Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Farmington, New Mexico (NM)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 53Number of bridges
  • 574ft / 175mTotal length
  • $10,827,000Total costs
  • 345,391Total average daily traffic
  • 36,324Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Farmington
  • No street view available for this location

New bridges in Farmington, NM - historical statistics
  • New bridges - historical statistics
  • 51930-1939
  • 31940-1949
  • 41950-1959
  • 31960-1969
  • 181970-1979
  • 121980-1989
  • 41990-1999
  • 12000-2009
  • 32010-2019
Reconstructed bridges in Farmington, NM - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Farmington, NM
Average Bridge Truck Traffic in Farmington, NM
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 6.5%Very good
  • 32.3%Good
  • 54.8%Satisfactory
  • 6.5%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.9%Very good
  • 51.6%Good
  • 32.3%Satisfactory
  • 3.2%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.5%Very good
  • 51.6%Good
  • 29.0%Satisfactory
  • 12.9%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.5%Very good
  • 31.4%Good
  • 33.3%Satisfactory
  • 9.8%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 9.5%Very good
  • 42.9%Good
  • 38.1%Satisfactory
  • 9.5%Fair
Find on map >>   Show street view

Structure Number: 343,  Location: 1.3 MI E BROWNING PARKWAY (Lat: 36.710139,  Lng: -108.136747),  Route carried "on" structure: US 64,  Year Built: 1940,  Status: Open,  Structure Length: 0.87m (2.85ft),  Average Daily Traffic: 18,269 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 25,709 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 88.836,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.6m (84.0ft),  Skew: 14 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2017,  Bridge Improvement Cost: $263,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $395,000 ( Estimate for 2030)
Find on map >>   Show street view

Structure Number: 3431,  Location: 1.1 MI NE BROWNING PARKWA (Lat: 36.710933,  Lng: -108.139669),  Route carried "on" structure: US 64,  Year Built: 1940,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 18,269 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 25,709 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 88.514,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.2m (56.4ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.67m (2.20ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $173,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $260,000 ( Estimate for 2030)
Find on map >>   Show street view

Structure Number: 3432,  Location: .1 Miles west /Browning P (Lat: 36.719100,  Lng: -108.161400),  Route carried "on" structure: US 64,  Year Built: 1940,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 11,658 (year 2020),  Truck Traffic: 27%,  Average Future Daily Traffic: 21,555 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 86.421,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.4m (76.8ft),  Skew: 24 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 63.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $300,000 ( Estimate for 2030)
Find on map >>   Show street view

Structure Number: 3664,  Location: 3.1 MI N OF JCT US 64 (Lat: 36.757694,  Lng: -108.156083),  Route carried "on" structure: State highway 516,  Year Built: 1937,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 31,504 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 44,342 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.989,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 1.8m (5.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 87.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020
Find on map >>   Show street view

Structure Number: 3665,  Location: 4.3 MI N OF JCT US 64 (Lat: 36.769539,  Lng: -108.142836),  Route carried "on" structure: State highway 516,  Year Built: 1937,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 24,778 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 29,387 (year 2040),  Design Load: H 15,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.920,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $311,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $467,000 ( Estimate for 2030)
Find on map >>   Show street view

Structure Number: 3666,  Location: 3.6 MI NE OF BROWING PRKW (Lat: 36.779125,  Lng: -108.123389),  Route carried "on" structure: State highway 516,  Year Built: 1937,  Status: Open,  Structure Length: 1.44m (4.72ft),  Average Daily Traffic: 16,055 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 22,593 (year 2040),  Design Load: H 15,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.095,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.7m (97.4ft),  Skew: 14 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.04m (3.41ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2017,  Bridge Improvement Cost: $323,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $484,000 ( Estimate for 2030)
Find on map >>   Show street view

Structure Number: 3667,  Location: 4.0 MI N OF BROWING PRKWY (Lat: 36.781753,  Lng: -108.118125),  Route carried "on" structure: State highway 516,  Year Built: 1937,  Status: Open,  Structure Length: 1.45m (4.76ft),  Average Daily Traffic: 16,055 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 22,593 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.575,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.3m (79.7ft),  Skew: 14 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.01m (3.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $355,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $533,000 ( Estimate for 2030),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 3668,  Location: 5.0 MI N OF BROWING PRKWY (Lat: 36.790158,  Lng: -108.103117),  Route carried "on" structure: State highway 516,  Year Built: 1937,  Status: Open,  Structure Length: 0.65m (2.13ft),  Average Daily Traffic: 16,055 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 22,593 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.104,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.4m (73.5ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2017,  Bridge Improvement Cost: $50,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $100,000 ( Estimate for 2030)
Find on map >>   Show street view

Structure Number: 5499,  Location: 2.7 MI N OF JCT NM-574 (Lat: 36.967653,  Lng: -108.191236),  Route carried "on" structure: State highway 170,  Year Built: 1955,  Status: Open,  Structure Length: 6.07m (19.91ft),  Average Daily Traffic: 2,000 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 1,544 (year 2040),  Design Load: H 15,  Features Intersected: LA PLATA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.568,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.07m (19.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $460,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $760,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5722,  Location: 0.5 MI S US-64 @ MP-39.8 (Lat: 36.744064,  Lng: -108.395664),  Route carried "on" structure: County highway 45675,  Year Built: 1957,  Status: Open,  Structure Length: 2.16m (7.09ft),  Average Daily Traffic: 1,673 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,727 (year 2040),  Design Load: H 15,  Features Intersected: STEVENS ARROYO,  Facility Carried by Structure: 45-6675
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 44.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2019,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5795,  Location: 3.48 MI W OF JCT NM-170 (Lat: 36.730353,  Lng: -108.312161),  Route carried "on" structure: County highway 45001,  Year Built: 1956,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,408 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,295 (year 2040),  Design Load: HS 20,  Features Intersected: DAIN ARROYO,  Facility Carried by Structure: 45-Z001
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.003,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2021
Find on map >>   Show street view

Structure Number: 6748,  Location: 2.3 MI W OF U.S. 550/ 64 (Lat: 36.704703,  Lng: -108.025650),  Route carried "on" structure: US 64,  Year Built: 1966,  Status: Open,  Structure Length: 1.60m (5.25ft),  Average Daily Traffic: 12,265 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 17,259 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 98.978,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.4m (76.8ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $423,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $635,000 ( Estimate for 2030)
Find on map >>   Show street view

Structure Number: 7439,  Location: W JCT MAIN & BROADWAY (Lat: 36.729794,  Lng: -108.224133),  Route carried "on" structure: US 64,  Year Built: 1974,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 14,157 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 18,663 (year 2040),  Design Load: HS 20,  Features Intersected: GLADE ARROYO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 80.435,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 31.7m (104.0ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $507,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $760,000 ( Estimate for 2030)
Find on map >>   Show street view

Structure Number: 7457,  Location: 0.1 MI E OF JCT NM-170 (Lat: 36.737244,  Lng: -108.250619),  Route carried "on" structure: US 64,  Year Built: 1975,  Status: Open,  Structure Length: 7.38m (24.21ft),  Average Daily Traffic: 17,826 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 25,086 (year 2040),  Design Load: HS 20,  Features Intersected: LA PLATA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 77.572,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.3m (83.0ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2019
Find on map >>   Show street view

Structure Number: 7526,  Location: 13.0 MI E OF JCT US-491 (Lat: 36.759931,  Lng: -108.466617),  Route carried "on" structure: US 64,  Year Built: 1979,  Status: Open,  Structure Length: 3.16m (10.37ft),  Average Daily Traffic: 13,319 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 10,280 (year 2040),  Design Load: HS 20,  Features Intersected: SHUMWAY ARROYO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 57.292,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.8m (81.4ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 31.1m (102.0ft),  Out-to-Out Width: 32.0m (105.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 65.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.26m (10.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $550,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $825,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7545,  Location: 0.7 MI S US-64/FRUITLAND (Lat: 36.744158,  Lng: -108.400286),  Route carried "on" structure: County highway 45001,  Year Built: 1975,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 1,408 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,295 (year 2040),  Design Load: HS 20,  Features Intersected: STEVENS ARROYO,  Facility Carried by Structure: 45-Z001
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.126,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 63.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2019,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 7552,  Location: 3.48 MI W OF JCT NM-170 (Lat: 36.731567,  Lng: -108.311975),  Route carried "on" structure: US 64,  Year Built: 1975,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 18,282 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 14,110 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 71.616,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.5m (113.2ft),  Skew: 12 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 89.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $289,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $433,000 ( Estimate for 2030)
Find on map >>   Show street view

Structure Number: 7666,  Location: 3.11 MI W OF JCT NM-511 (Lat: 36.784183,  Lng: -107.736167),  Route carried "on" structure: State highway 173,  Year Built: 1977,  Status: Open,  Structure Length: 6.37m (20.90ft),  Average Daily Traffic: 449 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 386 (year 2040),  Design Load: HS 15,  Features Intersected: PUMP CANYON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.140,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8013,  Location: .1 MI E Broadway/Scott Av (Lat: 36.727053,  Lng: -108.190942),  Route carried "on" structure: US 64,  Year Built: 1958,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 9.27m (30.41ft),  Average Daily Traffic: 6,061 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 8,529 (year 2040),  Design Load: HS 20,  Features Intersected: ANIMAS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 83.525,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 21 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 23.3m (76.4ft),  Out-to-Out Width: 27.4m (89.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 9.27m (30.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,340,000,  Roadway Improvement Cost: $134,000,  Total Project Cost: $2,010,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8111,  Location: 0.3 MI S NM 516 (Lat: 36.800261,  Lng: -108.081019),  Route carried "on" structure: County highway 45500,  Year Built: 1967,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 526 (year 2020),  Average Future Daily Traffic: 883 (year 2040),  Design Load: H 20,  Features Intersected: FLORA VISTA ARROYO,  Facility Carried by Structure: 45-3500
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.3m (30.5ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 52.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $100,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $300,000 ( Estimate for 2030),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8113,  Location: 1.2 MI S US-64 @ MP-39.8 (Lat: 37.283333,  Lng: -109.016667),  Route carried "on" structure: County highway 45675,  Year Built: 1960,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 12.10m (39.70ft),  Average Daily Traffic: 1,673 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,727 (year 2040),  Design Load: HS 20,  Features Intersected: SAN JUAN RIVER,  Facility Carried by Structure: 45-6675
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.4m (27.6ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.9m (98.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.82m (35.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $440,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $660,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8314,  Location: 11.78 MI E OF JCT US-491 (Lat: 36.760089,  Lng: -108.492069),  Route carried "on" structure: US 64,  Year Built: 1979,  Status: Open,  Structure Length: 0.96m (3.15ft),  Average Daily Traffic: 13,319 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 10,280 (year 2040),  Design Load: HS 20,  Features Intersected: VAUGHN ARROYO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 55.039,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.2m (95.8ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2019,  Bridge Improvement Cost: $216,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $324,000 ( Estimate for 2030)
Find on map >>   Show street view

Structure Number: 8399,  Location: 21.4 MI S OF JCT US 550 (Lat: 36.103686,  Lng: -107.955856),  Route carried "on" structure: State highway 57,  Year Built: 1983,  Status: Open,  Structure Length: 7.00m (22.97ft),  Average Daily Traffic: 144 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 124 (year 2040),  Design Load: HS 20,  Features Intersected: ESCAVADA WASH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.440,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 844,  Location: 35.0 MI S JCT 371 & P (Lat: 36.254356,  Lng: -108.271608),  Route carried "on" structure: State highway 371,  Year Built: 1984,  Status: Open,  Structure Length: 2.86m (9.38ft),  Average Daily Traffic: 2,376 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 3,449 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 115.129,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.3m (43.6ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 68.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.87m (9.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $212,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $318,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8441,  Location: 34.2 MI S JCT 371 & P (Lat: 36.265900,  Lng: -108.271611),  Route carried "on" structure: State highway 371,  Year Built: 1984,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 2,376 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 3,449 (year 2040),  Design Load: HS 20,  Features Intersected: HUNTER WASH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 116.999,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $293,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $439,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8571,  Location: 1.7 MI N JCT US64/NM-516 (Lat: 36.739347,  Lng: -108.166681),  Route carried "on" structure: State highway 516,  Year Built: 1985,  Status: Open,  Structure Length: 9.24m (30.31ft),  Average Daily Traffic: 16,010 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 22,530 (year 2040),  Design Load: HS 20,  Features Intersected: ANIMAS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.736,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.7m (61.4ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.2m (99.1ft),  Curb or Sidewalk Widths: Left: 2.6m (8.5ft),  Right: 2.5m (8.2ft),  Curb-To-Curb Width: 18.1m (59.4ft),  Out-to-Out Width: 23.2m (76.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8658,  Location: 2.15 MI N JCT US64/NM-516 (Lat: 36.742342,  Lng: -108.167261),  Route carried "on" structure: State highway 516,  Year Built: 1985,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 16,010 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 22,530 (year 2040),  Design Load: HS 20,  Features Intersected: NORTH FARMINGTON DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.414,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 21 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.4m (4.6ft),  Curb-To-Curb Width: 20.4m (66.9ft),  Out-to-Out Width: 25.5m (83.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 45.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8671,  Location: 0.85 MI E OF JCT NM-371 (Lat: 36.719114,  Lng: -108.208206),  Route carried "on" structure: US 5001,  Year Built: 1988,  Status: Open,  Structure Length: 9.88m (32.41ft),  Average Daily Traffic: 7,475 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 10,519 (year 2040),  Design Load: HS 20,  Features Intersected: ANIMAS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.808,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 23 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.7m (81.0ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 0.0m,  Curb-To-Curb Width: 21.1m (69.2ft),  Out-to-Out Width: 23.2m (76.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8803,  Location: 8.6 MI S OF JCT US 550 (Lat: 36.131564,  Lng: -107.656906),  Route carried "on" structure: County highway 45900,  Year Built: 1987,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 544 (year 2020),  Average Future Daily Traffic: 913 (year 2040),  Design Load: HS 20,  Features Intersected: ESCAVADA WASH,  Facility Carried by Structure: 45-7900
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8919,  Location: 0.5 MI S. OF US-64 (Lat: 36.720406,  Lng: -108.202703),  Route carried "on" structure: City street 4359,  Year Built: 1995,  Status: Open,  Structure Length: 6.84m (22.44ft),  Average Daily Traffic: 3,187 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,570 (year 2040),  Design Load: HS 20,  Features Intersected: ANIMAS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 33.8m (110.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.5m (8.2ft),  Curb-To-Curb Width: 14.5m (47.6ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8953,  Location: 0.8 MI S OF US-64/FRMGTON (Lat: 36.721706,  Lng: -108.224389),  Route carried "on" structure: State highway 371,  Year Built: 1996,  Status: Open,  Structure Length: 11.64m (38.19ft),  Average Daily Traffic: 5,086 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 7,383 (year 2040),  Design Load: HS 20,  Features Intersected: SAN JUAN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 171.556,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 38.4m (126.0ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 28.6m (93.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9036,  Location: 16.8 MI N OF US-64 (Lat: 36.963131,  Lng: -108.193036),  Route carried "on" structure: County highway 45000,  Year Built: 1986,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 544 (year 2020),  Average Future Daily Traffic: 913 (year 2040),  Design Load: HS 20,  Features Intersected: NM-170,  Facility Carried by Structure: 45-1120
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 13.0m (42.7ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.4m (112.9ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9435,  Location: 4.39 Mi E US-64/Fruitland (Lat: 36.732667,  Lng: -108.341333),  Route carried "on" structure: County highway 45600,  Year Built: 2010,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 1,408 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,295 (year 2040),  Design Load: HS 20,  Features Intersected: COOLIDGE ARROYO,  Facility Carried by Structure: 45-6100
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.955,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $15,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $300,000 ( Estimate for 2070)
Find on map >>   Show street view

Structure Number: 9479,  Location: 1.56 MI E OF JCT NM 574 (Lat: 36.928347,  Lng: -108.162531),  Route carried "on" structure: State highway 574,  Year Built: 2008,  Status: Open,  Structure Length: 1.59m (5.22ft),  Average Daily Traffic: 1,845 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 1,586 (year 2040),  Design Load: HS 20,  Features Intersected: MC DERMOTT ARROYO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.511,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 35.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 9643,  Location: 17.01 mi N of Jct US 64 (Lat: 36.964753,  Lng: -108.192697),  Route carried "on" structure: State highway 170,  Year Built: 2015,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 2,000 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 1,544 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.375,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 0.0m,  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2019,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9785,  Location: 0.3 MI E OF JCT NM 170 (Lat: 36.929003,  Lng: -108.185208),  Route carried "on" structure: State highway 574,  Year Built: 2019,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 2,019 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,636 (year 2039),  Design Load: HS 20,  Features Intersected: LA PLATA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $179,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $269,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: N801,  Location: 4.2MI E,6 MI S FARMINGTON (Lat: 36.640222,  Lng: -108.128194),  Route carried "on" structure: Federal lands road 3003,  Year Built: 1975,  Status: Open,  Structure Length: 14.74m (48.36ft),  Average Daily Traffic: 2,768 (year 2022),  Truck Traffic: 40%,  Average Future Daily Traffic: 3,446 (year 2040),  Design Load: HS 20,  Features Intersected: GALLEGOS WASH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.709,  Lanes on structure: 2,  Owner: Bureau of Indian Affairs,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 24.6m (80.7ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.50m (57.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Total Project Cost: $180,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: N802,  Location: 7M S 8M E FARMINGTON (Lat: 36.635028,  Lng: -108.049528),  Route carried "on" structure: Federal lands road 4002,  Year Built: 1974,  Status: Open,  Structure Length: 2.12m (6.96ft),  Average Daily Traffic: 258 (year 2022),  Truck Traffic: 5%,  Average Future Daily Traffic: 302 (year 2040),  Design Load: HS 20,  Features Intersected: MAIN CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.689,  Lanes on structure: 2,  Owner: Bureau of Indian Affairs,  Approaching Roadway Width: 9.0m (29.5ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.2m (66.3ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: N803,  Location: 8M S, 6M E. FARMINGTON (Lat: 36.608972,  Lng: -108.088361),  Route carried "on" structure: Federal lands road 3003,  Year Built: 1975,  Status: Open,  Structure Length: 2.49m (8.17ft),  Average Daily Traffic: 2,945 (year 2022),  Truck Traffic: 30%,  Average Future Daily Traffic: 3,446 (year 2040),  Design Load: HS 20,  Features Intersected: MAIN CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.858,  Lanes on structure: 2,  Owner: Bureau of Indian Affairs,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: N804,  Location: 8.1MI S,6 MI E FARMINGTON (Lat: 36.608333,  Lng: -108.087528),  Route carried "on" structure: Federal lands road 3003,  Year Built: 1975,  Status: Open,  Structure Length: 2.49m (8.17ft),  Average Daily Traffic: 2,945 (year 2022),  Truck Traffic: 30%,  Average Future Daily Traffic: 3,446 (year 2040),  Design Load: HS 20,  Features Intersected: DRAINAGE DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 32.019,  Lanes on structure: 2,  Owner: Bureau of Indian Affairs,  Approaching Roadway Width: 10.8m (35.4ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: N805,  Location: 10.8M S,6.2M E FARMINGTON (Lat: 36.580639,  Lng: -108.092056),  Route carried "on" structure: Federal lands road 4022,  Year Built: 1975,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 631 (year 2022),  Truck Traffic: 10%,  Average Future Daily Traffic: 738 (year 2040),  Design Load: HS 20,  Features Intersected: MAIN CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.253,  Lanes on structure: 2,  Owner: Bureau of Indian Affairs,  Approaching Roadway Width: 9.0m (29.5ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: N806,  Location: 10.8M S,6.3M E FARMINGTON (Lat: 36.580583,  Lng: -108.091778),  Route carried "on" structure: Federal lands road 4022,  Year Built: 1975,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 631 (year 2022),  Truck Traffic: 10%,  Average Future Daily Traffic: 738 (year 2040),  Design Load: HS 20,  Features Intersected: DRAINAGE DITCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.414,  Lanes on structure: 2,  Owner: Bureau of Indian Affairs,  Approaching Roadway Width: 7.8m (25.6ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.4m (73.5ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Discuss Farmington, New Mexico (NM) on our hugely popular New Mexico forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.