Bridge Statistics for Pittsburgh, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 739Number of bridges
  • 14,564ft / 4,439mTotal length
  • $433,022,000Total costs
  • 8,123,148Total average daily traffic
  • 545,684Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pittsburgh
  • No street view available for this location

New bridges in Pittsburgh, PA - historical statistics
  • New bridges - historical statistics
  • 5Before 1900
  • 211900-1909
  • 101910-1919
  • 631920-1929
  • 431930-1939
  • 161940-1949
  • 1261950-1959
  • 1341960-1969
  • 441970-1979
  • 1941980-1989
  • 421990-1999
  • 172000-2009
  • 232010-2019
  • 12020-2022
Reconstructed bridges in Pittsburgh, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 01930-1939
  • 11940-1949
  • 21950-1959
  • 21960-1969
  • 171970-1979
  • 351980-1989
  • 301990-1999
  • 452000-2009
  • 352010-2019
  • 22020-2022
Average Bridge Daily Traffic in Pittsburgh, PA
Average Bridge Truck Traffic in Pittsburgh, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.9%Very good
  • 47.6%Good
  • 23.6%Satisfactory
  • 14.4%Fair
  • 3.7%Poor
  • 1.1%Serious
  • 0.7%Critical
  • 0.4%Imminent failure
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.4%Very good
  • 32.0%Good
  • 29.9%Satisfactory
  • 22.1%Fair
  • 2.5%Poor
  • 1.1%Serious
  • 1.1%Critical
  • 0.7%Imminent failure
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.6%Excellent
  • 30.2%Very good
  • 34.9%Good
  • 21.7%Satisfactory
  • 7.5%Fair
  • 1.1%Poor
  • 0.7%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.2%Excellent
  • 13.5%Very good
  • 18.8%Good
  • 27.1%Satisfactory
  • 26.0%Fair
  • 9.4%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 22.2%Very good
  • 16.7%Good
  • 44.4%Satisfactory
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: 1235,  Location: CENTER AVE. OVER 1026 (Lat: 40.433333,  Lng: -79.991667),  Route carried "on" structure: State highway ,  Year Built: 1962,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 7,086 (year 2022),  Truck Traffic: 3%,  Average Future Daily Traffic: 15,878 (year 2032),  Design Load: HL 93,  Features Intersected: I-579, CROSSTOWN,  Facility Carried by Structure: CENTER AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 12,  Owner: State Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Skew: 33 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 5.5m (18.0ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 18.0m (59.1ft),  Out-to-Out Width: 25.8m (84.6ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 43.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 33.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $138,000,  Roadway Improvement Cost: $407,000,  Total Project Cost: $1,865,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1236,  Location: WEBSTER AVE OVER I-579 (Lat: 40.433333,  Lng: -79.991667),  Route carried "on" structure: State highway ,  Year Built: 1962,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 8.08m (26.51ft),  Average Daily Traffic: 3,285 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,398 (year 2032),  Design Load: HL 93,  Features Intersected: I-579,  Facility Carried by Structure: WEBSTER AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 33,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 39 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.4m (103.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 6.1m (20.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 17.5m (57.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.10m (26.57ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $1,740,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1237,  Location: I579 SB.OVER 5TH AVENUE (Lat: 40.439106,  Lng: -79.993772),  Route carried "on" structure: Interstate 579,  Year Built: 1962,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 6.43m (21.10ft),  Average Daily Traffic: 25,279 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 31,451 (year 2032),  Design Load: HS 20,  Features Intersected: FIFTH AVE,  Facility Carried by Structure: CROSSTOWN BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 1,  Length of Maximum Span: 31.7m (104.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.40m (21.00ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Bridge Improvement Cost: $72,000,  Roadway Improvement Cost: $212,000,  Total Project Cost: $971,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 124,  Location: 579 SB.OVER RAMP D (Lat: 40.441581,  Lng: -79.992581),  Route carried "on" structure: Interstate 579,  Year Built: 1962,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 25,279 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 31,451 (year 2032),  Design Load: HS 20,  Features Intersected: 7TH AVE RAMP D,  Facility Carried by Structure: CROSSTOWN BLVD
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.50m (14.76ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Bridge Improvement Cost: $16,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $213,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1241,  Location: Veterans Bridge (Lat: 40.447958,  Lng: -79.991092),  Route carried "on" structure: Interstate 579,  Year Built: 1986,  Status: Open,  Structure Length: 46.70m (153.22ft),  Average Daily Traffic: 29,197 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 30,463 (year 2032),  Design Load: HS 20,  Features Intersected: N-S RR,PAT LRT,PAT EBSWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.739,  Lanes on structure: 2,  Lanes under structure: 18,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 59.4m (194.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 46.70m (153.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1244,  Location: Veterans Bridge (Lat: 40.449872,  Lng: -79.993408),  Route carried "on" structure: Interstate 579,  Year Built: 1986,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 32.00m (104.99ft),  Average Daily Traffic: 54,476 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 61,914 (year 2032),  Design Load: HL 93,  Features Intersected: ALLEGHENY RIVER,  Facility Carried by Structure: Veterans Bridge
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.739,  Lanes on structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 41.1m (134.8ft),  Skew: 30 degrees,  Navigation Control: Yes ( Vertical Clearance: 999.7m (3,279.9ft), Horizontal Clearance: 9999.9m (32,808.1ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 134.1m (440.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 41.1m (134.8ft),  Out-to-Out Width: 43.4m (142.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 32.00m (104.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Underwater Inspection Date: October 2018,  Bridge Improvement Cost: $328,000,  Roadway Improvement Cost: $966,000,  Total Project Cost: $4,427,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1245,  Location: Veterans Bridge (Lat: 40.446497,  Lng: -79.990544),  Route carried "on" structure: Interstate 579,  Year Built: 1986,  Status: Open,  Structure Length: 48.43m (158.89ft),  Average Daily Traffic: 25,279 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 31,451 (year 2032),  Design Load: HS 20,  Features Intersected: N-S RR,PAT LRT,PAT EBSWY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.705,  Lanes on structure: 2,  Lanes under structure: 18,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 65.8m (215.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 48.40m (158.79ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1248,  Location: Vets Bridge N. Appr (Lat: 40.452958,  Lng: -79.996394),  Route carried "on" structure: Interstate 579,  Year Built: 1988,  Status: Open,  Structure Length: 56.02m (183.79ft),  Average Daily Traffic: 29,197 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 30,463 (year 2032),  Design Load: HL 93,  Features Intersected: SR28, 8108,EAST OHIO ST.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.535,  Lanes on structure: 2,  Lanes under structure: 14,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 16,  Length of Maximum Span: 50.0m (164.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 52.2 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 56.00m (183.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $96,000,  Roadway Improvement Cost: $282,000,  Total Project Cost: $1,293,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1286,  Location: Homestead Interchange (Lat: 40.405167,  Lng: -79.885339),  Route carried "on" structure: State highway 837,  Year Built: 1966,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 24.96m (81.89ft),  Average Daily Traffic: 8,226 (year 2021),  Truck Traffic: 11%,  Average Future Daily Traffic: 10,583 (year 2032),  Design Load: HL 93,  Features Intersected: RPS. C&D,RP.CARSON,LOCAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.780,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 46.0 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 25.00m (82.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $278,000,  Roadway Improvement Cost: $817,000,  Total Project Cost: $3,747,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1294,  Location: @ SOUTH END / WEST END BR (Lat: 40.444058,  Lng: -80.027978),  Route carried "on" structure: Ramp State highway 837,  Year Built: 1991,  Status: Open,  Structure Length: 18.41m (60.40ft),  Average Daily Traffic: 11,442 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 23,822 (year 2032),  Design Load: HS 20,  Features Intersected: W. CARSON ST., SR 3106,  Facility Carried by Structure: WEST END CIRCLE
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 38.927,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Number Of Approach Spans: 22,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 20.0m (65.6ft),  Out-to-Out Width: 23.3m (76.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 20.80m (68.24ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Critical Feature Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1302,  Location: 1/2 MI. N.W.OF SR2045 (Lat: 40.384656,  Lng: -79.932856),  Route carried "on" structure: State highway 885,  Year Built: 1963,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 15.30m (50.20ft),  Average Daily Traffic: 16,641 (year 2022),  Truck Traffic: 8%,  Average Future Daily Traffic: 26,552 (year 2032),  Design Load: HS 20,  Features Intersected: BALDWIN RD,RR,RAMP ST,CR,  Facility Carried by Structure: LEBANON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.978,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 29 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 31.1m (102.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.8m (61.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 15.30m (50.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $393,000,  Roadway Improvement Cost: $1,157,000,  Total Project Cost: $5,303,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1304,  Location: AT GLENWOOD INTERCHANGE (Lat: 40.389658,  Lng: -79.934100),  Route carried "on" structure: State highway 885,  Year Built: 1963,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 8,429 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,567 (year 2032),  Design Load: HS 20,  Features Intersected: GLASS RUN ROAD,  Facility Carried by Structure: MIFFLIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.327,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $46,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $620,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1307,  Location: AT GLENWOOD INTERCHANGE (Lat: 40.391744,  Lng: -79.934525),  Route carried "on" structure: State highway 885,  Year Built: 1967,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 8,382 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 6,740 (year 2032),  Design Load: HS 20,  Features Intersected: SR 8059,  Facility Carried by Structure: MIFFLIN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.885,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $20,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $265,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1309,  Location: GLENWOOD INTERCHANGE (Lat: 40.393253,  Lng: -79.934831),  Route carried "on" structure: State highway 885,  Year Built: 1967,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 16,811 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 13,307 (year 2032),  Design Load: HS 20,  Features Intersected: SR 8059(RAMP A),  Facility Carried by Structure: MIFFLIN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.885,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Skew: 22 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.9m (71.9ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $41,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $550,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 131,  Location: MA08 GLENWOOD BRIDGE (Lat: 40.397828,  Lng: -79.935614),  Route carried "on" structure: State highway 885,  Year Built: 1966,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 69.37m (227.59ft),  Average Daily Traffic: 16,811 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 13,307 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: MON R,3 RRS,CARSON ST,  Facility Carried by Structure: GLENWOOD BR
Minimum Vertical Clearance: 10.82m (35.50ft),  Kilometerpoint: 13.885,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 30 degrees,  Navigation Control: Yes ( Vertical Clearance: 999.7m (3,279.9ft), Horizontal Clearance: 9999.9m (32,808.1ft)),  Material/Design: Steel continuous,  Design/Construction: Truss - Deck,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 8,  Length of Maximum Span: 172.8m (566.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 22.9m (75.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 69.50m (228.02ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Underwater Inspection Date: June 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 132,  Location: Birmingham Bridge (Lat: 40.433333,  Lng: -79.966667),  Route carried "on" structure: State highway 885,  Year Built: 1928,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 33.01m (108.30ft),  Average Daily Traffic: 12,689 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 19,751 (year 2032),  Design Load: HL 93,  Features Intersected: FORBES, BIRM E&F, BRADY,  Facility Carried by Structure: BLVD ALLIES WB
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 20.258,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 39 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 24,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 33.50m (109.91ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $440,000,  Total Project Cost: $2,019,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1321,  Location: Birmingham Bridge (Lat: 40.433333,  Lng: -79.966667),  Route carried "on" structure: State highway 885,  Year Built: 1952,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 39.72m (130.31ft),  Average Daily Traffic: 8,060 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 12,518 (year 2032),  Design Load: HS 20,  Features Intersected: RAMP R,02266 RPS.,FORBES,  Facility Carried by Structure: RAMP S
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 20.246,  Lanes on structure: 2,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 20,  Length of Maximum Span: 30.2m (99.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 40.30m (132.22ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $153,000,  Roadway Improvement Cost: $452,000,  Total Project Cost: $2,070,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1322,  Location: Blvd of The Allies Bluffs (Lat: 40.436433,  Lng: -79.975231),  Route carried "on" structure: State highway 885,  Year Built: 1950,  Status: Open,  Structure Length: 6.19m (20.31ft),  Average Daily Traffic: 23,008 (year 2022),  Truck Traffic: 9%,  Average Future Daily Traffic: 25,196 (year 2032),  Design Load: HS 20,  Features Intersected: CLIFF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.116,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 27,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 88.10m (289.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $262,000,  Roadway Improvement Cost: $771,000,  Total Project Cost: $3,536,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1324,  Location: Blvd of The Allies Bluffs (Lat: 40.435050,  Lng: -79.986300),  Route carried "on" structure: State highway 885,  Year Built: 1950,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 10.24m (33.60ft),  Average Daily Traffic: 23,008 (year 2022),  Truck Traffic: 9%,  Average Future Daily Traffic: 25,196 (year 2032),  Design Load: HS 20,  Features Intersected: CLIFF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.077,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.50m (37.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $17,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $224,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 1325,  Location: 300'EAST OF LIBERTY BRIDG (Lat: 40.440000,  Lng: -80.005000),  Route carried "on" structure: State highway 885,  Year Built: 1981,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 23,008 (year 2022),  Truck Traffic: 9%,  Average Future Daily Traffic: 25,196 (year 2032),  Design Load: HL 93,  Features Intersected: CLIFF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.077,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 88.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 83.9 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 23.70m (77.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 138,  Location: Highland Park Bridge (Lat: 40.486083,  Lng: -79.913444),  Route carried "on" structure: State highway ,  Year Built: 1940,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 70.29m (230.61ft),  Average Daily Traffic: 37,191 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 50,540 (year 2032),  Design Load: HS 20,  Features Intersected: NS RR, ALLEGH R, AVR RR,  Facility Carried by Structure: HIGHLAND PARK BRG
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 0.295,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 30 degrees,  Navigation Control: Yes ( Vertical Clearance: 999.7m (3,279.9ft), Horizontal Clearance: 9999.9m (32,808.1ft)),  Material/Design: Steel continuous,  Design/Construction: Truss - Deck,  Number Of Spans In Main Unit: 7,  Number Of Approach Spans: 6,  Length of Maximum Span: 84.7m (277.9ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 73.90m (242.45ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $165,000,  Roadway Improvement Cost: $514,000,  Total Project Cost: $2,222,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 164,  Location: BIRMINGHAM BRIDGE (Lat: 40.432406,  Lng: -79.973583),  Route carried "on" structure: State highway ,  Year Built: 1976,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 50.66m (166.21ft),  Average Daily Traffic: 19,244 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 26,062 (year 2032),  Design Load: HS 20,  Features Intersected: MON RIVER, CSX RR,  Facility Carried by Structure: BIRMINGHAM BRIDGE
Minimum Vertical Clearance: 10.97m (35.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 28.7m (94.2ft),  Skew: 39 degrees,  Navigation Control: Yes ( Vertical Clearance: 999.7m (3,279.9ft), Horizontal Clearance: 9999.9m (32,808.1ft)),  Material/Design: Steel,  Design/Construction: Arch - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 11,  Length of Maximum Span: 189.0m (620.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 28.5m (93.5ft),  Out-to-Out Width: 32.0m (105.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 54.90m (180.12ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Underwater Inspection Date: October 2018,  Bridge Improvement Cost: $207,000,  Roadway Improvement Cost: $610,000,  Total Project Cost: $2,796,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 1642,  Location: Birmingham Bridge (Lat: 40.436122,  Lng: -79.972878),  Route carried "on" structure: State highway ,  Year Built: 1976,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 32.98m (108.20ft),  Average Daily Traffic: 19,244 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 26,062 (year 2032),  Design Load: HS 20,  Features Intersected: PKWY E,RP T,TRAIL,2ND AV,  Facility Carried by Structure: BIRMINGHAM BRG APR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 11,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.5m (77.1ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 56.7m (186.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 22.5m (73.8ft),  Out-to-Out Width: 24.6m (80.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 33.10m (108.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $769,000,  Roadway Improvement Cost: $2,266,000,  Total Project Cost: $10,386,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1655,  Location: 0.1 NE OF BEECHWOOD BLVD (Lat: 40.427614,  Lng: -79.927886),  Route carried "on" structure: Ramp State highway ,  Year Built: 1952,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 6,087 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,018 (year 2032),  Design Load: HS 20,  Features Intersected: BEECHWOOD BLVD,  Facility Carried by Structure: FORWARD AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $5,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $70,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1672,  Location: 31st Street Bridge (Lat: 40.464611,  Lng: -79.980061),  Route carried "on" structure: State highway ,  Year Built: 1928,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 83.18m (272.90ft),  Average Daily Traffic: 9,564 (year 2022),  Truck Traffic: 7%,  Average Future Daily Traffic: 7,840 (year 2032),  Design Load: H 20,  Features Intersected: ALLEG.RIV., RRS, LOCALS,  Facility Carried by Structure: 31st Street Bridge
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 12,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 9 degrees,  Navigation Control: Yes ( Vertical Clearance: 999.7m (3,279.9ft), Horizontal Clearance: 9999.9m (32,808.1ft)),  Material/Design: Steel,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 25,  Length of Maximum Span: 115.8m (379.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 82.90m (271.98ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $742,000,  Roadway Improvement Cost: $2,184,000,  Total Project Cost: $10,011,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1674,  Location: 40th Street Bridge (Lat: 40.472356,  Lng: -79.967864),  Route carried "on" structure: State highway ,  Year Built: 1924,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 74.13m (243.21ft),  Average Daily Traffic: 22,249 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 32,495 (year 2032),  Design Load: HS 20,  Features Intersected: NSRC, CSX, AVR,  Facility Carried by Structure: 40th Street Bridge
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 9 degrees,  Navigation Control: Yes ( Vertical Clearance: 999.7m (3,279.9ft), Horizontal Clearance: 9999.9m (32,808.1ft)),  Material/Design: Steel,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 13,  Length of Maximum Span: 115.8m (379.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 72.10m (236.55ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $1,370,000,  Roadway Improvement Cost: $4,035,000,  Total Project Cost: $18,496,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1687,  Location: Liberty Bridge (Lat: 40.435967,  Lng: -79.995250),  Route carried "on" structure: State highway ,  Year Built: 1921,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 34.41m (112.89ft),  Average Daily Traffic: 3,646 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 16,956 (year 2032),  Design Load: HS 20,  Features Intersected: 02270,PAT,2ND AV,ROSS ST,  Facility Carried by Structure: Blvd of the Allies
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 0.818,  Lanes on structure: 3,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 29 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 25,  Number Of Approach Spans: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 35.00m (114.83ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Bridge Improvement Cost: $415,000,  Roadway Improvement Cost: $1,221,000,  Total Project Cost: $5,598,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 174,  Location: Smithfield St Bridge (Lat: 40.416697,  Lng: -80.000000),  Route carried "on" structure: State highway ,  Year Built: 1995,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 6,075 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 16,014 (year 2032),  Design Load: HS 20,  Features Intersected: STATION SQUARE ACCESS RD,  Facility Carried by Structure: SMITHFIELD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Owner: Private,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 3.5m (11.5ft),  Curb-To-Curb Width: 16.3m (53.5ft),  Out-to-Out Width: 23.2m (76.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Other Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1742,  Location: Smithfield Street Bridge (Lat: 40.434753,  Lng: -80.002131),  Route carried "on" structure: State highway ,  Year Built: 1883,  Year Reconstructed: 1994,  Status: Posted for load,  Structure Length: 36.03m (118.21ft),  Average Daily Traffic: 6,075 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 16,016 (year 2032),  Design Load: HS 20,  Features Intersected: MONONGAHELA RIVER,CSX RR,  Facility Carried by Structure: Smithfield Street
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 0.156,  Lanes on structure: 3,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Navigation Control: Yes ( Vertical Clearance: 131.1m (430.1ft), Horizontal Clearance: 111.5m (365.8ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 5,  Length of Maximum Span: 109.7m (359.9ft),  Curb or Sidewalk Widths: Left: 3.3m (10.8ft),  Right: 3.2m (10.5ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 26.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 45.10m (147.97ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Critical Feature Inspection Date: July 2021,  Underwater Inspection Date: August 2019,  Other Special Inspection Date: July 2021,  Bridge Improvement Cost: $454,000,  Roadway Improvement Cost: $1,337,000,  Total Project Cost: $6,129,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1743,  Location: Smithfield St Bridge (Lat: 40.433333,  Lng: -80.003333),  Route carried "on" structure: State highway ,  Year Built: 1954,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 6,075 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 16,015 (year 2032),  Design Load: HS 20,  Features Intersected: I-376 & SR 8041(RAMP F),  Facility Carried by Structure: SMITHFIELD STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.521,  Lanes on structure: 3,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 16.2m (53.1ft),  Right: 6.9m (22.6ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 36.2m (118.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.80m (15.75ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Bridge Improvement Cost: $70,000,  Roadway Improvement Cost: $207,000,  Total Project Cost: $947,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1805,  Location: @ S END OF LIBERTY TUNNEL (Lat: 40.414408,  Lng: -80.009344),  Route carried "on" structure: State highway ,  Year Built: 1926,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 33,281 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 43,648 (year 2032),  Design Load: HS 20,  Features Intersected: SAW MILL RUN,  Facility Carried by Structure: WEST LIBERTY AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.972,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.3m (83.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 25.2m (82.7ft),  Out-to-Out Width: 28.2m (92.5ft)

Condition: Superstructure: Satisfactory,  Substructure: Fair,  Channel: Poor,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2019,  Bridge Improvement Cost: $12,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $157,000
Find on map >>   Show street view

Structure Number: 1808,  Location: Liberty Bridge (Lat: 40.429306,  Lng: -79.999150),  Route carried "on" structure: State highway ,  Year Built: 1928,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 81.17m (266.31ft),  Average Daily Traffic: 33,281 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 56,825 (year 2031),  Design Load: HS 20,  Features Intersected: MON R,I376,0837,2 AV,ARL,  Facility Carried by Structure: Liberty Bridge
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.855,  Lanes on structure: 4,  Lanes under structure: 75,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Navigation Control: Yes ( Vertical Clearance: 999.7m (3,279.9ft), Horizontal Clearance: 9999.9m (32,808.1ft)),  Material/Design: Steel continuous,  Design/Construction: Truss - Deck,  Number Of Spans In Main Unit: 15,  Number Of Approach Spans: 10,  Length of Maximum Span: 143.3m (470.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Fair,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 82.30m (270.01ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2021,  Critical Feature Inspection Date: April 2021,  Underwater Inspection Date: August 2019,  Bridge Improvement Cost: $1,270,000,  Roadway Improvement Cost: $3,741,000,  Total Project Cost: $17,147,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1861,  Location: NEAR GLENWOOD INTERCHANGE (Lat: 40.389586,  Lng: -79.938050),  Route carried "on" structure: State highway ,  Year Built: 1965,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 5,983 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 7,063 (year 2032),  Design Load: HS 20,  Features Intersected: GLASS RUN,  Facility Carried by Structure: GLASS RUN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.017,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2018