Bridge Statistics for Carrollton, Georgia (GA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 53Number of bridges
  • 584ft / 178mTotal length
  • $83,674,000Total costs
  • 433,882Total average daily traffic
  • 8,514Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Carrollton
  • No street view available for this location

New bridges in Carrollton, GA - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 51940-1949
  • 21950-1959
  • 91960-1969
  • 121970-1979
  • 91980-1989
  • 21990-1999
  • 22000-2009
  • 52010-2019
Reconstructed bridges in Carrollton, GA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21970-1979
  • 11980-1989
  • 31990-1999
  • 22000-2009
Average Bridge Daily Traffic in Carrollton, GA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 67.7%Good
  • 32.3%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 6.5%Very good
  • 74.2%Good
  • 12.9%Satisfactory
  • 6.5%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.5%Very good
  • 51.6%Good
  • 29.0%Satisfactory
  • 12.9%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 30.2%Very good
  • 48.8%Good
  • 14.0%Satisfactory
  • 7.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 11.1%Very good
  • 77.8%Good
  • 5.6%Satisfactory
  • 5.6%Fair
Find on map >>   Show street view

Structure Number: 455152,  Location: 4.5 MI N OF CARROLLTON (Lat: 33.635003,  Lng: -85.110153),  Route carried "on" structure: County highway 244,  Year Built: 2003,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 600 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 900 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: LITTLE BUCK CREEEK,  Facility Carried by Structure: MILLER ACADEMY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $117,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $176,000
Find on map >>   Show street view

Structure Number: 455157,  Location: 7 MILES SOUTH OF CARROLLT (Lat: 33.492239,  Lng: -85.023139),  Route carried "on" structure: County highway 1614,  Year Built: 2009,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 380 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 570 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: WHOOPING CREEK,  Facility Carried by Structure: CLEM LOWELL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.219,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.0m (128.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $750,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 455158,  Location: IN SOUTH CARROLLTON (Lat: 33.563044,  Lng: -85.080169),  Route carried "on" structure: City street 971,  Year Built: 2010,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,096 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,644 (year 2031),  Design Load: H 15,  Features Intersected: BUFFALO CREEK,  Facility Carried by Structure: NORTH ALLISON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $102,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $152,000
Find on map >>   Show street view

Structure Number: 45516,  Location: 6 MILES EAST OF CARROLLTO (Lat: 33.575100,  Lng: -84.968578),  Route carried "on" structure: County highway 457,  Year Built: 2011,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 1,890 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,835 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: SNAKE CREEK,  Facility Carried by Structure: HORSLEY MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $352,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $527,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 455161,  Location: 4.4 MILES SOUTH WEST OF C (Lat: 33.525939,  Lng: -85.118278),  Route carried "on" structure: County highway 36,  Year Built: 2011,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 104 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 156 (year 2030),  Design Load: H 15,  Features Intersected: BUFFALO CREEK,  Facility Carried by Structure: LAUREL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Underwater Inspection Date: April 2020,  Bridge Improvement Cost: $82,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $124,000
Find on map >>   Show street view

Structure Number: 455166,  Location: IN SOUTH CARROLLTON (Lat: 33.557558,  Lng: -85.073308),  Route carried "on" structure: US 27,  Year Built: 1977,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 8.93m (29.30ft),  Average Daily Traffic: 32,540 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 48,810 (year 2031),  Design Load: HS 20,  Features Intersected: SR 166 (US 27 ALT)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 41.5m (136.2ft),  Out-to-Out Width: 42.7m (140.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 38.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.73m (35.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $26,048,000,  Roadway Improvement Cost: $2,604,000,  Total Project Cost: $39,072,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 455167,  Location: IN SOUTH CARROLLTON (Lat: 33.561753,  Lng: -85.074269),  Route carried "on" structure: City street 800,  Year Built: 2013,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 7,740 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 11,610 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: BUFFALO CREEK,  Facility Carried by Structure: ROOP STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Inventory Rating: 78.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.17m (3.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,841,000,  Roadway Improvement Cost: $284,000,  Total Project Cost: $4,262,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 455168,  Location: IN SOUTH CARROLLTON (Lat: 33.563194,  Lng: -85.082614),  Route carried "on" structure: City street 1014,  Year Built: 2017,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,096 (year 2011),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,644 (year 2031),  Design Load: HS 20,  Features Intersected: BUFFALO CREEK,  Facility Carried by Structure: STADIUM DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $3,034,000,  Roadway Improvement Cost: $303,000,  Total Project Cost: $4,551,000 ( Estimate for 2018)
Find on map >>   Show street view

Structure Number: 45007,  Location: IN CENTRAL CARROLLTON (Lat: 33.575089,  Lng: -85.079028),  Route carried "under" structure: US 27,  Structure Length: 0. m,  Average Daily Traffic: 22,170 (year 2009),  Truck Traffic: 1%,  Features Intersected: M-808 SOUTH STREET,  Facility Carried by Structure: SOUTH STREET
Minimum Vertical Clearance: 5.76m (18.90ft),  Kilometerpoint: 19.312,  Lanes on structure: 4,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 450072,  Location: 2 MI E OF CARROLLTON (Lat: 33.576981,  Lng: -85.041681),  Route carried "under" structure: State highway 166,  Structure Length: 0. m,  Average Daily Traffic: 23,400 (year 1999),  Truck Traffic: 1%,  Features Intersected: M-812 HORSELY MILL ROAD,  Facility Carried by Structure: HORSELY MILL ROAD
Minimum Vertical Clearance: 5.58m (18.31ft),  Kilometerpoint: 28.968,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 450096,  Location: IN CARROLLTON (Lat: 33.576114,  Lng: -85.078939),  Route carried "under" structure: US 27,  Structure Length: 0. m,  Average Daily Traffic: 18,400 (year 2011),  Truck Traffic: 10%,  Features Intersected: SR 1 (US 27),  Facility Carried by Structure: NORFOLK SOU (71923
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 19.312,  Lanes on structure: 6,  Length of Maximum Span: 0.0m

Find on map >>   Show street view

Structure Number: 455166,  Location: IN SOUTH CARROLLTON (Lat: 33.557558,  Lng: -85.073308),  Route carried "under" structure: Alternate US 27,  Structure Length: 0. m,  Average Daily Traffic: 15,200 (year 1999),  Truck Traffic: 1%,  Features Intersected: SR 166 (US 27)
Minimum Vertical Clearance: 6.01m (19.72ft),  Kilometerpoint: 24.140,  Lanes on structure: 2,  Length of Maximum Span: 0.0m

Discuss Carrollton, Georgia (GA) on our hugely popular Georgia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.