m (4.3ft), Curb-To-Curb Width: 9.2m (30.2ft), Out-to-Out Width: 12.9m (42.3ft) Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Channel: Fair, Operating Rating: 70.0 metric tons, Inventory Rating: 27.5 metric tons, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Meets minimum limits, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 0.97m (3.18ft), Designated Inspection Frequency: Every 24 months, Inspection Date: April 2007, Bridge Improvement Cost: $278,000, Roadway Improvement Cost: $166,000, Total Project Cost: $444,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 334595, Location: 3.6 MI NW OF SPARKILL (Lat: 41.060511, Lng: -73.985689), Route carried "on" structure: City street , Year Built: 1994, Status: Open, Structure Length: 1.52m (4.99ft), Average Daily Traffic: 2,000 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 2,800 , Design Load: HS 25, Features Intersected: HACKENSACK RIVER, Facility Carried by Structure: BLAUVELT ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 14.3m (46.9ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 8.8m (28.9ft) Condition: Deck: Excellent, Superstructure: Very good, Substructure: Very good, Channel: Good, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 63.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.52m (4.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2006, Bridge Improvement Cost: $236,000, Roadway Improvement Cost: $141,000, Total Project Cost: $377,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing Find on map >>
Structure Number: 334596, Location: 3.2 MI SW OF NYACK (Lat: 41.070542, Lng: -73.976022), Route carried "on" structure: City street , Year Built: 1983, Status: Open, Structure Length: 2.56m (8.40ft), Average Daily Traffic: 2,500 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 3,500 , Design Load: HS 20, Features Intersected: HACKENSACK RIVER, Facility Carried by Structure: FIFTH AVENUE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 9.7m (31.8ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 24.9m (81.7ft), Curb-To-Curb Width: 9.7m (31.8ft), Out-to-Out Width: 10.4m (34.1ft) Condition: Deck: Fair, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 68.0 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 2.56m (8.40ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2007, Bridge Improvement Cost: $591,000, Roadway Improvement Cost: $351,000, Total Project Cost: $942,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete Find on map >>
Structure Number: 334597, Location: 3.8 MI NW OF SPARKILL (Lat: 41.058742, Lng: -73.992486), Route carried "on" structure: County highway , Year Built: 2006, Status: Open, Structure Length: 0.92m (3.02ft), Average Daily Traffic: 3,080 (year 2006), Truck Traffic: 6%, Average Future Daily Traffic: 4,312 (year 2026), Design Load: HS 25, Features Intersected: NAURAUSHAUN BROOK, Facility Carried by Structure: SICKLETOWN ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 9.0m (29.5ft), Material/Design: Concrete, Design/Construction: Frame, Number Of Spans In Main Unit: 1, Length of Maximum Span: 8.5m (27.9ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.5m (4.9ft), Curb-To-Curb Width: 9.0m (29.5ft), Out-to-Out Width: 11.8m (38.7ft) Condition: Superstructure: Excellent, Substructure: Excellent, Channel: Fair, Structural Evaluation: High priority of corrective action, Deck Geometry: Meets minimum limits, Waterway Adequacy: Meets minimum limits, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 0.92m (3.02ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2007, Bridge Improvement Cost: $238,000, Roadway Improvement Cost: $142,000, Total Project Cost: $380,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 334598, Location: 5.2 MI NW OF SPARKILL (Lat: 41.056361, Lng: -74.023703), Route carried "on" structure: City street , Year Built: 1930, Status: Open, Structure Length: 0.91m (2.99ft), Average Daily Traffic: 5,000 (year 2007), Truck Traffic: 8%, Average Future Daily Traffic: 7,000 , Features Intersected: MUDDY CREEK, Facility Carried by Structure: JEFFERSON AVENUE Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 8.8m (28.9ft), Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.6m (11.8ft), Curb-To-Curb Width: 9.3m (30.5ft), Out-to-Out Width: 10.3m (33.8ft) Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 72.5 metric tons, Inventory Rating: 32.6 metric tons, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Somewhat better than minimum adequacy, Length Of Structure Improvement: 0.91m (2.99ft), Designated Inspection Frequency: Every 24 months, Inspection Date: March 2007, Bridge Improvement Cost: $208,000, Roadway Improvement Cost: $124,000, Total Project Cost: $332,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 334599, Location: 3.2 MI NW OF SPARKILL (Lat: 41.044100, Lng: -73.987928), Route carried "on" structure: County highway , Year Built: 1954, Year Reconstructed: 1967, Status: Open, Structure Length: 3.65m (11.98ft), Average Daily Traffic: 10,000 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 14,000 , Design Load: HS 20, Features Intersected: TAPPAN LAKE, Facility Carried by Structure: VETERANS MEM DR Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 16.4m (53.8ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 2, Length of Maximum Span: 25.6m (84.0ft), Curb or Sidewalk Widths: Left: 0.7m (2.3ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 14.6m (47.9ft), Out-to-Out Width: 17.5m (57.4ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Fair, Channel: Good, Operating Rating: 72.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 43.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Superior to present desirable criteria, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 3.65m (11.98ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $208,000, Roadway Improvement Cost: $124,000, Total Project Cost: $332,000 ( Estimate for 2007), Wearing Surface/Protective System: Wearing Surface: Bituminous Find on map >>
Structure Number: 3346, Location: 3.2 MI NW OF SPARKILL (Lat: 41.054478, Lng: -73.982081), Route carried "on" structure: County highway , Year Built: 1967, Status: Open, Structure Length: 1.70m (5.58ft), Average Daily Traffic: 3,000 (year 2007), Truck Traffic: 6%, Average Future Daily Traffic: 4,200 , Design Load: HS 20, Features Intersected: TAPPAN LAKE, Facility Carried by Structure: CONVENT ROAD Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: County Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 15.8m (51.8ft), Curb or Sidewalk Widths: Left: 1.5m (4.9ft), Right: 1.5m (4.9ft), Curb-To-Curb Width: 12.1m (39.7ft), Out-to-Out Width: 15.8m (51.8ft) Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Satisfactory, Channel: Good, Operating Rating: 80.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 48.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: Better than present minimum criteria, Length Of Structure Improvement: 1.70m (5.58ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2007, Bridge Improvement Cost: $208,000, Roadway Improvement Cost: $124,000, Total Project Cost: $332,000 ( Estimate for 2007), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Epoxy Discuss this city on our hugely popular New York forum Back to: Orangetown, NY, New York, All US cities.
|
![]() |