Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Worcester, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 124Number of bridges
  • 2,149ft / 655mTotal length
  • $518,007,000Total costs
  • 3,635,557Total average daily traffic
  • 291,168Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Worcester
  • No street view available for this location

New bridges in Worcester, MA - historical statistics
  • New bridges - historical statistics
  • 41900-1909
  • 21910-1919
  • 31920-1929
  • 111930-1939
  • 261950-1959
  • 411960-1969
  • 181970-1979
  • 31980-1989
  • 41990-1999
  • 92000-2009
  • 32010-2019
Reconstructed bridges in Worcester, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 21960-1969
  • 101970-1979
  • 81980-1989
  • 11990-1999
  • 82000-2009
  • 12010-2019
Average Bridge Daily Traffic in Worcester, MA
Average Bridge Truck Traffic in Worcester, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 1.0%Excellent
  • 3.1%Very good
  • 28.6%Good
  • 52.0%Satisfactory
  • 14.3%Fair
  • 1.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 0.9%Excellent
  • 5.7%Very good
  • 19.8%Good
  • 39.6%Satisfactory
  • 27.4%Fair
  • 3.8%Poor
  • 2.8%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 1.9%Very good
  • 48.1%Good
  • 33.0%Satisfactory
  • 17.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.7%Very good
  • 39.3%Good
  • 25.0%Satisfactory
  • 17.9%Fair
  • 7.1%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 12.5%Good
  • 75.0%Satisfactory
  • 12.5%Fair
Find on map >>   Show street view

Structure Number: W441091T0DOTNBI,  Location: .1 MI. W. OF CAMBRIDGE ST (Lat: 42.243794,  Lng: -71.803814),  Route carried "on" structure: Interstate 290,  Year Built: 1966,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 10.66m (34.97ft),  Average Daily Traffic: 54,664 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 78,965 (year 2031),  Design Load: HS 20,  Features Intersected: OTHER 146 RAMP & PWRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.8m (97.8ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.70m (35.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,623,000,  Roadway Improvement Cost: $263,000,  Total Project Cost: $3,935,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W441091T1DOTNBI,  Location: .1 MI. W OF CAMBRIDGE ST. (Lat: 42.243994,  Lng: -71.803856),  Route carried "on" structure: Interstate 290,  Year Built: 1966,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 10.94m (35.89ft),  Average Daily Traffic: 49,130 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 78,965 (year 2031),  Design Load: HS 20,  Features Intersected: OTHER 146 RAMP & PWRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 31.1m (102.0ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.00m (36.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $3,319,000,  Roadway Improvement Cost: $332,000,  Total Project Cost: $4,979,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W441101RUDOTNBI,  Location: .1MI.STH.OFCAMBRIDGE ST. (Lat: 42.242581,  Lng: -71.809481),  Route carried "on" structure: Ramp Interstate 290,  Year Built: 1966,  Status: Open,  Structure Length: 1.72m (5.64ft),  Average Daily Traffic: 96,500 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 157,930 (year 2032),  Design Load: HS 20,  Features Intersected: WATER MIDDLE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.597,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 9 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft)

Condition: Channel: Poor,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,784,000,  Roadway Improvement Cost: $179,000,  Total Project Cost: $2,677,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: W441111THDOTNBI,  Location: .25 MI. E OF BURNCOAT ST (Lat: 42.290422,  Lng: -71.784611),  Route carried "on" structure: Interstate 290,  Year Built: 1967,  Status: Open,  Structure Length: 6.83m (22.41ft),  Average Daily Traffic: 47,061 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 66,331 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: ST 70 LINCOLN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.840,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 52.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.90m (22.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $4,960,000,  Roadway Improvement Cost: $497,000,  Total Project Cost: $7,441,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W441111TJDOTNBI,  Location: I-290 MM 8.6 (Lat: 42.290572,  Lng: -71.784364),  Route carried "on" structure: Interstate 290,  Year Built: 1967,  Status: Open,  Structure Length: 6.83m (22.41ft),  Average Daily Traffic: 34,813 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 78,965 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: ST 70 LINCOLN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 52.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.90m (22.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $4,960,000,  Roadway Improvement Cost: $497,000,  Total Project Cost: $7,441,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W44112216DOTNBI,  Location: .2 MI S OF LINCOLN ST (Lat: 42.290314,  Lng: -71.778761),  Route carried "on" structure: City street ,  Year Built: 1967,  Status: Open,  Structure Length: 5.91m (19.39ft),  Average Daily Traffic: 2,500 (year 2013),  Truck Traffic: 3%,  Average Future Daily Traffic: 3,948 (year 2032),  Design Load: H 20,  Features Intersected: I 290,  Facility Carried by Structure: HWY MARSH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.180,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 48.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.00m (19.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,795,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $5,693,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W441131TKDOTNBI,  Location: 0.3 MI S OF LINCOLN ST. (Lat: 42.290519,  Lng: -71.776822),  Route carried "on" structure: Interstate 290,  Year Built: 1967,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 53,955 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 78,965 (year 2032),  Design Load: HS 20,  Features Intersected: HWY COLBY AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.338,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.7m (51.5ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,948,000,  Roadway Improvement Cost: $195,000,  Total Project Cost: $2,923,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W441131TLDOTNBI,  Location: .3 MI.STH.OF LINCOLN ST. (Lat: 42.290731,  Lng: -71.776953),  Route carried "on" structure: Interstate 290,  Year Built: 1967,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 51,009 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 78,965 (year 2032),  Design Load: HS 20,  Features Intersected: HWY COLBY AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.338,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.7m (51.5ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $739,000,  Roadway Improvement Cost: $74,000,  Total Project Cost: $1,109,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W441141TMDOTNBI,  Location: .2 MI SO OF LINCOLN ST (Lat: 42.293161,  Lng: -71.760856),  Route carried "on" structure: Interstate 290,  Year Built: 1967,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 37,700 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 78,965 (year 2031),  Design Load: HS 20,  Features Intersected: HWY PLANTATION ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.704,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.3m (106.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $2,351,000,  Roadway Improvement Cost: $236,000,  Total Project Cost: $3,527,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W441141TNDOTNBI,  Location: 1.9 MI. E. OF I-190 (Lat: 42.293369,  Lng: -71.760897),  Route carried "on" structure: Interstate 290,  Year Built: 1967,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 39,930 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 78,965 (year 2031),  Design Load: HS 20,  Features Intersected: HWY PLANTATION ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.704,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.7m (51.5ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.3m (106.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $891,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $1,337,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W441171XCDOTNBI,  Location: .6 MI.WEST OF ST.12 (Lat: 42.314592,  Lng: -71.806867),  Route carried "on" structure: City street ,  Year Built: 1976,  Status: Open,  Structure Length: 5.39m (17.68ft),  Average Daily Traffic: 10,999 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 31,586 (year 2031),  Design Load: HS 20,  Features Intersected: I 190,  Facility Carried by Structure: HWY ARARAT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 28.9m (94.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.5m (60.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 55.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.40m (17.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $3,819,000,  Roadway Improvement Cost: $382,000,  Total Project Cost: $5,729,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W441181XDDOTNBI,  Location: .3 MI SO. OF WEST MTN ST. (Lat: 42.321525,  Lng: -71.803267),  Route carried "on" structure: City street ,  Year Built: 1975,  Status: Open,  Structure Length: 6.80m (22.31ft),  Average Daily Traffic: 6,792 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 13,424 (year 2031),  Design Load: HS 20,  Features Intersected: I 190,  Facility Carried by Structure: HWY FRONTAGE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.846,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.9m (107.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 62.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.90m (22.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $4,142,000,  Roadway Improvement Cost: $415,000,  Total Project Cost: $6,214,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W441201XEDOTNBI,  Location: .6 MI. W. OF ST-12 (Lat: 42.327106,  Lng: -71.804256),  Route carried "on" structure: City street 190,  Year Built: 1975,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 6.16m (20.21ft),  Average Daily Traffic: 14,284 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 18,162 (year 2033),  Design Load: HS 20,  Features Intersected: I 190,  Facility Carried by Structure: HWY W MOUNTN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.966,  Lanes on structure: 4,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.2m (95.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.5m (60.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 70.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $4,385,000,  Roadway Improvement Cost: $439,000,  Total Project Cost: $6,578,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W441241XFDOTNBI,  Location: I-190 NB/12 & RAMP B (Lat: 42.296114,  Lng: -71.802364),  Route carried "on" structure: Interstate 190,  Year Built: 1977,  Status: Open,  Structure Length: 23.47m (77.00ft),  Average Daily Traffic: 30,827 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 44,314 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: ST 12 NB & RAMP B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.320,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 15.6m (51.2ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 70.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 23.50m (77.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $16,062,000,  Roadway Improvement Cost: $1,607,000,  Total Project Cost: $24,094,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W441241XGDOTNBI,  Location: I-190 MM 0.9 (Lat: 42.296006,  Lng: -71.802617),  Route carried "on" structure: Interstate 190,  Year Built: 1977,  Status: Open,  Structure Length: 23.47m (77.00ft),  Average Daily Traffic: 28,298 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 45,024 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: ST 12 NB & RAMP B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.708,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.6m (51.2ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.6m (51.2ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 69.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 23.50m (77.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $6,204,000,  Roadway Improvement Cost: $621,000,  Total Project Cost: $9,307,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W441251XHDOTNBI,  Location: .5 MI. N. OF I-290 (Lat: 42.295339,  Lng: -71.802808),  Route carried "on" structure: Ramp Interstate 190,  Year Built: 1977,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 13,732 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 43,115 (year 2031),  Design Load: HS 20,  Features Intersected: ST 12 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 28.3m (92.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 71.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $702,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $1,054,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W441261XJDOTNBI,  Location: .5MI.NTH.OF I-290 (Lat: 42.298569,  Lng: -71.804256),  Route carried "on" structure: Interstate 190,  Year Built: 1977,  Status: Open,  Structure Length: 5.67m (18.60ft),  Average Daily Traffic: 37,000 (year 2013),  Truck Traffic: 15%,  Average Future Daily Traffic: 58,434 (year 2032),  Design Load: HS 20,  Features Intersected: ST 12 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.708,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 54.9m (180.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 5.70m (18.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,183,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $1,775,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W441261XKDOTNBI,  Location: AT MILE 1.0 (Lat: 42.298267,  Lng: -71.804311),  Route carried "on" structure: Interstate 190,  Year Built: 1977,  Status: Open,  Structure Length: 5.67m (18.60ft),  Average Daily Traffic: 29,020 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 58,434 (year 2032),  Design Load: HS 20,  Features Intersected: ST 12 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.708,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 33.5m (109.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 54.9m (180.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.6m (51.2ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 5.70m (18.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,505,000,  Roadway Improvement Cost: $151,000,  Total Project Cost: $2,258,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W441271XLDOTNBI,  Location: .5 MI S OF ARARAT ST (Lat: 42.298878,  Lng: -71.804194),  Route carried "on" structure: Ramp Interstate 190,  Year Built: 1977,  Status: Open,  Structure Length: 10.15m (33.30ft),  Average Daily Traffic: 5,780 (year 2016),  Truck Traffic: 15%,  Average Future Daily Traffic: 12,634 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: ST 12 SB & W BOYLSTON DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.0m (128.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 71.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 10.20m (33.46ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,155,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $1,733,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W4412820CDOTNBI,  Location: 100 FT E. OF I-190 (Lat: 42.299142,  Lng: -71.804108),  Route carried "on" structure: State highway 12,  Year Built: 1977,  Status: Open,  Structure Length: 8.23m (27.00ft),  Average Daily Traffic: 3,100 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,896 (year 2032),  Design Load: HS 20,  Features Intersected: ST 12 SB & W BOYLSTON DR,  Facility Carried by Structure: HWY STORES ST NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 9 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 40.2m (131.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 68.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.30m (27.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,879,000,  Roadway Improvement Cost: $188,000,  Total Project Cost: $2,819,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W441291KJDOTNBI,  Location: .1 MI W OF I-190 (Lat: 42.299286,  Lng: -71.801931),  Route carried "on" structure: State highway 12,  Year Built: 1977,  Status: Open,  Structure Length: 3.12m (10.24ft),  Average Daily Traffic: 12,200 (year 2014),  Truck Traffic: 12%,  Average Future Daily Traffic: 19,267 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: HWY NEPONSET ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.917,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.4m (37.4ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.6m (90.6ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 59.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $1,785,000,  Roadway Improvement Cost: $179,000,  Total Project Cost: $2,678,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Bituminous
Find on map >>   Show street view

Structure Number: W441301KKDOTNBI,  Location: .1 MI. W. OF I-190 (Lat: 42.299506,  Lng: -71.802136),  Route carried "on" structure: State highway 12,  Year Built: 1977,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 12,200 (year 2014),  Truck Traffic: 12%,  Average Future Daily Traffic: 19,267 (year 2033),  Design Load: HS 20,  Features Intersected: HWY NEPONSET ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.917,  Lanes on structure: 1,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.7m (90.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 69.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,191,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $1,787,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Bituminous
Find on map >>   Show street view

Structure Number: W441311XMDOTNBI,  Location: AT MATTSON AVE (Lat: 42.299017,  Lng: -71.804961),  Route carried "on" structure: Ramp Interstate 190,  Year Built: 1977,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 6,666 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 39,482 (year 2032),  Design Load: HS 20,  Features Intersected: HWY W BOYLSTON DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.770,  Lanes on structure: 1,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.6m (129.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Inventory Rating: 73.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,353,000,  Roadway Improvement Cost: $136,000,  Total Project Cost: $2,030,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W441321XNDOTNBI,  Location: 1000 FT W. OF NEPONSET ST (Lat: 42.299117,  Lng: -71.804658),  Route carried "on" structure: Interstate 190,  Year Built: 1977,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 24,697 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 55,276 (year 2032),  Design Load: HS 20,  Features Intersected: HWY W BOYLSTON DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.770,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.6m (129.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 75.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $872,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $1,309,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W441321XPDOTNBI,  Location: 800 FT W.OF NEPONSET ST (Lat: 42.299056,  Lng: -71.804806),  Route carried "on" structure: Interstate 190,  Year Built: 1977,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 36,870 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 55,276 (year 2032),  Design Load: HS 20,  Features Intersected: HWY W BOYLSTON DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.770,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.6m (129.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 75.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $872,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $1,309,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W441331XQDOTNBI,  Location: .1 MI S OF ARARAT ST (Lat: 42.304539,  Lng: -71.807756),  Route carried "on" structure: Interstate 190,  Year Built: 1976,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 31,135 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 47,379 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: HWY SHORE DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.770,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.0m (118.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.6m (51.2ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 75.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,056,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,585,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W441331XRDOTNBI,  Location: .1 MI SO OF ARARAT ST (Lat: 42.304514,  Lng: -71.807964),  Route carried "on" structure: Interstate 190,  Year Built: 1976,  Status: Open,  Structure Length: 3.83m (12.57ft),  Average Daily Traffic: 36,870 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 47,379 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: HWY SHORE DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.770,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.0m (118.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 15.6m (51.2ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 75.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,030,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,546,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W4413520FDOTNBI,  Location: 300 FT S. OF MALDEN ST (Lat: 42.323756,  Lng: -71.794225),  Route carried "on" structure: City street ,  Year Built: 1985,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 14,974 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 18,952 (year 2032),  Design Load: HS 20,  Features Intersected: RR BMRR,  Facility Carried by Structure: HWY W MOUNTN ST
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.002,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 20.4m (66.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 78.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,122,000,  Roadway Improvement Cost: $213,000,  Total Project Cost: $3,184,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W441361E7MUNNBI,  Location: 200 FT W OF ST-12 (Lat: 42.244906,  Lng: -71.833664),  Route carried "on" structure: City street ,  Year Built: 1958,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 24,713 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 55,907 (year 2032),  Features Intersected: WATER BEAVER BROOK,  Facility Carried by Structure: HWY MAIN&CURTIS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.591,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 29.0m (95.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 29.2m (95.8ft),  Out-to-Out Width: 35.8m (117.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 62.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: June 2021,  Underwater Inspection Date: October 2019,  Bridge Improvement Cost: $310,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $466,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: W441381TQDOTNBI,  Location: .3 MI.WST OF BURNCOAT ST. (Lat: 42.289114,  Lng: -71.796578),  Route carried "on" structure: Interstate 290,  Year Built: 1982,  Status: Open,  Structure Length: 8.95m (29.36ft),  Average Daily Traffic: 9,712 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 15,793 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I 290 RP DH & MILLBRK ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 44.2m (145.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Very good,  Operating Rating: 61.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.00m (29.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $3,649,000,  Roadway Improvement Cost: $365,000,  Total Project Cost: $5,474,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: W441391E5MUNNBI,  Location: .3 MI N OF ST-70 (Lat: 42.306553,  Lng: -71.765558),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 14,573 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 45,168 (year 2031),  Features Intersected: WATER POOR FARM BROOK,  Facility Carried by Structure: HWY NE CUTOFF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.451,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.8m (35.4ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 0.0m

Condition: Channel: Fair,  Culverts: Satisfactory,  Inventory Rating: 77.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.40m (1.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $241,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $362,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: W4414683JDOTNBI,  Location: MM 18.7 (Lat: 42.221383,  Lng: -71.786744),  Route carried "on" structure: State highway 146,  Year Built: 1997,  Status: Open,  Structure Length: 7.24m (23.75ft),  Average Daily Traffic: 19,891 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 45,800 (year 2032),  Design Load: HS 20,  Features Intersected: WATER BLACKSTONE RIVER
Minimum Vertical Clearance: 99.00m (324.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 6 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.0m (114.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.30m (23.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $413,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $620,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W44146AHGDOTNBI,  Location: .4 M. N. OF MILLBURY T.L. (Lat: 42.221319,  Lng: -71.786578),  Route carried "on" structure: State highway 146,  Year Built: 1997,  Status: Open,  Structure Length: 7.62m (25.00ft),  Average Daily Traffic: 20,540 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 45,800 (year 2032),  Design Load: HS 20,  Features Intersected: WATER BLACKSTONE RIVER
Minimum Vertical Clearance: 99.00m (324.80ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.4m (112.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.70m (25.26ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $4,719,000,  Roadway Improvement Cost: $472,000,  Total Project Cost: $7,079,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W44148ALHDOTNBI,  Location: .1 MI NORTH OF ST-146 (Lat: 42.245817,  Lng: -71.802886),  Route carried "on" structure: Ramp State highway 146,  Year Built: 2005,  Status: Open,  Structure Length: 11.26m (36.94ft),  Average Daily Traffic: 23,124 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 25,269 (year 2031),  Design Load: HS 20,  Features Intersected: ST146
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 55.1m (180.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 86.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.30m (37.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $2,771,000,  Roadway Improvement Cost: $278,000,  Total Project Cost: $4,157,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W44152AKVDOTNBI,  Location: I290 NB ON RAMP (Lat: 42.245383,  Lng: -71.802244),  Route carried "on" structure: State highway 146,  Year Built: 2006,  Status: Open,  Structure Length: 2.37m (7.78ft),  Average Daily Traffic: 16,000 (year 2011),  Truck Traffic: 2%,  Average Future Daily Traffic: 25,269 (year 2032),  Design Load: HS 20,  Features Intersected: OTHER BIKEWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 86.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,109,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $1,664,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: W44153AKWMUNNBI,  Location: JUST SW OF PED OVER 146 (Lat: 42.236533,  Lng: -71.796583),  Route carried "on" structure: City street ,  Year Built: 2006,  Status: Open,  Structure Length: 3.24m (10.63ft),  Average Daily Traffic: 300 (year 2021),  Truck Traffic: 40%,  Average Future Daily Traffic: 237 (year 2032),  Design Load: HS 20,  Features Intersected: WATER MIDDLE RIVER,  Facility Carried by Structure: HWY PAUL CLANCY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.0m (101.7ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 78.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.30m (10.83ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $374,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $562,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy,  Deck Protection: Internally Sealed
Discuss Worcester, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.