Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Marietta, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 219Number of bridges
  • 3,550ft / 1,082mTotal length
  • $2,528,890,000Total costs
  • 10,085,570Total average daily traffic
  • 173,052Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Marietta
  • No street view available for this location

New bridges in Marietta, GA - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 21940-1949
  • 61950-1959
  • 251960-1969
  • 231970-1979
  • 141980-1989
  • 171990-1999
  • 112000-2009
  • 292010-2019
  • 22020-2022
Reconstructed bridges in Marietta, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41970-1979
  • 101980-1989
  • 101990-1999
  • 12000-2009
  • 22010-2019
Average Bridge Daily Traffic in Marietta, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 4.3%Very good
  • 85.1%Good
  • 9.6%Satisfactory
  • 1.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 26.6%Very good
  • 72.3%Good
  • 1.1%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.7%Very good
  • 84.0%Good
  • 4.3%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.5%Excellent
  • 24.1%Very good
  • 58.2%Good
  • 10.1%Satisfactory
  • 3.8%Fair
  • 1.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 5.4%Very good
  • 83.8%Good
  • 5.4%Satisfactory
  • 5.4%Fair
Find on map >>   Show street view

Structure Number: 675201,  Location: 5.5 MI E OF KENNESAW (Lat: 34.035378,  Lng: -84.520378),  Route carried "on" structure: City street 9026,  Year Built: 1999,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 8,960 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 13,440 (year 2032),  Design Load: HS 20,  Features Intersected: LITTLE NOONDAY CREEK,  Facility Carried by Structure: BLACKWELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.656,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 9 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 675213,  Location: 5.8 MI E OF KENNESAW (Lat: 34.025219,  Lng: -84.514969),  Route carried "on" structure: County highway 3091,  Year Built: 1999,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,930 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,895 (year 2032),  Design Load: HS 20,  Features Intersected: LITTLE NOONDAY CREEK,  Facility Carried by Structure: RIO MONTANA DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $94,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $141,000
Find on map >>   Show street view

Structure Number: 675217,  Location: 5.6 MI E OF MARIETTA (Lat: 33.968247,  Lng: -84.455308),  Route carried "on" structure: County highway 1327,  Year Built: 1998,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 1,930 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,895 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SOPE CREEK,  Facility Carried by Structure: ROBINSON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.6m (61.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $238,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $358,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 675232,  Location: 3.2 MI S OF MARIETTA (Lat: 33.909208,  Lng: -84.569208),  Route carried "on" structure: County highway 957,  Year Built: 2001,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,930 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,895 (year 2032),  Design Load: HS 20,  Features Intersected: OLLEY CREEK,  Facility Carried by Structure: CUNNINGHAM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $133,000,  Roadway Improvement Cost: $13,000,  Total Project Cost: $199,000
Find on map >>   Show street view

Structure Number: 675233,  Location: 4.1 MI W OF MARIETTA (Lat: 33.944819,  Lng: -84.619558),  Route carried "on" structure: County highway 944,  Year Built: 2000,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 1,930 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,895 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NOSES CREEK,  Facility Carried by Structure: OLD DALLAS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.0m

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $176,000,  Roadway Improvement Cost: $18,000,  Total Project Cost: $264,000
Find on map >>   Show street view

Structure Number: 675239,  Location: 4.8 MI SW OF MARIETTA (Lat: 33.923956,  Lng: -84.629656),  Route carried "on" structure: County highway 905,  Year Built: 2002,  Status: Open,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 1,930 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,895 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BARRETT PARKWAY,  Facility Carried by Structure: IRWIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.4m (112.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 67524,  Location: 2 MILES SOUTH WEST OF MAR (Lat: 33.915469,  Lng: -84.628239),  Route carried "on" structure: County highway 8228,  Year Built: 2000,  Status: Open,  Structure Length: 93.27m (306.00ft),  Average Daily Traffic: 15,290 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 22,935 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NOSES/WARD CREEKS,  Facility Carried by Structure: BARRETT PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.265,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 38,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 23.6m (77.4ft),  Out-to-Out Width: 25.3m (83.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 25.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 15.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $18,478,000,  Roadway Improvement Cost: $1,848,000,  Total Project Cost: $27,716,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 675245,  Location: 3.8 MI E OF KENNESAW (Lat: 34.021578,  Lng: -84.552289),  Route carried "on" structure: County highway 3540,  Year Built: 1999,  Status: Open,  Structure Length: 11.58m (37.99ft),  Average Daily Traffic: 1,930 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,895 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NOONDAY CREEK,  Facility Carried by Structure: CHASTAIN MEADOWS P
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 24 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 23.2m (76.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 25.3m (83.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,295,000,  Roadway Improvement Cost: $229,000,  Total Project Cost: $3,442,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 675262,  Location: 5 MILES NORTH EAST OF MAR (Lat: 33.990669,  Lng: -84.477778),  Route carried "on" structure: County highway 575,  Year Built: 2009,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 1,050 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,575 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SEWELL CREEK TRIB.,  Facility Carried by Structure: HOLLY SPRINGS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $141,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $211,000
Find on map >>   Show street view

Structure Number: 675264,  Location: 4.8 MLES SOUTH OF KENNESA (Lat: 33.953269,  Lng: -84.612047),  Route carried "on" structure: County highway 4431,  Year Built: 2009,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 11,820 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 17,730 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NOSES CREEK,  Facility Carried by Structure: MOUNT CALVARY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $234,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $352,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 675267,  Location: 5.7 MI E OF KENNESAW (Lat: 34.031719,  Lng: -84.518489),  Route carried "on" structure: County highway 321,  Year Built: 2008,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 990 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,485 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: LITTLE NOONDAY CREEK,  Facility Carried by Structure: WORLEY DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $313,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $469,000,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 67527,  Location: 2.1 MI S OF MARIETTA (Lat: 33.923528,  Lng: -84.558669),  Route carried "on" structure: County highway 1083,  Year Built: 2008,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 1,930 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,895 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OLLEY CREEK TRIB.,  Facility Carried by Structure: BOOTH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $234,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $352,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 675275,  Location: 6 MILES NE OF MARIETTA (Lat: 33.985603,  Lng: -84.454719),  Route carried "on" structure: County highway 1308,  Year Built: 2010,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 12,030 (year 2009),  Truck Traffic: 1%,  Average Future Daily Traffic: 14,680 (year 2029),  Design Load: HS 20+Mod,  Features Intersected: SEWEL CREEK,  Facility Carried by Structure: SEWEL MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 1.9m (6.2ft),  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 61.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $598,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $897,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 675279,  Location: IN NORTH WEST MARIETTA (Lat: 33.968897,  Lng: -84.562683),  Route carried "on" structure: City street 9024,  Year Built: 2009,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 6,670 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 10,005 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: NOSES CREEK,  Facility Carried by Structure: KENNESAW AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $164,000,  Roadway Improvement Cost: $16,000,  Total Project Cost: $246,000
Find on map >>   Show street view

Structure Number: 67528,  Location: 3.7 MILES SOUTH WEST OF M (Lat: 33.920589,  Lng: -84.601339),  Route carried "on" structure: County highway 4394,  Year Built: 2009,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 1,940 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,910 (year 2031),  Design Load: H 15,  Features Intersected: WARD CREEK,  Facility Carried by Structure: CHEATHAM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $199,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $299,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 675281,  Location: 5.4 MILES WEST OF MARIETT (Lat: 33.935597,  Lng: -84.640836),  Route carried "on" structure: County highway 914,  Year Built: 2010,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 4,150 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 6,225 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: MUD CREEK,  Facility Carried by Structure: WEST SANDTOWN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $109,000,  Roadway Improvement Cost: $11,000,  Total Project Cost: $164,000
Find on map >>   Show street view

Structure Number: 675295,  Location: 4 MILES E. OF KENNESAW (Lat: 34.021436,  Lng: -84.544117),  Route carried "on" structure: County highway 239,  Year Built: 2009,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 1,930 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,895 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NOONDAY CREEK TRIB,  Facility Carried by Structure: ROCK BRIDGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $391,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $586,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 675296,  Location: 3 MILES WEST OF SYMRNA (Lat: 33.895769,  Lng: -84.586806),  Route carried "on" structure: County highway 9001,  Year Built: 2010,  Status: Open,  Structure Length: 15.48m (50.79ft),  Average Daily Traffic: 1,930 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,895 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: OLLEY CREEK,  Facility Carried by Structure: WINDY HILL/MACLAND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 41.5m (136.2ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 23.0m (75.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 83.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $3,068,000,  Roadway Improvement Cost: $307,000,  Total Project Cost: $4,601,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 675297,  Location: 3.6 MILES WEST OF SYMRNA (Lat: 33.896531,  Lng: -84.591217),  Route carried "on" structure: County highway 4394,  Year Built: 2010,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 1,930 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,895 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: WINDY HILL/MACLAND CONN.,  Facility Carried by Structure: CALLAWAY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 25 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 27.1m (88.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $952,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $1,428,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 675301,  Location: 3 MILES EAST OF MARIETTA (Lat: 33.997772,  Lng: -84.541050),  Route carried "on" structure: County highway 1044,  Year Built: 2012,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 200 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 300 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NOONDAY CREEK TRIB.,  Facility Carried by Structure: MARK AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $94,000,  Roadway Improvement Cost: $9,000,  Total Project Cost: $141,000
Find on map >>   Show street view

Structure Number: 675302,  Location: IN EAST MARIETTA (Lat: 33.960350,  Lng: -84.497256),  Route carried "on" structure: State highway 120,  Year Built: 2012,  Status: Open,  Structure Length: 6.40m (21.00ft),  Average Daily Traffic: 20,220 (year 2013),  Truck Traffic: 2%,  Average Future Daily Traffic: 20,220 (year 2030),  Design Load: HS 20+Mod,  Features Intersected: SR120
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.0m (105.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 675311,  Location: 6.5 E OF MARIETTA (Lat: 33.940858,  Lng: -84.437539),  Route carried "on" structure: County highway 1139,  Year Built: 2013,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 8,162 (year 2013),  Truck Traffic: 7%,  Average Future Daily Traffic: 10,993 (year 2033),  Design Load: HS 20,  Features Intersected: SOPE CREEK,  Facility Carried by Structure: PAPER MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.4m (126.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of replacement,  Length Of Structure Improvement: 4.61m (15.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $11,188,000,  Roadway Improvement Cost: $1,118,000,  Total Project Cost: $16,783,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 675314,  Location: 1.6 MI N OF MARIETTA (Lat: 33.976269,  Lng: -84.547389),  Route carried "on" structure: City street 9004,  Year Built: 2013,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 9,540 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 14,310 (year 2032),  Design Load: HS 20,  Features Intersected: SR 3 (US 41),  Facility Carried by Structure: CANTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 45.7m (149.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of replacement,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.49m (18.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $13,320,000,  Roadway Improvement Cost: $1,332,000,  Total Project Cost: $19,980,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 675318,  Location: 4 MI SOUTH OF KENNESAW (Lat: 33.966639,  Lng: -84.626478),  Route carried "on" structure: County highway 858,  Year Built: 2014,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 1,930 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,895 (year 2032),  Design Load: HS 20,  Features Intersected: MUD CREEK,  Facility Carried by Structure: BURNT HICKORY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 83.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.93m (9.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $7,104,000,  Roadway Improvement Cost: $710,000,  Total Project Cost: $10,656,000 ( Estimate for 2015),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 67532,  Location: IN NORTH MARIETTA (Lat: 33.981367,  Lng: -84.539900),  Route carried "on" structure: Alternate Interstate 75,  Year Built: 2016,  Status: Open,  Structure Length: 178.58m (585.89ft),  Average Daily Traffic: 9,999 (year 2016),  Average Future Daily Traffic: 9,999 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: SR 5-CANTON RD-GA NE RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 428.086,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 45,  Length of Maximum Span: 43.3m (142.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 214.27m (702.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $520,220,000,  Roadway Improvement Cost: $52,022,000,  Total Project Cost: $780,330,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 675321,  Location: NEAR KENNESAW (Lat: 34.009450,  Lng: -84.567481),  Route carried "on" structure: Alternate Interstate 401,  Year Built: 2016,  Status: Open,  Structure Length: 45.29m (148.59ft),  Average Daily Traffic: 9,999 (year 2016),  Average Future Daily Traffic: 8,030 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: I-75 SBL - I-75 RAMP - B,  Facility Carried by Structure: I-75 MANAGED LANES
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 432.914,  Lanes on structure: 1,  Lanes under structure: 14,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 55.5m (182.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 73.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 7.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 54.35m (178.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $131,942,000,  Roadway Improvement Cost: $13,194,000,  Total Project Cost: $197,913,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 675322,  Location: 3 MI E OF KENNESAW (Lat: 34.014097,  Lng: -84.558781),  Route carried "on" structure: Alternate Interstate 417,  Year Built: 2016,  Status: Open,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 9,999 (year 2016),  Average Future Daily Traffic: 9,999 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: SR 5C ERNEST BARRETT PKW,  Facility Carried by Structure: I-575 MANAGED LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 32.9m (107.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.53m (24.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $18,278,000,  Roadway Improvement Cost: $1,828,000,  Total Project Cost: $27,417,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 675323,  Location: 3 MI E OF KENNESAW (Lat: 34.024917,  Lng: -84.559881),  Route carried "on" structure: Alternate Interstate 417,  Year Built: 2016,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 9,999 (year 2016),  Average Future Daily Traffic: 9,999 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: NOONDAY CREEK,  Facility Carried by Structure: I-575 MANAGED LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 51.8m (169.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.22m (20.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $15,096,000,  Roadway Improvement Cost: $1,510,000,  Total Project Cost: $22,644,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 67533,  Location: IN EAST MARIETTA (Lat: 33.961394,  Lng: -84.520925),  Route carried "on" structure: Interstate 75,  Year Built: 2018,  Status: Open,  Structure Length: 13.38m (43.90ft),  Average Daily Traffic: 225,340 (year 2012),  Average Future Daily Traffic: 338,010 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: NORTH MARIETTA PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 426.476,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 44.2m (145.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.06m (52.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $38,998,000,  Roadway Improvement Cost: $3,900,000,  Total Project Cost: $58,497,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 675337,  Location: 2.7 MILES NORTH EAST OF S (Lat: 33.903100,  Lng: -84.474900),  Route carried "on" structure: Ramp Interstate 75,  Year Built: 2018,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 999 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,999 (year 2050),  Design Load: HS 20+Mod,  Features Intersected: I-75 MANAGED LANES
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 418.430,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 44.5m (146.0ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 72.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.33m (17.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $12,965,000,  Roadway Improvement Cost: $1,296,000,  Total Project Cost: $19,447,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 675338,  Location: IN EAST MARIETTA (Lat: 33.922281,  Lng: -84.485747),  Route carried "on" structure: Interstate 75,  Year Built: 2017,  Status: Open,  Structure Length: 70.44m (231.10ft),  Average Daily Traffic: 6,650 (year 2018),  Average Future Daily Traffic: 18,520 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: SR 280 DELK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 420.039,  Lanes on structure: 2,  Lanes under structure: 11,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 17,  Length of Maximum Span: 47.2m (154.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 84.52m (277.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $205,217,000,  Roadway Improvement Cost: $20,522,000,  Total Project Cost: $307,826,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 675339,  Location: IN EAST MARIETTA (Lat: 33.928617,  Lng: -84.489147),  Route carried "on" structure: Interstate 75,  Year Built: 2017,  Status: Open,  Structure Length: 38.95m (127.79ft),  Average Daily Traffic: 6,650 (year 2018),  Average Future Daily Traffic: 18,520 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: ROTTENWOOD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 421.648,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 10.8m (35.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 43.3m (142.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 86.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 46.76m (153.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $113,486,000,  Roadway Improvement Cost: $11,348,000,  Total Project Cost: $170,229,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 67534,  Location: IN EAST MARIETTA (Lat: 33.936231,  Lng: -84.497367),  Route carried "on" structure: Interstate 75,  Year Built: 2017,  Status: Open,  Structure Length: 107.72m (353.41ft),  Average Daily Traffic: 6,650 (year 2018),  Average Future Daily Traffic: 18,520 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: S. MARIETTA PKWY RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 423.258,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 25,  Length of Maximum Span: 43.3m (142.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 129.27m (424.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $313,819,000,  Roadway Improvement Cost: $31,382,000,  Total Project Cost: $470,728,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 675341,  Location: 2.7 MI E OF MARIETTA (Lat: 33.942036,  Lng: -84.506919),  Route carried "on" structure: Ramp Interstate 75,  Year Built: 2017,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 2,060 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,690 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: I-75 MANAGED LANES
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 423.258,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 48.8m (160.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.85m (19.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $14,208,000,  Roadway Improvement Cost: $1,421,000,  Total Project Cost: $21,312,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 675342,  Location: IN MARIETTA (Lat: 33.943881,  Lng: -84.509767),  Route carried "on" structure: Interstate 75,  Year Built: 2017,  Status: Open,  Structure Length: 12.80m (41.99ft),  Average Daily Traffic: 6,650 (year 2018),  Average Future Daily Traffic: 18,520 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: DETENTION POND
Minimum Vertical Clearance: 2.51m (8.23ft),  Kilometerpoint: 424.867,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 10.8m (35.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Inventory Rating: 36.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.36m (50.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $37,296,000,  Roadway Improvement Cost: $3,730,000,  Total Project Cost: $55,944,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 675343,  Location: IN MARIETTA (Lat: 33.945481,  Lng: -84.512181),  Route carried "on" structure: Interstate 75,  Year Built: 2017,  Status: Open,  Structure Length: 5.12m (16.80ft),  Average Daily Traffic: 6,650 (year 2018),  Average Future Daily Traffic: 18,520 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: BANBERRY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 424.867,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 51.2m (168.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.16m (20.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $14,918,000,  Roadway Improvement Cost: $1,492,000,  Total Project Cost: $22,377,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 675344,  Location: IN EAST MARIETTA (Lat: 33.950867,  Lng: -84.516781),  Route carried "on" structure: Interstate 75,  Year Built: 2018,  Status: Open,  Structure Length: 4.11m (13.48ft),  Average Daily Traffic: 224,470 (year 2012),  Average Future Daily Traffic: 336,705 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: ROSWELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 424.867,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.94m (16.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $11,988,000,  Roadway Improvement Cost: $1,199,000,  Total Project Cost: $17,982,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 675345,  Location: IN EAST MARIETTA (Lat: 33.973567,  Lng: -84.531850),  Route carried "on" structure: Interstate 75,  Year Built: 2018,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 225,340 (year 2012),  Average Future Daily Traffic: 338,010 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: ELIZABETH BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 426.476,  Lanes on structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.89m (6.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $4,588,000,  Roadway Improvement Cost: $688,000,  Total Project Cost: $6,882,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 675346,  Location: NORTH MARIETTA (Lat: 33.988750,  Lng: -84.547617),  Route carried "on" structure: Interstate 401,  Year Built: 2017,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 4,780 (year 2017),  Average Future Daily Traffic: 15,620 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: DICKSON ROAD,  Facility Carried by Structure: I-75 MANAGED LANES
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 431.304,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 12.0m (39.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 46.3m (151.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 87.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.55m (18.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $13,468,000,  Roadway Improvement Cost: $1,347,000,  Total Project Cost: $20,202,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 675347,  Location: NORTH MARIETTA (Lat: 33.990631,  Lng: -84.551381),  Route carried "on" structure: Interstate 401,  Year Built: 2017,  Status: Open,  Structure Length: 4.82m (15.81ft),  Average Daily Traffic: 4,780 (year 2018),  Average Future Daily Traffic: 328,770 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: BELLS FERRY ROAD,  Facility Carried by Structure: I-75 MANAGED LANE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 430.982,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 10.9m (35.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 48.2m (158.1ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 98.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.76m (18.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $14,030,000,  Roadway Improvement Cost: $1,403,000,  Total Project Cost: $21,045,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 675348,  Location: NORTH MARIETTA (Lat: 33.995831,  Lng: -84.559867),  Route carried "on" structure: Interstate 401,  Year Built: 2017,  Status: Open,  Structure Length: 28.71m (94.19ft),  Average Daily Traffic: 4,780 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 15,620 (year 2035),  Design Load: HS 20+Mod,  Features Intersected: I -75 ML & I -575 ML,  Facility Carried by Structure: I-575
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.0m (39.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.55m (18.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $13,498,000,  Roadway Improvement Cost: $1,350,000,  Total Project Cost: $20,247,000 ( Estimate for 2018),  Deck Structure Type: Concrete Cast-file-Place
Discuss Marietta, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.