Please register to participate in our discussions with 2 million other members - it's free and quick! Some forums can only be seen by registered members. After you create your account, you'll be able to customize options and access all our 15,000 new posts/day with fewer ads.
What's interesting about threads like this is that, while we complain about so many bad contractors on LI, it's good to know there are still plenty of folks who do the job right.
see bottom for the warrenty. is that a normal warrenty or can i do better??
what else can i shoot for?
[SIZE=2][SIZE=2][SIZE=2][LEFT]Installation of FUJITSU 36,000 BTU with 3-12000 BTU
power heads
zone 1= 12,000 BTU
zone 2= 12,000 BTU
zone 3= 12,000 BTU
Installation of FUJITSU 36,000 BTU with 2-9,000 & 2-
12,000 BTU power heads
zone 1= 12,000 BTU
zone 2= 12,000 BTU
zone 3= 7,000 BTU
zone 4= 7,000 BTU
Includes all necessary equipment, ,materials and labor
[/LEFT]
Warranty: 2 year labor ,3 year parts 6 year compressor
[/SIZE][/SIZE][/SIZE]
We had ours done by Center County (Robert) based in Westbury last year. 5-ton Carrier and new flex ductwork thoughout.
Colonial type, blower in attic, 2 ducts in attic, 4 on 2nd floor and 3 on 1st floor. Took 4 days, $10.5k. This is their busy season and alot of contracters are backed up 3-4 weeks already. I had a range of $8.5-16k.
Good luck, its the best improvement for the house so far
edit,
I also had a ductless priced out and it was $15k too. Placement of the units inside killed it for me as the only area in my living room would of been above the fireplace.
Second Cool Power-we had them install gas boiler and hot water heater after Sandy-very professional, reasonably priced, top-notch job during the installation, highly recommend them. Also, Universe Appliance in Seaford-they service our boiler and heater normally, we would have also gone with them after Sandy but their office was destroyed and the waiting list for the installation was 6 weeks as opposed to the 2 weeks with Cool Power.
So you are getting 2 separate 3 ton ductless split systems installed.
What type of house do you have?
Im pretty sure I can get that installed for you at a much cheaper price.
When do you need it done by? Im swamped right now.
Quote:
Originally Posted by miscus555
is $15k for all of this a good deal?
see bottom for the warrenty. is that a normal warrenty or can i do better??
what else can i shoot for?
[SIZE=2][SIZE=2][SIZE=2][LEFT]Installation of FUJITSU 36,000 BTU with 3-12000 BTU
power heads
zone 1= 12,000 BTU
zone 2= 12,000 BTU
zone 3= 12,000 BTU
Installation of FUJITSU 36,000 BTU with 2-9,000 & 2-
12,000 BTU power heads
zone 1= 12,000 BTU
zone 2= 12,000 BTU
zone 3= 7,000 BTU
zone 4= 7,000 BTU
Includes all necessary equipment, ,materials and labor
[/LEFT]
Warranty: 2 year labor ,3 year parts 6 year compressor
[/SIZE][/SIZE][/SIZE]
I'm sure he has company coming for Christmas and wants the place cool.
Quote:
Originally Posted by rocafeller05
So you are getting 2 separate 3 ton ductless split systems installed.
What type of house do you have?
Im pretty sure I can get that installed for you at a much cheaper price.
When do you need it done by? Im swamped right now.
Please register to post and access all features of our very popular forum. It is free and quick. Over $68,000 in prizes has already been given out to active posters on our forum. Additional giveaways are planned.
Detailed information about all U.S. cities, counties, and zip codes on our site: City-data.com.