Bridge Statistics for Los Angeles, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- National Bridge Inventory (NBI) Statistics
- 2,325Number of bridges
- 39,718ft / 12,106mTotal length
- $98,718,000Total costs
- 180,570,830Total average daily traffic
- 9,950,919Total average daily truck traffic
- National Bridge Inventory (NBI) Registered Bridges for Los Angeles
- No street view available for this location
- New bridges - historical statistics
- 121900-1909
- 41910-1919
- 431920-1929
- 721930-1939
- 1701940-1949
- 5201950-1959
- 6961960-1969
- 3091970-1979
- 1881980-1989
- 2231990-1999
- 512000-2009
- 372010-2019
- Reconstructed bridges - Historical Statistics
- 11920-1929
- 31930-1939
- 51940-1949
- 181950-1959
- 501960-1969
- 341970-1979
- 461980-1989
- 421990-1999
- 702000-2009
- 132010-2019
- Bridge Condition - Deck
- 81.7%Good
- 1.1%Satisfactory
- 15.5%Fair
- 1.7%Poor
- Bridge Condition - Superstructure
- 0.5%Very good
- 89.2%Good
- 1.1%Satisfactory
- 9.2%Fair
- Bridge Condition - Substructure
- 94.1%Good
- 2.3%Satisfactory
- 3.4%Fair
- 0.2%Poor
- Bridge Condition - Channel
- 16.2%Excellent
- 77.2%Very good
- 2.7%Good
- 2.2%Satisfactory
- 1.7%Fair
- 0.5%Poor
- 0.2%Serious
- Bridge Condition - Culverts
- 76.5%Good
- 23.5%Satisfactory
Find on map >> Show street view
Structure Number: 53 1306, Location: 07-LA-101-18.51-LA (Lat: 34.165358, Lng: -118.490347), Route carried "under" structure: US 101, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 29,000 (year 2018), Truck Traffic: 10%, Features Intersected: ENCINO EQUESTRIAN UC
Minimum Vertical Clearance: 3.00m (9.84ft), Kilometerpoint: 18.510, Lanes on structure: 14, Lanes under structure: 14, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 3.0m (9.8ft)
Structure Number: 53 1306, Location: 07-LA-101-18.51-LA (Lat: 34.165358, Lng: -118.490347), Route carried "under" structure: US 101, Year Built: 1958, Structure Length: 0. m, Average Daily Traffic: 29,000 (year 2018), Truck Traffic: 10%, Features Intersected: ENCINO EQUESTRIAN UC
Minimum Vertical Clearance: 3.00m (9.84ft), Kilometerpoint: 18.510, Lanes on structure: 14, Lanes under structure: 14, Material/Design: Concrete, Design/Construction: Frame, Length of Maximum Span: 3.0m (9.8ft)
Find on map >> Show street view
Structure Number: 53 131, Location: 07-LA-101-12.35-LA (Lat: 34.154644, Lng: -118.387622), Route carried "under" structure: City street L420, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 11,000 (year 2021), Truck Traffic: 1%, Features Intersected: COLFAX AVE, Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 4, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.9m (85.0ft)
Structure Number: 53 131, Location: 07-LA-101-12.35-LA (Lat: 34.154644, Lng: -118.387622), Route carried "under" structure: City street L420, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 11,000 (year 2021), Truck Traffic: 1%, Features Intersected: COLFAX AVE, Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 4, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.9m (85.0ft)
Find on map >> Show street view
Structure Number: 53 1314, Location: 07-LA-005-18.06-LA (Lat: 34.049617, Lng: -118.214353), Route carried "under" structure: Interstate 5, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 237,000 (year 2012), Features Intersected: INTERSTATE 5, Facility Carried by Structure: CESAR E. CHAVEZ AV
Minimum Vertical Clearance: 4.69m (15.39ft), Kilometerpoint: 18.060, Lanes on structure: 5, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 23.2m (76.1ft)
Structure Number: 53 1314, Location: 07-LA-005-18.06-LA (Lat: 34.049617, Lng: -118.214353), Route carried "under" structure: Interstate 5, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 237,000 (year 2012), Features Intersected: INTERSTATE 5, Facility Carried by Structure: CESAR E. CHAVEZ AV
Minimum Vertical Clearance: 4.69m (15.39ft), Kilometerpoint: 18.060, Lanes on structure: 5, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 23.2m (76.1ft)
Find on map >> Show street view
Structure Number: 53 1315, Location: 07-LA-101-12.85-LA (Lat: 34.154614, Lng: -118.396292), Route carried "under" structure: City street L408, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 25,000 (year 2011), Truck Traffic: 1%, Features Intersected: LAUREL CANYON BLVD, Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 6, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.5m (103.3ft)
Structure Number: 53 1315, Location: 07-LA-101-12.85-LA (Lat: 34.154614, Lng: -118.396292), Route carried "under" structure: City street L408, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 25,000 (year 2011), Truck Traffic: 1%, Features Intersected: LAUREL CANYON BLVD, Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 6, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.5m (103.3ft)
Find on map >> Show street view
Structure Number: 53 1316, Location: 07-LA-005-18.38-LA (Lat: 34.054197, Lng: -118.213789), Route carried "under" structure: Ramp Interstate 5, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 34,500 (year 2012), Truck Traffic: 10%, Features Intersected: S5-E10 CONNECTOR RAMP
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 18.380, Lanes on structure: 9, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 16.2m (53.1ft)
Structure Number: 53 1316, Location: 07-LA-005-18.38-LA (Lat: 34.054197, Lng: -118.213789), Route carried "under" structure: Ramp Interstate 5, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 34,500 (year 2012), Truck Traffic: 10%, Features Intersected: S5-E10 CONNECTOR RAMP
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 18.380, Lanes on structure: 9, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 16.2m (53.1ft)
Find on map >> Show street view
Structure Number: 53 1317F, Location: 07-LA-005-18.62-LA (Lat: 34.057922, Lng: -118.214725), Route carried "under" structure: Bypass Interstate 5, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 8,900 (year 2012), Truck Traffic: 2%, Features Intersected: MISSION RD - S5 ON RAMP
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 18.620, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 23.5m (77.1ft)
Structure Number: 53 1317F, Location: 07-LA-005-18.62-LA (Lat: 34.057922, Lng: -118.214725), Route carried "under" structure: Bypass Interstate 5, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 8,900 (year 2012), Truck Traffic: 2%, Features Intersected: MISSION RD - S5 ON RAMP
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 18.620, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 23.5m (77.1ft)
Find on map >> Show street view
Structure Number: 53 1318, Location: 07-LA-110-21.45-LA (Lat: 34.038278, Lng: -118.273714), Route carried "under" structure: Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 243,000 (year 2020), Truck Traffic: 8%, Features Intersected: INTERSTATE 10 WB
Minimum Vertical Clearance: 4.75m (15.58ft), Kilometerpoint: 14.840, Lanes on structure: 9, Lanes under structure: 3, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 18.0m (59.1ft)
Structure Number: 53 1318, Location: 07-LA-110-21.45-LA (Lat: 34.038278, Lng: -118.273714), Route carried "under" structure: Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 243,000 (year 2020), Truck Traffic: 8%, Features Intersected: INTERSTATE 10 WB
Minimum Vertical Clearance: 4.75m (15.58ft), Kilometerpoint: 14.840, Lanes on structure: 9, Lanes under structure: 3, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 18.0m (59.1ft)
Find on map >> Show street view
Structure Number: 53 1319, Location: 07-LA-110-21.48-LA (Lat: 34.038608, Lng: -118.273719), Route carried "under" structure: Ramp Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 267,100 (year 2020), Truck Traffic: 6%, Features Intersected: W10-S110 CONNECTOR RAMP
Minimum Vertical Clearance: 4.30m (14.11ft), Kilometerpoint: 14.750, Lanes on structure: 8, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Slab, Length of Maximum Span: 14.3m (46.9ft)
Structure Number: 53 1319, Location: 07-LA-110-21.48-LA (Lat: 34.038608, Lng: -118.273719), Route carried "under" structure: Ramp Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 267,100 (year 2020), Truck Traffic: 6%, Features Intersected: W10-S110 CONNECTOR RAMP
Minimum Vertical Clearance: 4.30m (14.11ft), Kilometerpoint: 14.750, Lanes on structure: 8, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Slab, Length of Maximum Span: 14.3m (46.9ft)
Find on map >> Show street view
Structure Number: 53 1325S, Location: 07-LA-005-18.37-LA (Lat: 34.053281, Lng: -118.213469), Route carried "under" structure: Ramp Interstate 5, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 43,500 (year 2012), Truck Traffic: 2%, Features Intersected: CONN NB 5 TO EB 10, Facility Carried by Structure: STATE ST ON-R OC
Minimum Vertical Clearance: 4.74m (15.55ft), Kilometerpoint: 18.370, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 24.1m (79.1ft)
Structure Number: 53 1325S, Location: 07-LA-005-18.37-LA (Lat: 34.053281, Lng: -118.213469), Route carried "under" structure: Ramp Interstate 5, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 43,500 (year 2012), Truck Traffic: 2%, Features Intersected: CONN NB 5 TO EB 10, Facility Carried by Structure: STATE ST ON-R OC
Minimum Vertical Clearance: 4.74m (15.55ft), Kilometerpoint: 18.370, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 24.1m (79.1ft)
Find on map >> Show street view
Structure Number: 53 1326K, Location: 07-LA-005-18.31-LA (Lat: 34.052958, Lng: -118.214603), Route carried "under" structure: Ramp Interstate 5, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 38,000 (year 2012), Truck Traffic: 2%, Features Intersected: W10-S5 CONNECTOR RAMP
Minimum Vertical Clearance: 4.64m (15.22ft), Kilometerpoint: 18.310, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.7m (90.9ft)
Structure Number: 53 1326K, Location: 07-LA-005-18.31-LA (Lat: 34.052958, Lng: -118.214603), Route carried "under" structure: Ramp Interstate 5, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 38,000 (year 2012), Truck Traffic: 2%, Features Intersected: W10-S5 CONNECTOR RAMP
Minimum Vertical Clearance: 4.64m (15.22ft), Kilometerpoint: 18.310, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.7m (90.9ft)
Find on map >> Show street view
Structure Number: 53 1327L, Location: 07-LA-060-0.38-LA (Lat: 34.029617, Lng: -118.218906), Route carried "under" structure: Ramp State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 91,700 (year 2019), Truck Traffic: 7%, Features Intersected: ROUTE 60 WB, Facility Carried by Structure: SOTO STREET
Minimum Vertical Clearance: 4.98m (16.34ft), Kilometerpoint: 0.380, Lanes on structure: 7, Lanes under structure: 4, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 23.8m (78.1ft)
Structure Number: 53 1327L, Location: 07-LA-060-0.38-LA (Lat: 34.029617, Lng: -118.218906), Route carried "under" structure: Ramp State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 91,700 (year 2019), Truck Traffic: 7%, Features Intersected: ROUTE 60 WB, Facility Carried by Structure: SOTO STREET
Minimum Vertical Clearance: 4.98m (16.34ft), Kilometerpoint: 0.380, Lanes on structure: 7, Lanes under structure: 4, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 23.8m (78.1ft)
Find on map >> Show street view
Structure Number: 53 1328, Location: 07-LA-010-18.59-LA (Lat: 34.054164, Lng: -118.212467), Route carried "under" structure: Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 96,000 (year 2010), Truck Traffic: 5%, Features Intersected: RTE 10 & CONN, Facility Carried by Structure: STATE STREET
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 18.590, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.1m (72.5ft)
Structure Number: 53 1328, Location: 07-LA-010-18.59-LA (Lat: 34.054164, Lng: -118.212467), Route carried "under" structure: Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 96,000 (year 2010), Truck Traffic: 5%, Features Intersected: RTE 10 & CONN, Facility Carried by Structure: STATE STREET
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 18.590, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.1m (72.5ft)
Find on map >> Show street view
Structure Number: 53 1328, Location: 07-LA-010-18.59-LA (Lat: 34.054164, Lng: -118.212467), Route carried "under" structure: Ramp Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 50,000 (year 2010), Truck Traffic: 5%, Features Intersected: RTE 10 & CONN, Facility Carried by Structure: STATE STREET
Minimum Vertical Clearance: 6.58m (21.59ft), Kilometerpoint: 18.590, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.1m (72.5ft)
Structure Number: 53 1328, Location: 07-LA-010-18.59-LA (Lat: 34.054164, Lng: -118.212467), Route carried "under" structure: Ramp Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 50,000 (year 2010), Truck Traffic: 5%, Features Intersected: RTE 10 & CONN, Facility Carried by Structure: STATE STREET
Minimum Vertical Clearance: 6.58m (21.59ft), Kilometerpoint: 18.590, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.1m (72.5ft)
Find on map >> Show street view
Structure Number: 53 1328, Location: 07-LA-010-18.59-LA (Lat: 34.054164, Lng: -118.212467), Route carried "under" structure: Ramp Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 30,000 (year 2010), Truck Traffic: 5%, Features Intersected: RTE 10 & CONN, Facility Carried by Structure: STATE STREET
Minimum Vertical Clearance: 4.78m (15.68ft), Kilometerpoint: 18.590, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.1m (72.5ft)
Structure Number: 53 1328, Location: 07-LA-010-18.59-LA (Lat: 34.054164, Lng: -118.212467), Route carried "under" structure: Ramp Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 30,000 (year 2010), Truck Traffic: 5%, Features Intersected: RTE 10 & CONN, Facility Carried by Structure: STATE STREET
Minimum Vertical Clearance: 4.78m (15.68ft), Kilometerpoint: 18.590, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.1m (72.5ft)
Find on map >> Show street view
Structure Number: 53 1328, Location: 07-LA-010-18.59-LA (Lat: 34.054164, Lng: -118.212467), Route carried "under" structure: Ramp Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 30,000 (year 2010), Truck Traffic: 5%, Features Intersected: RTE 10 & CONN, Facility Carried by Structure: STATE STREET
Minimum Vertical Clearance: 6.65m (21.82ft), Kilometerpoint: 18.590, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.1m (72.5ft)
Structure Number: 53 1328, Location: 07-LA-010-18.59-LA (Lat: 34.054164, Lng: -118.212467), Route carried "under" structure: Ramp Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 30,000 (year 2010), Truck Traffic: 5%, Features Intersected: RTE 10 & CONN, Facility Carried by Structure: STATE STREET
Minimum Vertical Clearance: 6.65m (21.82ft), Kilometerpoint: 18.590, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.1m (72.5ft)
Find on map >> Show street view
Structure Number: 53 1329, Location: 07-LA-005-18.42-LA (Lat: 34.054850, Lng: -118.213944), Route carried "under" structure: Ramp Interstate 5, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 2019), Truck Traffic: 2%, Features Intersected: I 10 & OFF-RAMP
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 18.420, Lanes on structure: 8, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.1m (72.5ft)
Structure Number: 53 1329, Location: 07-LA-005-18.42-LA (Lat: 34.054850, Lng: -118.213944), Route carried "under" structure: Ramp Interstate 5, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 2019), Truck Traffic: 2%, Features Intersected: I 10 & OFF-RAMP
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 18.420, Lanes on structure: 8, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.1m (72.5ft)
Find on map >> Show street view
Structure Number: 53 1329, Location: 07-LA-005-18.42-LA (Lat: 34.054850, Lng: -118.213944), Route carried "under" structure: Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 243,000 (year 2012), Truck Traffic: 8%, Features Intersected: I 10 & OFF-RAMP
Minimum Vertical Clearance: 7.70m (25.26ft), Kilometerpoint: 18.390, Lanes on structure: 8, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.1m (72.5ft)
Structure Number: 53 1329, Location: 07-LA-005-18.42-LA (Lat: 34.054850, Lng: -118.213944), Route carried "under" structure: Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 243,000 (year 2012), Truck Traffic: 8%, Features Intersected: I 10 & OFF-RAMP
Minimum Vertical Clearance: 7.70m (25.26ft), Kilometerpoint: 18.390, Lanes on structure: 8, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.1m (72.5ft)
Find on map >> Show street view
Structure Number: 53 1330F, Location: 07-LA-005-18.47-LA (Lat: 34.054911, Lng: -118.215267), Route carried "under" structure: State highway 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 96,000 (year 2021), Truck Traffic: 3%, Features Intersected: ROUTE 10
Minimum Vertical Clearance: 4.74m (15.55ft), Kilometerpoint: 0.580, Lanes on structure: 3, Lanes under structure: 7, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.1m (88.9ft)
Structure Number: 53 1330F, Location: 07-LA-005-18.47-LA (Lat: 34.054911, Lng: -118.215267), Route carried "under" structure: State highway 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 96,000 (year 2021), Truck Traffic: 3%, Features Intersected: ROUTE 10
Minimum Vertical Clearance: 4.74m (15.55ft), Kilometerpoint: 0.580, Lanes on structure: 3, Lanes under structure: 7, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.1m (88.9ft)
Find on map >> Show street view
Structure Number: 53 1331F, Location: 07-LA-010-S0.55-LA (Lat: 34.054961, Lng: -118.215819), Route carried "under" structure: Spur State highway 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 254,000 (year 2010), Truck Traffic: 6%, Features Intersected: INTERSTATE 10
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 0.550, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.9m (75.1ft)
Structure Number: 53 1331F, Location: 07-LA-010-S0.55-LA (Lat: 34.054961, Lng: -118.215819), Route carried "under" structure: Spur State highway 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 254,000 (year 2010), Truck Traffic: 6%, Features Intersected: INTERSTATE 10
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 0.550, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.9m (75.1ft)
Find on map >> Show street view
Structure Number: 53 1332F, Location: 07-LA-005-18.53-LA (Lat: 34.056069, Lng: -118.215219), Route carried "under" structure: Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 64,500 (year 2012), Truck Traffic: 2%, Features Intersected: CONN, BUSWAY, METROLINK
Minimum Vertical Clearance: 5.77m (18.93ft), Kilometerpoint: 18.360, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.9m (85.0ft)
Structure Number: 53 1332F, Location: 07-LA-005-18.53-LA (Lat: 34.056069, Lng: -118.215219), Route carried "under" structure: Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 64,500 (year 2012), Truck Traffic: 2%, Features Intersected: CONN, BUSWAY, METROLINK
Minimum Vertical Clearance: 5.77m (18.93ft), Kilometerpoint: 18.360, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.9m (85.0ft)
Find on map >> Show street view
Structure Number: 53 1332F, Location: 07-LA-005-18.53-LA (Lat: 34.056069, Lng: -118.215219), Route carried "under" structure: Ramp Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2019), Truck Traffic: 2%, Features Intersected: CONN, BUSWAY, METROLINK
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.560, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.9m (85.0ft)
Structure Number: 53 1332F, Location: 07-LA-005-18.53-LA (Lat: 34.056069, Lng: -118.215219), Route carried "under" structure: Ramp Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2019), Truck Traffic: 2%, Features Intersected: CONN, BUSWAY, METROLINK
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.560, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.9m (85.0ft)
Find on map >> Show street view
Structure Number: 53 1332F, Location: 07-LA-005-18.53-LA (Lat: 34.056069, Lng: -118.215219), Route carried "under" structure: Ramp Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 2019), Truck Traffic: 2%, Features Intersected: CONN, BUSWAY, METROLINK
Minimum Vertical Clearance: 6.48m (21.26ft), Kilometerpoint: 0.560, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.9m (85.0ft)
Structure Number: 53 1332F, Location: 07-LA-005-18.53-LA (Lat: 34.056069, Lng: -118.215219), Route carried "under" structure: Ramp Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 2019), Truck Traffic: 2%, Features Intersected: CONN, BUSWAY, METROLINK
Minimum Vertical Clearance: 6.48m (21.26ft), Kilometerpoint: 0.560, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.9m (85.0ft)
Find on map >> Show street view
Structure Number: 53 1333, Location: 07-LA-005-18.52-LA (Lat: 34.056172, Lng: -118.214036), Route carried "under" structure: Ramp Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 2021), Truck Traffic: 2%, Features Intersected: CONN, BUSWAY, METROLINK, Facility Carried by Structure: INTERSTATE 5
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.570, Lanes on structure: 9, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.6m (120.1ft)
Structure Number: 53 1333, Location: 07-LA-005-18.52-LA (Lat: 34.056172, Lng: -118.214036), Route carried "under" structure: Ramp Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 2021), Truck Traffic: 2%, Features Intersected: CONN, BUSWAY, METROLINK, Facility Carried by Structure: INTERSTATE 5
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.570, Lanes on structure: 9, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.6m (120.1ft)
Find on map >> Show street view
Structure Number: 53 1333, Location: 07-LA-005-18.52-LA (Lat: 34.056172, Lng: -118.214036), Route carried "under" structure: Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 65,000 (year 2021), Truck Traffic: 5%, Features Intersected: CONN, BUSWAY, METROLINK, Facility Carried by Structure: INTERSTATE 5
Minimum Vertical Clearance: 6.73m (22.08ft), Kilometerpoint: 18.410, Lanes on structure: 9, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.6m (120.1ft)
Structure Number: 53 1333, Location: 07-LA-005-18.52-LA (Lat: 34.056172, Lng: -118.214036), Route carried "under" structure: Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 65,000 (year 2021), Truck Traffic: 5%, Features Intersected: CONN, BUSWAY, METROLINK, Facility Carried by Structure: INTERSTATE 5
Minimum Vertical Clearance: 6.73m (22.08ft), Kilometerpoint: 18.410, Lanes on structure: 9, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.6m (120.1ft)
Find on map >> Show street view
Structure Number: 53 1333, Location: 07-LA-005-18.52-LA (Lat: 34.056172, Lng: -118.214036), Route carried "under" structure: Ramp Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 5,300 (year 2021), Truck Traffic: 2%, Features Intersected: CONN, BUSWAY, METROLINK, Facility Carried by Structure: INTERSTATE 5
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.570, Lanes on structure: 9, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.6m (120.1ft)
Structure Number: 53 1333, Location: 07-LA-005-18.52-LA (Lat: 34.056172, Lng: -118.214036), Route carried "under" structure: Ramp Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 5,300 (year 2021), Truck Traffic: 2%, Features Intersected: CONN, BUSWAY, METROLINK, Facility Carried by Structure: INTERSTATE 5
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.570, Lanes on structure: 9, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.6m (120.1ft)
Find on map >> Show street view
Structure Number: 53 1333F, Location: 07-LA-010-18.41-LA (Lat: 34.056131, Lng: -118.213686), Route carried "under" structure: Ramp Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 60,000 (year 2018), Truck Traffic: 2%, Features Intersected: CONN, BUSWAY, METROLINK
Minimum Vertical Clearance: 5.94m (19.49ft), Kilometerpoint: 18.410, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.3m (122.4ft)
Structure Number: 53 1333F, Location: 07-LA-010-18.41-LA (Lat: 34.056131, Lng: -118.213686), Route carried "under" structure: Ramp Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 60,000 (year 2018), Truck Traffic: 2%, Features Intersected: CONN, BUSWAY, METROLINK
Minimum Vertical Clearance: 5.94m (19.49ft), Kilometerpoint: 18.410, Lanes on structure: 2, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.3m (122.4ft)
Find on map >> Show street view
Structure Number: 53 1333F, Location: 07-LA-010-18.41-LA (Lat: 34.056131, Lng: -118.213686), Route carried "under" structure: Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 16,500 (year 2018), Truck Traffic: 1%, Features Intersected: CONN, BUSWAY, METROLINK
Minimum Vertical Clearance: 6.71m (22.01ft), Kilometerpoint: 18.410, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.3m (122.4ft)
Structure Number: 53 1333F, Location: 07-LA-010-18.41-LA (Lat: 34.056131, Lng: -118.213686), Route carried "under" structure: Interstate 10, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 16,500 (year 2018), Truck Traffic: 1%, Features Intersected: CONN, BUSWAY, METROLINK
Minimum Vertical Clearance: 6.71m (22.01ft), Kilometerpoint: 18.410, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.3m (122.4ft)
Find on map >> Show street view
Structure Number: 53 1336R, Location: 07-LA-101-11.75R-LA (Lat: 34.154086, Lng: -118.378889), Route carried "under" structure: Ramp State highway 170, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 76,200 (year 2011), Truck Traffic: 5%, Features Intersected: ROUTE 170, Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 14.600, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.5m (109.9ft)
Structure Number: 53 1336R, Location: 07-LA-101-11.75R-LA (Lat: 34.154086, Lng: -118.378889), Route carried "under" structure: Ramp State highway 170, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 76,200 (year 2011), Truck Traffic: 5%, Features Intersected: ROUTE 170, Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 14.600, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.5m (109.9ft)
Find on map >> Show street view
Structure Number: 53 1336R, Location: 07-LA-101-11.75R-LA (Lat: 34.154086, Lng: -118.378889), Route carried "under" structure: City street L423, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 4,391 (year 2011), Truck Traffic: 2%, Features Intersected: ROUTE 170, Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.5m (109.9ft)
Structure Number: 53 1336R, Location: 07-LA-101-11.75R-LA (Lat: 34.154086, Lng: -118.378889), Route carried "under" structure: City street L423, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 4,391 (year 2011), Truck Traffic: 2%, Features Intersected: ROUTE 170, Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.5m (109.9ft)
Find on map >> Show street view
Structure Number: 53 1336R, Location: 07-LA-101-11.75R-LA (Lat: 34.154086, Lng: -118.378889), Route carried "under" structure: State highway 170, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 82,000 (year 2021), Truck Traffic: 8%, Features Intersected: ROUTE 170, Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 14.600, Lanes on structure: 5, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.5m (109.9ft)
Structure Number: 53 1336R, Location: 07-LA-101-11.75R-LA (Lat: 34.154086, Lng: -118.378889), Route carried "under" structure: State highway 170, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 82,000 (year 2021), Truck Traffic: 8%, Features Intersected: ROUTE 170, Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 14.600, Lanes on structure: 5, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.5m (109.9ft)
Find on map >> Show street view
Structure Number: 53 1338L, Location: 07-LA-101-11.83L-LA (Lat: 34.153947, Lng: -118.378889), Route carried "under" structure: City street L423, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 7,500 (year 2021), Truck Traffic: 4%, Features Intersected: TUJUNGA AVE, Facility Carried by Structure: US HIGHWAY 101 SB
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 4, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.3m (92.8ft)
Structure Number: 53 1338L, Location: 07-LA-101-11.83L-LA (Lat: 34.153947, Lng: -118.378889), Route carried "under" structure: City street L423, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 7,500 (year 2021), Truck Traffic: 4%, Features Intersected: TUJUNGA AVE, Facility Carried by Structure: US HIGHWAY 101 SB
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 4, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.3m (92.8ft)
Find on map >> Show street view
Structure Number: 53 1339F, Location: 07-LA-101-11.63L-LA (Lat: 34.154358, Lng: -118.377117), Route carried "under" structure: US 101, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 175,000 (year 2021), Truck Traffic: 8%, Features Intersected: ROUTES 101 & 170, RNERSD, Facility Carried by Structure: RTE 134
Minimum Vertical Clearance: 4.64m (15.22ft), Kilometerpoint: 11.630, Lanes on structure: 4, Lanes under structure: 3, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 34.7m (113.8ft)
Structure Number: 53 1339F, Location: 07-LA-101-11.63L-LA (Lat: 34.154358, Lng: -118.377117), Route carried "under" structure: US 101, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 175,000 (year 2021), Truck Traffic: 8%, Features Intersected: ROUTES 101 & 170, RNERSD, Facility Carried by Structure: RTE 134
Minimum Vertical Clearance: 4.64m (15.22ft), Kilometerpoint: 11.630, Lanes on structure: 4, Lanes under structure: 3, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 34.7m (113.8ft)
Find on map >> Show street view
Structure Number: 53 1339F, Location: 07-LA-101-11.63L-LA (Lat: 34.154358, Lng: -118.377117), Route carried "under" structure: State highway 170, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 160,000 (year 2011), Truck Traffic: 8%, Features Intersected: ROUTES 101 & 170, RNERSD, Facility Carried by Structure: RTE 134
Minimum Vertical Clearance: 5.71m (18.73ft), Kilometerpoint: 14.510, Lanes on structure: 4, Lanes under structure: 7, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 34.7m (113.8ft)
Structure Number: 53 1339F, Location: 07-LA-101-11.63L-LA (Lat: 34.154358, Lng: -118.377117), Route carried "under" structure: State highway 170, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 160,000 (year 2011), Truck Traffic: 8%, Features Intersected: ROUTES 101 & 170, RNERSD, Facility Carried by Structure: RTE 134
Minimum Vertical Clearance: 5.71m (18.73ft), Kilometerpoint: 14.510, Lanes on structure: 4, Lanes under structure: 7, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 34.7m (113.8ft)
Find on map >> Show street view
Structure Number: 53 1344, Location: 07-LA-170-R14.78-LA (Lat: 34.156958, Lng: -118.378953), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 8,600 (year 2017), Truck Traffic: 2%, Features Intersected: RIVERSIDE-TUJUNGA, Facility Carried by Structure: ROUTE 170
Minimum Vertical Clearance: 4.69m (15.39ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 21.9m (71.9ft)
Structure Number: 53 1344, Location: 07-LA-170-R14.78-LA (Lat: 34.156958, Lng: -118.378953), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 8,600 (year 2017), Truck Traffic: 2%, Features Intersected: RIVERSIDE-TUJUNGA, Facility Carried by Structure: ROUTE 170
Minimum Vertical Clearance: 4.69m (15.39ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 21.9m (71.9ft)
Find on map >> Show street view
Structure Number: 53 1344, Location: 07-LA-170-R14.78-LA (Lat: 34.156958, Lng: -118.378953), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 8,400 (year 2017), Truck Traffic: 2%, Features Intersected: RIVERSIDE-TUJUNGA, Facility Carried by Structure: ROUTE 170
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 21.9m (71.9ft)
Structure Number: 53 1344, Location: 07-LA-170-R14.78-LA (Lat: 34.156958, Lng: -118.378953), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 8,400 (year 2017), Truck Traffic: 2%, Features Intersected: RIVERSIDE-TUJUNGA, Facility Carried by Structure: ROUTE 170
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 21.9m (71.9ft)
Find on map >> Show street view
Structure Number: 53 1345F, Location: 07-LA-134-0.04-LA (Lat: 34.153708, Lng: -118.375856), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 14,000 (year 2012), Truck Traffic: 2%, Features Intersected: RIVERSIDE DR, Facility Carried by Structure: W134-N101 CONNECTR
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.3m (109.3ft)
Structure Number: 53 1345F, Location: 07-LA-134-0.04-LA (Lat: 34.153708, Lng: -118.375856), Route carried "under" structure: City street , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 14,000 (year 2012), Truck Traffic: 2%, Features Intersected: RIVERSIDE DR, Facility Carried by Structure: W134-N101 CONNECTR
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 33.3m (109.3ft)
Find on map >> Show street view
Structure Number: 53 1349, Location: 07-LA-005-18.25-LA (Lat: 34.052003, Lng: -118.214344), Route carried "under" structure: Interstate 5, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 226,000 (year 2021), Truck Traffic: 7%, Features Intersected: ROUTE 5, Facility Carried by Structure: STATE STREET
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 18.250, Lanes on structure: 4, Lanes under structure: 12, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.8m (120.7ft)
Structure Number: 53 1349, Location: 07-LA-005-18.25-LA (Lat: 34.052003, Lng: -118.214344), Route carried "under" structure: Interstate 5, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 226,000 (year 2021), Truck Traffic: 7%, Features Intersected: ROUTE 5, Facility Carried by Structure: STATE STREET
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 18.250, Lanes on structure: 4, Lanes under structure: 12, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.8m (120.7ft)
Find on map >> Show street view
Structure Number: 53 1353, Location: 07-LA-101-13.88-LA (Lat: 34.156922, Lng: -118.413642), Route carried "under" structure: City street L401, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 8,500 (year 2019), Truck Traffic: 2%, Features Intersected: COLDWATER CANYON AVE, Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 6, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 26.5m (86.9ft)
Structure Number: 53 1353, Location: 07-LA-101-13.88-LA (Lat: 34.156922, Lng: -118.413642), Route carried "under" structure: City street L401, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 8,500 (year 2019), Truck Traffic: 2%, Features Intersected: COLDWATER CANYON AVE, Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 6, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 26.5m (86.9ft)
Find on map >> Show street view
Structure Number: 53 1355, Location: 07-LA-101-14.89-LA (Lat: 34.155808, Lng: -118.431039), Route carried "under" structure: City street L399, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 24,000 (year 2011), Truck Traffic: 4%, Features Intersected: WOODMAN AVE, Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.60m (15.09ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 8, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.7m (104.0ft)
Structure Number: 53 1355, Location: 07-LA-101-14.89-LA (Lat: 34.155808, Lng: -118.431039), Route carried "under" structure: City street L399, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 24,000 (year 2011), Truck Traffic: 4%, Features Intersected: WOODMAN AVE, Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.60m (15.09ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 8, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.7m (104.0ft)
Find on map >> Show street view
Structure Number: 53 1356L, Location: 07-LA-005-17.07-LA (Lat: 34.036447, Lng: -118.220775), Route carried "under" structure: Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 231,000 (year 2009), Truck Traffic: 7%, Features Intersected: ROUTE 5 SB, Facility Carried by Structure: WHITTIER BLVD
Minimum Vertical Clearance: 6.01m (19.72ft), Kilometerpoint: 17.070, Lanes on structure: 5, Lanes under structure: 5, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 24.7m (81.0ft)
Structure Number: 53 1356L, Location: 07-LA-005-17.07-LA (Lat: 34.036447, Lng: -118.220775), Route carried "under" structure: Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 231,000 (year 2009), Truck Traffic: 7%, Features Intersected: ROUTE 5 SB, Facility Carried by Structure: WHITTIER BLVD
Minimum Vertical Clearance: 6.01m (19.72ft), Kilometerpoint: 17.070, Lanes on structure: 5, Lanes under structure: 5, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 24.7m (81.0ft)
Find on map >> Show street view
Structure Number: 53 1356R, Location: 07-LA-005-17.07-LA (Lat: 34.036150, Lng: -118.220089), Route carried "under" structure: Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 231,000 (year 2009), Truck Traffic: 7%, Features Intersected: ROUTE 5 NB & E10-N5 CONN, Facility Carried by Structure: WHITTIER BLVD
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 17.070, Lanes on structure: 6, Lanes under structure: 5, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.0m (91.9ft)
Structure Number: 53 1356R, Location: 07-LA-005-17.07-LA (Lat: 34.036150, Lng: -118.220089), Route carried "under" structure: Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 231,000 (year 2009), Truck Traffic: 7%, Features Intersected: ROUTE 5 NB & E10-N5 CONN, Facility Carried by Structure: WHITTIER BLVD
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 17.070, Lanes on structure: 6, Lanes under structure: 5, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.0m (91.9ft)
Find on map >> Show street view
Structure Number: 53 1357S, Location: 07-LA-101-S0.22-LA (Lat: 34.036725, Lng: -118.220656), Route carried "under" structure: Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 140,000 (year 2017), Truck Traffic: 10%, Features Intersected: ROUTE 5 SB, Facility Carried by Structure: WHITTIER BL-N101
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 17.080, Lanes on structure: 1, Lanes under structure: 5, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 23.2m (76.1ft)
Structure Number: 53 1357S, Location: 07-LA-101-S0.22-LA (Lat: 34.036725, Lng: -118.220656), Route carried "under" structure: Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 140,000 (year 2017), Truck Traffic: 10%, Features Intersected: ROUTE 5 SB, Facility Carried by Structure: WHITTIER BL-N101
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 17.080, Lanes on structure: 1, Lanes under structure: 5, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 23.2m (76.1ft)
Find on map >> Show street view
Structure Number: 53 1366R, Location: 07-LA-005-16.90-LA (Lat: 34.033583, Lng: -118.220056), Route carried "under" structure: Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 231,000 (year 2009), Truck Traffic: 7%, Features Intersected: INTERSTATE 5 NB, Facility Carried by Structure: 7TH STREET
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 16.900, Lanes on structure: 4, Lanes under structure: 3, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 26.2m (86.0ft)
Structure Number: 53 1366R, Location: 07-LA-005-16.90-LA (Lat: 34.033583, Lng: -118.220056), Route carried "under" structure: Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 231,000 (year 2009), Truck Traffic: 7%, Features Intersected: INTERSTATE 5 NB, Facility Carried by Structure: 7TH STREET
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 16.900, Lanes on structure: 4, Lanes under structure: 3, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 26.2m (86.0ft)
Find on map >> Show street view
Structure Number: 53 1367G, Location: 07-LA-010-18.33-LA (Lat: 34.032778, Lng: -118.221508), Route carried "under" structure: City street , Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2011), Truck Traffic: 2%, Features Intersected: 5, 101, CONNS, 7TH, Facility Carried by Structure: E10-N5 CONNECTOR
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.2m (122.0ft)
Structure Number: 53 1367G, Location: 07-LA-010-18.33-LA (Lat: 34.032778, Lng: -118.221508), Route carried "under" structure: City street , Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2011), Truck Traffic: 2%, Features Intersected: 5, 101, CONNS, 7TH, Facility Carried by Structure: E10-N5 CONNECTOR
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.2m (122.0ft)
Find on map >> Show street view
Structure Number: 53 1367G, Location: 07-LA-010-18.33-LA (Lat: 34.032778, Lng: -118.221508), Route carried "under" structure: Ramp Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 2011), Truck Traffic: 5%, Features Intersected: 5, 101, CONNS, 7TH
Minimum Vertical Clearance: 4.78m (15.68ft), Kilometerpoint: 16.870, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.2m (122.0ft)
Structure Number: 53 1367G, Location: 07-LA-010-18.33-LA (Lat: 34.032778, Lng: -118.221508), Route carried "under" structure: Ramp Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 2011), Truck Traffic: 5%, Features Intersected: 5, 101, CONNS, 7TH
Minimum Vertical Clearance: 4.78m (15.68ft), Kilometerpoint: 16.870, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.2m (122.0ft)
Find on map >> Show street view
Structure Number: 53 1367G, Location: 07-LA-010-18.33-LA (Lat: 34.032778, Lng: -118.221508), Route carried "under" structure: Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 231,000 (year 2010), Truck Traffic: 7%, Features Intersected: 5, 101, CONNS, 7TH
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 16.870, Lanes on structure: 3, Lanes under structure: 5, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.2m (122.0ft)
Structure Number: 53 1367G, Location: 07-LA-010-18.33-LA (Lat: 34.032778, Lng: -118.221508), Route carried "under" structure: Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 231,000 (year 2010), Truck Traffic: 7%, Features Intersected: 5, 101, CONNS, 7TH
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 16.870, Lanes on structure: 3, Lanes under structure: 5, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.2m (122.0ft)
Find on map >> Show street view
Structure Number: 53 1367G, Location: 07-LA-010-18.33-LA (Lat: 34.032778, Lng: -118.221508), Route carried "under" structure: US 101, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 140,000 (year 2010), Truck Traffic: 5%, Features Intersected: 5, 101, CONNS, 7TH, Facility Carried by Structure: E10-N5 CONNECTOR
Minimum Vertical Clearance: 13.72m (45.01ft), Kilometerpoint: 0.010, Lanes on structure: 3, Lanes under structure: 7, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.2m (122.0ft)
Structure Number: 53 1367G, Location: 07-LA-010-18.33-LA (Lat: 34.032778, Lng: -118.221508), Route carried "under" structure: US 101, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 140,000 (year 2010), Truck Traffic: 5%, Features Intersected: 5, 101, CONNS, 7TH, Facility Carried by Structure: E10-N5 CONNECTOR
Minimum Vertical Clearance: 13.72m (45.01ft), Kilometerpoint: 0.010, Lanes on structure: 3, Lanes under structure: 7, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.2m (122.0ft)
Find on map >> Show street view
Structure Number: 53 1371, Location: 07-LA-101-15.38-LA (Lat: 34.155783, Lng: -118.439708), Route carried "under" structure: City street L398, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 7,500 (year 2019), Truck Traffic: 1%, Features Intersected: LOS ANGELES RI,HAZELTINE, Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.65m (15.26ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.2m (131.9ft)
Structure Number: 53 1371, Location: 07-LA-101-15.38-LA (Lat: 34.155783, Lng: -118.439708), Route carried "under" structure: City street L398, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 7,500 (year 2019), Truck Traffic: 1%, Features Intersected: LOS ANGELES RI,HAZELTINE, Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.65m (15.26ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.2m (131.9ft)
Find on map >> Show street view
Structure Number: 53 1373, Location: 07-LA-005-19.73-LA (Lat: 34.072794, Lng: -118.219500), Route carried "under" structure: Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 238,000 (year 2017), Truck Traffic: 6%, Features Intersected: ROUTE 5, Facility Carried by Structure: NORTH BROADWAY
Minimum Vertical Clearance: 4.74m (15.55ft), Kilometerpoint: 19.730, Lanes on structure: 8, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.9m (75.1ft)
Structure Number: 53 1373, Location: 07-LA-005-19.73-LA (Lat: 34.072794, Lng: -118.219500), Route carried "under" structure: Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 238,000 (year 2017), Truck Traffic: 6%, Features Intersected: ROUTE 5, Facility Carried by Structure: NORTH BROADWAY
Minimum Vertical Clearance: 4.74m (15.55ft), Kilometerpoint: 19.730, Lanes on structure: 8, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.9m (75.1ft)
Find on map >> Show street view
Structure Number: 53 1374, Location: 07-LA-005-20.12-LA (Lat: 34.078386, Lng: -118.220172), Route carried "under" structure: Interstate 5, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 225,000 (year 2021), Truck Traffic: 6%, Features Intersected: I 5 & CONN RAMPS, Facility Carried by Structure: HUMBOLDT ST
Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 20.120, Lanes on structure: 2, Lanes under structure: 11, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 20.4m (66.9ft)
Structure Number: 53 1374, Location: 07-LA-005-20.12-LA (Lat: 34.078386, Lng: -118.220172), Route carried "under" structure: Interstate 5, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 225,000 (year 2021), Truck Traffic: 6%, Features Intersected: I 5 & CONN RAMPS, Facility Carried by Structure: HUMBOLDT ST
Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 20.120, Lanes on structure: 2, Lanes under structure: 11, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 20.4m (66.9ft)
Find on map >> Show street view
Structure Number: 53 1376, Location: 07-LA-101-15.91-LA (Lat: 34.157097, Lng: -118.448422), Route carried "under" structure: City street L397, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 26,000 (year 2011), Truck Traffic: 1%, Features Intersected: VAN NUYS BLVD, Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 8, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 33.8m (110.9ft)
Structure Number: 53 1376, Location: 07-LA-101-15.91-LA (Lat: 34.157097, Lng: -118.448422), Route carried "under" structure: City street L397, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 26,000 (year 2011), Truck Traffic: 1%, Features Intersected: VAN NUYS BLVD, Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 8, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 33.8m (110.9ft)
Find on map >> Show street view
Structure Number: 53 1379, Location: 07-LA-005-19.86-LA (Lat: 34.074783, Lng: -118.219647), Route carried "under" structure: Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 238,000 (year 2017), Truck Traffic: 6%, Features Intersected: ROUTE 5 & N5-N110 CONN, Facility Carried by Structure: PASADENA AVE
Minimum Vertical Clearance: 6.00m (19.69ft), Kilometerpoint: 19.860, Lanes on structure: 5, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 26.0m (85.3ft)
Structure Number: 53 1379, Location: 07-LA-005-19.86-LA (Lat: 34.074783, Lng: -118.219647), Route carried "under" structure: Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 238,000 (year 2017), Truck Traffic: 6%, Features Intersected: ROUTE 5 & N5-N110 CONN, Facility Carried by Structure: PASADENA AVE
Minimum Vertical Clearance: 6.00m (19.69ft), Kilometerpoint: 19.860, Lanes on structure: 5, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 26.0m (85.3ft)
Find on map >> Show street view
Structure Number: 53 1386F, Location: 07-LA-005-16.59-LA (Lat: 34.029439, Lng: -118.216786), Route carried "under" structure: State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 90,000 (year 2017), Truck Traffic: 3%, Features Intersected: W60-W10, SOTO ST, & RAMP
Minimum Vertical Clearance: 9.73m (31.92ft), Kilometerpoint: 0.440, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.2m (122.0ft)
Structure Number: 53 1386F, Location: 07-LA-005-16.59-LA (Lat: 34.029439, Lng: -118.216786), Route carried "under" structure: State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 90,000 (year 2017), Truck Traffic: 3%, Features Intersected: W60-W10, SOTO ST, & RAMP
Minimum Vertical Clearance: 9.73m (31.92ft), Kilometerpoint: 0.440, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.2m (122.0ft)
Find on map >> Show street view
Structure Number: 53 1386F, Location: 07-LA-005-16.59-LA (Lat: 34.029439, Lng: -118.216786), Route carried "under" structure: Ramp State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 3,860 (year 2019), Truck Traffic: 2%, Features Intersected: W60-W10, SOTO ST, & RAMP
Minimum Vertical Clearance: 9.11m (29.89ft), Kilometerpoint: 0.540, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.2m (122.0ft)
Structure Number: 53 1386F, Location: 07-LA-005-16.59-LA (Lat: 34.029439, Lng: -118.216786), Route carried "under" structure: Ramp State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 3,860 (year 2019), Truck Traffic: 2%, Features Intersected: W60-W10, SOTO ST, & RAMP
Minimum Vertical Clearance: 9.11m (29.89ft), Kilometerpoint: 0.540, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.2m (122.0ft)
Find on map >> Show street view
Structure Number: 53 1386F, Location: 07-LA-005-16.59-LA (Lat: 34.029439, Lng: -118.216786), Route carried "under" structure: City street , Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 42,000 (year 2019), Truck Traffic: 3%, Features Intersected: W60-W10, SOTO ST, & RAMP, Facility Carried by Structure: S5&S101-E60 CONNEC
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.2m (122.0ft)
Structure Number: 53 1386F, Location: 07-LA-005-16.59-LA (Lat: 34.029439, Lng: -118.216786), Route carried "under" structure: City street , Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 42,000 (year 2019), Truck Traffic: 3%, Features Intersected: W60-W10, SOTO ST, & RAMP, Facility Carried by Structure: S5&S101-E60 CONNEC
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.2m (122.0ft)
Find on map >> Show street view
Structure Number: 53 1388S, Location: 07-LA-005-16.13-LA (Lat: 34.028189, Lng: -118.210808), Route carried "under" structure: Bypass Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 45,000 (year 2019), Truck Traffic: 2%, Features Intersected: NB I 5 & CONM TO WB 60, Facility Carried by Structure: EUCLID AVE ON-RAMP
Minimum Vertical Clearance: 5.51m (18.08ft), Kilometerpoint: 16.130, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.2m (131.9ft)
Structure Number: 53 1388S, Location: 07-LA-005-16.13-LA (Lat: 34.028189, Lng: -118.210808), Route carried "under" structure: Bypass Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 45,000 (year 2019), Truck Traffic: 2%, Features Intersected: NB I 5 & CONM TO WB 60, Facility Carried by Structure: EUCLID AVE ON-RAMP
Minimum Vertical Clearance: 5.51m (18.08ft), Kilometerpoint: 16.130, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.2m (131.9ft)
Find on map >> Show street view
Structure Number: 53 1388S, Location: 07-LA-005-16.13-LA (Lat: 34.028189, Lng: -118.210808), Route carried "under" structure: Ramp Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 39,000 (year 2019), Truck Traffic: 2%, Features Intersected: NB I 5 & CONM TO WB 60, Facility Carried by Structure: EUCLID AVE ON-RAMP
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 16.130, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.2m (131.9ft)
Structure Number: 53 1388S, Location: 07-LA-005-16.13-LA (Lat: 34.028189, Lng: -118.210808), Route carried "under" structure: Ramp Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 39,000 (year 2019), Truck Traffic: 2%, Features Intersected: NB I 5 & CONM TO WB 60, Facility Carried by Structure: EUCLID AVE ON-RAMP
Minimum Vertical Clearance: 4.72m (15.49ft), Kilometerpoint: 16.130, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.2m (131.9ft)
Find on map >> Show street view
Structure Number: 53 1389L, Location: 07-LA-005-16.14-LA (Lat: 34.027814, Lng: -118.212147), Route carried "under" structure: Ramp City street L340, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 1,300 (year 2019), Truck Traffic: 2%, Features Intersected: SB INTERSTATE 5, Facility Carried by Structure: EUCLID AVE OFF-RAM
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Concrete, Design/Construction: Slab, Length of Maximum Span: 16.2m (53.1ft)
Structure Number: 53 1389L, Location: 07-LA-005-16.14-LA (Lat: 34.027814, Lng: -118.212147), Route carried "under" structure: Ramp City street L340, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 1,300 (year 2019), Truck Traffic: 2%, Features Intersected: SB INTERSTATE 5, Facility Carried by Structure: EUCLID AVE OFF-RAM
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Concrete, Design/Construction: Slab, Length of Maximum Span: 16.2m (53.1ft)
Find on map >> Show street view
Structure Number: 53 1390R, Location: 07-LA-005-16.59-LA (Lat: 34.031031, Lng: -118.217344), Route carried "under" structure: City street L155, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 34,800 (year 2019), Truck Traffic: 2%, Features Intersected: SOTO STREET, Facility Carried by Structure: INTERSTATE 5 NB
Minimum Vertical Clearance: 4.59m (15.06ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 34.4m (112.9ft)
Structure Number: 53 1390R, Location: 07-LA-005-16.59-LA (Lat: 34.031031, Lng: -118.217344), Route carried "under" structure: City street L155, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 34,800 (year 2019), Truck Traffic: 2%, Features Intersected: SOTO STREET, Facility Carried by Structure: INTERSTATE 5 NB
Minimum Vertical Clearance: 4.59m (15.06ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 34.4m (112.9ft)
Find on map >> Show street view
Structure Number: 53 1391L, Location: 07-LA-005-16.59-LA (Lat: 34.029300, Lng: -118.217769), Route carried "under" structure: City street , Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 26,500 (year 2019), Truck Traffic: 8%, Features Intersected: ST RTE 60 WB, RAMPS,SOTO, Facility Carried by Structure: INTERSTATE 5 SB
Minimum Vertical Clearance: 5.76m (18.90ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.0m (141.1ft)
Structure Number: 53 1391L, Location: 07-LA-005-16.59-LA (Lat: 34.029300, Lng: -118.217769), Route carried "under" structure: City street , Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 26,500 (year 2019), Truck Traffic: 8%, Features Intersected: ST RTE 60 WB, RAMPS,SOTO, Facility Carried by Structure: INTERSTATE 5 SB
Minimum Vertical Clearance: 5.76m (18.90ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.0m (141.1ft)
Find on map >> Show street view
Structure Number: 53 1391L, Location: 07-LA-005-16.59-LA (Lat: 34.029300, Lng: -118.217769), Route carried "under" structure: Ramp Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 6,200 (year 2017), Truck Traffic: 2%, Features Intersected: ST RTE 60 WB, RAMPS,SOTO
Minimum Vertical Clearance: 4.54m (14.90ft), Kilometerpoint: 16.590, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.0m (141.1ft)
Structure Number: 53 1391L, Location: 07-LA-005-16.59-LA (Lat: 34.029300, Lng: -118.217769), Route carried "under" structure: Ramp Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 6,200 (year 2017), Truck Traffic: 2%, Features Intersected: ST RTE 60 WB, RAMPS,SOTO
Minimum Vertical Clearance: 4.54m (14.90ft), Kilometerpoint: 16.590, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.0m (141.1ft)
Find on map >> Show street view
Structure Number: 53 1391L, Location: 07-LA-005-16.59-LA (Lat: 34.029300, Lng: -118.217769), Route carried "under" structure: Ramp State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 4,550 (year 2017), Truck Traffic: 2%, Features Intersected: ST RTE 60 WB, RAMPS,SOTO, Facility Carried by Structure: INTERSTATE 5 SB
Minimum Vertical Clearance: 4.82m (15.81ft), Kilometerpoint: 16.590, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.0m (141.1ft)
Structure Number: 53 1391L, Location: 07-LA-005-16.59-LA (Lat: 34.029300, Lng: -118.217769), Route carried "under" structure: Ramp State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 4,550 (year 2017), Truck Traffic: 2%, Features Intersected: ST RTE 60 WB, RAMPS,SOTO, Facility Carried by Structure: INTERSTATE 5 SB
Minimum Vertical Clearance: 4.82m (15.81ft), Kilometerpoint: 16.590, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.0m (141.1ft)
Find on map >> Show street view
Structure Number: 53 1391L, Location: 07-LA-005-16.59-LA (Lat: 34.029300, Lng: -118.217769), Route carried "under" structure: State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 108,000 (year 2019), Truck Traffic: 7%, Features Intersected: ST RTE 60 WB, RAMPS,SOTO, Facility Carried by Structure: INTERSTATE 5 SB
Minimum Vertical Clearance: 11.83m (38.81ft), Kilometerpoint: 0.420, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.0m (141.1ft)
Structure Number: 53 1391L, Location: 07-LA-005-16.59-LA (Lat: 34.029300, Lng: -118.217769), Route carried "under" structure: State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 108,000 (year 2019), Truck Traffic: 7%, Features Intersected: ST RTE 60 WB, RAMPS,SOTO, Facility Carried by Structure: INTERSTATE 5 SB
Minimum Vertical Clearance: 11.83m (38.81ft), Kilometerpoint: 0.420, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.0m (141.1ft)
Find on map >> Show street view
Structure Number: 53 1393R, Location: 07-LA-060-R0.63-LA (Lat: 34.029156, Lng: -118.215247), Route carried "under" structure: US 101, Year Built: 1965, Structure Length: 0. m, Average Daily Traffic: 140,000 (year 2019), Truck Traffic: 5%, Features Intersected: I-5, CONN, RAMP, Facility Carried by Structure: ST RTE 60 EB
Minimum Vertical Clearance: 6.70m (21.98ft), Kilometerpoint: 0.010, Lanes on structure: 5, Lanes under structure: 3, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 45.7m (149.9ft)
Structure Number: 53 1393R, Location: 07-LA-060-R0.63-LA (Lat: 34.029156, Lng: -118.215247), Route carried "under" structure: US 101, Year Built: 1965, Structure Length: 0. m, Average Daily Traffic: 140,000 (year 2019), Truck Traffic: 5%, Features Intersected: I-5, CONN, RAMP, Facility Carried by Structure: ST RTE 60 EB
Minimum Vertical Clearance: 6.70m (21.98ft), Kilometerpoint: 0.010, Lanes on structure: 5, Lanes under structure: 3, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 45.7m (149.9ft)
Find on map >> Show street view
Structure Number: 53 1393R, Location: 07-LA-060-R0.63-LA (Lat: 34.029156, Lng: -118.215247), Route carried "under" structure: Interstate 5, Year Built: 1965, Structure Length: 0. m, Average Daily Traffic: 250,000 (year 2019), Truck Traffic: 7%, Features Intersected: I-5, CONN, RAMP, Facility Carried by Structure: ST RTE 60 EB
Minimum Vertical Clearance: 6.10m (20.01ft), Kilometerpoint: 16.380, Lanes on structure: 5, Lanes under structure: 3, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 45.7m (149.9ft)
Structure Number: 53 1393R, Location: 07-LA-060-R0.63-LA (Lat: 34.029156, Lng: -118.215247), Route carried "under" structure: Interstate 5, Year Built: 1965, Structure Length: 0. m, Average Daily Traffic: 250,000 (year 2019), Truck Traffic: 7%, Features Intersected: I-5, CONN, RAMP, Facility Carried by Structure: ST RTE 60 EB
Minimum Vertical Clearance: 6.10m (20.01ft), Kilometerpoint: 16.380, Lanes on structure: 5, Lanes under structure: 3, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 45.7m (149.9ft)
Find on map >> Show street view
Structure Number: 53 1393R, Location: 07-LA-060-R0.63-LA (Lat: 34.029156, Lng: -118.215247), Route carried "under" structure: Interstate 5, Year Built: 1965, Structure Length: 0. m, Average Daily Traffic: 250,000 (year 2019), Truck Traffic: 7%, Features Intersected: I-5, CONN, RAMP, Facility Carried by Structure: ST RTE 60 EB
Minimum Vertical Clearance: 4.50m (14.76ft), Kilometerpoint: 16.380, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 45.7m (149.9ft)
Structure Number: 53 1393R, Location: 07-LA-060-R0.63-LA (Lat: 34.029156, Lng: -118.215247), Route carried "under" structure: Interstate 5, Year Built: 1965, Structure Length: 0. m, Average Daily Traffic: 250,000 (year 2019), Truck Traffic: 7%, Features Intersected: I-5, CONN, RAMP, Facility Carried by Structure: ST RTE 60 EB
Minimum Vertical Clearance: 4.50m (14.76ft), Kilometerpoint: 16.380, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 45.7m (149.9ft)
Find on map >> Show street view
Structure Number: 53 1393R, Location: 07-LA-060-R0.63-LA (Lat: 34.029156, Lng: -118.215247), Route carried "under" structure: Interstate 5, Year Built: 1965, Structure Length: 0. m, Average Daily Traffic: 250,000 (year 2019), Truck Traffic: 7%, Features Intersected: I-5, CONN, RAMP, Facility Carried by Structure: ST RTE 60 EB
Minimum Vertical Clearance: 10.67m (35.01ft), Kilometerpoint: 16.380, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 45.7m (149.9ft)
Structure Number: 53 1393R, Location: 07-LA-060-R0.63-LA (Lat: 34.029156, Lng: -118.215247), Route carried "under" structure: Interstate 5, Year Built: 1965, Structure Length: 0. m, Average Daily Traffic: 250,000 (year 2019), Truck Traffic: 7%, Features Intersected: I-5, CONN, RAMP, Facility Carried by Structure: ST RTE 60 EB
Minimum Vertical Clearance: 10.67m (35.01ft), Kilometerpoint: 16.380, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 45.7m (149.9ft)
Find on map >> Show street view
Structure Number: 53 1394G, Location: 07-LA-060-R0.69-LA (Lat: 34.028369, Lng: -118.213794), Route carried "under" structure: City street , Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 2,260 (year 2015), Truck Traffic: 2%, Features Intersected: MARIETTA STREET, Facility Carried by Structure: E60-S5 CONNECTOR
Minimum Vertical Clearance: 11.35m (37.24ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.6m (74.1ft)
Structure Number: 53 1394G, Location: 07-LA-060-R0.69-LA (Lat: 34.028369, Lng: -118.213794), Route carried "under" structure: City street , Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 2,260 (year 2015), Truck Traffic: 2%, Features Intersected: MARIETTA STREET, Facility Carried by Structure: E60-S5 CONNECTOR
Minimum Vertical Clearance: 11.35m (37.24ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.6m (74.1ft)
Find on map >> Show street view
Structure Number: 53 1395S, Location: 07-LA-005-16.37-LA (Lat: 34.029489, Lng: -118.213858), Route carried "under" structure: Ramp State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 20,500 (year 2019), Truck Traffic: 5%, Features Intersected: ST RTE 60 WB, WB60-NB101, Facility Carried by Structure: NB5-SOTO ST OFFRMP
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 0.640, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 49.1m (161.1ft)
Structure Number: 53 1395S, Location: 07-LA-005-16.37-LA (Lat: 34.029489, Lng: -118.213858), Route carried "under" structure: Ramp State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 20,500 (year 2019), Truck Traffic: 5%, Features Intersected: ST RTE 60 WB, WB60-NB101, Facility Carried by Structure: NB5-SOTO ST OFFRMP
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 0.640, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 49.1m (161.1ft)
Find on map >> Show street view
Structure Number: 53 1395S, Location: 07-LA-005-16.37-LA (Lat: 34.029489, Lng: -118.213858), Route carried "under" structure: State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 189,000 (year 2019), Truck Traffic: 5%, Features Intersected: ST RTE 60 WB, WB60-NB101, Facility Carried by Structure: NB5-SOTO ST OFFRMP
Minimum Vertical Clearance: 7.72m (25.33ft), Kilometerpoint: 0.640, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 49.1m (161.1ft)
Structure Number: 53 1395S, Location: 07-LA-005-16.37-LA (Lat: 34.029489, Lng: -118.213858), Route carried "under" structure: State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 189,000 (year 2019), Truck Traffic: 5%, Features Intersected: ST RTE 60 WB, WB60-NB101, Facility Carried by Structure: NB5-SOTO ST OFFRMP
Minimum Vertical Clearance: 7.72m (25.33ft), Kilometerpoint: 0.640, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 49.1m (161.1ft)
Find on map >> Show street view
Structure Number: 53 1396L, Location: 07-LA-060-0.28-LA (Lat: 34.029731, Lng: -118.220581), Route carried "under" structure: Ramp State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 91,700 (year 2019), Truck Traffic: 7%, Features Intersected: ROUTE 60 WB, Facility Carried by Structure: BOYLE AVE
Minimum Vertical Clearance: 11.20m (36.75ft), Kilometerpoint: 0.280, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.3m (73.2ft)
Structure Number: 53 1396L, Location: 07-LA-060-0.28-LA (Lat: 34.029731, Lng: -118.220581), Route carried "under" structure: Ramp State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 91,700 (year 2019), Truck Traffic: 7%, Features Intersected: ROUTE 60 WB, Facility Carried by Structure: BOYLE AVE
Minimum Vertical Clearance: 11.20m (36.75ft), Kilometerpoint: 0.280, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 22.3m (73.2ft)
Find on map >> Show street view
Structure Number: 53 1397F, Location: 07-LA-060-R0.60-LA (Lat: 34.030419, Lng: -118.215825), Route carried "under" structure: Ramp State highway 60, Year Built: 1966, Structure Length: 0. m, Average Daily Traffic: 11,300 (year 2018), Truck Traffic: 3%, Features Intersected: SOTO ST OFF/ON RAMPS
Minimum Vertical Clearance: 5.63m (18.47ft), Kilometerpoint: 0.600, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.2m (131.9ft)
Structure Number: 53 1397F, Location: 07-LA-060-R0.60-LA (Lat: 34.030419, Lng: -118.215825), Route carried "under" structure: Ramp State highway 60, Year Built: 1966, Structure Length: 0. m, Average Daily Traffic: 11,300 (year 2018), Truck Traffic: 3%, Features Intersected: SOTO ST OFF/ON RAMPS
Minimum Vertical Clearance: 5.63m (18.47ft), Kilometerpoint: 0.600, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.2m (131.9ft)
Find on map >> Show street view
Structure Number: 53 1397F, Location: 07-LA-060-R0.60-LA (Lat: 34.030419, Lng: -118.215825), Route carried "under" structure: Ramp Interstate 5, Year Built: 1966, Structure Length: 0. m, Average Daily Traffic: 2,700 (year 2018), Truck Traffic: 3%, Features Intersected: SOTO ST OFF/ON RAMPS
Minimum Vertical Clearance: 4.64m (15.22ft), Kilometerpoint: 16.350, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.2m (131.9ft)
Structure Number: 53 1397F, Location: 07-LA-060-R0.60-LA (Lat: 34.030419, Lng: -118.215825), Route carried "under" structure: Ramp Interstate 5, Year Built: 1966, Structure Length: 0. m, Average Daily Traffic: 2,700 (year 2018), Truck Traffic: 3%, Features Intersected: SOTO ST OFF/ON RAMPS
Minimum Vertical Clearance: 4.64m (15.22ft), Kilometerpoint: 16.350, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.2m (131.9ft)
Find on map >> Show street view
Structure Number: 53 1397F, Location: 07-LA-060-R0.60-LA (Lat: 34.030419, Lng: -118.215825), Route carried "under" structure: Ramp Interstate 5, Year Built: 1966, Structure Length: 0. m, Average Daily Traffic: 6,200 (year 2018), Truck Traffic: 3%, Features Intersected: SOTO ST OFF/ON RAMPS
Minimum Vertical Clearance: 4.82m (15.81ft), Kilometerpoint: 16.360, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.2m (131.9ft)
Structure Number: 53 1397F, Location: 07-LA-060-R0.60-LA (Lat: 34.030419, Lng: -118.215825), Route carried "under" structure: Ramp Interstate 5, Year Built: 1966, Structure Length: 0. m, Average Daily Traffic: 6,200 (year 2018), Truck Traffic: 3%, Features Intersected: SOTO ST OFF/ON RAMPS
Minimum Vertical Clearance: 4.82m (15.81ft), Kilometerpoint: 16.360, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.2m (131.9ft)
Find on map >> Show street view
Structure Number: 53 1397R, Location: 07-LA-005-16.36-LA (Lat: 34.030258, Lng: -118.215897), Route carried "under" structure: Ramp Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 24,501 (year 2017), Truck Traffic: 3%, Features Intersected: W60, W60-N101 CON, RAMP
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 16.390, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 49.4m (162.1ft)
Structure Number: 53 1397R, Location: 07-LA-005-16.36-LA (Lat: 34.030258, Lng: -118.215897), Route carried "under" structure: Ramp Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 24,501 (year 2017), Truck Traffic: 3%, Features Intersected: W60, W60-N101 CON, RAMP
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 16.390, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 49.4m (162.1ft)
Find on map >> Show street view
Structure Number: 53 1397R, Location: 07-LA-005-16.36-LA (Lat: 34.030258, Lng: -118.215897), Route carried "under" structure: Ramp State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 50,100 (year 2019), Truck Traffic: 8%, Features Intersected: W60, W60-N101 CON, RAMP, Facility Carried by Structure: ROUTE I-5 N/B
Minimum Vertical Clearance: 6.80m (22.31ft), Kilometerpoint: 0.600, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 49.4m (162.1ft)
Structure Number: 53 1397R, Location: 07-LA-005-16.36-LA (Lat: 34.030258, Lng: -118.215897), Route carried "under" structure: Ramp State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 50,100 (year 2019), Truck Traffic: 8%, Features Intersected: W60, W60-N101 CON, RAMP, Facility Carried by Structure: ROUTE I-5 N/B
Minimum Vertical Clearance: 6.80m (22.31ft), Kilometerpoint: 0.600, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 49.4m (162.1ft)
Find on map >> Show street view
Structure Number: 53 1397R, Location: 07-LA-005-16.36-LA (Lat: 34.030258, Lng: -118.215897), Route carried "under" structure: State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 180,000 (year 2018), Truck Traffic: 8%, Features Intersected: W60, W60-N101 CON, RAMP, Facility Carried by Structure: ROUTE I-5 N/B
Minimum Vertical Clearance: 8.55m (28.05ft), Kilometerpoint: 0.600, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 49.4m (162.1ft)
Structure Number: 53 1397R, Location: 07-LA-005-16.36-LA (Lat: 34.030258, Lng: -118.215897), Route carried "under" structure: State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 180,000 (year 2018), Truck Traffic: 8%, Features Intersected: W60, W60-N101 CON, RAMP, Facility Carried by Structure: ROUTE I-5 N/B
Minimum Vertical Clearance: 8.55m (28.05ft), Kilometerpoint: 0.600, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 49.4m (162.1ft)
Find on map >> Show street view
Structure Number: 53 1398L, Location: 07-LA-060-R0.73-LA (Lat: 34.029881, Lng: -118.212711), Route carried "under" structure: State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 189,000 (year 2019), Truck Traffic: 5%, Features Intersected: ST RTE 60 WB & CONNS, Facility Carried by Structure: MARIETTA ST
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 0.730, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 23.5m (77.1ft)
Structure Number: 53 1398L, Location: 07-LA-060-R0.73-LA (Lat: 34.029881, Lng: -118.212711), Route carried "under" structure: State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 189,000 (year 2019), Truck Traffic: 5%, Features Intersected: ST RTE 60 WB & CONNS, Facility Carried by Structure: MARIETTA ST
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 0.730, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 23.5m (77.1ft)
Find on map >> Show street view
Structure Number: 53 1398L, Location: 07-LA-060-R0.73-LA (Lat: 34.029881, Lng: -118.212711), Route carried "under" structure: State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 108,500 (year 2019), Truck Traffic: 5%, Features Intersected: ST RTE 60 WB & CONNS, Facility Carried by Structure: MARIETTA ST
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 0.730, Lanes on structure: 2, Lanes under structure: 3, Toll: On toll road, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 23.5m (77.1ft)
Structure Number: 53 1398L, Location: 07-LA-060-R0.73-LA (Lat: 34.029881, Lng: -118.212711), Route carried "under" structure: State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 108,500 (year 2019), Truck Traffic: 5%, Features Intersected: ST RTE 60 WB & CONNS, Facility Carried by Structure: MARIETTA ST
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 0.730, Lanes on structure: 2, Lanes under structure: 3, Toll: On toll road, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 23.5m (77.1ft)
Find on map >> Show street view
Structure Number: 53 1398L, Location: 07-LA-060-R0.73-LA (Lat: 34.029881, Lng: -118.212711), Route carried "under" structure: State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 108,500 (year 2019), Truck Traffic: 5%, Features Intersected: ST RTE 60 WB & CONNS, Facility Carried by Structure: MARIETTA ST
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 0.730, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 23.5m (77.1ft)
Structure Number: 53 1398L, Location: 07-LA-060-R0.73-LA (Lat: 34.029881, Lng: -118.212711), Route carried "under" structure: State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 108,500 (year 2019), Truck Traffic: 5%, Features Intersected: ST RTE 60 WB & CONNS, Facility Carried by Structure: MARIETTA ST
Minimum Vertical Clearance: 5.03m (16.50ft), Kilometerpoint: 0.730, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 23.5m (77.1ft)
Find on map >> Show street view
Structure Number: 53 1398L, Location: 07-LA-060-R0.73-LA (Lat: 34.029881, Lng: -118.212711), Route carried "under" structure: State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 189,000 (year 2019), Truck Traffic: 5%, Features Intersected: ST RTE 60 WB & CONNS, Facility Carried by Structure: MARIETTA ST
Minimum Vertical Clearance: 5.51m (18.08ft), Kilometerpoint: 0.730, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 23.5m (77.1ft)
Structure Number: 53 1398L, Location: 07-LA-060-R0.73-LA (Lat: 34.029881, Lng: -118.212711), Route carried "under" structure: State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 189,000 (year 2019), Truck Traffic: 5%, Features Intersected: ST RTE 60 WB & CONNS, Facility Carried by Structure: MARIETTA ST
Minimum Vertical Clearance: 5.51m (18.08ft), Kilometerpoint: 0.730, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 23.5m (77.1ft)
Find on map >> Show street view
Structure Number: 53 1404S, Location: 07-LA-005-20.00-LA (Lat: 34.075350, Lng: -118.218847), Route carried "under" structure: Ramp Interstate 5, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 12,400 (year 2021), Truck Traffic: 2%, Features Intersected: N5-N110 CONNECTOR RAMP
Minimum Vertical Clearance: 5.56m (18.24ft), Kilometerpoint: 20.000, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 30.8m (101.0ft)
Structure Number: 53 1404S, Location: 07-LA-005-20.00-LA (Lat: 34.075350, Lng: -118.218847), Route carried "under" structure: Ramp Interstate 5, Year Built: 1959, Structure Length: 0. m, Average Daily Traffic: 12,400 (year 2021), Truck Traffic: 2%, Features Intersected: N5-N110 CONNECTOR RAMP
Minimum Vertical Clearance: 5.56m (18.24ft), Kilometerpoint: 20.000, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 30.8m (101.0ft)
Find on map >> Show street view
Structure Number: 53 1405, Location: 07-LA-005-20.26-LA (Lat: 34.079983, Lng: -118.221747), Route carried "under" structure: Ramp Other road , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2019), Truck Traffic: 2%, Features Intersected: METROLINK, Facility Carried by Structure: METROLINK RAILROAD
Minimum Vertical Clearance: 6.34m (20.80ft), Kilometerpoint: 20.260, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 53 1405, Location: 07-LA-005-20.26-LA (Lat: 34.079983, Lng: -118.221747), Route carried "under" structure: Ramp Other road , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2019), Truck Traffic: 2%, Features Intersected: METROLINK, Facility Carried by Structure: METROLINK RAILROAD
Minimum Vertical Clearance: 6.34m (20.80ft), Kilometerpoint: 20.260, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 53 1405, Location: 07-LA-005-20.26-LA (Lat: 34.079983, Lng: -118.221747), Route carried "under" structure: Interstate 5, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 225,000 (year 2009), Truck Traffic: 6%, Features Intersected: METROLINK, Facility Carried by Structure: METROLINK RAILROAD
Minimum Vertical Clearance: 4.54m (14.90ft), Kilometerpoint: 20.260, Lanes under structure: 7, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 53 1405, Location: 07-LA-005-20.26-LA (Lat: 34.079983, Lng: -118.221747), Route carried "under" structure: Interstate 5, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 225,000 (year 2009), Truck Traffic: 6%, Features Intersected: METROLINK, Facility Carried by Structure: METROLINK RAILROAD
Minimum Vertical Clearance: 4.54m (14.90ft), Kilometerpoint: 20.260, Lanes under structure: 7, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 53 1405, Location: 07-LA-005-20.26-LA (Lat: 34.079983, Lng: -118.221747), Route carried "under" structure: Ramp Other road , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2019), Truck Traffic: 2%, Features Intersected: METROLINK, Facility Carried by Structure: METROLINK RAILROAD
Minimum Vertical Clearance: 4.54m (14.90ft), Kilometerpoint: 20.260, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 53 1405, Location: 07-LA-005-20.26-LA (Lat: 34.079983, Lng: -118.221747), Route carried "under" structure: Ramp Other road , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2019), Truck Traffic: 2%, Features Intersected: METROLINK, Facility Carried by Structure: METROLINK RAILROAD
Minimum Vertical Clearance: 4.54m (14.90ft), Kilometerpoint: 20.260, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 53 1405, Location: 07-LA-005-20.26-LA (Lat: 34.079983, Lng: -118.221747), Route carried "under" structure: Ramp Other road , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 2019), Truck Traffic: 2%, Features Intersected: METROLINK, Facility Carried by Structure: METROLINK RAILROAD
Minimum Vertical Clearance: 6.09m (19.98ft), Kilometerpoint: 20.260, Lanes under structure: 1, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 53 1405, Location: 07-LA-005-20.26-LA (Lat: 34.079983, Lng: -118.221747), Route carried "under" structure: Ramp Other road , Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 2019), Truck Traffic: 2%, Features Intersected: METROLINK, Facility Carried by Structure: METROLINK RAILROAD
Minimum Vertical Clearance: 6.09m (19.98ft), Kilometerpoint: 20.260, Lanes under structure: 1, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 53 1407L, Location: 07-LA-060-0.15-LA (Lat: 34.029700, Lng: -118.222744), Route carried "under" structure: Ramp State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 91,700 (year 2012), Truck Traffic: 7%, Features Intersected: W60-W10 CONN, Facility Carried by Structure: L.A. TIMES SPUR UP
Minimum Vertical Clearance: 4.45m (14.60ft), Kilometerpoint: 0.150, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 23.5m (77.1ft)
Structure Number: 53 1407L, Location: 07-LA-060-0.15-LA (Lat: 34.029700, Lng: -118.222744), Route carried "under" structure: Ramp State highway 60, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 91,700 (year 2012), Truck Traffic: 7%, Features Intersected: W60-W10 CONN, Facility Carried by Structure: L.A. TIMES SPUR UP
Minimum Vertical Clearance: 4.45m (14.60ft), Kilometerpoint: 0.150, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 23.5m (77.1ft)
Find on map >> Show street view
Structure Number: 53 1409, Location: 07-LA-405-43.76-LA (Lat: 34.221142, Lng: -118.472986), Route carried "under" structure: City street L549, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 6,500 (year 2019), Truck Traffic: 10%, Features Intersected: ROSCOE BLVD, Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 6.86m (22.51ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 7, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.4m (103.0ft)
Structure Number: 53 1409, Location: 07-LA-405-43.76-LA (Lat: 34.221142, Lng: -118.472986), Route carried "under" structure: City street L549, Year Built: 1963, Structure Length: 0. m, Average Daily Traffic: 6,500 (year 2019), Truck Traffic: 10%, Features Intersected: ROSCOE BLVD, Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 6.86m (22.51ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 7, Material/Design: Concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 31.4m (103.0ft)
Find on map >> Show street view
Structure Number: 53 1411K, Location: 07-LA-005-19.50-LA (Lat: 34.070236, Lng: -118.218233), Route carried "under" structure: City street L139, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 3,300 (year 2015), Truck Traffic: 1%, Features Intersected: N BROADWAY OFF-RAMP, Facility Carried by Structure: INTERSTATE 5
Minimum Vertical Clearance: 4.77m (15.65ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 23.5m (77.1ft)
Structure Number: 53 1411K, Location: 07-LA-005-19.50-LA (Lat: 34.070236, Lng: -118.218233), Route carried "under" structure: City street L139, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 3,300 (year 2015), Truck Traffic: 1%, Features Intersected: N BROADWAY OFF-RAMP, Facility Carried by Structure: INTERSTATE 5
Minimum Vertical Clearance: 4.77m (15.65ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 23.5m (77.1ft)
Find on map >> Show street view
Structure Number: 53 1414, Location: 07-LA-002-14.46-LA (Lat: 34.094000, Lng: -118.255886), Route carried "under" structure: State highway 2, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 61,000 (year 2011), Truck Traffic: 5%, Features Intersected: ROUTE 2, Facility Carried by Structure: OAK GLEN PL OC
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 14.460, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.0m (82.0ft)
Structure Number: 53 1414, Location: 07-LA-002-14.46-LA (Lat: 34.094000, Lng: -118.255886), Route carried "under" structure: State highway 2, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 61,000 (year 2011), Truck Traffic: 5%, Features Intersected: ROUTE 2, Facility Carried by Structure: OAK GLEN PL OC
Minimum Vertical Clearance: 4.62m (15.16ft), Kilometerpoint: 14.460, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 25.0m (82.0ft)
Find on map >> Show street view
Structure Number: 53 1424, Location: 07-LA-005-20.31-LA (Lat: 34.080939, Lng: -118.221939), Route carried "under" structure: State highway 110, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 183,000 (year 2015), Truck Traffic: 1%, Features Intersected: SR 110 CON,ST,UP RR,RIV, Facility Carried by Structure: INTERSTATE 5
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 25.750, Lanes on structure: 7, Lanes under structure: 8, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 49.4m (162.1ft)
Structure Number: 53 1424, Location: 07-LA-005-20.31-LA (Lat: 34.080939, Lng: -118.221939), Route carried "under" structure: State highway 110, Year Built: 1962, Structure Length: 0. m, Average Daily Traffic: 183,000 (year 2015), Truck Traffic: 1%, Features Intersected: SR 110 CON,ST,UP RR,RIV, Facility Carried by Structure: INTERSTATE 5
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 25.750, Lanes on structure: 7, Lanes under structure: 8, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 49.4m (162.1ft)
Find on map >> Show street view
Structure Number: 53 1426, Location: 07-LA-005-19.43-LA (Lat: 34.069053, Lng: -118.217444), Route carried "under" structure: Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 234,000 (year 2012), Features Intersected: INTERSTATE 5, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 19.430, Lanes under structure: 13, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 26.8m (87.9ft)
Structure Number: 53 1426, Location: 07-LA-005-19.43-LA (Lat: 34.069053, Lng: -118.217444), Route carried "under" structure: Interstate 5, Year Built: 1960, Structure Length: 0. m, Average Daily Traffic: 234,000 (year 2012), Features Intersected: INTERSTATE 5, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 19.430, Lanes under structure: 13, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 26.8m (87.9ft)