Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Stony Ridge, Ohio (OH)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 47Number of bridges
  • 374ft / 114mTotal length
  • $338,617,000Total costs
  • 407,757Total average daily traffic
  • 100,101Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Stony Ridge
  • No street view available for this location

New bridges in Stony Ridge, OH - historical statistics
  • New bridges - historical statistics
  • 51940-1949
  • 131950-1959
  • 31960-1969
  • 41970-1979
  • 11980-1989
  • 101990-1999
  • 82000-2009
  • 22010-2019
  • 12020-2022
Reconstructed bridges in Stony Ridge, OH - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 61980-1989
  • 11990-1999
  • 32000-2009
  • 22010-2019
Average Bridge Daily Traffic in Stony Ridge, OH
Average Bridge Truck Traffic in Stony Ridge, OH
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 28.1%Excellent
  • 28.1%Very good
  • 25.0%Good
  • 12.5%Satisfactory
  • 6.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Excellent
  • 37.5%Very good
  • 18.8%Good
  • 12.5%Satisfactory
  • 6.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Excellent
  • 50.0%Very good
  • 28.1%Good
  • 9.4%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.7%Very good
  • 53.6%Good
  • 21.4%Satisfactory
  • 10.7%Fair
  • 3.6%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 20.0%Very good
  • 60.0%Good
  • 20.0%Satisfactory
Find on map >>   Show street view

Structure Number: 8706468,  Location: JCT SR 420 & USR 20 (Lat: 41.491431,  Lng: -83.463531),  Route carried "under" structure: US 20,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 6,030 (year 2015),  Truck Traffic: 14%,  Features Intersected: SR 420
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 17.912,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 8706476,  Location: JCT SR 420 & US 20 (Lat: 41.491531,  Lng: -83.463769),  Route carried "under" structure: US 20,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 9,783 (year 2018),  Truck Traffic: 11%,  Features Intersected: SR 420
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 17.960,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 8706484,  Location: 0.3MI EAST OF EXIT 71 (Lat: 41.523969,  Lng: -83.463589),  Route carried "under" structure: State highway 420,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 9,949 (year 2015),  Truck Traffic: 36%,  Features Intersected: OH TPK RMP
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 4.361,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 8729522,  Location: 2.8MI EAST OF EXIT 64 (Lat: 41.544669,  Lng: -83.528631),  Route carried "under" structure: Interstate 80K,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 31,648 (year 2015),  Truck Traffic: 27%,  Features Intersected: TRACY RD,  Facility Carried by Structure: I80 OH TPK
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 7.660,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 8729581,  Location: 2.9MI WEST OF EXIT 71 (Lat: 41.539911,  Lng: -83.511361),  Route carried "under" structure: County highway C0010,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 778 (year 2015),  Truck Traffic: 7%,  Features Intersected: I80 OHIO TPK,  Facility Carried by Structure: CR10
Minimum Vertical Clearance: 7.85m (25.75ft),  Kilometerpoint: 48.280,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>   Show street view

Structure Number: 8729689,  Location: 1.4MI WEST OF EXIT 71 (Lat: 41.533550,  Lng: -83.482211),  Route carried "under" structure: County highway 238A,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 292 (year 2015),  Truck Traffic: 8%,  Features Intersected: I80 OHIO TPK,  Facility Carried by Structure: CUMMINS RD
Minimum Vertical Clearance: 7.77m (25.49ft),  Kilometerpoint: 32.187,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>   Show street view

Structure Number: 8729743,  Location: 0.9MI WEST OF EXIT 71 (Lat: 41.529200,  Lng: -83.472581),  Route carried "under" structure: Interstate 80K,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 31,648 (year 2015),  Truck Traffic: 27%,  Features Intersected: LEMOYNE RD,  Facility Carried by Structure: I80 OHIO TPK
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 12.682,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 8729786,  Location: 0.3MI WEST OF EXIT 71 (Lat: 41.525911,  Lng: -83.463219),  Route carried "under" structure: State highway 420,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 9,338 (year 2012),  Truck Traffic: 22%,  Features Intersected: I80 OHIO TPK
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 3.846,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Discuss Stony Ridge, Ohio (OH) on our hugely popular Ohio forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.