Bridge Statistics for Richmond, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- National Bridge Inventory (NBI) Statistics
- 115Number of bridges
- 4,278ft / 1,304mTotal length
- $15,237,000Total costs
- 5,035,966Total average daily traffic
- 180,664Total average daily truck traffic
- National Bridge Inventory (NBI) Registered Bridges for Richmond
- No street view available for this location
- New bridges - historical statistics
- 21930-1939
- 171950-1959
- 171960-1969
- 81970-1979
- 261980-1989
- 401990-1999
- 42000-2009
- 12010-2019
- Reconstructed bridges - Historical Statistics
- 11960-1969
- 11970-1979
- 41980-1989
- 51990-1999
- 12000-2009
- Bridge Condition - Deck
- 57.4%Good
- 14.8%Satisfactory
- 24.1%Fair
- 3.7%Poor
- Bridge Condition - Superstructure
- 64.8%Good
- 9.3%Satisfactory
- 25.9%Fair
- Bridge Condition - Substructure
- 74.1%Good
- 9.3%Satisfactory
- 16.7%Fair
- Bridge Condition - Channel
- 41.7%Excellent
- 33.3%Very good
- 16.7%Good
- 8.3%Poor
- Bridge Condition - Culverts
- 60.0%Good
- 40.0%Satisfactory
Find on map >> Show street view
Structure Number: 28C0316, Location: 0.25 MI W/O 23RD ST (Lat: 37.935575, Lng: -122.351806), Route carried "under" structure: City street , Year Built: 1968, Structure Length: 0. m, Average Daily Traffic: 5,900 (year 2007), Truck Traffic: 2%, Features Intersected: MACDONALD AVE, Facility Carried by Structure: BARTD
Minimum Vertical Clearance: 4.60m (15.09ft), Kilometerpoint: 0.000, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 15.2m (49.9ft)
Structure Number: 28C0316, Location: 0.25 MI W/O 23RD ST (Lat: 37.935575, Lng: -122.351806), Route carried "under" structure: City street , Year Built: 1968, Structure Length: 0. m, Average Daily Traffic: 5,900 (year 2007), Truck Traffic: 2%, Features Intersected: MACDONALD AVE, Facility Carried by Structure: BARTD
Minimum Vertical Clearance: 4.60m (15.09ft), Kilometerpoint: 0.000, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 15.2m (49.9ft)
Find on map >> Show street view
Structure Number: 28C0317, Location: JUST S/O LINCOLN AVE (Lat: 37.942908, Lng: -122.358964), Route carried "under" structure: City street , Year Built: 1967, Structure Length: 0. m, Average Daily Traffic: 2,900 (year 2010), Truck Traffic: 1%, Features Intersected: UP RR,BNSF,AMTRAK,BARTD, Facility Carried by Structure: 13TH ST
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.9m (85.0ft)
Structure Number: 28C0317, Location: JUST S/O LINCOLN AVE (Lat: 37.942908, Lng: -122.358964), Route carried "under" structure: City street , Year Built: 1967, Structure Length: 0. m, Average Daily Traffic: 2,900 (year 2010), Truck Traffic: 1%, Features Intersected: UP RR,BNSF,AMTRAK,BARTD, Facility Carried by Structure: 13TH ST
Minimum Vertical Clearance: 4.95m (16.24ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.9m (85.0ft)
Find on map >> Show street view
Structure Number: 28C032, Location: 0.3 MI SE/O CASTRO ST (Lat: 37.947397, Lng: -122.363003), Route carried "under" structure: City street , Year Built: 1935, Structure Length: 0. m, Average Daily Traffic: 15,000 (year 2010), Truck Traffic: 5%, Features Intersected: 7TH STREET, Facility Carried by Structure: BNSF RY
Minimum Vertical Clearance: 4.41m (14.47ft), Kilometerpoint: 0.000, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.8m (55.1ft)
Structure Number: 28C032, Location: 0.3 MI SE/O CASTRO ST (Lat: 37.947397, Lng: -122.363003), Route carried "under" structure: City street , Year Built: 1935, Structure Length: 0. m, Average Daily Traffic: 15,000 (year 2010), Truck Traffic: 5%, Features Intersected: 7TH STREET, Facility Carried by Structure: BNSF RY
Minimum Vertical Clearance: 4.41m (14.47ft), Kilometerpoint: 0.000, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 16.8m (55.1ft)
Find on map >> Show street view
Structure Number: 28C047, Location: 0.5 MI S OF GERTRUDE AVE (Lat: 37.944756, Lng: -122.365692), Route carried "under" structure: County highway , Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 27,000 (year 1999), Truck Traffic: 5%, Features Intersected: RICHMOND PARKWAY, Facility Carried by Structure: BNSF RY
Minimum Vertical Clearance: 4.59m (15.06ft), Kilometerpoint: 0.000, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 34.4m (112.9ft)
Structure Number: 28C047, Location: 0.5 MI S OF GERTRUDE AVE (Lat: 37.944756, Lng: -122.365692), Route carried "under" structure: County highway , Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 27,000 (year 1999), Truck Traffic: 5%, Features Intersected: RICHMOND PARKWAY, Facility Carried by Structure: BNSF RY
Minimum Vertical Clearance: 4.59m (15.06ft), Kilometerpoint: 0.000, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 34.4m (112.9ft)
Find on map >> Show street view
Structure Number: 28C0471, Location: 1/2 MI S OF GETRUDE AVE (Lat: 37.948533, Lng: -122.368922), Route carried "under" structure: Ramp City street , Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2012), Truck Traffic: 5%, Features Intersected: CASTRO ST, Facility Carried by Structure: RICHMOND PARKWAY
Minimum Vertical Clearance: 5.37m (17.62ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 34.1m (111.9ft)
Structure Number: 28C0471, Location: 1/2 MI S OF GETRUDE AVE (Lat: 37.948533, Lng: -122.368922), Route carried "under" structure: Ramp City street , Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2012), Truck Traffic: 5%, Features Intersected: CASTRO ST, Facility Carried by Structure: RICHMOND PARKWAY
Minimum Vertical Clearance: 5.37m (17.62ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 34.1m (111.9ft)
Find on map >> Show street view
Structure Number: 28C0472, Location: INTCHG RICHMOND/GIANT RD (Lat: 37.981758, Lng: -122.348889), Route carried "under" structure: County highway , Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 6,800 (year 2012), Truck Traffic: 5%, Features Intersected: GIANT HIGHWAY, Facility Carried by Structure: RICHMOND PARKWAY
Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 38.3m (125.7ft)
Structure Number: 28C0472, Location: INTCHG RICHMOND/GIANT RD (Lat: 37.981758, Lng: -122.348889), Route carried "under" structure: County highway , Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 6,800 (year 2012), Truck Traffic: 5%, Features Intersected: GIANT HIGHWAY, Facility Carried by Structure: RICHMOND PARKWAY
Minimum Vertical Clearance: 5.36m (17.59ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 2, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 38.3m (125.7ft)
Find on map >> Show street view
Structure Number: 28C0474L, Location: 3 MI SW OF I-80 (Lat: 37.976603, Lng: -122.358803), Route carried "under" structure: County highway , Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2012), Truck Traffic: 5%, Features Intersected: GIANT,UP RR,BNSF,AMTRAK, Facility Carried by Structure: RICHMOND PKWY SB
Minimum Vertical Clearance: 8.21m (26.94ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.3m (142.1ft)
Structure Number: 28C0474L, Location: 3 MI SW OF I-80 (Lat: 37.976603, Lng: -122.358803), Route carried "under" structure: County highway , Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2012), Truck Traffic: 5%, Features Intersected: GIANT,UP RR,BNSF,AMTRAK, Facility Carried by Structure: RICHMOND PKWY SB
Minimum Vertical Clearance: 8.21m (26.94ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.3m (142.1ft)
Find on map >> Show street view
Structure Number: 28C0474R, Location: 3 MI SW OF I-80 (Lat: 37.976336, Lng: -122.358831), Route carried "under" structure: County highway , Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2012), Truck Traffic: 5%, Features Intersected: GIANT,UP RR,BNSF,AMTRAK, Facility Carried by Structure: RICHMOND PKWY NB
Minimum Vertical Clearance: 8.53m (27.99ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.3m (142.1ft)
Structure Number: 28C0474R, Location: 3 MI SW OF I-80 (Lat: 37.976336, Lng: -122.358831), Route carried "under" structure: County highway , Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2012), Truck Traffic: 5%, Features Intersected: GIANT,UP RR,BNSF,AMTRAK, Facility Carried by Structure: RICHMOND PKWY NB
Minimum Vertical Clearance: 8.53m (27.99ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.3m (142.1ft)