Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Clifton, New Jersey (NJ)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 172Number of bridges
  • 1,657ft / 505mTotal length
  • $37,940,000Total costs
  • 7,940,171Total average daily traffic
  • 238,955Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Clifton
  • No street view available for this location

New bridges in Clifton, NJ - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 31900-1909
  • 41910-1919
  • 11920-1929
  • 191930-1939
  • 171940-1949
  • 741950-1959
  • 241960-1969
  • 11980-1989
  • 71990-1999
  • 82000-2009
  • 92010-2019
  • 42020-2022
Reconstructed bridges in Clifton, NJ - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 01930-1939
  • 01940-1949
  • 131950-1959
  • 01960-1969
  • 01970-1979
  • 71980-1989
  • 41990-1999
  • 102000-2009
  • 42010-2019
Average Bridge Daily Traffic in Clifton, NJ
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 1.1%Excellent
  • 2.2%Very good
  • 30.8%Good
  • 45.1%Satisfactory
  • 19.8%Fair
  • 1.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 2.1%Excellent
  • 16.0%Very good
  • 14.9%Good
  • 40.4%Satisfactory
  • 25.5%Fair
  • 1.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.2%Excellent
  • 1.1%Very good
  • 30.9%Good
  • 54.3%Satisfactory
  • 9.6%Fair
  • 1.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.7%Excellent
  • 21.4%Very good
  • 14.3%Good
  • 35.7%Satisfactory
  • 17.9%Fair
Find on map >>   Show street view

Structure Number: 1613154,  Location: 1.28 MI NORTH of US 46 (Lat: 40.893611,  Lng: -74.168011),  Route carried "under" structure: County highway 509,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 5,287 (year 2021),  Truck Traffic: 4%,  Features Intersected: BROAD STREET(CR 509),  Facility Carried by Structure: ROUTE NJ 19
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 37.498,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 361541N,  Location: AT GSP & RT 3 JUNCTION (Lat: 40.850675,  Lng: -74.176375),  Route carried "under" structure: Ramp Other road GSP,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 9,700 (year 2020),  Truck Traffic: 1%,  Features Intersected: INT. 153 SB EXIT RAMP B,  Facility Carried by Structure: GARDEN ST PKWY NB
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 247.936,  Lanes on structure: 3,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 10.1m (33.1ft)

Find on map >>   Show street view

Structure Number: 361541S,  Location: AT GSP & RT 3 JUNCTION (Lat: 40.853419,  Lng: -74.176328),  Route carried "under" structure: Other road GSP,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 74,300 (year 2020),  Truck Traffic: 1%,  Features Intersected: GARDEN STATE PARKWAY SB,  Facility Carried by Structure: ROUTE NJ 3
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 248.129,  Lanes on structure: 7,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 361542N,  Location: AT GSP & RT 3 JUNCTION (Lat: 40.852131,  Lng: -74.175131),  Route carried "under" structure: State highway 3,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 128,369 (year 2020),  Truck Traffic: 4%,  Features Intersected: ROUTE NJ 3,  Facility Carried by Structure: GARDEN ST PKWY NB
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 2.462,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.1m (79.1ft)

Find on map >>   Show street view

Structure Number: 361542S,  Location: AT GSP & RT 3 JUNCTION (Lat: 40.854400,  Lng: -74.175831),  Route carried "under" structure: Other road GSP,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 96,655 (year 2020),  Features Intersected: GSP SB,  Facility Carried by Structure: ALLWOOD RD (CR602)
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 248.290,  Lanes on structure: 4,  Lanes under structure: 3,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 361543N,  Location: AT GSP & RT 3 JUNCTION (Lat: 40.853478,  Lng: -74.174511),  Route carried "under" structure: County highway 602,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 20,578 (year 2020),  Truck Traffic: 1%,  Features Intersected: ALLWOOD RD (CR 602),  Facility Carried by Structure: GARDEN ST PKWY NB
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.354,  Lanes on structure: 5,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 361544A,  Location: AT GSP & RT 3 JUNCTION (Lat: 40.859622,  Lng: -74.176972),  Route carried "under" structure: County highway 509,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 17,617 (year 2020),  Features Intersected: BROAD ST (CR 509),  Facility Carried by Structure: INT 153 RAMPS E&G
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 33.185,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>   Show street view

Structure Number: 361544S,  Location: AT GSP & RT 3 JUNCTION (Lat: 40.856128,  Lng: -74.174736),  Route carried "under" structure: Other road GSP,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 95,522 (year 2020),  Features Intersected: GARDEN STATE PARKWAY SB,  Facility Carried by Structure: INT 153 NB RAMP E
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 248.563,  Lanes on structure: 1,  Lanes under structure: 3,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 361554T,  Location: 0.5 MI S OF GSP & RT46 JC (Lat: 40.868836,  Lng: -74.168186),  Route carried "under" structure: Other road GSP,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 161,400 (year 2020),  Features Intersected: GARDEN ST PARKWAY,  Facility Carried by Structure: VAN HOUTEN AVE
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 250.092,  Lanes on structure: 3,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 361557T,  Location: 0.25 MI S OF GSP&RT46 JCT (Lat: 40.873669,  Lng: -74.166689),  Route carried "under" structure: Other road GSP,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 133,807 (year 2020),  Features Intersected: GARDEN ST PARKWAY,  Facility Carried by Structure: COLFAX AVE (CR609)
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 250.623,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 361558T,  Location: 2.3 MILES SOUTH OF I80 (Lat: 40.875392,  Lng: -74.168339),  Route carried "under" structure: Other road GSP,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 129,043 (year 2020),  Truck Traffic: 1%,  Features Intersected: GSP & ROUTE US 46,  Facility Carried by Structure: NB ENTRANCE RAMP F
Minimum Vertical Clearance: 13.36m (43.83ft),  Kilometerpoint: 250.881,  Lanes on structure: 1,  Lanes under structure: 7,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: 361558T,  Location: 2.3 MILES SOUTH OF I80 (Lat: 40.875392,  Lng: -74.168339),  Route carried "under" structure: Ramp US 46,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 2,122 (year 2020),  Truck Traffic: 1%,  Features Intersected: GSP & ROUTE US 46,  Facility Carried by Structure: NB ENTRANCE RAMP F
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 98.669,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: 361558T,  Location: 2.3 MILES SOUTH OF I80 (Lat: 40.875392,  Lng: -74.168339),  Route carried "under" structure: State highway 19,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 64,413 (year 2020),  Truck Traffic: 3%,  Features Intersected: GSP & ROUTE US 46,  Facility Carried by Structure: NB ENTRANCE RAMP F
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 0.177,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: 361558T,  Location: 2.3 MILES SOUTH OF I80 (Lat: 40.875392,  Lng: -74.168339),  Route carried "under" structure: Ramp US 46,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 2,122 (year 2020),  Truck Traffic: 1%,  Features Intersected: GSP & ROUTE US 46,  Facility Carried by Structure: NB ENTRANCE RAMP F
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 98.669,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: 361558T,  Location: 2.3 MILES SOUTH OF I80 (Lat: 40.875392,  Lng: -74.168339),  Route carried "under" structure: US 46,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 60,667 (year 2020),  Truck Traffic: 4%,  Features Intersected: GSP & ROUTE US 46,  Facility Carried by Structure: NB ENTRANCE RAMP F
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 98.862,  Lanes on structure: 1,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.2m (108.9ft)

Find on map >>   Show street view

Structure Number: 361559T,  Location: 2.5 MI N OF RT 3-GSP JCT (Lat: 40.876236,  Lng: -74.166375),  Route carried "under" structure: Other road GSP,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 128,533 (year 2020),  Truck Traffic: 1%,  Features Intersected: GARDEN ST PARKWAY,  Facility Carried by Structure: ROUTE US 46
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 250.913,  Lanes on structure: 6,  Lanes under structure: 7,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 361561A,  Location: 1.9 MILES SOUTH OF I80 (Lat: 40.878428,  Lng: -74.167900),  Route carried "under" structure: State highway 19,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 24,347 (year 2020),  Truck Traffic: 1%,  Features Intersected: SB SPUR & ROUTE NJ 19,  Facility Carried by Structure: INT. 154 SB RAMP
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.547,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 361561A,  Location: 1.9 MILES SOUTH OF I80 (Lat: 40.878428,  Lng: -74.167900),  Route carried "under" structure: Ramp Other road GSP,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 7,477 (year 2020),  Truck Traffic: 1%,  Features Intersected: SB SPUR & ROUTE NJ 19,  Facility Carried by Structure: INT. 154 SB RAMP
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 251.299,  Lanes on structure: 1,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.3m (96.1ft)

Find on map >>   Show street view

Structure Number: 361561S,  Location: AT GSP & RT 19 JUNCTION (Lat: 40.881086,  Lng: -74.165981),  Route carried "under" structure: Ramp Other road GSP,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 71,073 (year 2020),  Features Intersected: NB SPUR (ROUTE NJ 19)
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 251.380,  Lanes on structure: 4,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 361563S,  Location: 0.3 MI E OF GSP&RT20 JCT (Lat: 40.883150,  Lng: -74.164150),  Route carried "under" structure: City street ,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 12,950 (year 2020),  Truck Traffic: 3%,  Features Intersected: KULLER ROAD,  Facility Carried by Structure: GARDEN ST PKWY SB
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.579,  Lanes on structure: 4,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 361564N,  Location: 0.3 MI E OF GSP&RT20 JCT (Lat: 40.882628,  Lng: -74.164056),  Route carried "under" structure: City street ,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 12,950 (year 2020),  Truck Traffic: 3%,  Features Intersected: KULLER ROAD,  Facility Carried by Structure: GARDEN ST PKWY NB
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.579,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 361567T,  Location: 0.75 MI NE OF GSP&RT46 JC (Lat: 40.884967,  Lng: -74.159597),  Route carried "under" structure: Other road GSP,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 129,975 (year 2020),  Truck Traffic: 1%,  Features Intersected: GARDEN ST PARKWAY,  Facility Carried by Structure: HAZEL STREET
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 252.152,  Lanes on structure: 2,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 361570S,  Location: 1 MI NE OF GSP&RT46 JCT (Lat: 40.886806,  Lng: -74.151500),  Route carried "under" structure: County highway 601,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 14,169 (year 2020),  Truck Traffic: 4%,  Features Intersected: MAIN AVENUE (CR 601),  Facility Carried by Structure: GARDEN ST PKWY SB
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 7.998,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 361571N,  Location: 1 MI NE OF GSP&RT46 JCT (Lat: 40.886708,  Lng: -74.151417),  Route carried "under" structure: County highway 601,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 14,064 (year 2020),  Truck Traffic: 4%,  Features Intersected: MAIN AVENUE (CR 601),  Facility Carried by Structure: GARDEN ST PKWY NB
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 7.998,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 361571S,  Location: 1 MI NE OF GSP&RT46 JCT (Lat: 40.887236,  Lng: -74.149583),  Route carried "under" structure: City street ,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 9,115 (year 2020),  Truck Traffic: 4%,  Features Intersected: GETTY AVE,  Facility Carried by Structure: GSP SB
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 0.612,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 361572N,  Location: 1 MI NE OF GSP&RT46 JCT (Lat: 40.887111,  Lng: -74.149472),  Route carried "under" structure: City street ,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 9,300 (year 2020),  Truck Traffic: 3%,  Features Intersected: GETTY AVE,  Facility Carried by Structure: Parkway N
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.612,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 361573S,  Location: .75 MI W OF GSP&PASSAIC R (Lat: 40.888208,  Lng: -74.145292),  Route carried "under" structure: City street ,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 12,736 (year 2020),  Truck Traffic: 1%,  Features Intersected: CURIE AVENUE,  Facility Carried by Structure: GARDEN ST PKWY SB
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.5m (54.1ft)

Find on map >>   Show street view

Structure Number: 361574N,  Location: .75 MI W OF GSP&PASSAIC R (Lat: 40.887867,  Lng: -74.145292),  Route carried "under" structure: City street ,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 12,736 (year 2020),  Truck Traffic: 1%,  Features Intersected: CURIE AVENUE,  Facility Carried by Structure: GARDEN ST PKWY NB
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 16.5m (54.1ft)

Find on map >>   Show street view

Structure Number: 361578T,  Location: .5 MI W OF GSP&PASSAIC RV (Lat: 40.889022,  Lng: -74.139072),  Route carried "under" structure: Other road GSP,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 121,482 (year 2020),  Features Intersected: Garden State Parkway,  Facility Carried by Structure: Lakeview Avenue
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 253.954,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>   Show street view

Structure Number: 361581A,  Location: AT GSP&PASSAIC RIVER JCT (Lat: 40.888019,  Lng: -74.131631),  Route carried "under" structure: US 46,  Year Built: 1954,  Structure Length: 0. m,  Average Daily Traffic: 103,178 (year 2020),  Truck Traffic: 4%,  Features Intersected: ROUTE US 46,  Facility Carried by Structure: INT. 156 RAMP B
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 102.113,  Lanes on structure: 1,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 361582T,  Location: 0.9 MILES SOUTH OF I80 (Lat: 40.532400,  Lng: -74.074797),  Route carried "under" structure: US 46,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 110,969 (year 2021),  Truck Traffic: 1%,  Features Intersected: PASS.RIV.RT.46,RIVER DR,  Facility Carried by Structure: GARDEN STATE PKWY
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 164.671,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: 361582T,  Location: 0.9 MILES SOUTH OF I80 (Lat: 40.532400,  Lng: -74.074797),  Route carried "under" structure: County highway 507,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 12,367 (year 2021),  Truck Traffic: 1%,  Features Intersected: PASS.RIV.RT.46,RIVER DR,  Facility Carried by Structure: GARDEN STATE PKWY
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 3.106,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 37.8m (124.0ft)

Discuss Clifton, New Jersey (NJ) on our hugely popular New Jersey forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.