Bridge Statistics for San Francisco, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 358Number of bridges
  • 14,222ft / 4,335mTotal length
  • $3,359,000Total costs
  • 17,990,574Total average daily traffic
  • 561,159Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for San Francisco
  • No street view available for this location

New bridges in San Francisco, CA - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11910-1919
  • 31920-1929
  • 231930-1939
  • 21940-1949
  • 801950-1959
  • 1571960-1969
  • 221970-1979
  • 11980-1989
  • 51990-1999
  • 282000-2009
  • 352010-2019
Reconstructed bridges in San Francisco, CA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41950-1959
  • 101960-1969
  • 31970-1979
  • 11980-1989
  • 21990-1999
  • 32000-2009
  • 12010-2019
  • 12020-2022
Average Bridge Daily Traffic in San Francisco, CA
Average Bridge Truck Traffic in San Francisco, CA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 46.3%Good
  • 12.7%Satisfactory
  • 39.6%Fair
  • 1.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 77.6%Good
  • 4.5%Satisfactory
  • 17.9%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 88.8%Good
  • 2.2%Satisfactory
  • 9.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.1%Excellent
  • 35.7%Very good
  • 57.1%Good
Find on map >>   Show street view

Structure Number: 34 0126L,  Location: 04-SF-080-4.92-SF (Lat: 37.780253,  Lng: -122.398706),  Route carried "under" structure: City street ,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 27,000 (year 2015),  Truck Traffic: 2%,  Features Intersected: 2ND, 3RD AND 4TH STREET,  Facility Carried by Structure: INTERSTATE 80 WB
Minimum Vertical Clearance: 12.70m (41.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 49.7m (163.1ft)

Find on map >>   Show street view

Structure Number: 34 0126R,  Location: 04-SF-080-4.92-SF (Lat: 37.781158,  Lng: -122.397453),  Route carried "under" structure: City street ,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 27,000 (year 2015),  Truck Traffic: 2%,  Features Intersected: 2ND, 3RD, AND 4TH,  Facility Carried by Structure: INTERSTATE 80 EB
Minimum Vertical Clearance: 7.26m (23.82ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 34 0126R,  Location: 04-SF-080-4.92-SF (Lat: 37.781158,  Lng: -122.397453),  Route carried "under" structure: City street ,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 2015),  Truck Traffic: 2%,  Features Intersected: 2ND, 3RD, AND 4TH,  Facility Carried by Structure: INTERSTATE 80 EB
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 34 0127S,  Location: 04-SF-080-5.62R-SF (Lat: 37.787953,  Lng: -122.395094),  Route carried "under" structure: City street ,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2012),  Truck Traffic: 1%,  Features Intersected: ESX,HARR,CLEM,FOLSOM,1ST,  Facility Carried by Structure: WB80-FREMONT ST
Minimum Vertical Clearance: 6.19m (20.31ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: 34 0127S,  Location: 04-SF-080-5.62R-SF (Lat: 37.787953,  Lng: -122.395094),  Route carried "under" structure: City street ,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2012),  Truck Traffic: 1%,  Features Intersected: ESX,HARR,CLEM,FOLSOM,1ST,  Facility Carried by Structure: WB80-FREMONT ST
Minimum Vertical Clearance: 6.24m (20.47ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: 34 0127S,  Location: 04-SF-080-5.62R-SF (Lat: 37.787953,  Lng: -122.395094),  Route carried "under" structure: City street ,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 11,700 (year 2012),  Truck Traffic: 1%,  Features Intersected: ESX,HARR,CLEM,FOLSOM,1ST,  Facility Carried by Structure: WB80-FREMONT ST
Minimum Vertical Clearance: 4.56m (14.96ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: 34 0127S,  Location: 04-SF-080-5.62R-SF (Lat: 37.787953,  Lng: -122.395094),  Route carried "under" structure: City street ,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 16,000 (year 2012),  Truck Traffic: 1%,  Features Intersected: ESX,HARR,CLEM,FOLSOM,1ST,  Facility Carried by Structure: WB80-FREMONT ST
Minimum Vertical Clearance: 5.86m (19.23ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: 34 0127S,  Location: 04-SF-080-5.62R-SF (Lat: 37.787953,  Lng: -122.395094),  Route carried "under" structure: Business City street ,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2012),  Truck Traffic: 1%,  Features Intersected: ESX,HARR,CLEM,FOLSOM,1ST,  Facility Carried by Structure: WB80-FREMONT ST
Minimum Vertical Clearance: 6.19m (20.31ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: 34 0128K,  Location: 04-SF-080-5.50L-SF (Lat: 37.784581,  Lng: -122.393297),  Route carried "under" structure: Ramp Interstate 80,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 4,850 (year 2012),  Truck Traffic: 1%,  Features Intersected: STERLING-E80,BRYANT,RNCN
Minimum Vertical Clearance: 8.50m (27.89ft),  Kilometerpoint: 4.900,  Lanes on structure: 1,  Lanes under structure: 2,  Toll: Toll bridge,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 34.5m (113.2ft)

Find on map >>   Show street view

Structure Number: 34 0129C,  Location: 04-SF-080-4.97-SF (Lat: 37.779181,  Lng: -122.400236),  Route carried "under" structure: City street ,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 9,900 (year 2015),  Truck Traffic: 2%,  Features Intersected: 4TH STREET,  Facility Carried by Structure: 80 WB OFF RAMP
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: 34 0131L,  Location: 04-SF-280-R4.18L-SF (Lat: 37.734636,  Lng: -122.409547),  Route carried "under" structure: Business City street D008,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 24,800 (year 2019),  Truck Traffic: 3%,  Features Intersected: 280/101 INTERCHANGE,  Facility Carried by Structure: I 280 S, AU LINE
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 34 0131L,  Location: 04-SF-280-R4.18L-SF (Lat: 37.734636,  Lng: -122.409547),  Route carried "under" structure: US 101,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 234,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: 280/101 INTERCHANGE,  Facility Carried by Structure: I 280 S, AU LINE
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 1.980,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 34 0131L,  Location: 04-SF-280-R4.18L-SF (Lat: 37.734636,  Lng: -122.409547),  Route carried "under" structure: Business City street D095,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 15,000 (year 2018),  Truck Traffic: 3%,  Features Intersected: 280/101 INTERCHANGE,  Facility Carried by Structure: I 280 S, AU LINE
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 34 0132R,  Location: 04-SF-280-R4.16R-SF (Lat: 37.734122,  Lng: -122.409661),  Route carried "under" structure: Business City street D008,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 24,800 (year 2019),  Truck Traffic: 3%,  Features Intersected: 280/101 INTERCHANGE,  Facility Carried by Structure: I 280 N, AL LINE
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 34 0132R,  Location: 04-SF-280-R4.16R-SF (Lat: 37.734122,  Lng: -122.409661),  Route carried "under" structure: US 101,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 234,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: 280/101 INTERCHANGE,  Facility Carried by Structure: I 280 N, AL LINE
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 1.980,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 34 0132R,  Location: 04-SF-280-R4.16R-SF (Lat: 37.734122,  Lng: -122.409661),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: 280/101 INTERCHANGE
Minimum Vertical Clearance: 4.59m (15.06ft),  Kilometerpoint: 4.160,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 34 0132R,  Location: 04-SF-280-R4.16R-SF (Lat: 37.734122,  Lng: -122.409661),  Route carried "under" structure: Business City street D095,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 15,800 (year 2019),  Truck Traffic: 3%,  Features Intersected: 280/101 INTERCHANGE,  Facility Carried by Structure: I 280 N, AL LINE
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 34 0134G,  Location: 04-SF-280-R4.16R-SF (Lat: 37.734228,  Lng: -122.409736),  Route carried "under" structure: Interstate 101,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 261,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: 280/101 INTERCHANGE
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 1.980,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 34 0134G,  Location: 04-SF-280-R4.16R-SF (Lat: 37.734228,  Lng: -122.409736),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: 280/101 INTERCHANGE
Minimum Vertical Clearance: 6.30m (20.67ft),  Kilometerpoint: 4.160,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 34 0134G,  Location: 04-SF-280-R4.16R-SF (Lat: 37.734228,  Lng: -122.409736),  Route carried "under" structure: Ramp City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 4,000 (year 2019),  Truck Traffic: 5%,  Features Intersected: 280/101 INTERCHANGE,  Facility Carried by Structure: I 280N-101N (RE)
Minimum Vertical Clearance: 5.91m (19.39ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 34 0134G,  Location: 04-SF-280-R4.16R-SF (Lat: 37.734228,  Lng: -122.409736),  Route carried "under" structure: Business City street D101,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 11,600 (year 2019),  Truck Traffic: 3%,  Features Intersected: 280/101 INTERCHANGE,  Facility Carried by Structure: I 280N-101N (RE)
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 34 0134G,  Location: 04-SF-280-R4.16R-SF (Lat: 37.734228,  Lng: -122.409736),  Route carried "under" structure: Business City street D014,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 17,700 (year 2019),  Truck Traffic: 3%,  Features Intersected: 280/101 INTERCHANGE,  Facility Carried by Structure: I 280N-101N (RE)
Minimum Vertical Clearance: 5.85m (19.19ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 34 0134G,  Location: 04-SF-280-R4.16R-SF (Lat: 37.734228,  Lng: -122.409736),  Route carried "under" structure: Business City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 15,800 (year 2019),  Truck Traffic: 3%,  Features Intersected: 280/101 INTERCHANGE,  Facility Carried by Structure: I 280N-101N (RE)
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 34 0134G,  Location: 04-SF-280-R4.16R-SF (Lat: 37.734228,  Lng: -122.409736),  Route carried "under" structure: Ramp US 101,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: 280/101 INTERCHANGE
Minimum Vertical Clearance: 5.82m (19.09ft),  Kilometerpoint: 1.980,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 34 0134G,  Location: 04-SF-280-R4.16R-SF (Lat: 37.734228,  Lng: -122.409736),  Route carried "under" structure: Ramp US 101,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: 280/101 INTERCHANGE
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 1.980,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 34 0134G,  Location: 04-SF-280-R4.16R-SF (Lat: 37.734228,  Lng: -122.409736),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: 280/101 INTERCHANGE
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 4.160,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 34 0135G,  Location: 04-SF-101-1.79-SF (Lat: 37.732967,  Lng: -122.404989),  Route carried "under" structure: Business City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 4,000 (year 2019),  Truck Traffic: 10%,  Features Intersected: 280/101 INTERCHANGE,  Facility Carried by Structure: US101N-I 280S (WL)
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.9m (121.1ft)

Find on map >>   Show street view

Structure Number: 34 0135G,  Location: 04-SF-101-1.79-SF (Lat: 37.732967,  Lng: -122.404989),  Route carried "under" structure: US 101,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 221,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: 280/101 INTERCHANGE
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 1.980,  Lanes on structure: 1,  Lanes under structure: 7,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.9m (121.1ft)

Find on map >>   Show street view

Structure Number: 34 0135G,  Location: 04-SF-101-1.79-SF (Lat: 37.732967,  Lng: -122.404989),  Route carried "under" structure: Business City street D095,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 15,800 (year 2019),  Truck Traffic: 3%,  Features Intersected: 280/101 INTERCHANGE,  Facility Carried by Structure: US101N-I 280S (WL)
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.9m (121.1ft)

Find on map >>   Show street view

Structure Number: 34 0136G,  Location: 04-SF-101-1.79-SF (Lat: 37.732706,  Lng: -122.404858),  Route carried "under" structure: Interstate 101,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 221,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: 280/101 INTERCHANGE
Minimum Vertical Clearance: 5.84m (19.16ft),  Kilometerpoint: 1.980,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 31.2m (102.4ft)

Find on map >>   Show street view

Structure Number: 34 0136G,  Location: 04-SF-101-1.79-SF (Lat: 37.732706,  Lng: -122.404858),  Route carried "under" structure: Ramp Interstate 280,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: 280/101 INTERCHANGE
Minimum Vertical Clearance: 30.10m (98.75ft),  Kilometerpoint: 4.070,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 31.2m (102.4ft)

Find on map >>   Show street view

Structure Number: 34 0136G,  Location: 04-SF-101-1.79-SF (Lat: 37.732706,  Lng: -122.404858),  Route carried "under" structure: Business City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 4,000 (year 2019),  Truck Traffic: 10%,  Features Intersected: 280/101 INTERCHANGE,  Facility Carried by Structure: 280N - 101S (WU)
Minimum Vertical Clearance: 5.62m (18.44ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 31.2m (102.4ft)

Find on map >>   Show street view

Structure Number: 34 0136G,  Location: 04-SF-101-1.79-SF (Lat: 37.732706,  Lng: -122.404858),  Route carried "under" structure: Business City street D095,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 15,800 (year 2019),  Truck Traffic: 3%,  Features Intersected: 280/101 INTERCHANGE,  Facility Carried by Structure: 280N - 101S (WU)
Minimum Vertical Clearance: 5.83m (19.13ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 31.2m (102.4ft)

Find on map >>   Show street view

Structure Number: 34 0138C,  Location: 04-SF-080-4.97-SF (Lat: 37.779164,  Lng: -122.400097),  Route carried "under" structure: City street ,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 9,900 (year 2015),  Truck Traffic: 2%,  Features Intersected: 4TH STREET,  Facility Carried by Structure: 80 EB ONRAMP
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 41.8m (137.1ft)

Find on map >>   Show street view

Structure Number: 34 0139,  Location: 04-SF-101-2.91-SF (Lat: 37.749633,  Lng: -122.403308),  Route carried "under" structure: Ramp US 101,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 12,400 (year 2010),  Truck Traffic: 4%,  Features Intersected: SB 101 OFF-RMP TO CS.CHV,  Facility Carried by Structure: BIKE & PEDESTRIAN
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 2.910,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Length of Maximum Span: 21.5m (70.5ft)

Find on map >>   Show street view

Structure Number: 34 0155L,  Location: 04-SF-101-R9.58-SF (Lat: 37.803472,  Lng: -122.470822),  Route carried "under" structure: Ramp State highway 1,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 8,500 (year 2015),  Truck Traffic: 3%,  Features Intersected: 101 NB - 1 SB CONNECTOR
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 7.000,  Lanes on structure: 7,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 12.0m (39.4ft)

Find on map >>   Show street view

Structure Number: 34 0155R,  Location: 04-SF-101-R9.48-SF (Lat: 37.803667,  Lng: -122.470639),  Route carried "under" structure: Ramp US 101,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 59,000 (year 2009),  Truck Traffic: 1%,  Features Intersected: 101 NB - 1 SB CONNECTOR
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 9.500,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 11.3m (37.1ft)

Find on map >>   Show street view

Structure Number: 34 0157L,  Location: 04-SF-101-R9.35-SF (Lat: 37.802025,  Lng: -122.465272),  Route carried "under" structure: Ramp US 1,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 8,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: RTE 1 RMPS,CRISSY,COWLES
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 7.030,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 83.8m (274.9ft)

Find on map >>   Show street view

Structure Number: 34 0157R,  Location: 04-SF-101-R9.18-SF (Lat: 37.802200,  Lng: -122.465225),  Route carried "under" structure: State highway 1,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 64,000 (year 2019),  Truck Traffic: 2%,  Features Intersected: RTE 1N, LINCOLN,MCDOWELL
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 7.070,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 83.8m (274.9ft)

Find on map >>   Show street view

Structure Number: 34 0159G,  Location: 04-SF-101-R9.40-SF (Lat: 37.803333,  Lng: -122.469444),  Route carried "under" structure: State highway 1,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 64,000 (year 2019),  Truck Traffic: 2%,  Features Intersected: STATE ROUTE 1
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 7.070,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 34 0160G,  Location: 04-SF-001-7.00-SF (Lat: 37.801717,  Lng: -122.469200),  Route carried "under" structure: Business City street ,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 3,250 (year 2019),  Truck Traffic: 3%,  Features Intersected: LINCOLN BLVD,  Facility Carried by Structure: 1NB-101S CONNECTOR
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 34 0177,  Location: 04-SF-101-R4.74-SF (Lat: 37.770142,  Lng: -122.419456),  Route carried "under" structure: Business City street ,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 23,380 (year 2019),  Truck Traffic: 3%,  Features Intersected: 13TH ST,MISSION &OTIS ST,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 5.54m (18.18ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 58.0m (190.3ft)

Find on map >>   Show street view

Structure Number: 34 0177,  Location: 04-SF-101-R4.74-SF (Lat: 37.770142,  Lng: -122.419456),  Route carried "under" structure: Business City street ,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 22,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: 13TH ST,MISSION &OTIS ST,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 58.0m (190.3ft)

Find on map >>   Show street view

Structure Number: 34 0177,  Location: 04-SF-101-R4.74-SF (Lat: 37.770142,  Lng: -122.419456),  Route carried "under" structure: Business City street ,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 33,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: 13TH ST,MISSION &OTIS ST,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 58.0m (190.3ft)

Find on map >>   Show street view

Structure Number: 34 0177,  Location: 04-SF-101-R4.74-SF (Lat: 37.770142,  Lng: -122.419456),  Route carried "under" structure: Business City street ,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 23,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: 13TH ST,MISSION &OTIS ST,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 58.0m (190.3ft)

Find on map >>   Show street view

Structure Number: 34 0177,  Location: 04-SF-101-R4.74-SF (Lat: 37.770142,  Lng: -122.419456),  Route carried "under" structure: Business City street ,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 19,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: 13TH ST,MISSION &OTIS ST,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 7,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 58.0m (190.3ft)

Find on map >>   Show street view

Structure Number: 34C0002,  Location: PENNSYLVANIA AVE (Lat: 37.749811,  Lng: -122.393114),  Route carried "under" structure: City street ,  Year Built: 1936,  Structure Length: 0. m,  Average Daily Traffic: 20,729 (year 2016),  Truck Traffic: 10%,  Features Intersected: CESAR CHAVEZ ST,  Facility Carried by Structure: CALTRAIN & UP RR
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 22.7m (74.5ft)

Find on map >>   Show street view

Structure Number: 34C0014,  Location: OVER SAN JOSE AVE (Lat: 37.734614,  Lng: -122.428950),  Route carried "under" structure: City street ,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 36,960 (year 2016),  Truck Traffic: 4%,  Features Intersected: SAN JOSE AVE,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 0.000,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 40.1m (131.6ft)

Find on map >>   Show street view

Structure Number: 34C0015,  Location: SOUTH OF 34C0016 (Lat: 37.736514,  Lng: -122.426983),  Route carried "under" structure: City street ,  Year Built: 1927,  Structure Length: 0. m,  Average Daily Traffic: 50,000 (year 2016),  Truck Traffic: 4%,  Features Intersected: SAN JOSE AVE,  Facility Carried by Structure: RICHLAND AVE
Minimum Vertical Clearance: 7.00m (22.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 36.9m (121.1ft)

Find on map >>   Show street view

Structure Number: 34C0016,  Location: NORTH OF 34C0015 (Lat: 37.737697,  Lng: -122.425447),  Route carried "under" structure: City street ,  Year Built: 1930,  Structure Length: 0. m,  Average Daily Traffic: 50,000 (year 2016),  Truck Traffic: 4%,  Features Intersected: SAN JOSE AVE,  Facility Carried by Structure: HIGHLAND AVE
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 36.9m (121.1ft)

Find on map >>   Show street view

Structure Number: 34C0017,  Location: OVER BOSWORTH STREET (Lat: 37.733753,  Lng: -122.435667),  Route carried "under" structure: City street ,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 22,315 (year 2016),  Truck Traffic: 1%,  Features Intersected: BOSWORTH STREET,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 31.1m (102.0ft)

Find on map >>   Show street view

Structure Number: 34C0018,  Location: OVER ARMY STREET (Lat: 37.748772,  Lng: -122.406178),  Route carried "under" structure: City street ,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 63,120 (year 2016),  Truck Traffic: 5%,  Features Intersected: CESAR CHAVEZ ST,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.77m (18.93ft),  Kilometerpoint: 0.000,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 46.1m (151.2ft)

Find on map >>   Show street view

Structure Number: 34C0021,  Location: OVER CESAR CHAVEZ ST (Lat: 37.749089,  Lng: -122.404764),  Route carried "under" structure: City street ,  Year Built: 1974,  Structure Length: 0. m,  Average Daily Traffic: 30,960 (year 2011),  Truck Traffic: 5%,  Features Intersected: CESAR CHAVEZ ST,  Facility Carried by Structure: POTRERO AVE
Minimum Vertical Clearance: 4.69m (15.39ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 27.0m (88.6ft)

Find on map >>   Show street view

Structure Number: 34C0031,  Location: OVER MARKET ST (Lat: 37.752289,  Lng: -122.442986),  Route carried "under" structure: City street ,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 27,000 (year 2010),  Truck Traffic: 2%,  Features Intersected: MARKET STREET,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 29.6m (97.1ft)

Find on map >>   Show street view

Structure Number: 34C0033,  Location: OVER MARKET STREET (Lat: 37.756322,  Lng: -122.441269),  Route carried "under" structure: City street ,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 25,989 (year 2007),  Truck Traffic: 2%,  Features Intersected: MARKET STREET,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 34C0035,  Location: OVER BROADWAY (Lat: 37.796242,  Lng: -122.418328),  Route carried "under" structure: City street ,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 50,000 (year 2015),  Truck Traffic: 1%,  Features Intersected: BROADWAY,  Facility Carried by Structure: HYDE ST
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 10.1m (33.1ft)

Find on map >>   Show street view

Structure Number: 34C0039,  Location: OVER PORTOLA DRIVE (Lat: 37.740350,  Lng: -122.459486),  Route carried "under" structure: City street ,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 25,989 (year 2016),  Truck Traffic: 2%,  Features Intersected: PORTOLA DRIVE,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 33.0m (108.3ft)

Find on map >>   Show street view

Structure Number: 34C0042,  Location: OVER GEARY BLVD (Lat: 37.784322,  Lng: -122.432772),  Route carried "under" structure: City street ,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 41,040 (year 2017),  Truck Traffic: 5%,  Features Intersected: GEARY BLVD,  Facility Carried by Structure: FILLMORE ST
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 25.6m (84.0ft)

Find on map >>   Show street view

Structure Number: 34C0043,  Location: OVER GEARY BLVD (Lat: 37.784422,  Lng: -122.430928),  Route carried "under" structure: City street ,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 52,440 (year 2011),  Truck Traffic: 5%,  Features Intersected: GEARY BLVD,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 4.11m (13.48ft),  Kilometerpoint: 0.000,  Lanes under structure: 10,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 34C0047,  Location: NEAR CANDLESTICK (Lat: 37.711239,  Lng: -122.386678),  Route carried "under" structure: City street ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 960 (year 2011),  Truck Traffic: 5%,  Features Intersected: JAMESTOWN WAY,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 34C0048,  Location: NEAR CANDLESTICK PARK (Lat: 37.711042,  Lng: -122.386575),  Route carried "under" structure: City street ,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 2,640 (year 2016),  Truck Traffic: 5%,  Features Intersected: HARNEY WAY,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 34C0052,  Location: RANKIN ST (Lat: 37.741356,  Lng: -122.394272),  Route carried "under" structure: City street ,  Year Built: 1907,  Structure Length: 0. m,  Average Daily Traffic: 7,320 (year 2016),  Truck Traffic: 5%,  Features Intersected: JERROLD AVENUE,  Facility Carried by Structure: CALTRAIN & UP RR
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 13.2m (43.3ft)

Find on map >>   Show street view

Structure Number: 34C0053,  Location: I-280 (Lat: 37.745911,  Lng: -122.393658),  Route carried "under" structure: City street ,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 15,840 (year 2016),  Truck Traffic: 5%,  Features Intersected: EVANS AVENUE,  Facility Carried by Structure: CALTRAIN & UP RR
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 34C0057,  Location: OVER BEAGLE ST (Lat: 37.787297,  Lng: -122.391206),  Route carried "under" structure: City street ,  Year Built: 1936,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2017),  Truck Traffic: 10%,  Features Intersected: BEALE STREET,  Facility Carried by Structure: HARRISON STREET
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 25.1m (82.3ft)

Find on map >>   Show street view

Structure Number: 34C006,  Location: OVER WASHINGTON ST (Lat: 37.796061,  Lng: -122.398625),  Route carried "under" structure: City street ,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 7,320 (year 2011),  Truck Traffic: 2%,  Features Intersected: WASHINGTON ST,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 6.00m (19.69ft),  Kilometerpoint: 0.000,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 34C0061,  Location: OVER WASHINGTON ST (Lat: 37.795875,  Lng: -122.399850),  Route carried "under" structure: City street ,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 7,320 (year 2011),  Truck Traffic: 2%,  Features Intersected: WASHINGTON ST,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.87m (19.26ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 34C0063,  Location: OVER SUNSET BLVD (Lat: 37.764514,  Lng: -122.496261),  Route carried "under" structure: City street ,  Year Built: 1931,  Structure Length: 0. m,  Average Daily Traffic: 13,680 (year 2011),  Truck Traffic: 1%,  Features Intersected: SUNSET BLVD,  Facility Carried by Structure: LINCOLN WAY
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 34C0064,  Location: OVER BROTHERHOOD WAY (Lat: 37.713003,  Lng: -122.473247),  Route carried "under" structure: City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2016),  Truck Traffic: 5%,  Features Intersected: BROTHERHOOD WY,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 34C0066,  Location: OVER OCEAN AVE (Lat: 37.722658,  Lng: -122.451189),  Route carried "under" structure: City street ,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2016),  Truck Traffic: 12%,  Features Intersected: OCEAN AVE,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.97m (19.59ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 17.4m (57.1ft)

Find on map >>   Show street view

Structure Number: 34C0069,  Location: 0.1 MI N OLYMPIA ON CL A (Lat: 37.753033,  Lng: -122.456144),  Route carried "under" structure: City street ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 8,000 (year 2012),  Truck Traffic: 10%,  Features Intersected: CLARENDON AVE,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.9m (107.9ft)

Find on map >>   Show street view

Structure Number: 34C0071,  Location: 0.1 MI NW GIL AVE GRIF S (Lat: 37.718175,  Lng: -122.388225),  Route carried "under" structure: City street ,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2016),  Truck Traffic: 5%,  Features Intersected: GILMAN AVE,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 34C0086,  Location: JSO TERMINAL BUILDING (Lat: 37.785861,  Lng: -122.395472),  Route carried "under" structure: City street ,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2017),  Truck Traffic: 15%,  Features Intersected: HOWARD STREET,  Facility Carried by Structure: TERMINAL BUS RAMP
Minimum Vertical Clearance: 7.00m (22.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 57.6m (189.0ft)

Find on map >>   Show street view

Structure Number: 34C0086,  Location: JSO TERMINAL BUILDING (Lat: 37.785861,  Lng: -122.395472),  Route carried "under" structure: City street ,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2017),  Truck Traffic: 15%,  Features Intersected: HOWARD STREET,  Facility Carried by Structure: TERMINAL BUS RAMP
Minimum Vertical Clearance: 7.00m (22.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 57.6m (189.0ft)

Find on map >>   Show street view

Structure Number: 34C0087L,  Location: TO I80 EAST (Lat: 37.784833,  Lng: -122.394306),  Route carried "under" structure: City street ,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2017),  Truck Traffic: 15%,  Features Intersected: HARRISON STREET,  Facility Carried by Structure: TRANSIT BUS RAMP
Minimum Vertical Clearance: 5.97m (19.59ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.7m (84.3ft)

Find on map >>   Show street view

Structure Number: 34C0087R,  Location: RETURN TO TRANSIT CENTER (Lat: 37.785000,  Lng: -122.394111),  Route carried "under" structure: City street ,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2017),  Truck Traffic: 15%,  Features Intersected: HARRISON STREET,  Facility Carried by Structure: TRANSIT BUS RAMP
Minimum Vertical Clearance: 5.88m (19.29ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.7m (84.3ft)

Find on map >>   Show street view

Structure Number: 34C0088,  Location: NE OF THIRD STREET (Lat: 37.782361,  Lng: -122.396444),  Route carried "under" structure: City street ,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2017),  Truck Traffic: 15%,  Features Intersected: SECOND STREET,  Facility Carried by Structure: BUS STORAGE RAMP
Minimum Vertical Clearance: 5.30m (17.39ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 42.7m (140.1ft)