Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Los Angeles, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 2,325Number of bridges
  • 39,718ft / 12,106mTotal length
  • $98,718,000Total costs
  • 180,570,830Total average daily traffic
  • 9,950,919Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Los Angeles
  • No street view available for this location

New bridges in Los Angeles, CA - historical statistics
  • New bridges - historical statistics
  • 121900-1909
  • 41910-1919
  • 431920-1929
  • 721930-1939
  • 1701940-1949
  • 5201950-1959
  • 6961960-1969
  • 3091970-1979
  • 1881980-1989
  • 2231990-1999
  • 512000-2009
  • 372010-2019
Reconstructed bridges in Los Angeles, CA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 31930-1939
  • 51940-1949
  • 181950-1959
  • 501960-1969
  • 341970-1979
  • 461980-1989
  • 421990-1999
  • 702000-2009
  • 132010-2019
Average Bridge Truck Traffic in Los Angeles, CA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 81.7%Good
  • 1.1%Satisfactory
  • 15.5%Fair
  • 1.7%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 0.5%Very good
  • 89.2%Good
  • 1.1%Satisfactory
  • 9.2%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 94.1%Good
  • 2.3%Satisfactory
  • 3.4%Fair
  • 0.2%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 16.2%Excellent
  • 77.2%Very good
  • 2.7%Good
  • 2.2%Satisfactory
  • 1.7%Fair
  • 0.5%Poor
  • 0.2%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 76.5%Good
  • 23.5%Satisfactory
Find on map >>   Show street view

Structure Number: 53 1306,  Location: 07-LA-101-18.51-LA (Lat: 34.165358,  Lng: -118.490347),  Route carried "under" structure: US 101,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 29,000 (year 2018),  Truck Traffic: 10%,  Features Intersected: ENCINO EQUESTRIAN UC
Minimum Vertical Clearance: 3.00m (9.84ft),  Kilometerpoint: 18.510,  Lanes on structure: 14,  Lanes under structure: 14,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 3.0m (9.8ft)

Find on map >>   Show street view

Structure Number: 53 131,  Location: 07-LA-101-12.35-LA (Lat: 34.154644,  Lng: -118.387622),  Route carried "under" structure: City street L420,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 11,000 (year 2021),  Truck Traffic: 1%,  Features Intersected: COLFAX AVE,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 53 1314,  Location: 07-LA-005-18.06-LA (Lat: 34.049617,  Lng: -118.214353),  Route carried "under" structure: Interstate 5,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 237,000 (year 2012),  Features Intersected: INTERSTATE 5,  Facility Carried by Structure: CESAR E. CHAVEZ AV
Minimum Vertical Clearance: 4.69m (15.39ft),  Kilometerpoint: 18.060,  Lanes on structure: 5,  Lanes under structure: 10,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 53 1315,  Location: 07-LA-101-12.85-LA (Lat: 34.154614,  Lng: -118.396292),  Route carried "under" structure: City street L408,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 25,000 (year 2011),  Truck Traffic: 1%,  Features Intersected: LAUREL CANYON BLVD,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 6,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 31.5m (103.3ft)

Find on map >>   Show street view

Structure Number: 53 1316,  Location: 07-LA-005-18.38-LA (Lat: 34.054197,  Lng: -118.213789),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 34,500 (year 2012),  Truck Traffic: 10%,  Features Intersected: S5-E10 CONNECTOR RAMP
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 18.380,  Lanes on structure: 9,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 16.2m (53.1ft)

Find on map >>   Show street view

Structure Number: 53 1317F,  Location: 07-LA-005-18.62-LA (Lat: 34.057922,  Lng: -118.214725),  Route carried "under" structure: Bypass Interstate 5,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 8,900 (year 2012),  Truck Traffic: 2%,  Features Intersected: MISSION RD - S5 ON RAMP
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 18.620,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 53 1318,  Location: 07-LA-110-21.45-LA (Lat: 34.038278,  Lng: -118.273714),  Route carried "under" structure: Interstate 10,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 243,000 (year 2020),  Truck Traffic: 8%,  Features Intersected: INTERSTATE 10 WB
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 14.840,  Lanes on structure: 9,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 18.0m (59.1ft)

Find on map >>   Show street view

Structure Number: 53 1319,  Location: 07-LA-110-21.48-LA (Lat: 34.038608,  Lng: -118.273719),  Route carried "under" structure: Ramp Interstate 10,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 267,100 (year 2020),  Truck Traffic: 6%,  Features Intersected: W10-S110 CONNECTOR RAMP
Minimum Vertical Clearance: 4.30m (14.11ft),  Kilometerpoint: 14.750,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>   Show street view

Structure Number: 53 1325S,  Location: 07-LA-005-18.37-LA (Lat: 34.053281,  Lng: -118.213469),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 43,500 (year 2012),  Truck Traffic: 2%,  Features Intersected: CONN NB 5 TO EB 10,  Facility Carried by Structure: STATE ST ON-R OC
Minimum Vertical Clearance: 4.74m (15.55ft),  Kilometerpoint: 18.370,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 24.1m (79.1ft)

Find on map >>   Show street view

Structure Number: 53 1326K,  Location: 07-LA-005-18.31-LA (Lat: 34.052958,  Lng: -118.214603),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 38,000 (year 2012),  Truck Traffic: 2%,  Features Intersected: W10-S5 CONNECTOR RAMP
Minimum Vertical Clearance: 4.64m (15.22ft),  Kilometerpoint: 18.310,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 53 1327L,  Location: 07-LA-060-0.38-LA (Lat: 34.029617,  Lng: -118.218906),  Route carried "under" structure: Ramp State highway 60,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 91,700 (year 2019),  Truck Traffic: 7%,  Features Intersected: ROUTE 60 WB,  Facility Carried by Structure: SOTO STREET
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 0.380,  Lanes on structure: 7,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 23.8m (78.1ft)

Find on map >>   Show street view

Structure Number: 53 1328,  Location: 07-LA-010-18.59-LA (Lat: 34.054164,  Lng: -118.212467),  Route carried "under" structure: Interstate 10,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 96,000 (year 2010),  Truck Traffic: 5%,  Features Intersected: RTE 10 & CONN,  Facility Carried by Structure: STATE STREET
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 18.590,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 22.1m (72.5ft)

Find on map >>   Show street view

Structure Number: 53 1328,  Location: 07-LA-010-18.59-LA (Lat: 34.054164,  Lng: -118.212467),  Route carried "under" structure: Ramp Interstate 10,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 50,000 (year 2010),  Truck Traffic: 5%,  Features Intersected: RTE 10 & CONN,  Facility Carried by Structure: STATE STREET
Minimum Vertical Clearance: 6.58m (21.59ft),  Kilometerpoint: 18.590,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 22.1m (72.5ft)

Find on map >>   Show street view

Structure Number: 53 1328,  Location: 07-LA-010-18.59-LA (Lat: 34.054164,  Lng: -118.212467),  Route carried "under" structure: Ramp Interstate 10,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2010),  Truck Traffic: 5%,  Features Intersected: RTE 10 & CONN,  Facility Carried by Structure: STATE STREET
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 18.590,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 22.1m (72.5ft)

Find on map >>   Show street view

Structure Number: 53 1328,  Location: 07-LA-010-18.59-LA (Lat: 34.054164,  Lng: -118.212467),  Route carried "under" structure: Ramp Interstate 10,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 2010),  Truck Traffic: 5%,  Features Intersected: RTE 10 & CONN,  Facility Carried by Structure: STATE STREET
Minimum Vertical Clearance: 6.65m (21.82ft),  Kilometerpoint: 18.590,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 22.1m (72.5ft)

Find on map >>   Show street view

Structure Number: 53 1329,  Location: 07-LA-005-18.42-LA (Lat: 34.054850,  Lng: -118.213944),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2019),  Truck Traffic: 2%,  Features Intersected: I 10 & OFF-RAMP
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 18.420,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 22.1m (72.5ft)

Find on map >>   Show street view

Structure Number: 53 1329,  Location: 07-LA-005-18.42-LA (Lat: 34.054850,  Lng: -118.213944),  Route carried "under" structure: Interstate 10,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 243,000 (year 2012),  Truck Traffic: 8%,  Features Intersected: I 10 & OFF-RAMP
Minimum Vertical Clearance: 7.70m (25.26ft),  Kilometerpoint: 18.390,  Lanes on structure: 8,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 22.1m (72.5ft)

Find on map >>   Show street view

Structure Number: 53 1330F,  Location: 07-LA-005-18.47-LA (Lat: 34.054911,  Lng: -118.215267),  Route carried "under" structure: State highway 10,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 96,000 (year 2021),  Truck Traffic: 3%,  Features Intersected: ROUTE 10
Minimum Vertical Clearance: 4.74m (15.55ft),  Kilometerpoint: 0.580,  Lanes on structure: 3,  Lanes under structure: 7,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 27.1m (88.9ft)

Find on map >>   Show street view

Structure Number: 53 1331F,  Location: 07-LA-010-S0.55-LA (Lat: 34.054961,  Lng: -118.215819),  Route carried "under" structure: Spur State highway 10,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 254,000 (year 2010),  Truck Traffic: 6%,  Features Intersected: INTERSTATE 10
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.550,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 53 1332F,  Location: 07-LA-005-18.53-LA (Lat: 34.056069,  Lng: -118.215219),  Route carried "under" structure: Interstate 10,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 64,500 (year 2012),  Truck Traffic: 2%,  Features Intersected: CONN, BUSWAY, METROLINK
Minimum Vertical Clearance: 5.77m (18.93ft),  Kilometerpoint: 18.360,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 53 1332F,  Location: 07-LA-005-18.53-LA (Lat: 34.056069,  Lng: -118.215219),  Route carried "under" structure: Ramp Interstate 10,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2019),  Truck Traffic: 2%,  Features Intersected: CONN, BUSWAY, METROLINK
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.560,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 53 1332F,  Location: 07-LA-005-18.53-LA (Lat: 34.056069,  Lng: -118.215219),  Route carried "under" structure: Ramp Interstate 10,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2019),  Truck Traffic: 2%,  Features Intersected: CONN, BUSWAY, METROLINK
Minimum Vertical Clearance: 6.48m (21.26ft),  Kilometerpoint: 0.560,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 53 1333,  Location: 07-LA-005-18.52-LA (Lat: 34.056172,  Lng: -118.214036),  Route carried "under" structure: Ramp Interstate 10,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2021),  Truck Traffic: 2%,  Features Intersected: CONN, BUSWAY, METROLINK,  Facility Carried by Structure: INTERSTATE 5
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.570,  Lanes on structure: 9,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 53 1333,  Location: 07-LA-005-18.52-LA (Lat: 34.056172,  Lng: -118.214036),  Route carried "under" structure: Interstate 10,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 65,000 (year 2021),  Truck Traffic: 5%,  Features Intersected: CONN, BUSWAY, METROLINK,  Facility Carried by Structure: INTERSTATE 5
Minimum Vertical Clearance: 6.73m (22.08ft),  Kilometerpoint: 18.410,  Lanes on structure: 9,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 53 1333,  Location: 07-LA-005-18.52-LA (Lat: 34.056172,  Lng: -118.214036),  Route carried "under" structure: Ramp Interstate 10,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 5,300 (year 2021),  Truck Traffic: 2%,  Features Intersected: CONN, BUSWAY, METROLINK,  Facility Carried by Structure: INTERSTATE 5
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.570,  Lanes on structure: 9,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 53 1333F,  Location: 07-LA-010-18.41-LA (Lat: 34.056131,  Lng: -118.213686),  Route carried "under" structure: Ramp Interstate 10,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 60,000 (year 2018),  Truck Traffic: 2%,  Features Intersected: CONN, BUSWAY, METROLINK
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 18.410,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.3m (122.4ft)

Find on map >>   Show street view

Structure Number: 53 1333F,  Location: 07-LA-010-18.41-LA (Lat: 34.056131,  Lng: -118.213686),  Route carried "under" structure: Interstate 10,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 16,500 (year 2018),  Truck Traffic: 1%,  Features Intersected: CONN, BUSWAY, METROLINK
Minimum Vertical Clearance: 6.71m (22.01ft),  Kilometerpoint: 18.410,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.3m (122.4ft)

Find on map >>   Show street view

Structure Number: 53 1336R,  Location: 07-LA-101-11.75R-LA (Lat: 34.154086,  Lng: -118.378889),  Route carried "under" structure: Ramp State highway 170,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 76,200 (year 2011),  Truck Traffic: 5%,  Features Intersected: ROUTE 170,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 14.600,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 53 1336R,  Location: 07-LA-101-11.75R-LA (Lat: 34.154086,  Lng: -118.378889),  Route carried "under" structure: City street L423,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 4,391 (year 2011),  Truck Traffic: 2%,  Features Intersected: ROUTE 170,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 53 1336R,  Location: 07-LA-101-11.75R-LA (Lat: 34.154086,  Lng: -118.378889),  Route carried "under" structure: State highway 170,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 82,000 (year 2021),  Truck Traffic: 8%,  Features Intersected: ROUTE 170,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 14.600,  Lanes on structure: 5,  Lanes under structure: 8,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 53 1338L,  Location: 07-LA-101-11.83L-LA (Lat: 34.153947,  Lng: -118.378889),  Route carried "under" structure: City street L423,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 7,500 (year 2021),  Truck Traffic: 4%,  Features Intersected: TUJUNGA AVE,  Facility Carried by Structure: US HIGHWAY 101 SB
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 28.3m (92.8ft)

Find on map >>   Show street view

Structure Number: 53 1339F,  Location: 07-LA-101-11.63L-LA (Lat: 34.154358,  Lng: -118.377117),  Route carried "under" structure: US 101,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 175,000 (year 2021),  Truck Traffic: 8%,  Features Intersected: ROUTES 101 & 170, RNERSD,  Facility Carried by Structure: RTE 134
Minimum Vertical Clearance: 4.64m (15.22ft),  Kilometerpoint: 11.630,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 53 1339F,  Location: 07-LA-101-11.63L-LA (Lat: 34.154358,  Lng: -118.377117),  Route carried "under" structure: State highway 170,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 160,000 (year 2011),  Truck Traffic: 8%,  Features Intersected: ROUTES 101 & 170, RNERSD,  Facility Carried by Structure: RTE 134
Minimum Vertical Clearance: 5.71m (18.73ft),  Kilometerpoint: 14.510,  Lanes on structure: 4,  Lanes under structure: 7,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 34.7m (113.8ft)

Find on map >>   Show street view

Structure Number: 53 1344,  Location: 07-LA-170-R14.78-LA (Lat: 34.156958,  Lng: -118.378953),  Route carried "under" structure: City street ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 8,600 (year 2017),  Truck Traffic: 2%,  Features Intersected: RIVERSIDE-TUJUNGA,  Facility Carried by Structure: ROUTE 170
Minimum Vertical Clearance: 4.69m (15.39ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 53 1344,  Location: 07-LA-170-R14.78-LA (Lat: 34.156958,  Lng: -118.378953),  Route carried "under" structure: City street ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 8,400 (year 2017),  Truck Traffic: 2%,  Features Intersected: RIVERSIDE-TUJUNGA,  Facility Carried by Structure: ROUTE 170
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 53 1345F,  Location: 07-LA-134-0.04-LA (Lat: 34.153708,  Lng: -118.375856),  Route carried "under" structure: City street ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 14,000 (year 2012),  Truck Traffic: 2%,  Features Intersected: RIVERSIDE DR,  Facility Carried by Structure: W134-N101 CONNECTR
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 33.3m (109.3ft)

Find on map >>   Show street view

Structure Number: 53 1349,  Location: 07-LA-005-18.25-LA (Lat: 34.052003,  Lng: -118.214344),  Route carried "under" structure: Interstate 5,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 226,000 (year 2021),  Truck Traffic: 7%,  Features Intersected: ROUTE 5,  Facility Carried by Structure: STATE STREET
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 18.250,  Lanes on structure: 4,  Lanes under structure: 12,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.8m (120.7ft)

Find on map >>   Show street view

Structure Number: 53 1353,  Location: 07-LA-101-13.88-LA (Lat: 34.156922,  Lng: -118.413642),  Route carried "under" structure: City street L401,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 8,500 (year 2019),  Truck Traffic: 2%,  Features Intersected: COLDWATER CANYON AVE,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 6,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 53 1355,  Location: 07-LA-101-14.89-LA (Lat: 34.155808,  Lng: -118.431039),  Route carried "under" structure: City street L399,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 24,000 (year 2011),  Truck Traffic: 4%,  Features Intersected: WOODMAN AVE,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 8,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 31.7m (104.0ft)

Find on map >>   Show street view

Structure Number: 53 1356L,  Location: 07-LA-005-17.07-LA (Lat: 34.036447,  Lng: -118.220775),  Route carried "under" structure: Interstate 5,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 231,000 (year 2009),  Truck Traffic: 7%,  Features Intersected: ROUTE 5 SB,  Facility Carried by Structure: WHITTIER BLVD
Minimum Vertical Clearance: 6.01m (19.72ft),  Kilometerpoint: 17.070,  Lanes on structure: 5,  Lanes under structure: 5,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 24.7m (81.0ft)

Find on map >>   Show street view

Structure Number: 53 1356R,  Location: 07-LA-005-17.07-LA (Lat: 34.036150,  Lng: -118.220089),  Route carried "under" structure: Interstate 5,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 231,000 (year 2009),  Truck Traffic: 7%,  Features Intersected: ROUTE 5 NB & E10-N5 CONN,  Facility Carried by Structure: WHITTIER BLVD
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 17.070,  Lanes on structure: 6,  Lanes under structure: 5,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 53 1357S,  Location: 07-LA-101-S0.22-LA (Lat: 34.036725,  Lng: -118.220656),  Route carried "under" structure: Interstate 5,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 140,000 (year 2017),  Truck Traffic: 10%,  Features Intersected: ROUTE 5 SB,  Facility Carried by Structure: WHITTIER BL-N101
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 17.080,  Lanes on structure: 1,  Lanes under structure: 5,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: 53 1366R,  Location: 07-LA-005-16.90-LA (Lat: 34.033583,  Lng: -118.220056),  Route carried "under" structure: Interstate 5,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 231,000 (year 2009),  Truck Traffic: 7%,  Features Intersected: INTERSTATE 5 NB,  Facility Carried by Structure: 7TH STREET
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 16.900,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 53 1367G,  Location: 07-LA-010-18.33-LA (Lat: 34.032778,  Lng: -118.221508),  Route carried "under" structure: City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2011),  Truck Traffic: 2%,  Features Intersected: 5, 101, CONNS, 7TH,  Facility Carried by Structure: E10-N5 CONNECTOR
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: 53 1367G,  Location: 07-LA-010-18.33-LA (Lat: 34.032778,  Lng: -118.221508),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2011),  Truck Traffic: 5%,  Features Intersected: 5, 101, CONNS, 7TH
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 16.870,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: 53 1367G,  Location: 07-LA-010-18.33-LA (Lat: 34.032778,  Lng: -118.221508),  Route carried "under" structure: Interstate 5,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 231,000 (year 2010),  Truck Traffic: 7%,  Features Intersected: 5, 101, CONNS, 7TH
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 16.870,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: 53 1367G,  Location: 07-LA-010-18.33-LA (Lat: 34.032778,  Lng: -118.221508),  Route carried "under" structure: US 101,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 140,000 (year 2010),  Truck Traffic: 5%,  Features Intersected: 5, 101, CONNS, 7TH,  Facility Carried by Structure: E10-N5 CONNECTOR
Minimum Vertical Clearance: 13.72m (45.01ft),  Kilometerpoint: 0.010,  Lanes on structure: 3,  Lanes under structure: 7,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: 53 1371,  Location: 07-LA-101-15.38-LA (Lat: 34.155783,  Lng: -118.439708),  Route carried "under" structure: City street L398,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 7,500 (year 2019),  Truck Traffic: 1%,  Features Intersected: LOS ANGELES RI,HAZELTINE,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 53 1373,  Location: 07-LA-005-19.73-LA (Lat: 34.072794,  Lng: -118.219500),  Route carried "under" structure: Interstate 5,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 238,000 (year 2017),  Truck Traffic: 6%,  Features Intersected: ROUTE 5,  Facility Carried by Structure: NORTH BROADWAY
Minimum Vertical Clearance: 4.74m (15.55ft),  Kilometerpoint: 19.730,  Lanes on structure: 8,  Lanes under structure: 8,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 53 1374,  Location: 07-LA-005-20.12-LA (Lat: 34.078386,  Lng: -118.220172),  Route carried "under" structure: Interstate 5,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 225,000 (year 2021),  Truck Traffic: 6%,  Features Intersected: I 5 & CONN RAMPS,  Facility Carried by Structure: HUMBOLDT ST
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 20.120,  Lanes on structure: 2,  Lanes under structure: 11,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.4m (66.9ft)

Find on map >>   Show street view

Structure Number: 53 1376,  Location: 07-LA-101-15.91-LA (Lat: 34.157097,  Lng: -118.448422),  Route carried "under" structure: City street L397,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 26,000 (year 2011),  Truck Traffic: 1%,  Features Intersected: VAN NUYS BLVD,  Facility Carried by Structure: U.S. HIGHWAY 101
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: 53 1379,  Location: 07-LA-005-19.86-LA (Lat: 34.074783,  Lng: -118.219647),  Route carried "under" structure: Interstate 5,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 238,000 (year 2017),  Truck Traffic: 6%,  Features Intersected: ROUTE 5 & N5-N110 CONN,  Facility Carried by Structure: PASADENA AVE
Minimum Vertical Clearance: 6.00m (19.69ft),  Kilometerpoint: 19.860,  Lanes on structure: 5,  Lanes under structure: 10,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.0m (85.3ft)

Find on map >>   Show street view

Structure Number: 53 1386F,  Location: 07-LA-005-16.59-LA (Lat: 34.029439,  Lng: -118.216786),  Route carried "under" structure: State highway 60,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 90,000 (year 2017),  Truck Traffic: 3%,  Features Intersected: W60-W10, SOTO ST, & RAMP
Minimum Vertical Clearance: 9.73m (31.92ft),  Kilometerpoint: 0.440,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: 53 1386F,  Location: 07-LA-005-16.59-LA (Lat: 34.029439,  Lng: -118.216786),  Route carried "under" structure: Ramp State highway 60,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 3,860 (year 2019),  Truck Traffic: 2%,  Features Intersected: W60-W10, SOTO ST, & RAMP
Minimum Vertical Clearance: 9.11m (29.89ft),  Kilometerpoint: 0.540,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: 53 1386F,  Location: 07-LA-005-16.59-LA (Lat: 34.029439,  Lng: -118.216786),  Route carried "under" structure: City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 42,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: W60-W10, SOTO ST, & RAMP,  Facility Carried by Structure: S5&S101-E60 CONNEC
Minimum Vertical Clearance: 4.52m (14.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: 53 1388S,  Location: 07-LA-005-16.13-LA (Lat: 34.028189,  Lng: -118.210808),  Route carried "under" structure: Bypass Interstate 5,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 45,000 (year 2019),  Truck Traffic: 2%,  Features Intersected: NB I 5 & CONM TO WB 60,  Facility Carried by Structure: EUCLID AVE ON-RAMP
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 16.130,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 53 1388S,  Location: 07-LA-005-16.13-LA (Lat: 34.028189,  Lng: -118.210808),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 39,000 (year 2019),  Truck Traffic: 2%,  Features Intersected: NB I 5 & CONM TO WB 60,  Facility Carried by Structure: EUCLID AVE ON-RAMP
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 16.130,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 53 1389L,  Location: 07-LA-005-16.14-LA (Lat: 34.027814,  Lng: -118.212147),  Route carried "under" structure: Ramp City street L340,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 1,300 (year 2019),  Truck Traffic: 2%,  Features Intersected: SB INTERSTATE 5,  Facility Carried by Structure: EUCLID AVE OFF-RAM
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Slab,  Length of Maximum Span: 16.2m (53.1ft)

Find on map >>   Show street view

Structure Number: 53 1390R,  Location: 07-LA-005-16.59-LA (Lat: 34.031031,  Lng: -118.217344),  Route carried "under" structure: City street L155,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 34,800 (year 2019),  Truck Traffic: 2%,  Features Intersected: SOTO STREET,  Facility Carried by Structure: INTERSTATE 5 NB
Minimum Vertical Clearance: 4.59m (15.06ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 53 1391L,  Location: 07-LA-005-16.59-LA (Lat: 34.029300,  Lng: -118.217769),  Route carried "under" structure: City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 26,500 (year 2019),  Truck Traffic: 8%,  Features Intersected: ST RTE 60 WB, RAMPS,SOTO,  Facility Carried by Structure: INTERSTATE 5 SB
Minimum Vertical Clearance: 5.76m (18.90ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 43.0m (141.1ft)

Find on map >>   Show street view

Structure Number: 53 1391L,  Location: 07-LA-005-16.59-LA (Lat: 34.029300,  Lng: -118.217769),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 6,200 (year 2017),  Truck Traffic: 2%,  Features Intersected: ST RTE 60 WB, RAMPS,SOTO
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 16.590,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 43.0m (141.1ft)

Find on map >>   Show street view

Structure Number: 53 1391L,  Location: 07-LA-005-16.59-LA (Lat: 34.029300,  Lng: -118.217769),  Route carried "under" structure: Ramp State highway 60,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 4,550 (year 2017),  Truck Traffic: 2%,  Features Intersected: ST RTE 60 WB, RAMPS,SOTO,  Facility Carried by Structure: INTERSTATE 5 SB
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 16.590,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 43.0m (141.1ft)

Find on map >>   Show street view

Structure Number: 53 1391L,  Location: 07-LA-005-16.59-LA (Lat: 34.029300,  Lng: -118.217769),  Route carried "under" structure: State highway 60,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 108,000 (year 2019),  Truck Traffic: 7%,  Features Intersected: ST RTE 60 WB, RAMPS,SOTO,  Facility Carried by Structure: INTERSTATE 5 SB
Minimum Vertical Clearance: 11.83m (38.81ft),  Kilometerpoint: 0.420,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 43.0m (141.1ft)

Find on map >>   Show street view

Structure Number: 53 1393R,  Location: 07-LA-060-R0.63-LA (Lat: 34.029156,  Lng: -118.215247),  Route carried "under" structure: US 101,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 140,000 (year 2019),  Truck Traffic: 5%,  Features Intersected: I-5, CONN, RAMP,  Facility Carried by Structure: ST RTE 60 EB
Minimum Vertical Clearance: 6.70m (21.98ft),  Kilometerpoint: 0.010,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 53 1393R,  Location: 07-LA-060-R0.63-LA (Lat: 34.029156,  Lng: -118.215247),  Route carried "under" structure: Interstate 5,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 250,000 (year 2019),  Truck Traffic: 7%,  Features Intersected: I-5, CONN, RAMP,  Facility Carried by Structure: ST RTE 60 EB
Minimum Vertical Clearance: 6.10m (20.01ft),  Kilometerpoint: 16.380,  Lanes on structure: 5,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 53 1393R,  Location: 07-LA-060-R0.63-LA (Lat: 34.029156,  Lng: -118.215247),  Route carried "under" structure: Interstate 5,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 250,000 (year 2019),  Truck Traffic: 7%,  Features Intersected: I-5, CONN, RAMP,  Facility Carried by Structure: ST RTE 60 EB
Minimum Vertical Clearance: 4.50m (14.76ft),  Kilometerpoint: 16.380,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 53 1393R,  Location: 07-LA-060-R0.63-LA (Lat: 34.029156,  Lng: -118.215247),  Route carried "under" structure: Interstate 5,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 250,000 (year 2019),  Truck Traffic: 7%,  Features Intersected: I-5, CONN, RAMP,  Facility Carried by Structure: ST RTE 60 EB
Minimum Vertical Clearance: 10.67m (35.01ft),  Kilometerpoint: 16.380,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.7m (149.9ft)

Find on map >>   Show street view

Structure Number: 53 1394G,  Location: 07-LA-060-R0.69-LA (Lat: 34.028369,  Lng: -118.213794),  Route carried "under" structure: City street ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 2,260 (year 2015),  Truck Traffic: 2%,  Features Intersected: MARIETTA STREET,  Facility Carried by Structure: E60-S5 CONNECTOR
Minimum Vertical Clearance: 11.35m (37.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 53 1395S,  Location: 07-LA-005-16.37-LA (Lat: 34.029489,  Lng: -118.213858),  Route carried "under" structure: Ramp State highway 60,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 20,500 (year 2019),  Truck Traffic: 5%,  Features Intersected: ST RTE 60 WB, WB60-NB101,  Facility Carried by Structure: NB5-SOTO ST OFFRMP
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 0.640,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 49.1m (161.1ft)

Find on map >>   Show street view

Structure Number: 53 1395S,  Location: 07-LA-005-16.37-LA (Lat: 34.029489,  Lng: -118.213858),  Route carried "under" structure: State highway 60,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 189,000 (year 2019),  Truck Traffic: 5%,  Features Intersected: ST RTE 60 WB, WB60-NB101,  Facility Carried by Structure: NB5-SOTO ST OFFRMP
Minimum Vertical Clearance: 7.72m (25.33ft),  Kilometerpoint: 0.640,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 49.1m (161.1ft)

Find on map >>   Show street view

Structure Number: 53 1396L,  Location: 07-LA-060-0.28-LA (Lat: 34.029731,  Lng: -118.220581),  Route carried "under" structure: Ramp State highway 60,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 91,700 (year 2019),  Truck Traffic: 7%,  Features Intersected: ROUTE 60 WB,  Facility Carried by Structure: BOYLE AVE
Minimum Vertical Clearance: 11.20m (36.75ft),  Kilometerpoint: 0.280,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 53 1397F,  Location: 07-LA-060-R0.60-LA (Lat: 34.030419,  Lng: -118.215825),  Route carried "under" structure: Ramp State highway 60,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 11,300 (year 2018),  Truck Traffic: 3%,  Features Intersected: SOTO ST OFF/ON RAMPS
Minimum Vertical Clearance: 5.63m (18.47ft),  Kilometerpoint: 0.600,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 53 1397F,  Location: 07-LA-060-R0.60-LA (Lat: 34.030419,  Lng: -118.215825),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 2,700 (year 2018),  Truck Traffic: 3%,  Features Intersected: SOTO ST OFF/ON RAMPS
Minimum Vertical Clearance: 4.64m (15.22ft),  Kilometerpoint: 16.350,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 53 1397F,  Location: 07-LA-060-R0.60-LA (Lat: 34.030419,  Lng: -118.215825),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 6,200 (year 2018),  Truck Traffic: 3%,  Features Intersected: SOTO ST OFF/ON RAMPS
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 16.360,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 53 1397R,  Location: 07-LA-005-16.36-LA (Lat: 34.030258,  Lng: -118.215897),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 24,501 (year 2017),  Truck Traffic: 3%,  Features Intersected: W60, W60-N101 CON, RAMP
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 16.390,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 49.4m (162.1ft)

Find on map >>   Show street view

Structure Number: 53 1397R,  Location: 07-LA-005-16.36-LA (Lat: 34.030258,  Lng: -118.215897),  Route carried "under" structure: Ramp State highway 60,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 50,100 (year 2019),  Truck Traffic: 8%,  Features Intersected: W60, W60-N101 CON, RAMP,  Facility Carried by Structure: ROUTE I-5 N/B
Minimum Vertical Clearance: 6.80m (22.31ft),  Kilometerpoint: 0.600,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 49.4m (162.1ft)

Find on map >>   Show street view

Structure Number: 53 1397R,  Location: 07-LA-005-16.36-LA (Lat: 34.030258,  Lng: -118.215897),  Route carried "under" structure: State highway 60,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 180,000 (year 2018),  Truck Traffic: 8%,  Features Intersected: W60, W60-N101 CON, RAMP,  Facility Carried by Structure: ROUTE I-5 N/B
Minimum Vertical Clearance: 8.55m (28.05ft),  Kilometerpoint: 0.600,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 49.4m (162.1ft)

Find on map >>   Show street view

Structure Number: 53 1398L,  Location: 07-LA-060-R0.73-LA (Lat: 34.029881,  Lng: -118.212711),  Route carried "under" structure: State highway 60,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 189,000 (year 2019),  Truck Traffic: 5%,  Features Intersected: ST RTE 60 WB & CONNS,  Facility Carried by Structure: MARIETTA ST
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.730,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 53 1398L,  Location: 07-LA-060-R0.73-LA (Lat: 34.029881,  Lng: -118.212711),  Route carried "under" structure: State highway 60,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 108,500 (year 2019),  Truck Traffic: 5%,  Features Intersected: ST RTE 60 WB & CONNS,  Facility Carried by Structure: MARIETTA ST
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.730,  Lanes on structure: 2,  Lanes under structure: 3,  Toll: On toll road,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 53 1398L,  Location: 07-LA-060-R0.73-LA (Lat: 34.029881,  Lng: -118.212711),  Route carried "under" structure: State highway 60,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 108,500 (year 2019),  Truck Traffic: 5%,  Features Intersected: ST RTE 60 WB & CONNS,  Facility Carried by Structure: MARIETTA ST
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.730,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 53 1398L,  Location: 07-LA-060-R0.73-LA (Lat: 34.029881,  Lng: -118.212711),  Route carried "under" structure: State highway 60,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 189,000 (year 2019),  Truck Traffic: 5%,  Features Intersected: ST RTE 60 WB & CONNS,  Facility Carried by Structure: MARIETTA ST
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 0.730,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 53 1404S,  Location: 07-LA-005-20.00-LA (Lat: 34.075350,  Lng: -118.218847),  Route carried "under" structure: Ramp Interstate 5,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 12,400 (year 2021),  Truck Traffic: 2%,  Features Intersected: N5-N110 CONNECTOR RAMP
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 20.000,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 53 1405,  Location: 07-LA-005-20.26-LA (Lat: 34.079983,  Lng: -118.221747),  Route carried "under" structure: Ramp Other road ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2019),  Truck Traffic: 2%,  Features Intersected: METROLINK,  Facility Carried by Structure: METROLINK RAILROAD
Minimum Vertical Clearance: 6.34m (20.80ft),  Kilometerpoint: 20.260,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 53 1405,  Location: 07-LA-005-20.26-LA (Lat: 34.079983,  Lng: -118.221747),  Route carried "under" structure: Interstate 5,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 225,000 (year 2009),  Truck Traffic: 6%,  Features Intersected: METROLINK,  Facility Carried by Structure: METROLINK RAILROAD
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 20.260,  Lanes under structure: 7,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 53 1405,  Location: 07-LA-005-20.26-LA (Lat: 34.079983,  Lng: -118.221747),  Route carried "under" structure: Ramp Other road ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2019),  Truck Traffic: 2%,  Features Intersected: METROLINK,  Facility Carried by Structure: METROLINK RAILROAD
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 20.260,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 53 1405,  Location: 07-LA-005-20.26-LA (Lat: 34.079983,  Lng: -118.221747),  Route carried "under" structure: Ramp Other road ,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2019),  Truck Traffic: 2%,  Features Intersected: METROLINK,  Facility Carried by Structure: METROLINK RAILROAD
Minimum Vertical Clearance: 6.09m (19.98ft),  Kilometerpoint: 20.260,  Lanes under structure: 1,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 53 1407L,  Location: 07-LA-060-0.15-LA (Lat: 34.029700,  Lng: -118.222744),  Route carried "under" structure: Ramp State highway 60,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 91,700 (year 2012),  Truck Traffic: 7%,  Features Intersected: W60-W10 CONN,  Facility Carried by Structure: L.A. TIMES SPUR UP
Minimum Vertical Clearance: 4.45m (14.60ft),  Kilometerpoint: 0.150,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 53 1409,  Location: 07-LA-405-43.76-LA (Lat: 34.221142,  Lng: -118.472986),  Route carried "under" structure: City street L549,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 6,500 (year 2019),  Truck Traffic: 10%,  Features Intersected: ROSCOE BLVD,  Facility Carried by Structure: INTERSTATE 405
Minimum Vertical Clearance: 6.86m (22.51ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 7,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 31.4m (103.0ft)

Find on map >>   Show street view

Structure Number: 53 1411K,  Location: 07-LA-005-19.50-LA (Lat: 34.070236,  Lng: -118.218233),  Route carried "under" structure: City street L139,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 3,300 (year 2015),  Truck Traffic: 1%,  Features Intersected: N BROADWAY OFF-RAMP,  Facility Carried by Structure: INTERSTATE 5
Minimum Vertical Clearance: 4.77m (15.65ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 23.5m (77.1ft)

Find on map >>   Show street view

Structure Number: 53 1414,  Location: 07-LA-002-14.46-LA (Lat: 34.094000,  Lng: -118.255886),  Route carried "under" structure: State highway 2,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 61,000 (year 2011),  Truck Traffic: 5%,  Features Intersected: ROUTE 2,  Facility Carried by Structure: OAK GLEN PL OC
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 14.460,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 53 1424,  Location: 07-LA-005-20.31-LA (Lat: 34.080939,  Lng: -118.221939),  Route carried "under" structure: State highway 110,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 183,000 (year 2015),  Truck Traffic: 1%,  Features Intersected: SR 110 CON,ST,UP RR,RIV,  Facility Carried by Structure: INTERSTATE 5
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 25.750,  Lanes on structure: 7,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 49.4m (162.1ft)

Find on map >>   Show street view

Structure Number: 53 1426,  Location: 07-LA-005-19.43-LA (Lat: 34.069053,  Lng: -118.217444),  Route carried "under" structure: Interstate 5,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 234,000 (year 2012),  Features Intersected: INTERSTATE 5,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 19.430,  Lanes under structure: 13,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 26.8m (87.9ft)

Discuss Los Angeles, California (CA) on our hugely popular California forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.