Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Porterdale, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 207ft / 62.5mTotal length
  • $14,759,000Total costs
  • 203,210Total average daily traffic
  • 7,616Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Porterdale
  • No street view available for this location

New bridges in Porterdale, GA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11940-1949
  • 11950-1959
  • 51960-1969
  • 11970-1979
  • 21980-1989
  • 12000-2009
Average Bridge Daily Traffic in Porterdale, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Very good
  • 42.9%Good
  • 28.6%Satisfactory
  • 14.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Very good
  • 42.9%Good
  • 28.6%Satisfactory
  • 14.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 71.4%Good
  • 14.3%Satisfactory
  • 14.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 27.3%Very good
  • 45.5%Good
  • 27.3%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 60.0%Good
  • 40.0%Satisfactory
Find on map >>   Show street view

Structure Number: 2170012,  Location: IN PORTERDALE (Lat: 33.570319,  Lng: -83.897158),  Route carried "on" structure: State highway 81,  Year Built: 1943,  Status: Open,  Structure Length: 9.51m (31.20ft),  Average Daily Traffic: 8,850 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 13,275 (year 2031),  Design Load: H 15,  Features Intersected: YELLOW RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 11.9m (39.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 32.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2020,  Underwater Inspection Date: September 2018,  Bridge Improvement Cost: $1,219,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $1,829,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2170024,  Location: 2 MI W OF COVINGTON (Lat: 33.614750,  Lng: -83.914958),  Route carried "on" structure: Interstate 20,  Year Built: 1964,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 9.63m (31.59ft),  Average Daily Traffic: 61,420 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 92,130 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: YELLOW RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 141.622,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 30.8m (101.0ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 33.2m (108.9ft),  Out-to-Out Width: 35.1m (115.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: January 2021,  Underwater Inspection Date: September 2018,  Bridge Improvement Cost: $2,582,000,  Roadway Improvement Cost: $258,000,  Total Project Cost: $3,872,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2170041,  Location: 2 MI W OF COVINGTON (Lat: 33.614478,  Lng: -83.915019),  Route carried "on" structure: County highway 516,  Year Built: 1937,  Status: Open,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 9,570 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 14,355 (year 2031),  Design Load: H 15,  Features Intersected: YELLOW RIVER,  Facility Carried by Structure: FRONTAGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 34.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 49.68m (162.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: January 2021,  Underwater Inspection Date: September 2018,  Bridge Improvement Cost: $1,211,000,  Roadway Improvement Cost: $121,000,  Total Project Cost: $1,817,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2170053,  Location: 3 MI E OF COVINGTON (Lat: 33.582719,  Lng: -83.920539),  Route carried "on" structure: County highway 1701,  Year Built: 1961,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 12,430 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 18,645 (year 2031),  Design Load: H 15,  Features Intersected: BEAVERDAM CREEK,  Facility Carried by Structure: BROWN BRIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $123,000
Find on map >>   Show street view

Structure Number: 2170054,  Location: 2.5 MI W OF COVINGTON (Lat: 33.588147,  Lng: -83.896969),  Route carried "on" structure: County highway 1701,  Year Built: 1961,  Status: Posted for load,  Structure Length: 9.54m (31.30ft),  Average Daily Traffic: 9,480 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 14,220 (year 2031),  Design Load: H 15,  Features Intersected: YELLOW RIVER,  Facility Carried by Structure: BROWN BRIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.875,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 24.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 49.83m (163.48ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: December 2020,  Underwater Inspection Date: September 2018,  Bridge Improvement Cost: $1,223,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $1,834,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2170059,  Location: 1 MI S OF COVINGTON (Lat: 33.559408,  Lng: -83.882278),  Route carried "on" structure: County highway 2503,  Year Built: 1988,  Status: Open,  Structure Length: 10.06m (33.01ft),  Average Daily Traffic: 13,980 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 20,970 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: YELLOW RIVER,  Facility Carried by Structure: COVINGTON BYPASS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: January 2021,  Underwater Inspection Date: September 2018,  Bridge Improvement Cost: $1,289,000,  Roadway Improvement Cost: $129,000,  Total Project Cost: $1,934,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2175005,  Location: JUST W OF PORTERDALE (Lat: 33.576269,  Lng: -83.905039),  Route carried "on" structure: County highway 24,  Year Built: 1960,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 8,330 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 12,495 (year 2031),  Design Load: H 15,  Features Intersected: BEAVERDAM CREEK,  Facility Carried by Structure: CROWELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $152,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $229,000
Find on map >>   Show street view

Structure Number: 2175006,  Location: 3 MI W OF COVINGTON (Lat: 33.615678,  Lng: -83.930628),  Route carried "on" structure: County highway 37,  Year Built: 1960,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 4,670 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,005 (year 2031),  Design Load: H 15,  Features Intersected: YELLOW RIVER TRIB,  Facility Carried by Structure: FAIRVIEW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $129,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $193,000
Find on map >>   Show street view

Structure Number: 2175007,  Location: 1 MI NW OF PORTERDALE (Lat: 33.587008,  Lng: -83.931589),  Route carried "on" structure: County highway 41,  Year Built: 1983,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 4,800 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,200 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BEAVERDAM CREEK,  Facility Carried by Structure: JACK NEELY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $145,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $217,000
Find on map >>   Show street view

Structure Number: 2175031,  Location: 3 MI S OF COVINGTON (Lat: 33.538478,  Lng: -83.871989),  Route carried "on" structure: County highway 181,  Year Built: 1959,  Status: Posted for load,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 3,020 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,530 (year 2031),  Design Load: H 15,  Features Intersected: DRIED INDIAN CREEK,  Facility Carried by Structure: FLAT SHOALS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 29.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $527,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 2175051,  Location: 2.5 MI W OF COVINGTON (Lat: 33.615747,  Lng: -83.920558),  Route carried "on" structure: County highway 43,  Year Built: 2004,  Status: Open,  Structure Length: 6.80m (22.31ft),  Average Daily Traffic: 2,620 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 3,930 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I-20,  Facility Carried by Structure: ALMON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.1m (111.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 19.9m (65.3ft),  Out-to-Out Width: 24.1m (79.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,347,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $2,020,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 2175054,  Location: 5 MI WEST OF HIGH PIONT (Lat: 33.513950,  Lng: -83.935028),  Route carried "on" structure: County highway 236,  Year Built: 1970,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,940 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,910 (year 2031),  Design Load: H 15,  Features Intersected: WILDCAT CREEK,  Facility Carried by Structure: CHESTNUT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $109,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $164,000
Find on map >>   Show street view

Structure Number: 2175051,  Location: 2.5 MI W OF COVINGTON (Lat: 33.615747,  Lng: -83.920558),  Route carried "under" structure: Interstate 20,  Structure Length: 0. m,  Average Daily Traffic: 62,100 (year 2001),  Truck Traffic: 10%,  Features Intersected: CR 43 ALMON ROAD,  Facility Carried by Structure: ALMON ROAD
Minimum Vertical Clearance: 5.10m (16.73ft),  Kilometerpoint: 141.622,  Lanes on structure: 4,  Length of Maximum Span: 0.0m

Discuss Porterdale, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.