Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Tracy, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 84Number of bridges
  • 1,099ft / 335mTotal length
  • $17,042,000Total costs
  • 1,588,302Total average daily traffic
  • 199,048Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Tracy
  • No street view available for this location

New bridges in Tracy, CA - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 11940-1949
  • 81950-1959
  • 301960-1969
  • 331970-1979
  • 21980-1989
  • 71990-1999
  • 12010-2019
Reconstructed bridges in Tracy, CA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 01980-1989
  • 01990-1999
  • 02000-2009
  • 132010-2019
Average Bridge Daily Traffic in Tracy, CA
Average Bridge Truck Traffic in Tracy, CA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 27.6%Good
  • 15.5%Satisfactory
  • 27.6%Fair
  • 29.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 63.8%Good
  • 1.7%Satisfactory
  • 24.1%Fair
  • 10.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 86.2%Good
  • 13.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.0%Excellent
  • 50.0%Very good
  • 20.0%Good
  • 20.0%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 20.0%Good
  • 80.0%Satisfactory
Find on map >>   Show street view

Structure Number: 29 0024,  Location: 10-SJ-580-13.54 (Lat: 37.719464,  Lng: -121.535717),  Route carried "on" structure: County highway ,  Year Built: 1967,  Status: Open,  Structure Length: 7.28m (23.88ft),  Average Daily Traffic: 870 (year 1998),  Truck Traffic: 15%,  Average Future Daily Traffic: 3,336 (year 2042),  Design Load: HS 20,  Features Intersected: ROUTE 580,  Facility Carried by Structure: PATTERSON PASS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 28.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 29 0074L,  Location: 10-SJ-205-R4.54 (Lat: 37.748764,  Lng: -121.476353),  Route carried "on" structure: Interstate 205,  Year Built: 1970,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 9.33m (30.61ft),  Average Daily Traffic: 53,000 (year 2009),  Truck Traffic: 12%,  Average Future Daily Traffic: 84,581 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: UP RR & BYRON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.540,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 23.1m (75.8ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.33m (30.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 29 0074R,  Location: 10-SJ-205-R4.54 (Lat: 37.748614,  Lng: -121.476006),  Route carried "on" structure: Interstate 205,  Year Built: 1970,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 9.33m (30.61ft),  Average Daily Traffic: 53,000 (year 2009),  Truck Traffic: 12%,  Average Future Daily Traffic: 84,581 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: UP RR & BYRON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.540,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 4,  Length of Maximum Span: 23.1m (75.8ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 29 008,  Location: 10-SJ-580-8.15 (Lat: 37.671947,  Lng: -121.457519),  Route carried "on" structure: County highway Y340,  Year Built: 1966,  Status: Open,  Structure Length: 7.23m (23.72ft),  Average Daily Traffic: 2,500 (year 1999),  Truck Traffic: 10%,  Average Future Daily Traffic: 10,011 (year 2042),  Design Load: HS 20,  Features Intersected: ROUTE 580,  Facility Carried by Structure: CORRAL HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 29 0081L,  Location: 10-SJ-580-7.88 (Lat: 37.669756,  Lng: -121.453353),  Route carried "on" structure: Interstate 580,  Year Built: 1966,  Status: Open,  Structure Length: 3.85m (12.63ft),  Average Daily Traffic: 16,000 (year 2009),  Truck Traffic: 18%,  Average Future Daily Traffic: 23,546 (year 2040),  Design Load: HS 20,  Features Intersected: CORRAL HOLLOW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.880,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 28.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $495,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $831,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 29 0081R,  Location: 10-SJ-580-7.88 (Lat: 37.669956,  Lng: -121.453033),  Route carried "on" structure: Interstate 580,  Year Built: 1966,  Status: Open,  Structure Length: 3.85m (12.63ft),  Average Daily Traffic: 16,000 (year 2009),  Truck Traffic: 18%,  Average Future Daily Traffic: 23,546 (year 2040),  Design Load: HS 20,  Features Intersected: CORRAL HOLLOW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.880,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 28.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $495,000,  Roadway Improvement Cost: $99,000,  Total Project Cost: $831,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 29 0082L,  Location: 10-SJ-580-12.76 (Lat: 37.712675,  Lng: -121.524267),  Route carried "on" structure: Interstate 580,  Year Built: 1967,  Status: Open,  Structure Length: 8.45m (27.72ft),  Average Daily Traffic: 13,300 (year 2009),  Truck Traffic: 14%,  Average Future Daily Traffic: 52,233 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: UP RR & ACE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.760,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.7m (104.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 64.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.35m (27.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,068,000,  Roadway Improvement Cost: $213,000,  Total Project Cost: $1,794,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 29 0082R,  Location: 10-SJ-580-12.74 (Lat: 37.712614,  Lng: -121.523514),  Route carried "on" structure: Interstate 580,  Year Built: 1967,  Status: Open,  Structure Length: 8.45m (27.72ft),  Average Daily Traffic: 13,300 (year 2009),  Truck Traffic: 14%,  Average Future Daily Traffic: 52,233 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: UP RR & ACE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.740,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.7m (104.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 64.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.44m (27.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,064,000,  Roadway Improvement Cost: $212,000,  Total Project Cost: $1,787,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 29 0083L,  Location: 10-SJ-580-11.51 (Lat: 37.701708,  Lng: -121.506111),  Route carried "on" structure: Interstate 580,  Year Built: 1967,  Status: Open,  Structure Length: 5.54m (18.18ft),  Average Daily Traffic: 13,300 (year 2009),  Truck Traffic: 14%,  Average Future Daily Traffic: 26,731 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: UP RR & ACE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.510,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.52m (18.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $698,000,  Roadway Improvement Cost: $139,000,  Total Project Cost: $1,172,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 29 0083R,  Location: 10-SJ-580-11.51 (Lat: 37.701853,  Lng: -121.505708),  Route carried "on" structure: Interstate 580,  Year Built: 1967,  Status: Open,  Structure Length: 5.54m (18.18ft),  Average Daily Traffic: 13,300 (year 2009),  Truck Traffic: 14%,  Average Future Daily Traffic: 26,731 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: UP RR & ACE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.510,  Lanes on structure: 2,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.52m (18.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $698,000,  Roadway Improvement Cost: $139,000,  Total Project Cost: $1,172,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 29 0094,  Location: 10-SJ-580-6.57 (Lat: 37.657936,  Lng: -121.434333),  Route carried "on" structure: County highway ,  Year Built: 1966,  Status: Open,  Structure Length: 9.39m (30.81ft),  Average Daily Traffic: 4,190 (year 2010),  Truck Traffic: 2%,  Average Future Daily Traffic: 6,994 (year 2042),  Design Load: HS 20,  Features Intersected: ROUTE 580,  Facility Carried by Structure: TRACY BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.0m (32.8ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 31.4m (103.0ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 31.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 29 0132R,  Location: 10-SJ-205-R5.94 (Lat: 37.757836,  Lng: -121.453444),  Route carried "on" structure: Interstate 205,  Year Built: 1970,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 47,000 (year 2009),  Truck Traffic: 12%,  Average Future Daily Traffic: 75,183 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CORRAL HOLLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.940,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.7m (94.2ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 20.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 29 0161R,  Location: 10-SJ-132-L0.68 (Lat: 37.638881,  Lng: -121.403108),  Route carried "on" structure: State highway 132,  Year Built: 1966,  Status: Open,  Structure Length: 18.14m (59.51ft),  Average Daily Traffic: 10,000 (year 2009),  Truck Traffic: 25%,  Average Future Daily Traffic: 12,000 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: INTERSTATE ROUTE 580
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.680,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 58.5m (191.9ft),  Curb-To-Curb Width: 11.5m (37.7ft),  Out-to-Out Width: 12.1m (39.7ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 48 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: November 2021,  Other Special Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 29 0162,  Location: 10-SJ-132-0.24 (Lat: 37.638861,  Lng: -121.397681),  Route carried "on" structure: County highway Y349,  Year Built: 1966,  Status: Open,  Structure Length: 6.00m (19.69ft),  Average Daily Traffic: 1,500 (year 2010),  Truck Traffic: 38%,  Average Future Daily Traffic: 2,300 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: STATE ROUTE 132,  Facility Carried by Structure: CHRISMAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 36.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.00m (19.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $636,000,  Roadway Improvement Cost: $127,000,  Total Project Cost: $1,068,000 ( Estimate for 2019),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 29 0164L,  Location: 10-SJ-580-11.30 (Lat: 37.699817,  Lng: -121.502986),  Route carried "on" structure: Interstate 580,  Year Built: 1966,  Status: Open,  Structure Length: 2.51m (8.23ft),  Average Daily Traffic: 13,300 (year 2009),  Truck Traffic: 14%,  Average Future Daily Traffic: 26,731 (year 2040),  Design Load: HS 20,  Features Intersected: VALLEY VIEW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.300,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $738,000,  Roadway Improvement Cost: $147,000,  Total Project Cost: $1,240,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 29 0164R,  Location: 10-SJ-580-11.30 (Lat: 37.700064,  Lng: -121.502753),  Route carried "on" structure: Interstate 580,  Year Built: 1966,  Status: Open,  Structure Length: 2.51m (8.23ft),  Average Daily Traffic: 13,300 (year 2009),  Truck Traffic: 14%,  Average Future Daily Traffic: 26,731 (year 2040),  Design Load: HS 20,  Features Intersected: VALLEY VIEW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.300,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $321,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $539,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 29 0165L,  Location: 10-SJ-580-9.71 (Lat: 37.685864,  Lng: -121.479958),  Route carried "on" structure: Interstate 580,  Year Built: 1966,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 13,300 (year 2009),  Truck Traffic: 14%,  Average Future Daily Traffic: 26,731 (year 2040),  Design Load: HS 20,  Features Intersected: VALPICO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.710,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Good,  Operating Rating: 67.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $667,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $1,120,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 29 0165R,  Location: 10-SJ-580-9.71 (Lat: 37.686183,  Lng: -121.479839),  Route carried "on" structure: Interstate 580,  Year Built: 1966,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 13,300 (year 2009),  Truck Traffic: 14%,  Average Future Daily Traffic: 26,731 (year 2040),  Design Load: HS 20,  Features Intersected: VALPICO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.710,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Good,  Operating Rating: 67.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.26m (7.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $290,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $487,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 29 017,  Location: 10-SJ-580-1.41 (Lat: 37.611458,  Lng: -121.360928),  Route carried "on" structure: County highway ,  Year Built: 1967,  Status: Open,  Structure Length: 10.76m (35.30ft),  Average Daily Traffic: 450 (year 1998),  Truck Traffic: 5%,  Average Future Daily Traffic: 657 (year 2042),  Design Load: HS 20,  Features Intersected: INTERSTATE 580,  Facility Carried by Structure: BIRD ROAD OC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 34.2m (112.2ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 26.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 20.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.76m (35.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,119,000,  Roadway Improvement Cost: $223,000,  Total Project Cost: $1,879,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 29 0172L,  Location: 10-SJ-580-12.03 (Lat: 37.706267,  Lng: -121.513669),  Route carried "on" structure: Interstate 580,  Year Built: 1967,  Status: Open,  Structure Length: 2.08m (6.82ft),  Average Daily Traffic: 13,300 (year 2009),  Truck Traffic: 14%,  Average Future Daily Traffic: 52,233 (year 2040),  Design Load: HS 20,  Features Intersected: HANSEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.030,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Good,  Operating Rating: 62.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.07m (6.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $262,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $440,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 29 0172R,  Location: 10-SJ-580-12.03 (Lat: 37.706550,  Lng: -121.513481),  Route carried "on" structure: Interstate 580,  Year Built: 1967,  Status: Open,  Structure Length: 2.08m (6.82ft),  Average Daily Traffic: 13,300 (year 2009),  Truck Traffic: 14%,  Average Future Daily Traffic: 52,233 (year 2040),  Design Load: HS 20,  Features Intersected: HANSEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.030,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes (Inventory Route: 5,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.08m (6.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $264,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $443,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 29 0178L,  Location: 10-SJ-205-R7.01-TRA (Lat: 37.762994,  Lng: -121.435364),  Route carried "on" structure: Interstate 205,  Year Built: 1970,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 4.77m (15.65ft),  Average Daily Traffic: 47,500 (year 2009),  Truck Traffic: 12%,  Average Future Daily Traffic: 71,528 (year 2040),  Design Load: HS 20,  Features Intersected: TRACY BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.010,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 16.9m (55.4ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.1m (85.6ft),  Curb-To-Curb Width: 16.9m (55.4ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 29 0178R,  Location: 10-SJ-205-R7.01-TRA (Lat: 37.762733,  Lng: -121.435358),  Route carried "on" structure: Interstate 205,  Year Built: 1970,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 4.77m (15.65ft),  Average Daily Traffic: 47,500 (year 2009),  Truck Traffic: 12%,  Average Future Daily Traffic: 71,528 (year 2040),  Design Load: HS 20,  Features Intersected: TRACY BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.010,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 16.9m (55.4ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.1m (85.6ft),  Curb-To-Curb Width: 16.9m (55.4ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 29 0181,  Location: 10-SJ-205-R9.61 (Lat: 37.765194,  Lng: -121.387917),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Open,  Structure Length: 7.07m (23.20ft),  Average Daily Traffic: 840 (year 1999),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,336 (year 2042),  Design Load: HS 20,  Features Intersected: ROUTE 205,  Facility Carried by Structure: PARADISE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.9m (114.5ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 29 0182,  Location: 10-SJ-205-R7.52-TRA (Lat: 37.763253,  Lng: -121.426092),  Route carried "on" structure: City street Y346,  Year Built: 1970,  Status: Open,  Structure Length: 6.57m (21.56ft),  Average Daily Traffic: 9,470 (year 1999),  Truck Traffic: 4%,  Average Future Daily Traffic: 31,179 (year 2042),  Design Load: HS 20,  Features Intersected: INTERSTATE 205,  Facility Carried by Structure: HOLLY DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.9m (107.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 55.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 29 0183L,  Location: 10-SJ-205-R7.85-TRA (Lat: 37.763528,  Lng: -121.420011),  Route carried "on" structure: Interstate 205,  Year Built: 1970,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 47,500 (year 2009),  Truck Traffic: 12%,  Average Future Daily Traffic: 71,528 (year 2040),  Design Load: HS 20,  Features Intersected: SUGAR SPUR RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.850,  Lanes on structure: 3,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.1m (75.8ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 19.1m (62.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 37.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 29.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 29 0183R,  Location: 10-SJ-205-R7.85-TRA (Lat: 37.763258,  Lng: -121.419992),  Route carried "on" structure: Interstate 205,  Year Built: 1970,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 47,500 (year 2009),  Truck Traffic: 12%,  Average Future Daily Traffic: 71,528 (year 2040),  Design Load: HS 20,  Features Intersected: SUGAR SPUR RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.850,  Lanes on structure: 3,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 17.0m (55.8ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.1m (75.8ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 33.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 29 0184L,  Location: 10-SJ-205-R8.12-TRA (Lat: 37.764267,  Lng: -121.415017),  Route carried "on" structure: Interstate 205,  Year Built: 1970,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 4.92m (16.14ft),  Average Daily Traffic: 47,500 (year 2009),  Truck Traffic: 12%,  Average Future Daily Traffic: 71,528 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: MACARTHUR DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.120,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 17.0m (55.8ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 29 0184R,  Location: 10-SJ-205-R8.12-TRA (Lat: 37.764003,  Lng: -121.415019),  Route carried "on" structure: Interstate 205,  Year Built: 1970,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 4.92m (16.14ft),  Average Daily Traffic: 47,500 (year 2009),  Truck Traffic: 12%,  Average Future Daily Traffic: 71,528 (year 2040),  Design Load: HS 20,  Features Intersected: MACARTHUR DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.120,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 17.0m (55.8ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 29 0186K,  Location: 10-SJ-205-R5.29-TRA (Lat: 37.753817,  Lng: -121.464628),  Route carried "on" structure: Ramp Interstate 205,  Year Built: 1997,  Status: Open,  Structure Length: 10.80m (35.43ft),  Average Daily Traffic: 6,900 (year 2005),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,166 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: GRANT LINE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.290,  Lanes on structure: 1,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.8m (35.4ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 54.0m (177.2ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 29 0186L,  Location: 10-SJ-205-R5.29-TRA (Lat: 37.753875,  Lng: -121.463861),  Route carried "on" structure: Interstate 205,  Year Built: 1970,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 10.77m (35.33ft),  Average Daily Traffic: 47,000 (year 2009),  Truck Traffic: 12%,  Average Future Daily Traffic: 75,183 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: GRANT LINE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.290,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 6 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 35.2m (115.5ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 29 0186R,  Location: 10-SJ-205-R5.29-TRA (Lat: 37.753872,  Lng: -121.463133),  Route carried "on" structure: Interstate 205,  Year Built: 1970,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 10.77m (35.33ft),  Average Daily Traffic: 47,000 (year 2009),  Truck Traffic: 12%,  Average Future Daily Traffic: 75,183 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: GRANT LINE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.290,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 6 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 35.2m (115.5ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 29 0203,  Location: 10-SJ-205-R3.37 (Lat: 37.741347,  Lng: -121.495964),  Route carried "on" structure: County highway Y332,  Year Built: 1970,  Status: Open,  Structure Length: 12.44m (40.81ft),  Average Daily Traffic: 1,000 (year 1998),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,203 (year 2042),  Design Load: HS 20,  Features Intersected: RTE 205,  Facility Carried by Structure: OLD US 50 OC
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 61.0m (200.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Critical Feature Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 29 0208,  Location: 10-SJ-205-2.38 (Lat: 37.741636,  Lng: -121.513264),  Route carried "on" structure: County highway ,  Year Built: 1970,  Status: Open,  Structure Length: 7.22m (23.69ft),  Average Daily Traffic: 680 (year 1998),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,735 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: I 205,  Facility Carried by Structure: HANSEN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.4m (116.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Operating Rating: 82.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 29 0214L,  Location: 10-SJ-205-R10.48 (Lat: 37.764986,  Lng: -121.372078),  Route carried "on" structure: Interstate 205,  Year Built: 1970,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 48,500 (year 2009),  Truck Traffic: 11%,  Average Future Daily Traffic: 62,130 (year 2040),  Design Load: HS 20,  Features Intersected: EL RANCHO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.480,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 17.0m (55.8ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 29 0214R,  Location: 10-SJ-205-R10.48 (Lat: 37.764722,  Lng: -121.371975),  Route carried "on" structure: Interstate 205,  Year Built: 1970,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 48,500 (year 2009),  Truck Traffic: 11%,  Average Future Daily Traffic: 62,130 (year 2040),  Design Load: HS 20,  Features Intersected: EL RANCHO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.480,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes (Inventory Route: 2,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 17.0m (55.8ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 29 0261,  Location: 10-SJ-005-7.48 (Lat: 37.696303,  Lng: -121.343711),  Route carried "on" structure: County highway ,  Year Built: 1971,  Status: Open,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 164 (year 2010),  Truck Traffic: 10%,  Average Future Daily Traffic: 547 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: INTERSTATE ROUTE 5,  Facility Carried by Structure: LINNE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.4m (103.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 42.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 29C0028,  Location: 3 MI NORTH OF S.H. 205 (Lat: 37.804028,  Lng: -121.449592),  Route carried "on" structure: County highway ,  Year Built: 1956,  Status: Open,  Structure Length: 10.07m (33.04ft),  Average Daily Traffic: 7,008 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,207 (year 2040),  Design Load: HS 20,  Features Intersected: OLD RIVER,  Facility Carried by Structure: S. TRACY BOULEVARD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 34.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 10.07m (33.04ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2020,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $978,000,  Roadway Improvement Cost: $195,000,  Total Project Cost: $1,643,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place
Discuss Tracy, California (CA) on our hugely popular California forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.