Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for San Francisco, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 358Number of bridges
  • 14,222ft / 4,335mTotal length
  • $3,359,000Total costs
  • 17,990,574Total average daily traffic
  • 561,159Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for San Francisco
  • No street view available for this location

New bridges in San Francisco, CA - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11910-1919
  • 31920-1929
  • 231930-1939
  • 21940-1949
  • 801950-1959
  • 1571960-1969
  • 221970-1979
  • 11980-1989
  • 51990-1999
  • 282000-2009
  • 352010-2019
Reconstructed bridges in San Francisco, CA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41950-1959
  • 101960-1969
  • 31970-1979
  • 11980-1989
  • 21990-1999
  • 32000-2009
  • 12010-2019
  • 12020-2022
Average Bridge Daily Traffic in San Francisco, CA
Average Bridge Truck Traffic in San Francisco, CA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 46.3%Good
  • 12.7%Satisfactory
  • 39.6%Fair
  • 1.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 77.6%Good
  • 4.5%Satisfactory
  • 17.9%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 88.8%Good
  • 2.2%Satisfactory
  • 9.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.1%Excellent
  • 35.7%Very good
  • 57.1%Good
Find on map >>   Show street view

Structure Number: 34 0071F,  Location: 04-SF-101-1.94-SF (Lat: 37.734861,  Lng: -122.409717),  Route carried "under" structure: Ramp State highway 101,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 450 (year 2018),  Truck Traffic: 2%,  Features Intersected: 280/101 IC -ALEMANY BLVD
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 1.940,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 34 0071F,  Location: 04-SF-101-1.94-SF (Lat: 37.734861,  Lng: -122.409717),  Route carried "under" structure: City street D014,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 2,500 (year 2018),  Truck Traffic: 3%,  Features Intersected: 280/101 IC -ALEMANY BLVD,  Facility Carried by Structure: S101-S280 CONNECTO
Minimum Vertical Clearance: 6.71m (22.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 34 0073,  Location: 04-SF-280-R3.87-SF (Lat: 37.731919,  Lng: -122.414628),  Route carried "under" structure: Interstate 280,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 170,000 (year 2019),  Truck Traffic: 1%,  Features Intersected: ROUTE I 280,  Facility Carried by Structure: ALEMANY BLVD NB
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 3.870,  Lanes on structure: 2,  Lanes under structure: 10,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: 34 0074,  Location: 04-SF-280-R3.28-SF (Lat: 37.731261,  Lng: -122.425347),  Route carried "under" structure: Interstate 280,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 170,000 (year 2017),  Truck Traffic: 1%,  Features Intersected: ROUTE I 280,  Facility Carried by Structure: ALEMANY BLVD SB
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 3.280,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 44.2m (145.0ft)

Find on map >>   Show street view

Structure Number: 34 0075,  Location: 04-SF-280-R3.23-SF (Lat: 37.731789,  Lng: -122.426097),  Route carried "under" structure: Interstate 280,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 170,000 (year 2019),  Truck Traffic: 1%,  Features Intersected: ROUTE I 280,  Facility Carried by Structure: JUSTIN DRIVE
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 3.230,  Lanes on structure: 3,  Lanes under structure: 8,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 34 0076,  Location: 04-SF-280-R3.53-SF (Lat: 37.732400,  Lng: -122.420878),  Route carried "under" structure: Interstate 280,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 170,000 (year 2009),  Truck Traffic: 1%,  Features Intersected: INTERSTATE 280,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 3.530,  Lanes under structure: 14,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 34 0077,  Location: 04-SF-101-R4.25L-SF (Lat: 37.769892,  Lng: -122.418478),  Route carried "under" structure: Ramp US 101,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 84,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: I-80 & US 101 RAMPS,STRS
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 4.250,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.2m (105.6ft)

Find on map >>   Show street view

Structure Number: 34 0077,  Location: 04-SF-101-R4.25L-SF (Lat: 37.769892,  Lng: -122.418478),  Route carried "under" structure: Ramp US 101,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 84,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: I-80 & US 101 RAMPS,STRS
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 4.250,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.2m (105.6ft)

Find on map >>   Show street view

Structure Number: 34 0077,  Location: 04-SF-101-R4.25L-SF (Lat: 37.769892,  Lng: -122.418478),  Route carried "under" structure: Ramp US 101,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2019),  Truck Traffic: 1%,  Features Intersected: I-80 & US 101 RAMPS,STRS
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 4.250,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.2m (105.6ft)

Find on map >>   Show street view

Structure Number: 34 0077,  Location: 04-SF-101-R4.25L-SF (Lat: 37.769892,  Lng: -122.418478),  Route carried "under" structure: City street ,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 4,000 (year 2019),  Truck Traffic: 1%,  Features Intersected: I-80 & US 101 RAMPS,STRS,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.2m (105.6ft)

Find on map >>   Show street view

Structure Number: 34 0077,  Location: 04-SF-101-R4.25L-SF (Lat: 37.769892,  Lng: -122.418478),  Route carried "under" structure: City street ,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 6,000 (year 2019),  Truck Traffic: 1%,  Features Intersected: I-80 & US 101 RAMPS,STRS,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.2m (105.6ft)

Find on map >>   Show street view

Structure Number: 34 0077,  Location: 04-SF-101-R4.25L-SF (Lat: 37.769892,  Lng: -122.418478),  Route carried "under" structure: City street ,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 4,000 (year 2019),  Truck Traffic: 1%,  Features Intersected: I-80 & US 101 RAMPS,STRS,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.2m (105.6ft)

Find on map >>   Show street view

Structure Number: 34 0077,  Location: 04-SF-101-R4.25L-SF (Lat: 37.769892,  Lng: -122.418478),  Route carried "under" structure: City street ,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 3,500 (year 2019),  Truck Traffic: 1%,  Features Intersected: I-80 & US 101 RAMPS,STRS,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.2m (105.6ft)

Find on map >>   Show street view

Structure Number: 34 0077,  Location: 04-SF-101-R4.25L-SF (Lat: 37.769892,  Lng: -122.418478),  Route carried "under" structure: Ramp Interstate 80,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 199,000 (year 2019),  Truck Traffic: 5%,  Features Intersected: I-80 & US 101 RAMPS,STRS,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.71m (15.45ft),  Kilometerpoint: 5.450,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.2m (105.6ft)

Find on map >>   Show street view

Structure Number: 34 0077,  Location: 04-SF-101-R4.25L-SF (Lat: 37.769892,  Lng: -122.418478),  Route carried "under" structure: Interstate 80,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 84,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: I-80 & US 101 RAMPS,STRS,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 5.450,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.2m (105.6ft)

Find on map >>   Show street view

Structure Number: 34 0077,  Location: 04-SF-101-R4.25L-SF (Lat: 37.769892,  Lng: -122.418478),  Route carried "under" structure: Ramp US 101,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2019),  Truck Traffic: 1%,  Features Intersected: I-80 & US 101 RAMPS,STRS
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 4.250,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.2m (105.6ft)

Find on map >>   Show street view

Structure Number: 34 0077,  Location: 04-SF-101-R4.25L-SF (Lat: 37.769892,  Lng: -122.418478),  Route carried "under" structure: Ramp Interstate 80,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 199,000 (year 2019),  Truck Traffic: 5%,  Features Intersected: I-80 & US 101 RAMPS,STRS,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 5.450,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.2m (105.6ft)

Find on map >>   Show street view

Structure Number: 34 0077,  Location: 04-SF-101-R4.25L-SF (Lat: 37.769892,  Lng: -122.418478),  Route carried "under" structure: City street ,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 35,001 (year 2019),  Truck Traffic: 1%,  Features Intersected: I-80 & US 101 RAMPS,STRS,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 7.55m (24.77ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.2m (105.6ft)

Find on map >>   Show street view

Structure Number: 34 0077,  Location: 04-SF-101-R4.25L-SF (Lat: 37.769892,  Lng: -122.418478),  Route carried "under" structure: City street ,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 3,500 (year 2019),  Truck Traffic: 1%,  Features Intersected: I-80 & US 101 RAMPS,STRS,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.2m (105.6ft)

Find on map >>   Show street view

Structure Number: 34 0077,  Location: 04-SF-101-R4.25L-SF (Lat: 37.769892,  Lng: -122.418478),  Route carried "under" structure: City street ,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 3,500 (year 2019),  Truck Traffic: 1%,  Features Intersected: I-80 & US 101 RAMPS,STRS,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.2m (105.6ft)

Find on map >>   Show street view

Structure Number: 34 0077,  Location: 04-SF-101-R4.25L-SF (Lat: 37.769892,  Lng: -122.418478),  Route carried "under" structure: City street ,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 3,500 (year 2019),  Truck Traffic: 1%,  Features Intersected: I-80 & US 101 RAMPS,STRS,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.2m (105.6ft)

Find on map >>   Show street view

Structure Number: 34 0077,  Location: 04-SF-101-R4.25L-SF (Lat: 37.769892,  Lng: -122.418478),  Route carried "under" structure: City street ,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 3,500 (year 2019),  Truck Traffic: 1%,  Features Intersected: I-80 & US 101 RAMPS,STRS,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 11.60m (38.06ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.2m (105.6ft)

Find on map >>   Show street view

Structure Number: 34 0077,  Location: 04-SF-101-R4.25L-SF (Lat: 37.769892,  Lng: -122.418478),  Route carried "under" structure: City street ,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 4,000 (year 2019),  Truck Traffic: 1%,  Features Intersected: I-80 & US 101 RAMPS,STRS,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.2m (105.6ft)

Find on map >>   Show street view

Structure Number: 34 0077,  Location: 04-SF-101-R4.25L-SF (Lat: 37.769892,  Lng: -122.418478),  Route carried "under" structure: City street ,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 6,000 (year 2019),  Truck Traffic: 2%,  Features Intersected: I-80 & US 101 RAMPS,STRS,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.2m (105.6ft)

Find on map >>   Show street view

Structure Number: 34 0077,  Location: 04-SF-101-R4.25L-SF (Lat: 37.769892,  Lng: -122.418478),  Route carried "under" structure: City street ,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2019),  Truck Traffic: 1%,  Features Intersected: I-80 & US 101 RAMPS,STRS,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.58m (15.03ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.2m (105.6ft)

Find on map >>   Show street view

Structure Number: 34 0078,  Location: 04-SF-280-R2.62-SF (Lat: 37.731322,  Lng: -122.436961),  Route carried "under" structure: Interstate 280,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 170,000 (year 2009),  Truck Traffic: 1%,  Features Intersected: RTE I 280S ONRAMP,  Facility Carried by Structure: THERESA ST POC
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 2.620,  Lanes under structure: 8,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 34 0078,  Location: 04-SF-280-R2.62-SF (Lat: 37.731322,  Lng: -122.436961),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 10,300 (year 2010),  Truck Traffic: 2%,  Features Intersected: RTE I 280S ONRAMP,  Facility Carried by Structure: THERESA ST POC
Minimum Vertical Clearance: 5.84m (19.16ft),  Kilometerpoint: 2.820,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 34 0078,  Location: 04-SF-280-R2.62-SF (Lat: 37.731322,  Lng: -122.436961),  Route carried "under" structure: Interstate 280,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 170,000 (year 2009),  Truck Traffic: 1%,  Features Intersected: RTE I 280S ONRAMP,  Facility Carried by Structure: THERESA ST POC
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 2.620,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 34 0078,  Location: 04-SF-280-R2.62-SF (Lat: 37.731322,  Lng: -122.436961),  Route carried "under" structure: Business City street D012,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2010),  Truck Traffic: 2%,  Features Intersected: RTE I 280S ONRAMP,  Facility Carried by Structure: THERESA ST POC
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.000,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 34 0079K,  Location: 04-SF-280-R2.72-SF (Lat: 37.731550,  Lng: -122.436367),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2017),  Truck Traffic: 5%,  Features Intersected: I 280,SAN JOSE,MUNI,BART
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 2.720,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 42.1m (138.1ft)

Find on map >>   Show street view

Structure Number: 34 0079K,  Location: 04-SF-280-R2.72-SF (Lat: 37.731550,  Lng: -122.436367),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2017),  Truck Traffic: 5%,  Features Intersected: I 280,SAN JOSE,MUNI,BART
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 2.720,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 42.1m (138.1ft)

Find on map >>   Show street view

Structure Number: 34 0079K,  Location: 04-SF-280-R2.72-SF (Lat: 37.731550,  Lng: -122.436367),  Route carried "under" structure: City street D012,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 21,600 (year 2017),  Truck Traffic: 2%,  Features Intersected: I 280,SAN JOSE,MUNI,BART,  Facility Carried by Structure: I280S OFF-MONTEREY
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 42.1m (138.1ft)

Find on map >>   Show street view

Structure Number: 34 0079K,  Location: 04-SF-280-R2.72-SF (Lat: 37.731550,  Lng: -122.436367),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 23,200 (year 2017),  Truck Traffic: 2%,  Features Intersected: I 280,SAN JOSE,MUNI,BART
Minimum Vertical Clearance: 9.14m (29.99ft),  Kilometerpoint: 2.720,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 42.1m (138.1ft)

Find on map >>   Show street view

Structure Number: 34 0079L,  Location: 04-SF-280-R2.70-SF (Lat: 37.731322,  Lng: -122.435497),  Route carried "under" structure: Other road ,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2017),  Truck Traffic: 5%,  Features Intersected: SAN JOSE AVE, MUNIRAIL,  Facility Carried by Structure: ROUTE I 280 SB
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 34 0079L,  Location: 04-SF-280-R2.70-SF (Lat: 37.731322,  Lng: -122.435497),  Route carried "under" structure: Business City street D012,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2017),  Truck Traffic: 5%,  Features Intersected: SAN JOSE AVE, MUNIRAIL,  Facility Carried by Structure: ROUTE I 280 SB
Minimum Vertical Clearance: 4.87m (15.98ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 34 0079R,  Location: 04-SF-280-R2.70-SF (Lat: 37.731067,  Lng: -122.435700),  Route carried "under" structure: Other road ,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2016),  Truck Traffic: 5%,  Features Intersected: SAN JOSE AVE, MUNIRAIL,  Facility Carried by Structure: ROUTE I 280
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 34 0079R,  Location: 04-SF-280-R2.70-SF (Lat: 37.731067,  Lng: -122.435700),  Route carried "under" structure: Business City street D012,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2016),  Truck Traffic: 5%,  Features Intersected: SAN JOSE AVE, MUNIRAIL,  Facility Carried by Structure: ROUTE I 280
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 34 0079S,  Location: 04-SF-280-R2.69-SF (Lat: 37.730853,  Lng: -122.435778),  Route carried "under" structure: Business City street D012,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2017),  Truck Traffic: 5%,  Features Intersected: SAN JOSE AVE, MUNIRAIL,  Facility Carried by Structure: RTE I 280N OFFRAMP
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 34 0079S,  Location: 04-SF-280-R2.69-SF (Lat: 37.730853,  Lng: -122.435778),  Route carried "under" structure: Business City street D012,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2017),  Truck Traffic: 2%,  Features Intersected: SAN JOSE AVE, MUNIRAIL,  Facility Carried by Structure: RTE I 280N OFFRAMP
Minimum Vertical Clearance: 4.96m (16.27ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 34 0079S,  Location: 04-SF-280-R2.69-SF (Lat: 37.730853,  Lng: -122.435778),  Route carried "under" structure: Other road ,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2017),  Truck Traffic: 95%,  Features Intersected: SAN JOSE AVE, MUNIRAIL,  Facility Carried by Structure: RTE I 280N OFFRAMP
Minimum Vertical Clearance: 4.77m (15.65ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 34 0081,  Location: 04-SF-280-R2.69-SF (Lat: 37.731469,  Lng: -122.436519),  Route carried "under" structure: Interstate 280,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 170,000 (year 2019),  Truck Traffic: 1%,  Features Intersected: I 280,SAN JOSE,MUNI,BART
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 2.690,  Lanes on structure: 1,  Lanes under structure: 8,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: 34 0081,  Location: 04-SF-280-R2.69-SF (Lat: 37.731469,  Lng: -122.436519),  Route carried "under" structure: Business City street D012,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 21,600 (year 2019),  Truck Traffic: 2%,  Features Intersected: I 280,SAN JOSE,MUNI,BART,  Facility Carried by Structure: MONTEREY-I 280N ON
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: 34 0081,  Location: 04-SF-280-R2.69-SF (Lat: 37.731469,  Lng: -122.436519),  Route carried "under" structure: Ramp City street D012,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2019),  Truck Traffic: 5%,  Features Intersected: I 280,SAN JOSE,MUNI,BART,  Facility Carried by Structure: MONTEREY-I 280N ON
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: 34 0081,  Location: 04-SF-280-R2.69-SF (Lat: 37.731469,  Lng: -122.436519),  Route carried "under" structure: Ramp City street D012,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2019),  Truck Traffic: 5%,  Features Intersected: I 280,SAN JOSE,MUNI,BART,  Facility Carried by Structure: MONTEREY-I 280N ON
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: 34 0082,  Location: 04-SF-280-R2.21-SF (Lat: 37.728239,  Lng: -122.444028),  Route carried "under" structure: Interstate 280,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 170,000 (year 2017),  Truck Traffic: 1%,  Features Intersected: RTE I 280, BART-2 TRACKS,  Facility Carried by Structure: PAULDING/JUDSON ST
Minimum Vertical Clearance: 4.74m (15.55ft),  Kilometerpoint: 2.210,  Lanes on structure: 2,  Lanes under structure: 9,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 34 0083,  Location: 04-SF-280-R2.47-SF (Lat: 37.730222,  Lng: -122.439747),  Route carried "under" structure: Interstate 280,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 170,000 (year 2019),  Truck Traffic: 1%,  Features Intersected: RTE I 280, BART TUNNELS,  Facility Carried by Structure: BADEN STREET
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 2.470,  Lanes on structure: 2,  Lanes under structure: 9,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 34 0085,  Location: 04-SF-280-R0.71-SF (Lat: 37.710433,  Lng: -122.457075),  Route carried "under" structure: Business State highway 82,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 21,600 (year 2017),  Truck Traffic: 2%,  Features Intersected: SAN JOSE & SICKLES AVE,  Facility Carried by Structure: I 280
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 0.200,  Lanes on structure: 8,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.4m (96.5ft)

Find on map >>   Show street view

Structure Number: 34 0085,  Location: 04-SF-280-R0.71-SF (Lat: 37.710433,  Lng: -122.457075),  Route carried "under" structure: Business City street D041,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2017),  Truck Traffic: 2%,  Features Intersected: SAN JOSE & SICKLES AVE,  Facility Carried by Structure: I 280
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.4m (96.5ft)

Find on map >>   Show street view

Structure Number: 34 0085S,  Location: 04-SF-280-R0.75-SF (Lat: 37.710694,  Lng: -122.455464),  Route carried "under" structure: Business City street D041,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2010),  Truck Traffic: 2%,  Features Intersected: SICKLES AVENUE,  Facility Carried by Structure: RTE I 280 N ONRAMP
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.3m (83.0ft)

Find on map >>   Show street view

Structure Number: 34 0086,  Location: 04-SF-280-R0.90-SF (Lat: 37.712369,  Lng: -122.453983),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 13,300 (year 2010),  Truck Traffic: 2%,  Features Intersected: SB 280 OFF-RAMP,  Facility Carried by Structure: SAN JOSE AVE
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.900,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 16.2m (53.1ft)

Find on map >>   Show street view

Structure Number: 34 0087,  Location: 04-SF-280-R1.46-SF (Lat: 37.718144,  Lng: -122.448800),  Route carried "under" structure: Interstate 280,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 166,000 (year 2017),  Truck Traffic: 1%,  Features Intersected: ROUTE I 280,  Facility Carried by Structure: SAN JOSE, MUNIRAIL
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 1.460,  Lanes on structure: 4,  Lanes under structure: 9,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 34 0088,  Location: 04-SF-101-4.12-SF (Lat: 37.764311,  Lng: -122.404817),  Route carried "under" structure: City street D206,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 3,650 (year 2019),  Truck Traffic: 2%,  Features Intersected: BAYSHORE VIADUCT,  Facility Carried by Structure: ST RTE 101 (5TH ST
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: 34 0088,  Location: 04-SF-101-4.12-SF (Lat: 37.764311,  Lng: -122.404817),  Route carried "under" structure: City street D183,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 3,100 (year 2019),  Truck Traffic: 2%,  Features Intersected: BAYSHORE VIADUCT,  Facility Carried by Structure: ST RTE 101 (5TH ST
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: 34 0088,  Location: 04-SF-101-4.12-SF (Lat: 37.764311,  Lng: -122.404817),  Route carried "under" structure: City street D020,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 3,100 (year 2019),  Truck Traffic: 2%,  Features Intersected: BAYSHORE VIADUCT,  Facility Carried by Structure: ST RTE 101 (5TH ST
Minimum Vertical Clearance: 4.21m (13.81ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: 34 0088,  Location: 04-SF-101-4.12-SF (Lat: 37.764311,  Lng: -122.404817),  Route carried "under" structure: City street D184,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 3,100 (year 2019),  Truck Traffic: 2%,  Features Intersected: BAYSHORE VIADUCT,  Facility Carried by Structure: ST RTE 101 (5TH ST
Minimum Vertical Clearance: 4.92m (16.14ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: 34 0088,  Location: 04-SF-101-4.12-SF (Lat: 37.764311,  Lng: -122.404817),  Route carried "under" structure: City street D190,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 3,100 (year 2019),  Truck Traffic: 2%,  Features Intersected: BAYSHORE VIADUCT,  Facility Carried by Structure: ST RTE 101 (5TH ST
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: 34 0088,  Location: 04-SF-101-4.12-SF (Lat: 37.764311,  Lng: -122.404817),  Route carried "under" structure: City street D203,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 3,100 (year 2019),  Truck Traffic: 2%,  Features Intersected: BAYSHORE VIADUCT,  Facility Carried by Structure: ST RTE 101 (5TH ST
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: 34 0088,  Location: 04-SF-101-4.12-SF (Lat: 37.764311,  Lng: -122.404817),  Route carried "under" structure: City street ,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 3,100 (year 2019),  Truck Traffic: 2%,  Features Intersected: BAYSHORE VIADUCT,  Facility Carried by Structure: ST RTE 101 (5TH ST
Minimum Vertical Clearance: 11.80m (38.71ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: 34 0088,  Location: 04-SF-101-4.12-SF (Lat: 37.764311,  Lng: -122.404817),  Route carried "under" structure: City street D141,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 3,100 (year 2019),  Truck Traffic: 2%,  Features Intersected: BAYSHORE VIADUCT,  Facility Carried by Structure: ST RTE 101 (5TH ST
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: 34 0088,  Location: 04-SF-101-4.12-SF (Lat: 37.764311,  Lng: -122.404817),  Route carried "under" structure: City street D199,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 2,600 (year 2019),  Truck Traffic: 2%,  Features Intersected: BAYSHORE VIADUCT,  Facility Carried by Structure: ST RTE 101 (5TH ST
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: 34 0089,  Location: 04-SF-280-R2.91-SF (Lat: 37.731969,  Lng: -122.432092),  Route carried "under" structure: City street D076,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 600 (year 2017),  Truck Traffic: 2%,  Features Intersected: LYELL STREET,  Facility Carried by Structure: NB AND SB RTE 280
Minimum Vertical Clearance: 9.14m (29.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 9,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 34 009,  Location: 04-SF-280-R2.82-SF (Lat: 37.732289,  Lng: -122.434678),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 4,000 (year 2017),  Truck Traffic: 3%,  Features Intersected: SAN JOSE,I280 RAMPS,BART,  Facility Carried by Structure: MONTEREY BLV EB ON
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 2.820,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 34 009,  Location: 04-SF-280-R2.82-SF (Lat: 37.732289,  Lng: -122.434678),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 4,000 (year 2017),  Truck Traffic: 3%,  Features Intersected: SAN JOSE,I280 RAMPS,BART,  Facility Carried by Structure: MONTEREY BLV EB ON
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 2.820,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 34 009,  Location: 04-SF-280-R2.82-SF (Lat: 37.732289,  Lng: -122.434678),  Route carried "under" structure: City street D012,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 7,100 (year 2017),  Truck Traffic: 2%,  Features Intersected: SAN JOSE,I280 RAMPS,BART,  Facility Carried by Structure: MONTEREY BLV EB ON
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 34 009,  Location: 04-SF-280-R2.82-SF (Lat: 37.732289,  Lng: -122.434678),  Route carried "under" structure: City street D012,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 7,100 (year 2017),  Truck Traffic: 2%,  Features Intersected: SAN JOSE,I280 RAMPS,BART,  Facility Carried by Structure: MONTEREY BLV EB ON
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 34 009,  Location: 04-SF-280-R2.82-SF (Lat: 37.732289,  Lng: -122.434678),  Route carried "under" structure: Other road D012,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2017),  Truck Traffic: 99%,  Features Intersected: SAN JOSE,I280 RAMPS,BART,  Facility Carried by Structure: MONTEREY BLV EB ON
Minimum Vertical Clearance: 99.90m (327.76ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 34 0091,  Location: 04-SF-280-R2.87-SF (Lat: 37.732728,  Lng: -122.433897),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 153,800 (year 2017),  Truck Traffic: 2%,  Features Intersected: BOSWORTH & SB280 ONRAMP,  Facility Carried by Structure: MONTEREY BL WB ON
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 2.870,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.5m (123.0ft)

Find on map >>   Show street view

Structure Number: 34 0091,  Location: 04-SF-280-R2.87-SF (Lat: 37.732728,  Lng: -122.433897),  Route carried "under" structure: City street ,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 1,650 (year 2017),  Truck Traffic: 2%,  Features Intersected: BOSWORTH & SB280 ONRAMP,  Facility Carried by Structure: MONTEREY BL WB ON
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.5m (123.0ft)

Find on map >>   Show street view

Structure Number: 34 0092Y,  Location: 04-SF-280-R2.90-SF (Lat: 37.732794,  Lng: -122.432406),  Route carried "under" structure: City street ,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2017),  Truck Traffic: 2%,  Features Intersected: BOSWORTH STREET,  Facility Carried by Structure: SANJOSE-I280 RAMPS
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 34 0093,  Location: 04-SF-280-R2.04-SF (Lat: 37.726642,  Lng: -122.446092),  Route carried "under" structure: Interstate 280,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 170,000 (year 2017),  Truck Traffic: 1%,  Features Intersected: INTERSTATE 280,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 2.040,  Lanes under structure: 9,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 34 0093,  Location: 04-SF-280-R2.04-SF (Lat: 37.726642,  Lng: -122.446092),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2017),  Truck Traffic: 2%,  Features Intersected: INTERSTATE 280,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.48m (17.98ft),  Kilometerpoint: 2.040,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 34 0094,  Location: 04-SF-280-R1.77-SF (Lat: 37.722844,  Lng: -122.448247),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 153,800 (year 2019),  Truck Traffic: 2%,  Features Intersected: 280, 280 ON/OFF-RAMP,  Facility Carried by Structure: OCEAN AV, MUNIRAIL
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 1.770,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 34 0094,  Location: 04-SF-280-R1.77-SF (Lat: 37.722844,  Lng: -122.448247),  Route carried "under" structure: Interstate 280,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 170,000 (year 2019),  Truck Traffic: 1%,  Features Intersected: 280, 280 ON/OFF-RAMP,  Facility Carried by Structure: OCEAN AV, MUNIRAIL
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 1.770,  Lanes on structure: 3,  Lanes under structure: 11,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 34 0094,  Location: 04-SF-280-R1.77-SF (Lat: 37.722844,  Lng: -122.448247),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 153,800 (year 2019),  Truck Traffic: 2%,  Features Intersected: 280, 280 ON/OFF-RAMP,  Facility Carried by Structure: OCEAN AV, MUNIRAIL
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 1.770,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 34 0095,  Location: 04-SF-280-R1.65-SF (Lat: 37.721272,  Lng: -122.448375),  Route carried "under" structure: Interstate 280,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 166,000 (year 2019),  Truck Traffic: 1%,  Features Intersected: ROUTE I 280,  Facility Carried by Structure: GENEVA AVE
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 1.650,  Lanes on structure: 4,  Lanes under structure: 9,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 34 0096,  Location: 04-SF-280-R1.06-SF (Lat: 37.713906,  Lng: -122.452211),  Route carried "under" structure: Interstate 280,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 166,000 (year 2009),  Truck Traffic: 1%,  Features Intersected: INTERSTATE 280,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 1.060,  Lanes under structure: 10,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 34 0098,  Location: 04-SF-280-R6.39-SF (Lat: 37.760197,  Lng: -122.392811),  Route carried "under" structure: Business City street D192,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 250 (year 2017),  Truck Traffic: 1%,  Features Intersected: ROUTE 280,  Facility Carried by Structure: 20TH STREET
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 34 0098,  Location: 04-SF-280-R6.39-SF (Lat: 37.760197,  Lng: -122.392811),  Route carried "under" structure: Interstate 280,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 97,000 (year 2017),  Truck Traffic: 2%,  Features Intersected: ROUTE 280,  Facility Carried by Structure: 20TH STREET
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 6.390,  Lanes on structure: 2,  Lanes under structure: 11,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 34 0099,  Location: 04-SF-280-R6.57-SF (Lat: 37.762733,  Lng: -122.393028),  Route carried "under" structure: Business City street D192,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 350 (year 2017),  Truck Traffic: 1%,  Features Intersected: ROUTE 280,  Facility Carried by Structure: 18TH STREET
Minimum Vertical Clearance: 5.80m (19.03ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 34 0099,  Location: 04-SF-280-R6.57-SF (Lat: 37.762733,  Lng: -122.393028),  Route carried "under" structure: Interstate 280,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 68,200 (year 2017),  Truck Traffic: 3%,  Features Intersected: ROUTE 280,  Facility Carried by Structure: 18TH STREET
Minimum Vertical Clearance: 4.64m (15.22ft),  Kilometerpoint: 6.570,  Lanes on structure: 4,  Lanes under structure: 12,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 34 01,  Location: 04-SF-280-R6.61-SF (Lat: 37.764233,  Lng: -122.392669),  Route carried "under" structure: City street D141,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 1,500 (year 2016),  Truck Traffic: 1%,  Features Intersected: CHINA BASIN VIADUCT,  Facility Carried by Structure: INTERSTATE 280
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.9m (167.0ft)

Find on map >>   Show street view

Structure Number: 34 01,  Location: 04-SF-280-R6.61-SF (Lat: 37.764233,  Lng: -122.392669),  Route carried "under" structure: City street D193,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 400 (year 2016),  Truck Traffic: 1%,  Features Intersected: CHINA BASIN VIADUCT,  Facility Carried by Structure: INTERSTATE 280
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.9m (167.0ft)

Find on map >>   Show street view

Structure Number: 34 01,  Location: 04-SF-280-R6.61-SF (Lat: 37.764233,  Lng: -122.392669),  Route carried "under" structure: City street D142,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 560 (year 2016),  Truck Traffic: 1%,  Features Intersected: CHINA BASIN VIADUCT,  Facility Carried by Structure: INTERSTATE 280
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.9m (167.0ft)

Find on map >>   Show street view

Structure Number: 34 0102,  Location: 04-SF-101-2.61-SF (Lat: 37.744103,  Lng: -122.405978),  Route carried "under" structure: US 101,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 234,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: U.S. HIGHWAY 101,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 2.610,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>   Show street view

Structure Number: 34 0103,  Location: 04-SF-101-0.56-SF (Lat: 37.715247,  Lng: -122.398747),  Route carried "under" structure: US 101,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 184,500 (year 2018),  Truck Traffic: 5%,  Features Intersected: ROUTE 101,  Facility Carried by Structure: BAYSHORE BLVD
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 0.560,  Lanes on structure: 3,  Lanes under structure: 11,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 53.0m (173.9ft)

Find on map >>   Show street view

Structure Number: 34 0114J,  Location: 04-SF-101-2.95-SF (Lat: 37.748942,  Lng: -122.404664),  Route carried "under" structure: City street D015,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 130,000 (year 2018),  Truck Traffic: 2%,  Features Intersected: CESAR CHAVEZ BLVD,  Facility Carried by Structure: U.S.HIGHWAY 101
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: 34 0115K,  Location: 04-SF-101-2.96-SF (Lat: 37.749000,  Lng: -122.404311),  Route carried "under" structure: City street D015,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 130,000 (year 2018),  Truck Traffic: 2%,  Features Intersected: POTRERO AVENUE,  Facility Carried by Structure: CESAR CHVZ OFFRAMP
Minimum Vertical Clearance: 6.93m (22.74ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 34 0118R,  Location: 04-SF-080-4.95-SF (Lat: 37.785411,  Lng: -122.391519),  Route carried "under" structure: Ramp Interstate 80,  Year Built: 1935,  Structure Length: 0. m,  Average Daily Traffic: 8,600 (year 2012),  Truck Traffic: 1%,  Features Intersected: W80-FREMONT ST OFF RAMP
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 5.450,  Lanes on structure: 5,  Lanes under structure: 1,  Toll: Toll bridge,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 34 0123L,  Location: 04-SF-280-T7.18-SF (Lat: 37.770219,  Lng: -122.397783),  Route carried "under" structure: Business City street ,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 2,500 (year 2018),  Truck Traffic: 4%,  Features Intersected: CHINA BASIN, BERRY, 6 ST,  Facility Carried by Structure: RTE 280 NB ON-RAMP
Minimum Vertical Clearance: 9.00m (29.53ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 50.9m (167.0ft)

Find on map >>   Show street view

Structure Number: 34 0123R,  Location: 04-SF-280-T7.18-SF (Lat: 37.770228,  Lng: -122.397653),  Route carried "under" structure: Business City street ,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 2,500 (year 2017),  Truck Traffic: 4%,  Features Intersected: CHINA BASIN, BERRY, 6 ST,  Facility Carried by Structure: RTE 280 NB OFFRAMP
Minimum Vertical Clearance: 9.00m (29.53ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 47.2m (154.9ft)

Find on map >>   Show street view

Structure Number: 34 0126L,  Location: 04-SF-080-4.92-SF (Lat: 37.780253,  Lng: -122.398706),  Route carried "under" structure: City street ,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 2015),  Truck Traffic: 2%,  Features Intersected: 2ND, 3RD AND 4TH STREET,  Facility Carried by Structure: INTERSTATE 80 WB
Minimum Vertical Clearance: 11.20m (36.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 49.7m (163.1ft)

Discuss San Francisco, California (CA) on our hugely popular California forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.