Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Huntsville, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 639Number of bridges
  • 11,867ft / 3,617mTotal length
  • $1,521,431,000Total costs
  • 10,240,811Total average daily traffic
  • 528,271Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Huntsville
  • No street view available for this location

New bridges in Huntsville, AL - historical statistics
  • New bridges - historical statistics
  • 21900-1909
  • 31910-1919
  • 131920-1929
  • 381930-1939
  • 241940-1949
  • 421950-1959
  • 711960-1969
  • 551970-1979
  • 1011980-1989
  • 1771990-1999
  • 662000-2009
  • 352010-2019
  • 122020-2022
Reconstructed bridges in Huntsville, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21930-1939
  • 11940-1949
  • 31950-1959
  • 61960-1969
  • 31970-1979
  • 81980-1989
  • 31990-1999
  • 62000-2009
  • 12010-2019
Average Bridge Daily Traffic in Huntsville, AL
Average Bridge Truck Traffic in Huntsville, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 3.9%Excellent
  • 8.5%Very good
  • 47.5%Good
  • 29.9%Satisfactory
  • 9.5%Fair
  • 0.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 4.9%Excellent
  • 9.4%Very good
  • 53.8%Good
  • 24.5%Satisfactory
  • 7.0%Fair
  • 0.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 3.5%Excellent
  • 11.2%Very good
  • 50.3%Good
  • 26.2%Satisfactory
  • 7.7%Fair
  • 1.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 2.2%Excellent
  • 16.3%Very good
  • 37.2%Good
  • 31.7%Satisfactory
  • 12.0%Fair
  • 0.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 3.1%Excellent
  • 6.6%Very good
  • 47.6%Good
  • 30.8%Satisfactory
  • 11.9%Fair
Find on map >>   Show street view

Structure Number: 1797,  Location: 1 MI. NE OF BEADLE LANE (Lat: 34.623611,  Lng: -86.728014),  Route carried "on" structure: County highway 10,  Year Built: 2000,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 650 (year 2000),  Truck Traffic: 4%,  Average Future Daily Traffic: 980 (year 2042),  Design Load: HS 20,  Features Intersected: SWAN POND CREEK,  Facility Carried by Structure: ZIERDT RD
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.2m (33.5ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 78.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $418,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $460,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18152,  Location: 3 MILES EAST OF U.S. 431 (Lat: 34.682169,  Lng: -86.448156),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 1.42m (4.66ft),  Average Daily Traffic: 10,400 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 14,560 (year 2037),  Design Load: HS 20,  Features Intersected: PEAVEY CREEK,  Facility Carried by Structure: EASTERN BYPASS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.828,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 2.4m (7.9ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 27.1m (88.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.09m (6.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,075,000,  Roadway Improvement Cost: $108,000,  Total Project Cost: $1,183,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18345,  Location: US231 OVER WEATHERLY RD (Lat: 34.646639,  Lng: -86.566639),  Route carried "on" structure: US 231,  Year Built: 2009,  Status: Open,  Structure Length: 12.30m (40.35ft),  Average Daily Traffic: 24,124 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 33,774 (year 2040),  Design Load: HS 20,  Features Intersected: WEATHERLY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 501.472,  Lanes on structure: 3,  Lanes under structure: 10,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.8m (48.6ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 41.0m (134.5ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 56.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 13.14m (43.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $4,416,000,  Roadway Improvement Cost: $442,000,  Total Project Cost: $4,858,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18346,  Location: US231 OVER WHITESBURG DR (Lat: 34.650139,  Lng: -86.566944),  Route carried "on" structure: US ?????,  Year Built: 2009,  Status: Open,  Structure Length: 12.31m (40.39ft),  Average Daily Traffic: 48,248 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 62,547 (year 2040),  Design Load: HS 20,  Features Intersected: WHITESBURG DRIVE,  Facility Carried by Structure: US 231/SR 53
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 501.793,  Lanes on structure: 3,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.8m (48.6ft),  Skew: 32 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 41.0m (134.5ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 13.16m (43.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $4,331,000,  Roadway Improvement Cost: $433,000,  Total Project Cost: $4,764,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18545,  Location: HIDDEN LAKE AND MOSSY PT. (Lat: 34.626111,  Lng: -86.495000),  Route carried "on" structure: City street ,  Year Built: 2001,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 500 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 700 (year 2041),  Design Load: HS 20,  Features Intersected: UNKNOWN TRIBUTARY,  Facility Carried by Structure: HIDDEN LAKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 62.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $538,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $592,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18641,  Location: MORGAN-MADISON CO LINE (Lat: 34.573300,  Lng: -86.569900),  Route carried "on" structure: US 231,  Year Built: 2006,  Status: Open,  Structure Length: 63.25m (207.51ft),  Average Daily Traffic: 10,175 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,226 (year 2033),  Design Load: HS 20,  Features Intersected: TENNESSEE RIVER,  Facility Carried by Structure: SR 53
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 493.137,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 10 degrees,  Navigation Control: Yes ( Vertical Clearance: 20.1m (65.9ft), Horizontal Clearance: 91.4m (299.9ft)),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Number Of Approach Spans: 4,  Length of Maximum Span: 297.2m (975.1ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 67.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 63.25m (207.51ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Underwater Inspection Date: July 2021,  Bridge Improvement Cost: $25,153,000,  Roadway Improvement Cost: $2,515,000,  Total Project Cost: $27,668,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18697,  Location: 5.8 MILES S. OF US 431 (Lat: 34.639639,  Lng: -86.567111),  Route carried "on" structure: US 231,  Year Built: 2004,  Status: Open,  Structure Length: 7.16m (23.49ft),  Average Daily Traffic: 68,302 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 95,623 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED TRIBUTARY,  Facility Carried by Structure: AL 53
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 500.577,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.19m (26.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $11,117,000,  Roadway Improvement Cost: $1,112,000,  Total Project Cost: $12,229,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18698,  Location: 5.6 MI.S. JCT.US431,231 (Lat: 34.641908,  Lng: -86.566906),  Route carried "on" structure: US 231,  Year Built: 2004,  Status: Open,  Structure Length: 1.03m (3.38ft),  Average Daily Traffic: 43,506 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 60,908 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED TRIBUTARY,  Facility Carried by Structure: AL 53
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 500.889,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 82.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,020,000,  Roadway Improvement Cost: $202,000,  Total Project Cost: $2,222,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18739,  Location: 0.2 MILE EAST OF U.S. 431 (Lat: 34.660000,  Lng: -86.478333),  Route carried "on" structure: City street ,  Year Built: 2002,  Status: Open,  Structure Length: 3.73m (12.24ft),  Average Daily Traffic: 19,400 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 27,160 (year 2040),  Design Load: HS 20,  Features Intersected: BIG COVE CREEK,  Facility Carried by Structure: EASTERN BYPASS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 17.8m (58.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 73.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.66m (15.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,851,000,  Roadway Improvement Cost: $185,000,  Total Project Cost: $2,036,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1874,  Location: 1 MILE S.E. OF U.S. 72 (Lat: 34.770556,  Lng: -86.526944),  Route carried "on" structure: City street ,  Year Built: 1994,  Status: Open,  Structure Length: 3.12m (10.24ft),  Average Daily Traffic: 3,000 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 4,200 (year 2037),  Design Load: HS 20,  Features Intersected: CHASE CREEK,  Facility Carried by Structure: OLD GURLEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 75.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.98m (13.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,341,000,  Roadway Improvement Cost: $234,000,  Total Project Cost: $2,575,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 18757,  Location: 500 FT N of Bob Wade LN (Lat: 34.829167,  Lng: -86.648611),  Route carried "on" structure: City street ,  Year Built: 1975,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 13,980 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 19,572 (year 2040),  Features Intersected: DRY CREEK,  Facility Carried by Structure: PULASKI PIKE
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 14.484,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 16.2m (53.1ft),  Out-to-Out Width: 26.5m (86.9ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 72.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,301,000,  Roadway Improvement Cost: $130,000,  Total Project Cost: $1,431,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1876,  Location: .5 MILE EAST PULASKI PIKE (Lat: 34.816822,  Lng: -86.633369),  Route carried "on" structure: City street ,  Year Built: 2002,  Status: Open,  Structure Length: 1.20m (3.94ft),  Average Daily Traffic: 200 (year 2017),  Truck Traffic: 1%,  Average Future Daily Traffic: 280 (year 2037),  Design Load: HS 20,  Features Intersected: DRY CREEK,  Facility Carried by Structure: INNOVATION WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $575,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $633,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1891,  Location: .5 MI JCT SR 255 * SR53 (Lat: 34.794014,  Lng: -86.662119),  Route carried "on" structure: State highway 255,  Year Built: 2005,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 17,293 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 24,211 (year 2039),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.011,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 23 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 69.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.37m (7.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $4,922,000,  Roadway Improvement Cost: $492,000,  Total Project Cost: $5,414,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18911,  Location: 2.1 MI. N JCT.SR255, SR53 (Lat: 34.815278,  Lng: -86.649444),  Route carried "on" structure: State highway 255,  Year Built: 2005,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 15,370 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 21,518 (year 2039),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.568,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 59.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,033,000,  Roadway Improvement Cost: $203,000,  Total Project Cost: $2,236,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 18929,  Location: ????????????????????????? (Lat: 34.786528,  Lng: -86.717317),  Route carried "on" structure: County highway 27,  Year Built: 2004,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 850 (year 2003),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,100 (year 2035),  Design Load: HS 20,  Features Intersected: DOUGLASS BRANCH,  Facility Carried by Structure: MT ZION ROAD
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 17.8m (58.4ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 76.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.63m (5.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $291,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $320,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1893,  Location: ????????????????????????? (Lat: 34.616653,  Lng: -86.492450),  Route carried "on" structure: County highway 207,  Year Built: 2004,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 600 (year 1992),  Truck Traffic: 1%,  Average Future Daily Traffic: 660 (year 2035),  Design Load: HS 20,  Features Intersected: GREEN MOUNTAIN BRANCH,  Facility Carried by Structure: OLD BIG COVE ROAD
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.62m (5.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $290,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $319,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19,  Location: 0.5 MILE EAST SLAUGHTER R (Lat: 34.709000,  Lng: -86.701139),  Route carried "on" structure: City street 301,  Year Built: 2015,  Status: Open,  Structure Length: 10.67m (35.01ft),  Average Daily Traffic: 14,000 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 19,600 (year 2037),  Design Load: HS 20,  Features Intersected: INDIAN CREEK,  Facility Carried by Structure: OLD MADISON PIKE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 19.2m (63.0ft),  Out-to-Out Width: 20.9m (68.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Operating Rating: 46.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.57m (37.96ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $5,395,000,  Roadway Improvement Cost: $540,000,  Total Project Cost: $5,935,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19014,  Location: .2 MILE EAST OF 431 (Lat: 34.660000,  Lng: -86.478333),  Route carried "on" structure: City street ,  Year Built: 2003,  Status: Open,  Structure Length: 3.78m (12.40ft),  Average Daily Traffic: 19,000 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 26,600 (year 2036),  Design Load: HS 20,  Features Intersected: BIG COVE CREEK,  Facility Carried by Structure: EASTERN BYPASS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 79.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.71m (15.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,583,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $1,741,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19103,  Location: .2 MILES WEST WALL TRIANA (Lat: 34.662222,  Lng: -86.754444),  Route carried "on" structure: City street ,  Year Built: 1955,  Status: Posted for load,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 75 (year 2022),  Average Future Daily Traffic: 105 (year 2042),  Features Intersected: SHORT PIKE @ RELIEF CHAN,  Facility Carried by Structure: SHORT PIKE
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.9m (22.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 15.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 9.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $271,000,  Roadway Improvement Cost: $27,000,  Total Project Cost: $298,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 19104,  Location: 0.3 MILES WEST OF WALL TR (Lat: 34.578889,  Lng: -86.754444),  Route carried "on" structure: City street ,  Year Built: 1955,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 85 (year 2020),  Average Future Daily Traffic: 105 (year 2035),  Features Intersected: Bradford Creek,  Facility Carried by Structure: SHORT PIKE ROAD
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $346,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $381,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 19118,  Location: 0.10 MILE EAST OF SLAUGHT (Lat: 34.713333,  Lng: -86.713333),  Route carried "on" structure: City street ,  Year Built: 2004,  Status: Open,  Structure Length: 5.46m (17.91ft),  Average Daily Traffic: 6,800 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 9,520 (year 2039),  Design Load: HS 20,  Features Intersected: INDIAN CREEK,  Facility Carried by Structure: FARROW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 27.3m (89.6ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 0.0m,  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 84.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.49m (21.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,290,000,  Roadway Improvement Cost: $129,000,  Total Project Cost: $1,419,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19196,  Location: .1 MI. EAST OF JEFF RD. (Lat: 34.786508,  Lng: -86.712289),  Route carried "on" structure: County highway 27,  Year Built: 2014,  Status: Open,  Structure Length: 3.46m (11.35ft),  Average Daily Traffic: 10,802 (year 2013),  Average Future Daily Traffic: 6,370 (year 2040),  Design Load: HS 20,  Features Intersected: INDIAN CREEK,  Facility Carried by Structure: BLAKE BOTTOM RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.3m (56.8ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Channel: Excellent,  Culverts: Very good,  Operating Rating: 41.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 4.36m (14.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,209,000,  Roadway Improvement Cost: $121,000,  Total Project Cost: $1,330,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19197,  Location: 0.6 MI. N OF JCT US 72 W (Lat: 34.757097,  Lng: -86.767444),  Route carried "on" structure: County highway 16,  Year Built: 1939,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 4,070 (year 2011),  Truck Traffic: 2%,  Average Future Daily Traffic: 6,050 (year 2032),  Design Load: HS 20,  Features Intersected: KNOX CREEEK,  Facility Carried by Structure: BALCH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 74.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.58m (15.03ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,193,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $1,312,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19202,  Location: .50 MILE WEST OF WALL TRI (Lat: 34.663333,  Lng: -86.760833),  Route carried "on" structure: City street ,  Year Built: 1936,  Status: Posted for load,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 50 (year 2015),  Average Future Daily Traffic: 70 (year 2035),  Design Load: H 10,  Features Intersected: BRADFORD CREEK,  Facility Carried by Structure: JAMES MADISON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.047,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 6.2m (20.3ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.19m (10.47ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $503,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $553,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 19241,  Location: 3 MI N JCT SR 36 & SR 53 (Lat: 34.565608,  Lng: -86.576514),  Route carried "on" structure: US 231,  Year Built: 2006,  Status: Open,  Structure Length: 14.63m (48.00ft),  Average Daily Traffic: 10,175 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,226 (year 2033),  Design Load: HS 20,  Features Intersected: TN River Relief,  Facility Carried by Structure: SR 53
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 492.025,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 17.4m (57.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 71.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 15.41m (50.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $6,341,000,  Roadway Improvement Cost: $634,000,  Total Project Cost: $6,975,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19242,  Location: 3 MI N JCT SR 36 & SR 53 (Lat: 34.568617,  Lng: -86.574242),  Route carried "on" structure: US 231,  Year Built: 2006,  Status: Open,  Structure Length: 13.41m (44.00ft),  Average Daily Traffic: 10,175 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 13,226 (year 2033),  Design Load: HS 20,  Features Intersected: TN RIVER RELIEF,  Facility Carried by Structure: SR 53
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 492.443,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 48.8m (160.1ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 64.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 14.22m (46.65ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $5,754,000,  Roadway Improvement Cost: $575,000,  Total Project Cost: $6,329,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19255,  Location: 1.3 MI N OLD MADISON PIKE (Lat: 34.725700,  Lng: -86.706161),  Route carried "on" structure: City street 5,  Year Built: 2003,  Status: Open,  Structure Length: 1.80m (5.91ft),  Average Daily Traffic: 12,000 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 16,800 (year 2039),  Design Load: HS 20,  Features Intersected: RAINBOW CREEK,  Facility Carried by Structure: SLAUGHTER ROAD
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.966,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.51m (8.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $854,000,  Roadway Improvement Cost: $85,000,  Total Project Cost: $939,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19316,  Location: CR 47 AT SEALS DRIVE (Lat: 33.197344,  Lng: -86.610594),  Route carried "on" structure: County highway 47,  Year Built: 2000,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 4,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,600 (year 2040),  Design Load: HS 20,  Features Intersected: UT TO BEESWAX CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $339,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $373,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19318,  Location: CR 47 .2 MI. NO. CR 446 (Lat: 33.244572,  Lng: -86.620897),  Route carried "on" structure: County highway 47,  Year Built: 2000,  Status: Open,  Structure Length: 0.65m (2.13ft),  Average Daily Traffic: 4,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,600 (year 2040),  Design Load: HS 20,  Features Intersected: UT TO YELLO LEAF CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.27m (4.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $386,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19321,  Location: BOOKER'S MILL (Lat: 31.527189,  Lng: -87.033133),  Route carried "on" structure: County highway 22,  Year Built: 2006,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 487 (year 2005),  Truck Traffic: 4%,  Average Future Daily Traffic: 441 (year 2033),  Design Load: HS 20,  Features Intersected: COLD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.21m (20.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,362,000,  Roadway Improvement Cost: $136,000,  Total Project Cost: $1,498,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 19324,  Location: .05 MI. W JCT SR21 (Lat: 33.696694,  Lng: -85.824972),  Route carried "on" structure: US 1,  Year Built: 1960,  Status: Open,  Structure Length: 0.89m (2.92ft),  Average Daily Traffic: 10,833 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 15,166 (year 2039),  Design Load: HS 20,  Features Intersected: SNOW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 376.828,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 25.9m (85.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,836,000,  Roadway Improvement Cost: $184,000,  Total Project Cost: $2,020,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19335,  Location: .5 MILE WEST SR 219 (Lat: 32.780944,  Lng: -87.125000),  Route carried "on" structure: County highway 70,  Year Built: 1985,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 30 (year 2004),  Average Future Daily Traffic: 45 (year 2033),  Features Intersected: BEAVERDAM CRK RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 18.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 13.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.59m (5.22ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $174,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $191,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 19339,  Location: NEAR BARFIELD (Lat: 33.369517,  Lng: -85.660128),  Route carried "on" structure: County highway ,  Year Built: 2005,  Status: Open,  Structure Length: 2.06m (6.76ft),  Average Daily Traffic: 195 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 282 (year 2036),  Design Load: HS 20,  Features Intersected: MAD INDIAN CREEK,  Facility Carried by Structure: EAST MILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.9m (16.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 14.1m (46.3ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 78.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $783,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $861,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19345,  Location: 1 MI S JCT CR 87 (Lat: 34.465278,  Lng: -87.197222),  Route carried "on" structure: County highway 186,  Year Built: 2005,  Status: Open,  Structure Length: 1.26m (4.13ft),  Average Daily Traffic: 124 (year 2004),  Average Future Daily Traffic: 150 (year 2036),  Design Load: HS 20,  Features Intersected: COLD BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 5.6m (18.4ft),  Right: 5.6m (18.4ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Channel: Very good,  Culverts: Excellent,  Operating Rating: 87.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.93m (6.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $557,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $613,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19347,  Location: 803 MASTIN LAKE ROAD (Lat: 34.766667,  Lng: -86.581667),  Route carried "on" structure: City street ,  Year Built: 2004,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 6,700 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 9,380 (year 2037),  Design Load: HS 20,  Features Intersected: TRIB TO PINHOOK CREEK,  Facility Carried by Structure: MASTIN LAKE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 22.6m (74.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.39m (4.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $595,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $655,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 19348,  Location: 0.1E OF BLK WARRIOR RIVER (Lat: 34.065750,  Lng: -86.289389),  Route carried "on" structure: US 278,  Year Built: 2008,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 5,295 (year 2018),  Truck Traffic: 17%,  Average Future Daily Traffic: 7,413 (year 2038),  Design Load: HS 20,  Features Intersected: BLACK WARRIOR RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 183.362,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 56.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.14m (23.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,202,000,  Roadway Improvement Cost: $220,000,  Total Project Cost: $2,422,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 19351,  Location: 1.5MI.S. OF BUTTERMILK RD (Lat: 33.160092,  Lng: -87.427358),  Route carried "on" structure: County highway 364,  Year Built: 2004,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 500 (year 2004),  Truck Traffic: 5%,  Average Future Daily Traffic: 800 (year 2035),  Design Load: HS 20,  Features Intersected: TRIB.TO COTTONDALE CK.,  Facility Carried by Structure: CLEMENTS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 74.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $351,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $386,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19352,  Location: SEC 20 T4S R3W (Lat: 34.671389,  Lng: -86.865011),  Route carried "on" structure: County highway 10,  Year Built: 2005,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 1,165 (year 2009),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,730 (year 2029),  Design Load: HS 20,  Features Intersected: LIMESTONE CREEK,  Facility Carried by Structure: OLD HIGHWAY 20
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 75.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 9.52m (31.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,959,000,  Roadway Improvement Cost: $196,000,  Total Project Cost: $2,155,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 19353,  Location: 1 MI. W OF HWY.431 (Lat: 33.547669,  Lng: -85.627950),  Route carried "on" structure: County highway 22,  Year Built: 2004,  Status: Open,  Structure Length: 1.15m (3.77ft),  Average Daily Traffic: 105 (year 2006),  Truck Traffic: 5%,  Average Future Daily Traffic: 150 (year 2035),  Design Load: HS 20,  Features Intersected: CHULAFINNEE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $330,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Discuss Huntsville, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.