Bridge Statistics for Montgomery, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 464Number of bridges
  • 8,547ft / 2,605mTotal length
  • $1,263,763,000Total costs
  • 8,220,647Total average daily traffic
  • 853,526Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Montgomery
  • No street view available for this location

New bridges in Montgomery, AL - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 101920-1929
  • 181930-1939
  • 151940-1949
  • 331950-1959
  • 1331960-1969
  • 1241970-1979
  • 431980-1989
  • 371990-1999
  • 262000-2009
  • 232010-2019
  • 12020-2022
Reconstructed bridges in Montgomery, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 41950-1959
  • 31960-1969
  • 31970-1979
  • 141980-1989
  • 101990-1999
  • 22000-2009
Average Bridge Daily Traffic in Montgomery, AL
Average Bridge Truck Traffic in Montgomery, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 0.8%Excellent
  • 4.7%Very good
  • 23.5%Good
  • 44.7%Satisfactory
  • 24.7%Fair
  • 1.6%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.7%Excellent
  • 36.5%Very good
  • 43.9%Good
  • 11.8%Satisfactory
  • 2.4%Fair
  • 0.8%Poor
  • 0.4%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.5%Excellent
  • 40.4%Very good
  • 44.7%Good
  • 7.8%Satisfactory
  • 1.6%Fair
  • 0.8%Poor
  • 0.4%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 0.8%Excellent
  • 1.9%Very good
  • 55.3%Good
  • 37.4%Satisfactory
  • 4.6%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 21.8%Excellent
  • 58.0%Very good
  • 18.5%Good
  • 1.7%Satisfactory
  • 18.5%Fair
Find on map >>   Show street view

Structure Number: 13605,  Location: NW ENTRANCE TO MALL (Lat: 32.388331,  Lng: -86.210172),  Route carried "on" structure: City street 14,  Year Built: 1985,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 4,500 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,100 (year 2038),  Design Load: H 20,  Features Intersected: EASTDALE DITCH,  Facility Carried by Structure: EASTDALE LOOP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.0m (59.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $488,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $537,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13617,  Location: 5.0 MI N of Northport (Lat: 33.628783,  Lng: -88.073164),  Route carried "on" structure: State highway 17,  Year Built: 1985,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 1,191 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,715 (year 2040),  Design Load: HS 20,  Features Intersected: Mud Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 376.218,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 64.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $521,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $573,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13663,  Location: 0.17 MI E OF MOBILE HWY (Lat: 32.332500,  Lng: -86.339800),  Route carried "on" structure: City street 58,  Year Built: 1985,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 35 (year 1990),  Average Future Daily Traffic: 50 (year 2038),  Design Load: HS 20,  Features Intersected: GENETTA DITCH,  Facility Carried by Structure: WHATLEY RD
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.150,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 51.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.34m (7.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $324,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $356,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13885,  Location: 5.3 MI.S.OF I65 (Lat: 32.210883,  Lng: -86.348819),  Route carried "on" structure: US 31,  Year Built: 1986,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 4,200 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,395 (year 2033),  Design Load: HS 20,  Features Intersected: PINTLALA CRK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 271.770,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 50.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.29m (23.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,100,000,  Roadway Improvement Cost: $210,000,  Total Project Cost: $2,310,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13886,  Location: 4.0 MI.S.OF I65 (Lat: 32.218975,  Lng: -86.348814),  Route carried "on" structure: US 31,  Year Built: 1986,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 4,200 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 5,395 (year 2033),  Design Load: HS 20,  Features Intersected: BEULAH BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 273.622,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 43.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $548,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $603,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13887,  Location: 0.6 MI.S.OF SOU BLVD (Lat: 32.319281,  Lng: -86.349247),  Route carried "on" structure: Bypass US 31,  Year Built: 1986,  Status: Open,  Structure Length: 24.63m (80.81ft),  Average Daily Traffic: 7,885 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 10,129 (year 2033),  Design Load: HS 20,  Features Intersected: CATOMA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 286.114,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 18,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 24.63m (80.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $7,094,000,  Roadway Improvement Cost: $709,000,  Total Project Cost: $7,803,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13895,  Location: EASTERN BYPASS AND I85 (Lat: 32.362114,  Lng: -86.212172),  Route carried "on" structure: Ramp US 80,  Year Built: 1986,  Status: Open,  Structure Length: 6.13m (20.11ft),  Average Daily Traffic: 4,686 (year 2011),  Truck Traffic: 4%,  Average Future Daily Traffic: 7,679 (year 2031),  Design Load: HS 20,  Features Intersected: I85 NBL,  Facility Carried by Structure: AL9 RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 172.890,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.0m (95.1ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 82.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.17m (23.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,524,000,  Roadway Improvement Cost: $152,000,  Total Project Cost: $1,676,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14082,  Location: 200 FT S OF IRIS LN (Lat: 32.329800,  Lng: -86.316100),  Route carried "on" structure: City street ,  Year Built: 1948,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 3,500 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,100 (year 2038),  Design Load: H 15,  Features Intersected: CLOVERLAND DITCH,  Facility Carried by Structure: ROSA L PARKS AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.1m (36.4ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 60.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $747,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $822,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 14457,  Location: 0.3 MI N OF I65 (Lat: 32.367564,  Lng: -86.317331),  Route carried "on" structure: Interstate 85,  Year Built: 1971,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 5.97m (19.59ft),  Average Daily Traffic: 94,970 (year 2013),  Truck Traffic: 11%,  Average Future Daily Traffic: 125,167 (year 2033),  Design Load: HS 20,  Features Intersected: ROSA PARKS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.497,  Lanes on structure: 9,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 43.9m (144.0ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.5m (73.8ft),  Curb-To-Curb Width: 45.3m (148.6ft),  Out-to-Out Width: 46.9m (153.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 45.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.00m (22.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $7,397,000,  Roadway Improvement Cost: $740,000,  Total Project Cost: $8,137,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14459,  Location: 0.6 MI N OF I65 (Lat: 32.367708,  Lng: -86.311872),  Route carried "on" structure: Interstate 85,  Year Built: 1965,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 5.15m (16.90ft),  Average Daily Traffic: 94,970 (year 2013),  Truck Traffic: 11%,  Average Future Daily Traffic: 125,167 (year 2033),  Design Load: HS 20,  Features Intersected: HOLCOMBE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.980,  Lanes on structure: 8,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 35.7m (117.1ft),  Out-to-Out Width: 36.0m (118.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 49.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.17m (20.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $4,995,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $5,495,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14461,  Location: 1.06 MI N OF I65 (Lat: 32.367833,  Lng: -86.304594),  Route carried "on" structure: Interstate 85,  Year Built: 1966,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 5.15m (16.90ft),  Average Daily Traffic: 83,530 (year 2013),  Truck Traffic: 13%,  Average Future Daily Traffic: 110,089 (year 2033),  Design Load: HS 20,  Features Intersected: MCDONOUGH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.672,  Lanes on structure: 6,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 32.0m (105.0ft),  Out-to-Out Width: 34.5m (113.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 55.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.17m (20.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $4,784,000,  Roadway Improvement Cost: $478,000,  Total Project Cost: $5,262,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14463,  Location: 1.11 MI N OF I65 (Lat: 32.367856,  Lng: -86.303353),  Route carried "on" structure: Interstate 85,  Year Built: 1966,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 5.46m (17.91ft),  Average Daily Traffic: 83,530 (year 2013),  Truck Traffic: 13%,  Average Future Daily Traffic: 110,089 (year 2033),  Design Load: HS 20,  Features Intersected: HULL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.801,  Lanes on structure: 6,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 32.0m (105.0ft),  Out-to-Out Width: 33.8m (110.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 64.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.49m (21.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $4,895,000,  Roadway Improvement Cost: $490,000,  Total Project Cost: $5,385,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14465,  Location: 1.18 MI N OF I65 (Lat: 32.367878,  Lng: -86.302100),  Route carried "on" structure: Interstate 85,  Year Built: 1966,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 5.46m (17.91ft),  Average Daily Traffic: 83,530 (year 2013),  Truck Traffic: 13%,  Average Future Daily Traffic: 110,089 (year 2033),  Design Load: HS 20,  Features Intersected: DECATUR ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.897,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 32.0m (105.0ft),  Out-to-Out Width: 33.8m (110.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.49m (21.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $4,895,000,  Roadway Improvement Cost: $490,000,  Total Project Cost: $5,385,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14469,  Location: 1.5 MI N OF I65 (Lat: 32.367986,  Lng: -86.296261),  Route carried "on" structure: Interstate 85,  Year Built: 1969,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 5.15m (16.90ft),  Average Daily Traffic: 104,310 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 137,476 (year 2033),  Design Load: HS 20,  Features Intersected: S JACKSON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.445,  Lanes on structure: 10,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 44.8m (147.0ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 46.6m (152.9ft),  Out-to-Out Width: 48.6m (159.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 51.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.17m (20.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $6,731,000,  Roadway Improvement Cost: $673,000,  Total Project Cost: $7,404,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14659,  Location: 1.6 MI N OF US 110 (Lat: 32.361900,  Lng: -86.133500),  Route carried "on" structure: County highway 234,  Year Built: 1988,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 1,500 (year 1988),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,500 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: RYAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 60.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,053,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $1,158,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 15396,  Location: .9 OF A MI. WEST OFUS 80 (Lat: 32.285128,  Lng: -86.445700),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 90 (year 1988),  Average Future Daily Traffic: 125 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: TALLANT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 71.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $440,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $484,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 15398,  Location: .9 MI E OF LOWERWETUMPKA (Lat: 32.441953,  Lng: -86.252008),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 86 (year 1988),  Average Future Daily Traffic: 125 (year 2040),  Design Load: HS 20,  Features Intersected: GALBRAITH MILL CREEK,  Facility Carried by Structure: STOKES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $440,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $484,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 154,  Location: .7 MI N FORBES RD (Lat: 32.421556,  Lng: -86.303467),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 52 (year 1988),  Average Future Daily Traffic: 100 (year 2040),  Design Load: HS 20,  Features Intersected: CONNELLY MILL CREEK,  Facility Carried by Structure: JACKSON FERRY RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.12m (16.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,053,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $1,158,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 15401,  Location: .9 MI S FOURSPOTS ROAD (Lat: 32.411544,  Lng: -86.262528),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 48 (year 1988),  Average Future Daily Traffic: 60 (year 2040),  Design Load: HS 20,  Features Intersected: GALBRAITH MILL CREEK,  Facility Carried by Structure: LOUIS PREISTER RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.99m (9.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $615,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $677,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 15438,  Location: 2.1 MI E OF MONTG LOWNDES (Lat: 32.350978,  Lng: -86.444456),  Route carried "on" structure: County highway 18,  Year Built: 1991,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 1,000 (year 1991),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,500 (year 2040),  Design Load: HS 20,  Features Intersected: STONES SLOUGH,  Facility Carried by Structure: OLD SELMA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $584,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $642,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 15471,  Location: 200FT E OF FOREST PARK DR (Lat: 32.377600,  Lng: -86.264400),  Route carried "on" structure: City street ,  Year Built: 1991,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 150 (year 1991),  Truck Traffic: 1%,  Average Future Daily Traffic: 404 (year 2038),  Design Load: HS 20,  Features Intersected: THREE MILE BRANCH,  Facility Carried by Structure: GREEN PINE LN
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.100,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 51.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $623,000,  Roadway Improvement Cost: $62,000,  Total Project Cost: $685,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 15506,  Location: 1.4 MI.S.OF SOU.BLVD. (Lat: 32.315383,  Lng: -86.336869),  Route carried "on" structure: Interstate 65,  Year Built: 1966,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 30.21m (99.11ft),  Average Daily Traffic: 32,555 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 41,245 (year 2033),  Design Load: HS 20,  Features Intersected: CATOMA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 269.370,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 13 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 23,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 41.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 30.21m (99.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $14,500,000,  Roadway Improvement Cost: $1,450,000,  Total Project Cost: $15,950,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15507,  Location: 1.4 MI.S.OF SOU.BLVD. (Lat: 32.315250,  Lng: -86.336519),  Route carried "on" structure: Interstate 65,  Year Built: 1966,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 30.21m (99.11ft),  Average Daily Traffic: 32,555 (year 2013),  Truck Traffic: 16%,  Average Future Daily Traffic: 41,245 (year 2033),  Design Load: HS 20,  Features Intersected: CATOMA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 269.370,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 13 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 23,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 41.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 30.21m (99.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $14,500,000,  Roadway Improvement Cost: $1,450,000,  Total Project Cost: $15,950,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1553,  Location: 0.4 MI.W.OF JCT.US 31 (Lat: 32.311667,  Lng: -86.356667),  Route carried "on" structure: US 80,  Year Built: 1992,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 12,126 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 15,856 (year 2033),  Design Load: HS 20,  Features Intersected: L*N RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 206.743,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 16 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 56.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.18m (16.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,918,000,  Roadway Improvement Cost: $192,000,  Total Project Cost: $2,110,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15531,  Location: 0.4 MI.W.JCT OF US 31 (Lat: 32.311667,  Lng: -86.356667),  Route carried "on" structure: US 80,  Year Built: 1992,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 12,126 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 15,856 (year 2033),  Design Load: HS 20,  Features Intersected: L*N RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 206.743,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 16 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 55.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.18m (16.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,918,000,  Roadway Improvement Cost: $192,000,  Total Project Cost: $2,110,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15532,  Location: US 80 * US 31 INT. (Lat: 32.311817,  Lng: -86.350217),  Route carried "on" structure: US 80,  Year Built: 1992,  Status: Open,  Structure Length: 7.25m (23.79ft),  Average Daily Traffic: 16,685 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 21,817 (year 2033),  Design Load: HS 20,  Features Intersected: US 31
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 207.303,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 42.1m (138.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 72.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.28m (27.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $2,384,000,  Roadway Improvement Cost: $238,000,  Total Project Cost: $2,622,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15533,  Location: US 80 * US 31 INT (Lat: 32.311817,  Lng: -86.350217),  Route carried "on" structure: US 80,  Year Built: 1992,  Status: Open,  Structure Length: 7.25m (23.79ft),  Average Daily Traffic: 16,685 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 21,817 (year 2033),  Design Load: HS 20,  Features Intersected: US 31
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 207.303,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 42.1m (138.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 8.28m (27.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $2,384,000,  Roadway Improvement Cost: $238,000,  Total Project Cost: $2,622,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15534,  Location: 0.1 MI. W. JCT. US 31 (Lat: 32.311817,  Lng: -86.350217),  Route carried "on" structure: US 80,  Year Built: 1992,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 33,370 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 43,635 (year 2033),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 207.303,  Lanes on structure: 13,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 17 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 48.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $8,812,000,  Roadway Improvement Cost: $881,000,  Total Project Cost: $9,693,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15535,  Location: 0.7 MI E OF JCT OF US 31 (Lat: 32.309933,  Lng: -86.333750),  Route carried "on" structure: Ramp US 80,  Year Built: 1992,  Status: Open,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 14,930 (year 2000),  Truck Traffic: 10%,  Average Future Daily Traffic: 28,529 (year 2030),  Design Load: HS 20,  Features Intersected: I65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 208.626,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 74.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.40m (34.12ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $2,924,000,  Roadway Improvement Cost: $292,000,  Total Project Cost: $3,216,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15536,  Location: 0.7 MI E OF JCT OF US 31 (Lat: 32.310700,  Lng: -86.335300),  Route carried "on" structure: Ramp US 80,  Year Built: 1992,  Status: Open,  Structure Length: 8.84m (29.00ft),  Average Daily Traffic: 14,120 (year 1999),  Truck Traffic: 16%,  Average Future Daily Traffic: 26,466 (year 2030),  Design Load: HS 20,  Features Intersected: US 80 WBL (RAMP)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 208.837,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 75.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.82m (32.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,760,000,  Roadway Improvement Cost: $276,000,  Total Project Cost: $3,036,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15537,  Location: 0.7 MI E OF JCT OF US 31 (Lat: 32.310700,  Lng: -86.335300),  Route carried "on" structure: US 80,  Year Built: 1992,  Status: Open,  Structure Length: 8.60m (28.22ft),  Average Daily Traffic: 10,285 (year 1999),  Truck Traffic: 11%,  Average Future Daily Traffic: 19,657 (year 2030),  Design Load: HS 20,  Features Intersected: I-65
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 208.626,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 11 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.59m (31.46ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $3,550,000,  Roadway Improvement Cost: $355,000,  Total Project Cost: $3,905,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15687,  Location: 0.8 M. N. LOW. WETUMPKA R (Lat: 32.443467,  Lng: -86.284333),  Route carried "on" structure: County highway 94,  Year Built: 1993,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 65 (year 1993),  Average Future Daily Traffic: 93 (year 2040),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: COOSADA FERRY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.999,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $387,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 15699,  Location: 0.7 MI. N. OF WASDEN RD. (Lat: 32.266881,  Lng: -86.399100),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 500 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 650 (year 2041),  Design Load: HS 20,  Features Intersected: DRAINAGE RELIEF,  Facility Carried by Structure: FELDER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $283,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $311,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 157,  Location: 1.2 MI. N. OF WASDEN RD. (Lat: 32.272603,  Lng: -86.403903),  Route carried "on" structure: County highway 14,  Year Built: 1992,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 500 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 650 (year 2041),  Design Load: HS 20,  Features Intersected: DRAINAGE RELIEF,  Facility Carried by Structure: FELDER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $283,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $311,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 15701,  Location: 1.2 M S OF SELMA HWY (Lat: 32.287489,  Lng: -86.413522),  Route carried "on" structure: County highway ,  Year Built: 1992,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 650 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 650 (year 2039),  Design Load: HS 20,  Features Intersected: CREEK,  Facility Carried by Structure: FELDER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $283,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $311,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 15757,  Location: MONTGOMERY-ELMORE CO LINE (Lat: 32.454778,  Lng: -86.204644),  Route carried "on" structure: US 231,  Year Built: 1993,  Status: Open,  Structure Length: 32.80m (107.61ft),  Average Daily Traffic: 16,115 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 21,962 (year 2033),  Design Load: HS 20,  Features Intersected: TALLAPOOSA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 184.698,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 11,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 32.80m (107.61ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Underwater Inspection Date: August 2021,  Bridge Improvement Cost: $9,671,000,  Roadway Improvement Cost: $967,000,  Total Project Cost: $10,638,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16199,  Location: 0.17 MI E OF ANN ST (Lat: 32.367300,  Lng: -86.268300),  Route carried "on" structure: City street 36,  Year Built: 1985,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 3,600 (year 1995),  Truck Traffic: 1%,  Average Future Daily Traffic: 5,100 (year 2038),  Design Load: HS 20,  Features Intersected: THREE MILE BRANCH,  Facility Carried by Structure: CHESTNUT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.900,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 76.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.02m (6.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,572,000,  Roadway Improvement Cost: $157,000,  Total Project Cost: $1,729,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 16239,  Location: 2 MI E OF U.S. 31 (Lat: 32.277686,  Lng: -86.315681),  Route carried "on" structure: County highway 42,  Year Built: 1994,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 2.08m (6.82ft),  Average Daily Traffic: 3,000 (year 2004),  Truck Traffic: 25%,  Average Future Daily Traffic: 3,000 (year 2041),  Design Load: H 20,  Features Intersected: WILEY CREEK,  Facility Carried by Structure: HYUNDAI BLVD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 71.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $780,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $858,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 16394,  Location: 0.2 MI.E.LOW.WETMPKA.RD. (Lat: 32.452761,  Lng: -86.257286),  Route carried "on" structure: County highway 174,  Year Built: 1995,  Status: Posted for load,  Structure Length: 1.78m (5.84ft),  Average Daily Traffic: 50 (year 2002),  Average Future Daily Traffic: 55 (year 2041),  Design Load: H 10,  Features Intersected: GALBRAITH MILL CREEK,  Facility Carried by Structure: OLD LOW.WETMPKA RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.7m (31.8ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.9m (19.4ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 32.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.49m (8.17ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $393,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $432,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous