- Bridge Condition - Deck
- 25.7%Very good
- 31.4%Good
- 28.6%Satisfactory
- 11.4%Fair
- 2.9%Serious
- Bridge Condition - Superstructure
- 28.6%Very good
- 28.6%Good
- 31.4%Satisfactory
- 5.7%Fair
- 2.9%Poor
- 2.9%Serious
- Bridge Condition - Substructure
- 2.9%Excellent
- 22.9%Very good
- 28.6%Good
- 28.6%Satisfactory
- 11.4%Fair
- 2.9%Poor
- 2.9%Critical
- Bridge Condition - Channel
- 1.1%Excellent
- 8.8%Very good
- 29.7%Good
- 46.2%Satisfactory
- 14.3%Fair
- Bridge Condition - Culverts
- 29.7%Good
- 51.6%Satisfactory
- 15.6%Fair
- 1.6%Poor
- 1.6%Serious
Find on map >> Show street view
Structure Number: DAPAMCANN000B12, Location: NEAR BLD 194 (Lat: 33.623069, Lng: -85.961131), Route carried "on" structure: Other road , Year Built: 1996, Status: Open, Structure Length: 0.63m (2.07ft), Average Daily Traffic: 3,000 (year 2015), Truck Traffic: 40%, Average Future Daily Traffic: 3,000 (year 2043), Features Intersected: COLDWATER SPRING RUNOFF, Facility Carried by Structure: ROOSEVELT DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 6.6m (21.7ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft), Curb-To-Curb Width: 6.6m (21.7ft), Out-to-Out Width: 12.4m (40.7ft)
Condition: Channel: Very good, Culverts: Good, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.35m (4.43ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $3,000, Roadway Improvement Cost: $1,000, Total Project Cost: $4,000 ( Estimate for 2021)
Structure Number: DAPAMCANN000B12, Location: NEAR BLD 194 (Lat: 33.623069, Lng: -85.961131), Route carried "on" structure: Other road , Year Built: 1996, Status: Open, Structure Length: 0.63m (2.07ft), Average Daily Traffic: 3,000 (year 2015), Truck Traffic: 40%, Average Future Daily Traffic: 3,000 (year 2043), Features Intersected: COLDWATER SPRING RUNOFF, Facility Carried by Structure: ROOSEVELT DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 6.6m (21.7ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft), Curb-To-Curb Width: 6.6m (21.7ft), Out-to-Out Width: 12.4m (40.7ft)
Condition: Channel: Very good, Culverts: Good, Deck Geometry: High priority of replacement, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.35m (4.43ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $3,000, Roadway Improvement Cost: $1,000, Total Project Cost: $4,000 ( Estimate for 2021)
Find on map >> Show street view
Structure Number: DAPAMCANN000B18, Location: NEXT TO BLD 264 (Lat: 33.618819, Lng: -85.990061), Route carried "on" structure: Other road , Year Built: 2015, Status: Open, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 40 (year 2017), Truck Traffic: 10%, Average Future Daily Traffic: 60 (year 2043), Features Intersected: CANE CREEK RUNOFF, Facility Carried by Structure: LAKE TO GATE C RD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 4, Length of Maximum Span: 1.8m (5.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 9.1m (29.9ft)
Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 42.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.51m (4.95ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $5,000, Total Project Cost: $6,000 ( Estimate for 2021)
Structure Number: DAPAMCANN000B18, Location: NEXT TO BLD 264 (Lat: 33.618819, Lng: -85.990061), Route carried "on" structure: Other road , Year Built: 2015, Status: Open, Structure Length: 0.85m (2.79ft), Average Daily Traffic: 40 (year 2017), Truck Traffic: 10%, Average Future Daily Traffic: 60 (year 2043), Features Intersected: CANE CREEK RUNOFF, Facility Carried by Structure: LAKE TO GATE C RD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 4, Length of Maximum Span: 1.8m (5.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 9.1m (29.9ft)
Condition: Channel: Satisfactory, Culverts: Good, Operating Rating: 42.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.51m (4.95ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $5,000, Total Project Cost: $6,000 ( Estimate for 2021)
Find on map >> Show street view
Structure Number: DAPAMCANN01037T, Location: NEAR LAKE AREA (Lat: 33.620239, Lng: -85.985019), Route carried "on" structure: Other road , Year Built: 1997, Status: Closed, Structure Length: 1.11m (3.64ft), Average Daily Traffic: 40 (year 2015), Average Future Daily Traffic: 50 (year 2041), Features Intersected: CANE CREEK RUNOFF, Facility Carried by Structure: OLD US HWY 78
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Army, Approaching Roadway Width: 5.1m (16.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 11.1m (36.4ft), Curb-To-Curb Width: 4.5m (14.8ft), Out-to-Out Width: 4.5m (14.8ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 1.78m (5.84ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2019, Bridge Improvement Cost: $5,000, Roadway Improvement Cost: $1,000, Total Project Cost: $6,000 ( Estimate for 2019), Deck Structure Type: Open Grating
Structure Number: DAPAMCANN01037T, Location: NEAR LAKE AREA (Lat: 33.620239, Lng: -85.985019), Route carried "on" structure: Other road , Year Built: 1997, Status: Closed, Structure Length: 1.11m (3.64ft), Average Daily Traffic: 40 (year 2015), Average Future Daily Traffic: 50 (year 2041), Features Intersected: CANE CREEK RUNOFF, Facility Carried by Structure: OLD US HWY 78
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Army, Approaching Roadway Width: 5.1m (16.7ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 11.1m (36.4ft), Curb-To-Curb Width: 4.5m (14.8ft), Out-to-Out Width: 4.5m (14.8ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Channel: Satisfactory, Deck Geometry: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 1.78m (5.84ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2019, Bridge Improvement Cost: $5,000, Roadway Improvement Cost: $1,000, Total Project Cost: $6,000 ( Estimate for 2019), Deck Structure Type: Open Grating
Find on map >> Show street view
Structure Number: DAPAMCANN01137E, Location: NEAR CSDP (Lat: 33.681800, Lng: -85.944600), Route carried "on" structure: Other road , Year Built: 2008, Status: Open, Structure Length: 1.50m (4.92ft), Average Daily Traffic: 250 (year 2015), Truck Traffic: 5%, Average Future Daily Traffic: 260 (year 2043), Features Intersected: CANE CREEK, Facility Carried by Structure: NORTH PATROL RD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 7.0m (23.0ft), Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 4.1m (13.5ft)
Condition: Channel: Good, Culverts: Good, Operating Rating: 97.2 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 97.2 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 2.18m (7.15ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $2,000, Roadway Improvement Cost: $1,000, Total Project Cost: $3,000 ( Estimate for 2021)
Structure Number: DAPAMCANN01137E, Location: NEAR CSDP (Lat: 33.681800, Lng: -85.944600), Route carried "on" structure: Other road , Year Built: 2008, Status: Open, Structure Length: 1.50m (4.92ft), Average Daily Traffic: 250 (year 2015), Truck Traffic: 5%, Average Future Daily Traffic: 260 (year 2043), Features Intersected: CANE CREEK, Facility Carried by Structure: NORTH PATROL RD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 7.0m (23.0ft), Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 4.1m (13.5ft)
Condition: Channel: Good, Culverts: Good, Operating Rating: 97.2 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 97.2 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 2.18m (7.15ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $2,000, Roadway Improvement Cost: $1,000, Total Project Cost: $3,000 ( Estimate for 2021)
Find on map >> Show street view
Structure Number: DAPAMCANN01137I, Location: NORTH OF BYNUM RD (Lat: 33.619769, Lng: -85.970319), Route carried "on" structure: Other road , Year Built: 2019, Status: Open, Structure Length: 5.82m (19.09ft), Average Daily Traffic: 9,000 (year 2017), Truck Traffic: 60%, Average Future Daily Traffic: 13,400 (year 2043), Design Load: HL 93, Features Intersected: CSX/NORFOLK S RR, Facility Carried by Structure: MCARTHUR AVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 30.2m (99.1ft), Curb-To-Curb Width: 14.3m (46.9ft), Out-to-Out Width: 15.1m (49.5ft)
Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 34.0 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: DAPAMCANN01137I, Location: NORTH OF BYNUM RD (Lat: 33.619769, Lng: -85.970319), Route carried "on" structure: Other road , Year Built: 2019, Status: Open, Structure Length: 5.82m (19.09ft), Average Daily Traffic: 9,000 (year 2017), Truck Traffic: 60%, Average Future Daily Traffic: 13,400 (year 2043), Design Load: HL 93, Features Intersected: CSX/NORFOLK S RR, Facility Carried by Structure: MCARTHUR AVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 30.2m (99.1ft), Curb-To-Curb Width: 14.3m (46.9ft), Out-to-Out Width: 15.1m (49.5ft)
Condition: Deck: Very good, Superstructure: Very good, Substructure: Very good, Operating Rating: 44.1 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 34.0 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Underclear: Superior to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: DAPAMCANN01137L, Location: SOUT OF F100 ROW (Lat: 33.661861, Lng: -85.964781), Route carried "on" structure: Other road , Year Built: 1941, Status: Open, Structure Length: 0.63m (2.07ft), Average Daily Traffic: 30 (year 2017), Truck Traffic: 1%, Average Future Daily Traffic: 35 (year 2043), Features Intersected: CANE CREEK, Facility Carried by Structure: ELWOOD AVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 3.7m (12.1ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft)
Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 42.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.25m (4.10ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $32,000, Total Project Cost: $33,000 ( Estimate for 2021)
Structure Number: DAPAMCANN01137L, Location: SOUT OF F100 ROW (Lat: 33.661861, Lng: -85.964781), Route carried "on" structure: Other road , Year Built: 1941, Status: Open, Structure Length: 0.63m (2.07ft), Average Daily Traffic: 30 (year 2017), Truck Traffic: 1%, Average Future Daily Traffic: 35 (year 2043), Features Intersected: CANE CREEK, Facility Carried by Structure: ELWOOD AVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 3.7m (12.1ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft)
Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 42.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.25m (4.10ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $1,000, Roadway Improvement Cost: $32,000, Total Project Cost: $33,000 ( Estimate for 2021)
Find on map >> Show street view
Structure Number: DAPAMCANN01137M, Location: EAST OF ELWOOD AVE (Lat: 33.662811, Lng: -85.963869), Route carried "on" structure: Other road , Year Built: 1941, Status: Open, Structure Length: 0.95m (3.12ft), Average Daily Traffic: 20 (year 2021), Truck Traffic: 1%, Average Future Daily Traffic: 35 (year 2043), Features Intersected: CANE CREEK, Facility Carried by Structure: F100
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Army, Approaching Roadway Width: 3.7m (12.1ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.0m (9.8ft)
Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 42.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.63m (5.35ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $23,000, Roadway Improvement Cost: $4,000, Total Project Cost: $27,000 ( Estimate for 2021)
Structure Number: DAPAMCANN01137M, Location: EAST OF ELWOOD AVE (Lat: 33.662811, Lng: -85.963869), Route carried "on" structure: Other road , Year Built: 1941, Status: Open, Structure Length: 0.95m (3.12ft), Average Daily Traffic: 20 (year 2021), Truck Traffic: 1%, Average Future Daily Traffic: 35 (year 2043), Features Intersected: CANE CREEK, Facility Carried by Structure: F100
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Army, Approaching Roadway Width: 3.7m (12.1ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.0m (9.8ft)
Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 42.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.63m (5.35ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $23,000, Roadway Improvement Cost: $4,000, Total Project Cost: $27,000 ( Estimate for 2021)
Find on map >> Show street view
Structure Number: DAPAMCANN01137N, Location: BTW F100 & F300 ROW (Lat: 33.664061, Lng: -85.961319), Route carried "on" structure: Other road , Year Built: 1941, Status: Open, Structure Length: 0.96m (3.15ft), Average Daily Traffic: 30 (year 2017), Truck Traffic: 1%, Average Future Daily Traffic: 35 (year 2043), Features Intersected: CANE CREEK, Facility Carried by Structure: F200 ROW
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Army, Approaching Roadway Width: 4.3m (14.1ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.0m (9.8ft)
Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 42.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.63m (5.35ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $9,000, Roadway Improvement Cost: $23,000, Total Project Cost: $32,000 ( Estimate for 2021)
Structure Number: DAPAMCANN01137N, Location: BTW F100 & F300 ROW (Lat: 33.664061, Lng: -85.961319), Route carried "on" structure: Other road , Year Built: 1941, Status: Open, Structure Length: 0.96m (3.15ft), Average Daily Traffic: 30 (year 2017), Truck Traffic: 1%, Average Future Daily Traffic: 35 (year 2043), Features Intersected: CANE CREEK, Facility Carried by Structure: F200 ROW
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Army, Approaching Roadway Width: 4.3m (14.1ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.0m (9.8ft)
Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 42.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.63m (5.35ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $9,000, Roadway Improvement Cost: $23,000, Total Project Cost: $32,000 ( Estimate for 2021)
Find on map >> Show street view
Structure Number: DAPAMCANN01137P, Location: BTW F200 & F400 (Lat: 33.665261, Lng: -85.958869), Route carried "on" structure: Other road , Year Built: 1941, Status: Open, Structure Length: 0.95m (3.12ft), Average Daily Traffic: 30 (year 2017), Truck Traffic: 1%, Average Future Daily Traffic: 35 (year 2043), Features Intersected: CANE CREEK, Facility Carried by Structure: F300 ROW
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Army, Approaching Roadway Width: 3.7m (12.1ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.0m (9.8ft)
Condition: Channel: Fair, Culverts: Fair, Operating Rating: 42.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.66m (5.45ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $26,000, Roadway Improvement Cost: $8,000, Total Project Cost: $34,000 ( Estimate for 2021)
Structure Number: DAPAMCANN01137P, Location: BTW F200 & F400 (Lat: 33.665261, Lng: -85.958869), Route carried "on" structure: Other road , Year Built: 1941, Status: Open, Structure Length: 0.95m (3.12ft), Average Daily Traffic: 30 (year 2017), Truck Traffic: 1%, Average Future Daily Traffic: 35 (year 2043), Features Intersected: CANE CREEK, Facility Carried by Structure: F300 ROW
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Army, Approaching Roadway Width: 3.7m (12.1ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.0m (9.8ft)
Condition: Channel: Fair, Culverts: Fair, Operating Rating: 42.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.66m (5.45ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $26,000, Roadway Improvement Cost: $8,000, Total Project Cost: $34,000 ( Estimate for 2021)
Find on map >> Show street view
Structure Number: DAPAMCANN01137Q, Location: BTW F300 & F500 ROW (Lat: 33.666511, Lng: -85.954981), Route carried "on" structure: Other road , Year Built: 1941, Status: Open, Structure Length: 0.95m (3.12ft), Average Daily Traffic: 30 (year 2017), Truck Traffic: 1%, Average Future Daily Traffic: 35 (year 2043), Features Intersected: CANE CREEK, Facility Carried by Structure: EAST ELWOOD AVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Army, Approaching Roadway Width: 4.3m (14.1ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.0m (9.8ft)
Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 42.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.63m (5.35ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $1,000, Total Project Cost: $1,000 ( Estimate for 2021)
Structure Number: DAPAMCANN01137Q, Location: BTW F300 & F500 ROW (Lat: 33.666511, Lng: -85.954981), Route carried "on" structure: Other road , Year Built: 1941, Status: Open, Structure Length: 0.95m (3.12ft), Average Daily Traffic: 30 (year 2017), Truck Traffic: 1%, Average Future Daily Traffic: 35 (year 2043), Features Intersected: CANE CREEK, Facility Carried by Structure: EAST ELWOOD AVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Army, Approaching Roadway Width: 4.3m (14.1ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.0m (9.8ft)
Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 42.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.63m (5.35ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $1,000, Total Project Cost: $1,000 ( Estimate for 2021)
Find on map >> Show street view
Structure Number: DAPAMCANN01137R, Location: ANNISTON AD (Lat: 33.668989, Lng: -85.954950), Route carried "on" structure: Other road , Year Built: 1941, Status: Open, Structure Length: 0.98m (3.22ft), Average Daily Traffic: 30 (year 2017), Truck Traffic: 1%, Average Future Daily Traffic: 35 (year 2043), Features Intersected: CANE CREEK, Facility Carried by Structure: LANCE MISSLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Army, Approaching Roadway Width: 3.7m (12.1ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.0m (9.8ft)
Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 54.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.63m (5.35ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $10,000, Roadway Improvement Cost: $14,000, Total Project Cost: $34,000 ( Estimate for 2021)
Structure Number: DAPAMCANN01137R, Location: ANNISTON AD (Lat: 33.668989, Lng: -85.954950), Route carried "on" structure: Other road , Year Built: 1941, Status: Open, Structure Length: 0.98m (3.22ft), Average Daily Traffic: 30 (year 2017), Truck Traffic: 1%, Average Future Daily Traffic: 35 (year 2043), Features Intersected: CANE CREEK, Facility Carried by Structure: LANCE MISSLE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Army, Approaching Roadway Width: 3.7m (12.1ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.0m (9.8ft)
Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 54.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.63m (5.35ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $10,000, Roadway Improvement Cost: $14,000, Total Project Cost: $34,000 ( Estimate for 2021)
Find on map >> Show street view
Structure Number: DAPAMCANN01137S, Location: ANNISTON AD (Lat: 33.670211, Lng: -85.954769), Route carried "on" structure: Other road , Year Built: 1941, Status: Open, Structure Length: 0.95m (3.12ft), Average Daily Traffic: 30 (year 2017), Truck Traffic: 1%, Average Future Daily Traffic: 35 (year 2043), Features Intersected: CANE CREEK, Facility Carried by Structure: F700 ROW
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Army, Approaching Roadway Width: 4.0m (13.1ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.0m (9.8ft)
Condition: Channel: Satisfactory, Culverts: Fair, Operating Rating: 54.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 1.63m (5.35ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $21,000, Roadway Improvement Cost: $8,000, Total Project Cost: $29,000 ( Estimate for 2021)
Structure Number: DAPAMCANN01137S, Location: ANNISTON AD (Lat: 33.670211, Lng: -85.954769), Route carried "on" structure: Other road , Year Built: 1941, Status: Open, Structure Length: 0.95m (3.12ft), Average Daily Traffic: 30 (year 2017), Truck Traffic: 1%, Average Future Daily Traffic: 35 (year 2043), Features Intersected: CANE CREEK, Facility Carried by Structure: F700 ROW
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Army, Approaching Roadway Width: 4.0m (13.1ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.0m (9.8ft)
Condition: Channel: Satisfactory, Culverts: Fair, Operating Rating: 54.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 1.63m (5.35ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $21,000, Roadway Improvement Cost: $8,000, Total Project Cost: $29,000 ( Estimate for 2021)
Find on map >> Show street view
Structure Number: DAPAMCANN01137T, Location: BLDG 623 ROAD (Lat: 33.669350, Lng: -85.946331), Route carried "on" structure: Other road , Year Built: 1941, Status: Open, Structure Length: 0.69m (2.26ft), Average Daily Traffic: 30 (year 2017), Truck Traffic: 1%, Average Future Daily Traffic: 35 (year 2043), Features Intersected: CANE CREEK, Facility Carried by Structure: 623 ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Army, Approaching Roadway Width: 4.9m (16.1ft), Skew: 4 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.3m (10.8ft)
Condition: Channel: Fair, Culverts: Satisfactory, Operating Rating: 54.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 1.32m (4.33ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $8,000, Roadway Improvement Cost: $18,000, Total Project Cost: $26,000 ( Estimate for 2021)
Structure Number: DAPAMCANN01137T, Location: BLDG 623 ROAD (Lat: 33.669350, Lng: -85.946331), Route carried "on" structure: Other road , Year Built: 1941, Status: Open, Structure Length: 0.69m (2.26ft), Average Daily Traffic: 30 (year 2017), Truck Traffic: 1%, Average Future Daily Traffic: 35 (year 2043), Features Intersected: CANE CREEK, Facility Carried by Structure: 623 ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Army, Approaching Roadway Width: 4.9m (16.1ft), Skew: 4 degrees, Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.3m (10.8ft)
Condition: Channel: Fair, Culverts: Satisfactory, Operating Rating: 54.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 1.32m (4.33ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $8,000, Roadway Improvement Cost: $18,000, Total Project Cost: $26,000 ( Estimate for 2021)
Find on map >> Show street view
Structure Number: DAPAMCANN01137U, Location: EAST C700 ROAD (Lat: 33.670831, Lng: -85.946400), Route carried "on" structure: Other road , Year Built: 1940, Status: Open, Structure Length: 1.01m (3.31ft), Average Daily Traffic: 30 (year 2017), Truck Traffic: 1%, Average Future Daily Traffic: 35 (year 2043), Features Intersected: CANE CREEK, Facility Carried by Structure: 635 ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Army, Approaching Roadway Width: 3.7m (12.1ft), Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 4, Length of Maximum Span: 1.8m (5.9ft)
Condition: Channel: Fair, Culverts: Good, Operating Rating: 85.2 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 65.4 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.67m (5.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $9,000, Roadway Improvement Cost: $32,000, Total Project Cost: $41,000 ( Estimate for 2021)
Structure Number: DAPAMCANN01137U, Location: EAST C700 ROAD (Lat: 33.670831, Lng: -85.946400), Route carried "on" structure: Other road , Year Built: 1940, Status: Open, Structure Length: 1.01m (3.31ft), Average Daily Traffic: 30 (year 2017), Truck Traffic: 1%, Average Future Daily Traffic: 35 (year 2043), Features Intersected: CANE CREEK, Facility Carried by Structure: 635 ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Army, Approaching Roadway Width: 3.7m (12.1ft), Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 4, Length of Maximum Span: 1.8m (5.9ft)
Condition: Channel: Fair, Culverts: Good, Operating Rating: 85.2 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 65.4 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Better than present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.67m (5.48ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $9,000, Roadway Improvement Cost: $32,000, Total Project Cost: $41,000 ( Estimate for 2021)
Find on map >> Show street view
Structure Number: DAPAMCANN01137W, Location: WEST C1000 ROAD (Lat: 33.674231, Lng: -85.946381), Route carried "on" structure: ServiceOther road , Year Built: 1941, Status: Open, Structure Length: 0.62m (2.03ft), Average Daily Traffic: 30 (year 2017), Truck Traffic: 1%, Average Future Daily Traffic: 35 (year 2043), Features Intersected: CANE CREEK, Facility Carried by Structure: 635 ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 6.2m (20.3ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft)
Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 42.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.22m (4.00ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $7,000, Roadway Improvement Cost: $8,000, Total Project Cost: $15,000 ( Estimate for 2021)
Structure Number: DAPAMCANN01137W, Location: WEST C1000 ROAD (Lat: 33.674231, Lng: -85.946381), Route carried "on" structure: ServiceOther road , Year Built: 1941, Status: Open, Structure Length: 0.62m (2.03ft), Average Daily Traffic: 30 (year 2017), Truck Traffic: 1%, Average Future Daily Traffic: 35 (year 2043), Features Intersected: CANE CREEK, Facility Carried by Structure: 635 ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 6.2m (20.3ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 2, Length of Maximum Span: 3.0m (9.8ft)
Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 42.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.22m (4.00ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $7,000, Roadway Improvement Cost: $8,000, Total Project Cost: $15,000 ( Estimate for 2021)
Find on map >> Show street view
Structure Number: DAPAMCANN01137X, Location: OLD CLA (Lat: 33.673861, Lng: -85.951450), Route carried "on" structure: Other road , Year Built: 1941, Status: Open, Structure Length: 0.96m (3.15ft), Average Daily Traffic: 30 (year 2017), Truck Traffic: 1%, Average Future Daily Traffic: 35 (year 2043), Features Intersected: CANE CREEK, Facility Carried by Structure: COOSA AVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.0m (9.8ft)
Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 54.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.63m (5.35ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $11,000, Roadway Improvement Cost: $8,000, Total Project Cost: $19,000 ( Estimate for 2021)
Structure Number: DAPAMCANN01137X, Location: OLD CLA (Lat: 33.673861, Lng: -85.951450), Route carried "on" structure: Other road , Year Built: 1941, Status: Open, Structure Length: 0.96m (3.15ft), Average Daily Traffic: 30 (year 2017), Truck Traffic: 1%, Average Future Daily Traffic: 35 (year 2043), Features Intersected: CANE CREEK, Facility Carried by Structure: COOSA AVE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Concrete, Design/Construction: Culvert, Number Of Spans In Main Unit: 3, Length of Maximum Span: 3.0m (9.8ft)
Condition: Channel: Satisfactory, Culverts: Satisfactory, Operating Rating: 54.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 32.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 1.63m (5.35ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $11,000, Roadway Improvement Cost: $8,000, Total Project Cost: $19,000 ( Estimate for 2021)
Find on map >> Show street view
Structure Number: DAPAMCANN01137Y, Location: EAST OF G101 (Lat: 33.675269, Lng: -85.949869), Route carried "on" structure: Other road , Year Built: 1940, Status: Open, Structure Length: 0.80m (2.62ft), Average Daily Traffic: 30 (year 2017), Truck Traffic: 1%, Average Future Daily Traffic: 35 (year 2043), Features Intersected: CANE CREEK, Facility Carried by Structure: BRIDGE E OF G101
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 6.1m (20.0ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 5, Length of Maximum Span: 1.5m (4.9ft)
Condition: Channel: Fair, Culverts: Poor, Operating Rating: 62.5 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 48.3 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.46m (4.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $24,000, Roadway Improvement Cost: $8,000, Total Project Cost: $32,000 ( Estimate for 2021)
Structure Number: DAPAMCANN01137Y, Location: EAST OF G101 (Lat: 33.675269, Lng: -85.949869), Route carried "on" structure: Other road , Year Built: 1940, Status: Open, Structure Length: 0.80m (2.62ft), Average Daily Traffic: 30 (year 2017), Truck Traffic: 1%, Average Future Daily Traffic: 35 (year 2043), Features Intersected: CANE CREEK, Facility Carried by Structure: BRIDGE E OF G101
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Owner: Army, Approaching Roadway Width: 6.1m (20.0ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Culvert, Number Of Spans In Main Unit: 5, Length of Maximum Span: 1.5m (4.9ft)
Condition: Channel: Fair, Culverts: Poor, Operating Rating: 62.5 metric tons, Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Inventory Rating: 48.3 metric tons, Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings, Structural Evaluation: Meets minimum limits, Waterway Adequacy: Better than present minimum criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.46m (4.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $24,000, Roadway Improvement Cost: $8,000, Total Project Cost: $32,000 ( Estimate for 2021)
Find on map >> Show street view
Structure Number: DAPAMCANN01137Z, Location: SOUTH OF G1002 (Lat: 33.676189, Lng: -85.947661), Route carried "on" structure: Other road , Year Built: 1940, Status: Open, Structure Length: 1.22m (4.00ft), Average Daily Traffic: 30 (year 2017), Truck Traffic: 1%, Average Future Daily Traffic: 35 (year 2043), Features Intersected: CANE CREEK RUNOFF, Facility Carried by Structure: PATROL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Army, Approaching Roadway Width: 3.7m (12.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.2m (40.0ft), Curb-To-Curb Width: 3.9m (12.8ft), Out-to-Out Width: 3.9m (12.8ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 52.6 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.5 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.89m (6.20ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $2,000, Roadway Improvement Cost: $34,000, Total Project Cost: $36,000 ( Estimate for 2021), Deck Structure Type: Steel plate
Structure Number: DAPAMCANN01137Z, Location: SOUTH OF G1002 (Lat: 33.676189, Lng: -85.947661), Route carried "on" structure: Other road , Year Built: 1940, Status: Open, Structure Length: 1.22m (4.00ft), Average Daily Traffic: 30 (year 2017), Truck Traffic: 1%, Average Future Daily Traffic: 35 (year 2043), Features Intersected: CANE CREEK RUNOFF, Facility Carried by Structure: PATROL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: Army, Approaching Roadway Width: 3.7m (12.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 1, Length of Maximum Span: 12.2m (40.0ft), Curb-To-Curb Width: 3.9m (12.8ft), Out-to-Out Width: 3.9m (12.8ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Channel: Good, Operating Rating: 52.6 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.5 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 1.89m (6.20ft), Designated Inspection Frequency: Every 24 months, Inspection Date: November 2021, Bridge Improvement Cost: $2,000, Roadway Improvement Cost: $34,000, Total Project Cost: $36,000 ( Estimate for 2021), Deck Structure Type: Steel plate
Find on map >> Show street view
Structure Number: 834, Location: .2 MI W ALA 21 (Lat: 33.706569, Lng: -85.824017), Route carried "under" structure: County highway 110, Year Built: 1930, Structure Length: 0. m, Average Daily Traffic: 130 (year 1989), Truck Traffic: 1%, Features Intersected: CO 110, Facility Carried by Structure: SO RAILROAD
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.010, Lanes under structure: 1, Material/Design: Wood or Timber, Design/Construction: Frame, Length of Maximum Span: 4.3m (14.1ft)
Structure Number: 834, Location: .2 MI W ALA 21 (Lat: 33.706569, Lng: -85.824017), Route carried "under" structure: County highway 110, Year Built: 1930, Structure Length: 0. m, Average Daily Traffic: 130 (year 1989), Truck Traffic: 1%, Features Intersected: CO 110, Facility Carried by Structure: SO RAILROAD
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.010, Lanes under structure: 1, Material/Design: Wood or Timber, Design/Construction: Frame, Length of Maximum Span: 4.3m (14.1ft)
Find on map >> Show street view
Structure Number: 761, Location: 0.3 MI WEST JCT. US 431 (Lat: 33.698056, Lng: -85.826389), Route carried "under" structure: US 431, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 17,870 (year 2013), Truck Traffic: 8%, Features Intersected: US 431, Facility Carried by Structure: SOUTHERN RAILROAD
Minimum Vertical Clearance: 5.24m (17.19ft), Kilometerpoint: 377.053, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 15.2m (49.9ft)
Structure Number: 761, Location: 0.3 MI WEST JCT. US 431 (Lat: 33.698056, Lng: -85.826389), Route carried "under" structure: US 431, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 17,870 (year 2013), Truck Traffic: 8%, Features Intersected: US 431, Facility Carried by Structure: SOUTHERN RAILROAD
Minimum Vertical Clearance: 5.24m (17.19ft), Kilometerpoint: 377.053, Lanes under structure: 4, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 15.2m (49.9ft)
Find on map >> Show street view
Structure Number: 13398, Location: 10.1 MI E US 78 (Lat: 33.654486, Lng: -85.836706), Route carried "under" structure: Ramp City street , Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 600 (year 1994), Truck Traffic: 3%, Features Intersected: NFKSOU RR GLEN ADDIE AVE, Facility Carried by Structure: SR 202
Minimum Vertical Clearance: 10.01m (32.84ft), Kilometerpoint: 10.099, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 41.8m (137.1ft)
Structure Number: 13398, Location: 10.1 MI E US 78 (Lat: 33.654486, Lng: -85.836706), Route carried "under" structure: Ramp City street , Year Built: 1984, Structure Length: 0. m, Average Daily Traffic: 600 (year 1994), Truck Traffic: 3%, Features Intersected: NFKSOU RR GLEN ADDIE AVE, Facility Carried by Structure: SR 202
Minimum Vertical Clearance: 10.01m (32.84ft), Kilometerpoint: 10.099, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 41.8m (137.1ft)
Find on map >> Show street view
Structure Number: 19328, Location: INTERSECT OF SR1/SR21 (Lat: 33.702022, Lng: -85.822833), Route carried "under" structure: State highway 21, Year Built: 2011, Structure Length: 0. m, Average Daily Traffic: 28,130 (year 2020), Truck Traffic: 3%, Features Intersected: SR21, Facility Carried by Structure: SR1/US431
Minimum Vertical Clearance: 7.28m (23.88ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.6m (129.9ft)
Structure Number: 19328, Location: INTERSECT OF SR1/SR21 (Lat: 33.702022, Lng: -85.822833), Route carried "under" structure: State highway 21, Year Built: 2011, Structure Length: 0. m, Average Daily Traffic: 28,130 (year 2020), Truck Traffic: 3%, Features Intersected: SR21, Facility Carried by Structure: SR1/US431
Minimum Vertical Clearance: 7.28m (23.88ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.6m (129.9ft)
Find on map >> Show street view
Structure Number: 19356, Location: INTERSECTION OF SR1/SR21 (Lat: 33.700917, Lng: -85.822917), Route carried "under" structure: State highway 21, Year Built: 2011, Structure Length: 0. m, Average Daily Traffic: 28,130 (year 2020), Truck Traffic: 3%, Features Intersected: SR21, Facility Carried by Structure: SR1/US431
Minimum Vertical Clearance: 7.13m (23.39ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 39.6m (129.9ft)
Structure Number: 19356, Location: INTERSECTION OF SR1/SR21 (Lat: 33.700917, Lng: -85.822917), Route carried "under" structure: State highway 21, Year Built: 2011, Structure Length: 0. m, Average Daily Traffic: 28,130 (year 2020), Truck Traffic: 3%, Features Intersected: SR21, Facility Carried by Structure: SR1/US431