Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Chicopee, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 55Number of bridges
  • 1,411ft / 430mTotal length
  • $594,613,000Total costs
  • 1,633,959Total average daily traffic
  • 171,578Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Chicopee
  • No street view available for this location

New bridges in Chicopee, MA - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 21930-1939
  • 21940-1949
  • 281950-1959
  • 41960-1969
  • 101970-1979
  • 31980-1989
  • 41990-1999
  • 12000-2009
Reconstructed bridges in Chicopee, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31970-1979
  • 111980-1989
  • 51990-1999
  • 32000-2009
  • 12010-2019
Average Bridge Daily Traffic in Chicopee, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 2.1%Very good
  • 29.2%Good
  • 47.9%Satisfactory
  • 18.8%Fair
  • 2.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 2.1%Very good
  • 20.8%Good
  • 41.7%Satisfactory
  • 29.2%Fair
  • 6.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.6%Good
  • 52.1%Satisfactory
  • 31.3%Fair
  • 2.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.5%Very good
  • 47.4%Good
  • 42.1%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 66.7%Satisfactory
Find on map >>   Show street view

Structure Number: C130440WJDOTNBI,  Location: 1 M N JCT I-90 (Lat: 42.171583,  Lng: -72.610192),  Route carried "on" structure: Interstate 391,  Year Built: 1978,  Status: Open,  Structure Length: 2.79m (9.15ft),  Average Daily Traffic: 49,525 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 51,112 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HWY MCKINSTRY AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 23 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 16.1m (52.8ft),  Out-to-Out Width: 33.9m (111.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 73.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $3,538,000,  Roadway Improvement Cost: $354,000,  Total Project Cost: $5,308,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: C13045123DOTNBI,  Location: MM 3.9 ON I-391 (Lat: 42.181278,  Lng: -72.605508),  Route carried "on" structure: State highway 141,  Year Built: 1979,  Status: Open,  Structure Length: 6.41m (21.03ft),  Average Daily Traffic: 10,800 (year 2000),  Truck Traffic: 10%,  Average Future Daily Traffic: 17,056 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I 391
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.647,  Lanes on structure: 5,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 27.4m (89.9ft),  Skew: 23 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 31.5m (103.3ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 30.9m (101.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.50m (21.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,391,000,  Roadway Improvement Cost: $240,000,  Total Project Cost: $3,587,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: C1304613VDOT634,  Location: 850' E OF INT MEADOW ST (Lat: 42.182431,  Lng: -72.607758),  Route carried "on" structure: State highway 141,  Year Built: 1979,  Status: Open,  Structure Length: 1.66m (5.45ft),  Average Daily Traffic: 9,633 (year 2016),  Average Future Daily Traffic: 17,056 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: RR BMRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.679,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.1m (49.5ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 23.5m (77.1ft),  Out-to-Out Width: 33.5m (109.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 71.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $224,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $337,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: C130470WQDOTNBI,  Location: MM 4.0 ON I-391 (Lat: 42.184764,  Lng: -72.606303),  Route carried "on" structure: Interstate 391,  Year Built: 1979,  Status: Open,  Structure Length: 2.40m (7.87ft),  Average Daily Traffic: 35,948 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 51,112 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: RR BMRR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.995,  Lanes on structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.2m (72.8ft),  Curb-To-Curb Width: 28.0m (91.9ft),  Out-to-Out Width: 46.5m (152.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 77.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,226,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $1,840,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: C130490WMDOTNBI,  Location: MM 1.8 ON I-391 (Lat: 42.151917,  Lng: -72.612300),  Route carried "on" structure: Interstate 391,  Year Built: 1979,  Status: Open,  Structure Length: 7.38m (24.21ft),  Average Daily Traffic: 26,000 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 65,688 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: WATER N BR CHICOPEE RIV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.414,  Lanes on structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.2m (105.6ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 32.2m (105.6ft),  Out-to-Out Width: 33.9m (111.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 52.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.40m (24.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $9,854,000,  Roadway Improvement Cost: $986,000,  Total Project Cost: $14,782,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: C130500WNDOTNBI,  Location: 1.65 M N SPRINGFIELD C.L. (Lat: 42.151636,  Lng: -72.611431),  Route carried "on" structure: Ramp Interstate 391,  Year Built: 1979,  Status: Open,  Structure Length: 8.72m (28.61ft),  Average Daily Traffic: 4,725 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 6,535 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: WATER N BR CHICOPEE RIV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.414,  Lanes on structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.5m (103.3ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 63.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.80m (28.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $2,628,000,  Roadway Improvement Cost: $263,000,  Total Project Cost: $3,943,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: C130524HYDOTNBI,  Location: MM 49.0 ON I-90 EB (Lat: 42.169556,  Lng: -72.580958),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 31,163 (year 2017),  Truck Traffic: 12%,  Average Future Daily Traffic: 51,060 (year 2032),  Design Load: HS 20,  Features Intersected: I 90 EXIT 49 RAMPS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 78.856,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 19.6m (64.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $293,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $440,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: C130524J0DOTNBI,  Location: MM 49.0 ON I-90 WB (Lat: 42.169917,  Lng: -72.580925),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 34,525 (year 2017),  Truck Traffic: 12%,  Average Future Daily Traffic: 51,060 (year 2032),  Design Load: HS 20,  Features Intersected: I 90 RAMPS INT 49
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 78.856,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 54.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,030,000,  Roadway Improvement Cost: $104,000,  Total Project Cost: $1,546,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: C130534HMDOTNBI,  Location: MM 51.2 ON I-90 EB (Lat: 42.161383,  Lng: -72.542100),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 32,675 (year 2017),  Truck Traffic: 12%,  Average Future Daily Traffic: 49,614 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I 90 EXIT 51 RAMPS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 82.235,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,299,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $1,949,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: C130534HNDOTNBI,  Location: MM 51.2 ON I-90 WB (Lat: 42.161722,  Lng: -72.542033),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 25,031 (year 2017),  Truck Traffic: 12%,  Average Future Daily Traffic: 49,614 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I 90 EXIT 51 RAMPS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 82.235,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 54.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,023,000,  Roadway Improvement Cost: $103,000,  Total Project Cost: $1,535,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: C13055AEYMUNNBI,  Location: UNDER I391 @ DELTA PARK (Lat: 42.147253,  Lng: -72.614117),  Route carried "on" structure: City street ,  Year Built: 1997,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 300 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,579 (year 2032),  Design Load: HS 20,  Features Intersected: WATER DWIGHT MFG CANAL,  Facility Carried by Structure: HWY DEPOT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.2m (23.6ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 41.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $264,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $397,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: C13056136DOTNBI,  Location: 200' N JCT ST 141 (Lat: 42.158008,  Lng: -72.549247),  Route carried "on" structure: City street ,  Year Built: 1991,  Status: Open,  Structure Length: 10.76m (35.30ft),  Average Daily Traffic: 18,620 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 26,548 (year 2032),  Design Load: HS 20,  Features Intersected: WATER CHICOPEE RIVER,  Facility Carried by Structure: HWY TECHNOLGY DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 67.1m (220.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 23.4m (76.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 73.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.80m (35.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $2,648,000,  Roadway Improvement Cost: $265,000,  Total Project Cost: $3,973,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: C13057AHJMUNNBI,  Location: 570' E OF CAREW ST (Lat: 42.155833,  Lng: -72.557633),  Route carried "on" structure: City street 141,  Year Built: 1993,  Status: Open,  Structure Length: 0.68m (2.23ft),  Average Daily Traffic: 9,698 (year 2015),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,190 (year 2032),  Features Intersected: WATER POOR BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.50m (1.64ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $316,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $475,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: C13058AHHMUNNBI,  Location: .8 M E OF SHERIDAN STREET (Lat: 42.162428,  Lng: -72.560425),  Route carried "on" structure: City street ,  Year Built: 1958,  Status: Open,  Structure Length: 1.72m (5.64ft),  Average Daily Traffic: 13,664 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 28,999 (year 2032),  Features Intersected: WATER COOLEY BROOK,  Facility Carried by Structure: HWY FULLER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 2.5m (8.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.60m (1.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $724,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $1,087,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: G090130LHMUNNBI,  Location: .6 MI E OF S HADLEY LINE (Lat: 42.221717,  Lng: -72.536575),  Route carried "on" structure: City street ,  Year Built: 1940,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 8,000 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 10,897 (year 2031),  Design Load: H 20,  Features Intersected: WATER STONY BROOK,  Facility Carried by Structure: HWY NEW LDLOW RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.821,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.5m (47.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 51.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: December 2020,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $1,083,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,625,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: C130524HYDOTNBI,  Location: .2MI.S.LOMBARD RD (Lat: 42.166667,  Lng: -72.583333),  Route carried "under" structure: Ramp Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 2,483 (year 0000),  Features Intersected: I 90 EB RAMP OFF INTR 5
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 78.856,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.8m (55.1ft)

Find on map >>   Show street view

Structure Number: C130524J0DOTNBI,  Location: .2MI.S.LOMBARD RD (Lat: 42.166667,  Lng: -72.583333),  Route carried "under" structure: Ramp Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 2,345 (year 0000),  Features Intersected: I 90 EB RAMP OFF INTR 5
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 78.856,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.8m (55.1ft)

Find on map >>   Show street view

Structure Number: C130534HMDOTNBI,  Location: .2MI.S.LOMBARD RD (Lat: 42.166667,  Lng: -72.550000),  Route carried "under" structure: Ramp Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 1,853 (year 0000),  Features Intersected: I 90 EB RAMPS INTRCNG 6
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 82.235,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.8m (55.1ft)

Find on map >>   Show street view

Structure Number: C130534HNDOTNBI,  Location: .2MI.S.LOMBARD RD (Lat: 42.166667,  Lng: -72.550000),  Route carried "under" structure: Ramp Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 6,659 (year 0000),  Features Intersected: I 90 EB RAMPS INTRCNG 6
Minimum Vertical Clearance: 4.32m (14.17ft),  Kilometerpoint: 82.235,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.8m (55.1ft)

Discuss Chicopee, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.