Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Colchester, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 70Number of bridges
  • 886ft / 270mTotal length
  • $111,054,000Total costs
  • 53,307Total average daily traffic
  • 9,272Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Colchester
  • No street view available for this location

New bridges in Colchester, NY - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11920-1929
  • 31930-1939
  • 41940-1949
  • 51950-1959
  • 271960-1969
  • 71970-1979
  • 11980-1989
  • 41990-1999
  • 82000-2009
  • 92010-2019
Reconstructed bridges in Colchester, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 71980-1989
  • 41990-1999
  • 22000-2009
  • 72010-2019
Average Bridge Truck Traffic in Colchester, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.4%Excellent
  • 26.8%Very good
  • 41.1%Good
  • 12.5%Satisfactory
  • 14.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 19.6%Excellent
  • 21.4%Very good
  • 28.6%Good
  • 16.1%Satisfactory
  • 10.7%Fair
  • 3.6%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.7%Excellent
  • 25.0%Very good
  • 23.2%Good
  • 21.4%Satisfactory
  • 17.9%Fair
  • 1.8%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 10.3%Very good
  • 22.4%Good
  • 41.4%Satisfactory
  • 20.7%Fair
  • 5.2%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Fair
Find on map >>   Show street view

Structure Number: 102077,  Location: 8.6 MI N JCT SH 30 & SH 1 (Lat: 42.040331,  Lng: -75.067650),  Route carried "on" structure: State highway 30,  Year Built: 1949,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 569 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 572 (year 2040),  Design Load: HS 15,  Features Intersected: TROUT BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.837,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $462,000,  Roadway Improvement Cost: $271,000,  Total Project Cost: $733,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 102078,  Location: JCT SH 30 & SH 206 (Lat: 42.080364,  Lng: -74.995025),  Route carried "on" structure: State highway 30,  Year Built: 1949,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 1,523 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,532 (year 2040),  Design Load: HS 15,  Features Intersected: DOWNS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.071,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.8m (61.7ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $819,000,  Roadway Improvement Cost: $480,000,  Total Project Cost: $1,299,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102079,  Location: .9 MI E JCT SH 30 & SH206 (Lat: 42.074628,  Lng: -74.981939),  Route carried "on" structure: State highway 30,  Year Built: 2017,  Status: Open,  Structure Length: 8.11m (26.61ft),  Average Daily Traffic: 1,523 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,532 (year 2040),  Design Load: HL 93,  Features Intersected: E BR DELAWARE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.535,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: Local Agency,  Maintenance Responsibility: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 40.2m (131.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.10m (26.57ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $2,056,000,  Roadway Improvement Cost: $1,204,000,  Total Project Cost: $3,260,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 104044,  Location: .5 MI NW JCT SH 206 & SH (Lat: 42.086997,  Lng: -75.001897),  Route carried "on" structure: State highway 206,  Year Built: 1949,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 1,565 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,574 (year 2040),  Features Intersected: WILSON HOLLOW BRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.585,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $724,000,  Roadway Improvement Cost: $424,000,  Total Project Cost: $1,148,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1054941,  Location: EXIT 92 OF SH 17 (Lat: 41.970467,  Lng: -75.021569),  Route carried "on" structure: State highway 17,  Year Built: 1968,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 13.11m (43.01ft),  Average Daily Traffic: 2,831 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 4,418 (year 2040),  Design Load: HS 20,  Features Intersected: CR 17, BEAVER KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.031,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 54.9m (180.1ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.10m (42.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $3,003,000,  Roadway Improvement Cost: $1,759,000,  Total Project Cost: $4,762,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1054942,  Location: EXIT 92 RTE 17 INT (Lat: 41.970242,  Lng: -75.022283),  Route carried "on" structure: State highway 17,  Year Built: 1968,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 13.87m (45.51ft),  Average Daily Traffic: 2,831 (year 2020),  Truck Traffic: 30%,  Average Future Daily Traffic: 4,418 (year 2040),  Design Load: HS 20,  Features Intersected: CR 17, BEAVER KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.031,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 54.9m (180.1ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.86m (45.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $3,169,000,  Roadway Improvement Cost: $1,856,000,  Total Project Cost: $5,024,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1054951,  Location: 0.5 MI E EXIT 92 - SH 17 (Lat: 41.969964,  Lng: -75.014758),  Route carried "on" structure: State highway 17,  Year Built: 1968,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 15.79m (51.80ft),  Average Daily Traffic: 2,522 (year 2020),  Truck Traffic: 26%,  Average Future Daily Traffic: 3,935 (year 2040),  Design Load: HS 20,  Features Intersected: CR 17, BEAVER KILL, Chil
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.578,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 42.9m (140.7ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.78m (51.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $3,628,000,  Roadway Improvement Cost: $2,125,000,  Total Project Cost: $5,753,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1054952,  Location: 0.5 MI E EXIT 92 RTE 17 (Lat: 41.969572,  Lng: -75.014431),  Route carried "on" structure: State highway 17,  Year Built: 1968,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 17.31m (56.79ft),  Average Daily Traffic: 2,522 (year 2020),  Truck Traffic: 26%,  Average Future Daily Traffic: 3,935 (year 2040),  Design Load: HS 20,  Features Intersected: CR 17, BEAVER KILL, Chil
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.578,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 42.9m (140.7ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 17.31m (56.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $3,975,000,  Roadway Improvement Cost: $2,328,000,  Total Project Cost: $6,303,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1054961,  Location: 3.9 MI NW SULLIVAN CO LN (Lat: 41.959111,  Lng: -74.990736),  Route carried "on" structure: State highway 17,  Year Built: 1968,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 9.81m (32.19ft),  Average Daily Traffic: 1,947 (year 2020),  Truck Traffic: 26%,  Average Future Daily Traffic: 3,037 (year 2040),  Design Load: HS 20,  Features Intersected: RUSSEL BROOK ROAD, RUSSE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.976,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.81m (32.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,327,000,  Roadway Improvement Cost: $1,363,000,  Total Project Cost: $3,690,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1054962,  Location: 3.9 MI NW SULLIVAN CL (Lat: 41.958836,  Lng: -74.990894),  Route carried "on" structure: State highway 17,  Year Built: 1968,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 9.48m (31.10ft),  Average Daily Traffic: 1,947 (year 2020),  Truck Traffic: 26%,  Average Future Daily Traffic: 3,037 (year 2040),  Design Load: HS 20,  Features Intersected: RUSSELL BROOK RD, RUSSEL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.976,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.47m (31.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $2,255,000,  Roadway Improvement Cost: $1,320,000,  Total Project Cost: $3,575,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1054971,  Location: 2.7 MI NW SULLIVAN CL (Lat: 41.952083,  Lng: -74.971553),  Route carried "on" structure: State highway 17,  Year Built: 1968,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 16.73m (54.89ft),  Average Daily Traffic: 1,947 (year 2020),  Truck Traffic: 26%,  Average Future Daily Traffic: 3,037 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: COOK FALLS ROAD, BEAVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.858,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 40.2m (131.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 44.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 16.73m (54.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $3,558,000,  Roadway Improvement Cost: $2,084,000,  Total Project Cost: $5,642,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1054972,  Location: 2.7 MI NW SULLIVAN CL (Lat: 41.951808,  Lng: -74.971053),  Route carried "on" structure: State highway 17,  Year Built: 1968,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 18.29m (60.01ft),  Average Daily Traffic: 1,947 (year 2020),  Truck Traffic: 26%,  Average Future Daily Traffic: 3,037 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: COOK FALLS ROAD, BEAVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.858,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 42.9m (140.7ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.28m (59.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $3,876,000,  Roadway Improvement Cost: $2,270,000,  Total Project Cost: $6,145,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1054981,  Location: 2.4 MI NW SULLIVAN CO LN (Lat: 41.950494,  Lng: -74.965869),  Route carried "on" structure: State highway 17,  Year Built: 1968,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 14.17m (46.49ft),  Average Daily Traffic: 1,947 (year 2020),  Truck Traffic: 26%,  Average Future Daily Traffic: 3,037 (year 2040),  Design Load: HS 20,  Features Intersected: CR 17, BEAVER KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 52.389,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 61.0m (200.1ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.17m (46.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $3,317,000,  Roadway Improvement Cost: $1,942,000,  Total Project Cost: $5,259,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1054982,  Location: 2.4 MI NW SULLIVAN CL (Lat: 41.950144,  Lng: -74.965481),  Route carried "on" structure: State highway 17,  Year Built: 1968,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 14.17m (46.49ft),  Average Daily Traffic: 1,947 (year 2020),  Truck Traffic: 26%,  Average Future Daily Traffic: 3,037 (year 2040),  Design Load: HS 20,  Features Intersected: CR 17, BEAVER KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 52.389,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 61.0m (200.1ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.17m (46.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $3,317,000,  Roadway Improvement Cost: $1,942,000,  Total Project Cost: $5,259,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1054991,  Location: 0.6MI N SULLIVAN CL (Lat: 41.956056,  Lng: -74.936194),  Route carried "on" structure: State highway 17,  Year Built: 1968,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 11.06m (36.29ft),  Average Daily Traffic: 1,947 (year 2020),  Truck Traffic: 26%,  Average Future Daily Traffic: 3,037 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CR 17, BEAVER KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 55.205,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 42.0m (137.8ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.06m (36.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,438,000,  Roadway Improvement Cost: $1,428,000,  Total Project Cost: $3,866,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1054992,  Location: 0.6MI N SULLIVAN CL (Lat: 41.955961,  Lng: -74.936925),  Route carried "on" structure: State highway 17,  Year Built: 1968,  Status: Open,  Structure Length: 13.17m (43.21ft),  Average Daily Traffic: 1,947 (year 2020),  Truck Traffic: 26%,  Average Future Daily Traffic: 3,037 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: CR 17, BEAVER KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 55.205,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 42.9m (140.7ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 37.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.16m (43.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,817,000,  Roadway Improvement Cost: $1,650,000,  Total Project Cost: $4,467,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 109455,  Location: 2.6 MI NW JCT SH 206 & SH (Lat: 42.107644,  Lng: -75.027811),  Route carried "on" structure: State highway 206,  Year Built: 1937,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 1,565 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,574 (year 2040),  Features Intersected: WILSON HOLLOW BRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.271,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft)

Condition: Channel: Fair,  Culverts: Fair,  Inventory Rating: 71.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $269,000,  Roadway Improvement Cost: $157,000,  Total Project Cost: $426,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 22266,  Location: 5.5 MILES NE OF ROSCOE (Lat: 41.985278,  Lng: -74.850453),  Route carried "on" structure: Other road ,  Year Built: 1978,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 55 (year 2018),  Average Future Daily Traffic: 77 (year 2038),  Design Load: HS 20,  Features Intersected: BERRY BROOK,  Facility Carried by Structure: HOLIDAY&BRY BK RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.4m (40.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $581,000,  Roadway Improvement Cost: $340,000,  Total Project Cost: $921,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 222661,  Location: 5.5 MILES NE OF ROSCOE (Lat: 41.985917,  Lng: -74.849603),  Route carried "on" structure: Other road ,  Year Built: 1978,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 55 (year 2018),  Average Future Daily Traffic: 77 (year 2038),  Design Load: HS 20,  Features Intersected: BERRY BROOK,  Facility Carried by Structure: HOLIDAY & BERRY BR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $470,000,  Roadway Improvement Cost: $276,000,  Total Project Cost: $746,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 222664,  Location: 3 MI SW OF DOWNSVILLE (Lat: 42.044733,  Lng: -75.021364),  Route carried "on" structure: Other road ,  Year Built: 1983,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 243 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 340 (year 2036),  Design Load: HS 20,  Features Intersected: CAMPBELL BROOK,  Facility Carried by Structure: RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.969,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $406,000,  Roadway Improvement Cost: $238,000,  Total Project Cost: $644,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 222665,  Location: 8 MI NE DOWNSVILLE (Lat: 42.129083,  Lng: -74.898333),  Route carried "on" structure: Other road ,  Year Built: 1930,  Year Reconstructed: 1999,  Status: Posted for load,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 7 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 10 (year 2037),  Features Intersected: COLES CLOVE BROOK,  Facility Carried by Structure: EDWARDS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.257,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 4.0m (13.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $153,000,  Roadway Improvement Cost: $89,000,  Total Project Cost: $242,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 226611,  Location: 2.1 MI NE OF DOWNSVILLE (Lat: 42.102333,  Lng: -74.970669),  Route carried "on" structure: Other road ,  Year Built: 1974,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 25 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 35 (year 2037),  Design Load: HS 20,  Features Intersected: DOWNS BROOK,  Facility Carried by Structure: DOE BROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $311,000,  Roadway Improvement Cost: $182,000,  Total Project Cost: $493,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 227075,  Location: Colchester (Lat: 42.059156,  Lng: -74.872217),  Route carried "on" structure: County highway ,  Year Built: 2014,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 50 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 70 (year 2039),  Design Load: HS 20,  Features Intersected: Holiday Brook,  Facility Carried by Structure: Holiday Brook Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $289,000,  Roadway Improvement Cost: $169,000,  Total Project Cost: $458,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335187,  Location: 2.5 MI N OF ROCKLAND (Lat: 41.965092,  Lng: -74.906906),  Route carried "on" structure: County highway 206,  Year Built: 1955,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 2,371 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,473 (year 2040),  Design Load: HS 20,  Features Intersected: BEAVER KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 64.794,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.2m (82.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.18m (16.99ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: November 2020,  Underwater Inspection Date: October 2013,  Bridge Improvement Cost: $1,617,000,  Roadway Improvement Cost: $947,000,  Total Project Cost: $2,564,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 335188,  Location: 4.5 MI NORTH OF ROCKLAND (Lat: 41.967758,  Lng: -74.898739),  Route carried "on" structure: Other road ,  Year Built: 1995,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 201 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 281 (year 2037),  Design Load: HS 20,  Features Intersected: SPRING BROOK,  Facility Carried by Structure: BEAVER KILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $237,000,  Roadway Improvement Cost: $139,000,  Total Project Cost: $376,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 335189,  Location: 5.3 MI NORTH OF ROCKLAND (Lat: 41.978758,  Lng: -74.893497),  Route carried "on" structure: County highway 206,  Year Built: 1977,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 1,637 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,707 (year 2040),  Design Load: HS 20,  Features Intersected: SPRING BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 62.783,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,783,000,  Roadway Improvement Cost: $1,044,000,  Total Project Cost: $2,827,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33519,  Location: 5.6 MI N OF ROSCOE (Lat: 41.988539,  Lng: -74.893742),  Route carried "on" structure: County highway 206,  Year Built: 2001,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 1,637 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,707 (year 2040),  Design Load: HS 20,  Features Intersected: SPRING BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 61.673,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.46m (8.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $584,000,  Roadway Improvement Cost: $342,000,  Total Project Cost: $926,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335191,  Location: 5.7 MI N OF ROSCOE (Lat: 42.002364,  Lng: -74.892642),  Route carried "on" structure: County highway 206,  Year Built: 2002,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 1,637 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,707 (year 2040),  Design Load: HS 20,  Features Intersected: SPRING BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 60.096,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.43m (7.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $647,000,  Roadway Improvement Cost: $379,000,  Total Project Cost: $1,026,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335192,  Location: 6.1 MI N OF ROSCO (Lat: 42.005314,  Lng: -74.892278),  Route carried "on" structure: County highway 206,  Year Built: 2002,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 1,637 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,707 (year 2040),  Features Intersected: SPRING BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 59.758,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Poor,  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.46m (8.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $594,000,  Roadway Improvement Cost: $348,000,  Total Project Cost: $942,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335193,  Location: 6.8 MI N OF ROCKLAND (Lat: 42.014264,  Lng: -74.890361),  Route carried "on" structure: County highway 206,  Year Built: 2002,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 1,637 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,707 (year 2040),  Features Intersected: SPRING BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 58.761,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.0m (88.6ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Poor,  Inventory Rating: 68.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $678,000,  Roadway Improvement Cost: $397,000,  Total Project Cost: $1,074,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335194,  Location: 7.2 MI N OF ROCKLAND (Lat: 42.018444,  Lng: -74.891097),  Route carried "on" structure: County highway 206,  Year Built: 2002,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 1,637 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,707 (year 2040),  Design Load: HS 20,  Features Intersected: SPRING BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 58.278,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.46m (8.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $579,000,  Roadway Improvement Cost: $339,000,  Total Project Cost: $919,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335195,  Location: 1.2 MI NW OF DOWNSVILLE (Lat: 42.094200,  Lng: -74.984772),  Route carried "on" structure: County highway ,  Year Built: 2017,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 1,040 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,456 (year 2036),  Design Load: HL 93,  Features Intersected: TELFORD HLLOW BRK,  Facility Carried by Structure: COUNTY ROAD 26
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.965,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Excellent,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $712,000,  Roadway Improvement Cost: $417,000,  Total Project Cost: $1,129,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 335196,  Location: 1.7 MI NW OF DOWNSVILLE (Lat: 42.102736,  Lng: -74.985281),  Route carried "on" structure: County highway ,  Year Built: 1954,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 793 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,110 (year 2037),  Design Load: HS 20,  Features Intersected: TELFORD HOLLOW BK,  Facility Carried by Structure: COUNTY ROAD 26
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.931,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $523,000,  Roadway Improvement Cost: $306,000,  Total Project Cost: $829,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335197,  Location: 2 MI NW OF DOWNSVILLE (Lat: 42.107353,  Lng: -74.987169),  Route carried "on" structure: County highway ,  Year Built: 2015,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 793 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,110 (year 2037),  Design Load: HS 20,  Features Intersected: TELFORD HLLOW BRK,  Facility Carried by Structure: COUNTY ROAD 26
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.478,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,022,000,  Roadway Improvement Cost: $1,184,000,  Total Project Cost: $3,206,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 335198,  Location: COOKS FALLS-BEAVER KLL RV (Lat: 41.946581,  Lng: -74.979425),  Route carried "on" structure: Other road ,  Year Built: 1977,  Status: Open,  Structure Length: 5.61m (18.41ft),  Average Daily Traffic: 111 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 155 (year 2037),  Design Load: HS 20,  Features Intersected: BEAVER KILL RIVER,  Facility Carried by Structure: COOKS BROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.0m (91.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.60m (18.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,409,000,  Roadway Improvement Cost: $825,000,  Total Project Cost: $2,234,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 3352,  Location: 0.25 M_WEST_SR206/BEAVERK (Lat: 41.965492,  Lng: -74.909028),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 86 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 120 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: MORTON BROOK,  Facility Carried by Structure: MORTON HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Poor,  Operating Rating: 97.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $432,000,  Roadway Improvement Cost: $253,000,  Total Project Cost: $686,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335201,  Location: 1 MI N OF HORTON (Lat: 41.985886,  Lng: -75.007892),  Route carried "on" structure: Other road ,  Year Built: 1957,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 153 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 214 (year 2037),  Design Load: HS 20,  Features Intersected: HORTON BROOK,  Facility Carried by Structure: HORTON BROOK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.722,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $416,000,  Roadway Improvement Cost: $244,000,  Total Project Cost: $660,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous