Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Escondido, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 155Number of bridges
  • 1,814ft / 553mTotal length
  • $4,750,000Total costs
  • 6,296,826Total average daily traffic
  • 365,772Total average daily truck traffic
  • 6,302,634Total future (year 2034) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Escondido
  • No street view available for this location

New bridges in Escondido, CA - historical statistics
  • New bridges - historical statistics
  • 21900-1909
  • 41940-1949
  • 21950-1959
  • 311960-1969
  • 911970-1979
  • 121980-1989
  • 61990-1999
  • 42000-2009
  • 32010-2018
Reconstructed bridges in Escondido, CA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21960-1969
  • 41970-1979
  • 31980-1989
  • 21990-1999
  • 162000-2009
Average Bridge Daily Traffic in Escondido, CA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.6%Very good
  • 39.5%Good
  • 17.4%Satisfactory
  • 16.3%Fair
  • 1.2%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 34.5%Very good
  • 60.9%Good
  • 4.6%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 47.1%Very good
  • 52.9%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 69.4%Excellent
  • 20.4%Very good
  • 10.2%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 28.6%Very good
  • 64.3%Good
  • 7.1%Satisfactory
Find on map >>   Show street view

Structure Number: 57C0782,  Location: 1.1M N/O EL NORTE PKWY (Lat: 33.155197,  Lng: -117.091856),  Route carried "on" structure: City street ,  Year Built: 2006,  Status: Open,  Structure Length: 0.10m (0.33ft),  Average Daily Traffic: 10,740 (year 2014),  Truck Traffic: 2%,  Average Future Daily Traffic: 11,000 (year 2034),  Features Intersected: REIDY CREEK,  Facility Carried by Structure: N. BROADWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 235.0m (771.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 0.2m (0.7ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 2.8m (9.2ft)

Condition: Channel: Excellent,  Culverts: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2016
Find on map >>   Show street view

Structure Number: 57C0783,  Location: 1.05M N/O EL NORTE PKWY (Lat: 33.156831,  Lng: -117.092117),  Route carried "on" structure: City street ,  Year Built: 2006,  Status: Open,  Structure Length: 0.33m (1.08ft),  Average Daily Traffic: 11,100 (year 2014),  Truck Traffic: 2%,  Average Future Daily Traffic: 12,500 (year 2034),  Features Intersected: REIDY CREEK,  Facility Carried by Structure: N. BROADWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 195.0m (639.8ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 2.8m (9.2ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2016
Find on map >>   Show street view

Structure Number: 57C0784,  Location: INT. OF JESMOND DENE RD (Lat: 33.168036,  Lng: -117.090342),  Route carried "on" structure: City street ,  Year Built: 2005,  Status: Open,  Structure Length: 1.18m (3.87ft),  Average Daily Traffic: 11,100 (year 2014),  Truck Traffic: 2%,  Average Future Daily Traffic: 12,000 (year 2034),  Features Intersected: REIDY CREEK,  Facility Carried by Structure: N. BROADWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 195.0m (639.8ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft)

Condition: Channel: Excellent,  Culverts: Satisfactory,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: March 2016
Find on map >>   Show street view

Structure Number: 57C0808M,  Location: 0.24MI N/O FELICITA ROAD (Lat: 33.085256,  Lng: -117.081683),  Route carried "on" structure: County highway ,  Year Built: 2010,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 350 (year 2016),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,122 (year 2036),  Features Intersected: SAN DIEGUITO R. TRIB.,  Facility Carried by Structure: MILLER AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 106.0m (347.8ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.5m (8.2ft),  Curb-To-Curb Width: 11.5m (37.7ft),  Out-to-Out Width: 1.5m (4.9ft)

Condition: Channel: Excellent,  Culverts: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: June 2017
Discuss Escondido, California (CA) on our hugely popular California forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.