- 2,325Number of bridges
- 39,718ft / 12,106mTotal length
- $98,718,000Total costs
- 180,570,830Total average daily traffic
- 9,950,919Total average daily truck traffic
- National Bridge Inventory (NBI) Registered Bridges for Los Angeles
- No street view available for this location
- New bridges - historical statistics
- 121900-1909
- 41910-1919
- 431920-1929
- 721930-1939
- 1701940-1949
- 5201950-1959
- 6961960-1969
- 3091970-1979
- 1881980-1989
- 2231990-1999
- 512000-2009
- 372010-2019
- Reconstructed bridges - Historical Statistics
- 11920-1929
- 31930-1939
- 51940-1949
- 181950-1959
- 501960-1969
- 341970-1979
- 461980-1989
- 421990-1999
- 702000-2009
- 132010-2019
- Bridge Condition - Deck
- 81.7%Good
- 1.1%Satisfactory
- 15.5%Fair
- 1.7%Poor
- Bridge Condition - Superstructure
- 0.5%Very good
- 89.2%Good
- 1.1%Satisfactory
- 9.2%Fair
- Bridge Condition - Substructure
- 94.1%Good
- 2.3%Satisfactory
- 3.4%Fair
- 0.2%Poor
- Bridge Condition - Channel
- 16.2%Excellent
- 77.2%Very good
- 2.7%Good
- 2.2%Satisfactory
- 1.7%Fair
- 0.5%Poor
- 0.2%Serious
- Bridge Condition - Culverts
- 76.5%Good
- 23.5%Satisfactory
Find on map >> Show street view
Structure Number: 53 2685, Location: 07-LA-103-0.50-LA (Lat: 33.777117, Lng: -118.233733), Route carried "under" structure: State highway 103, Year Built: 1981, Structure Length: 0. m, Average Daily Traffic: 14,400 (year 2009), Truck Traffic: 56%, Features Intersected: STATE ROUTE 103, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.84m (19.16ft), Kilometerpoint: 0.500, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.0m (105.0ft)
Structure Number: 53 2685, Location: 07-LA-103-0.50-LA (Lat: 33.777117, Lng: -118.233733), Route carried "under" structure: State highway 103, Year Built: 1981, Structure Length: 0. m, Average Daily Traffic: 14,400 (year 2009), Truck Traffic: 56%, Features Intersected: STATE ROUTE 103, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.84m (19.16ft), Kilometerpoint: 0.500, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 32.0m (105.0ft)
Find on map >> Show street view
Structure Number: 53 2695, Location: 07-LA-001-26.15-LA (Lat: 33.934267, Lng: -118.396308), Route carried "under" structure: State highway 1, Year Built: 1982, Structure Length: 0. m, Average Daily Traffic: 60,800 (year 2017), Truck Traffic: 3%, Features Intersected: ROUTE 1, Facility Carried by Structure: AIRPORT ACCESS RD
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 26.150, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.6m (84.0ft)
Structure Number: 53 2695, Location: 07-LA-001-26.15-LA (Lat: 33.934267, Lng: -118.396308), Route carried "under" structure: State highway 1, Year Built: 1982, Structure Length: 0. m, Average Daily Traffic: 60,800 (year 2017), Truck Traffic: 3%, Features Intersected: ROUTE 1, Facility Carried by Structure: AIRPORT ACCESS RD
Minimum Vertical Clearance: 5.26m (17.26ft), Kilometerpoint: 26.150, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.6m (84.0ft)
Find on map >> Show street view
Structure Number: 53 2709, Location: 07-LA-001-26.84-LA (Lat: 33.943533, Lng: -118.396453), Route carried "under" structure: State highway 1, Year Built: 1983, Structure Length: 0. m, Average Daily Traffic: 10,800 (year 2017), Truck Traffic: 1%, Features Intersected: STATE ROUTE 1, Facility Carried by Structure: WORLD WAY (SOUTH)
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 26.840, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Concrete, Length of Maximum Span: 28.3m (92.8ft)
Structure Number: 53 2709, Location: 07-LA-001-26.84-LA (Lat: 33.943533, Lng: -118.396453), Route carried "under" structure: State highway 1, Year Built: 1983, Structure Length: 0. m, Average Daily Traffic: 10,800 (year 2017), Truck Traffic: 1%, Features Intersected: STATE ROUTE 1, Facility Carried by Structure: WORLD WAY (SOUTH)
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 26.840, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Concrete, Length of Maximum Span: 28.3m (92.8ft)
Find on map >> Show street view
Structure Number: 53 271, Location: 07-LA-001-26.94-LA (Lat: 33.944975, Lng: -118.396594), Route carried "under" structure: State highway 1, Year Built: 1983, Structure Length: 0. m, Average Daily Traffic: 57,800 (year 2017), Truck Traffic: 2%, Features Intersected: ROUTE 1, Facility Carried by Structure: WORLDWAY CONNECTOR
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 26.940, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 23.5m (77.1ft)
Structure Number: 53 271, Location: 07-LA-001-26.94-LA (Lat: 33.944975, Lng: -118.396594), Route carried "under" structure: State highway 1, Year Built: 1983, Structure Length: 0. m, Average Daily Traffic: 57,800 (year 2017), Truck Traffic: 2%, Features Intersected: ROUTE 1, Facility Carried by Structure: WORLDWAY CONNECTOR
Minimum Vertical Clearance: 4.85m (15.91ft), Kilometerpoint: 26.940, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 23.5m (77.1ft)
Find on map >> Show street view
Structure Number: 53 2711, Location: 07-LA-001-26.96-LA (Lat: 33.945328, Lng: -118.396406), Route carried "under" structure: State highway 1, Year Built: 1983, Structure Length: 0. m, Average Daily Traffic: 57,800 (year 2017), Truck Traffic: 2%, Features Intersected: SR 1, Facility Carried by Structure: WORLD WAY (NORTH)
Minimum Vertical Clearance: 4.75m (15.58ft), Kilometerpoint: 26.960, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.0m (82.0ft)
Structure Number: 53 2711, Location: 07-LA-001-26.96-LA (Lat: 33.945328, Lng: -118.396406), Route carried "under" structure: State highway 1, Year Built: 1983, Structure Length: 0. m, Average Daily Traffic: 57,800 (year 2017), Truck Traffic: 2%, Features Intersected: SR 1, Facility Carried by Structure: WORLD WAY (NORTH)
Minimum Vertical Clearance: 4.75m (15.58ft), Kilometerpoint: 26.960, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 25.0m (82.0ft)
Find on map >> Show street view
Structure Number: 53 2712, Location: 07-LA-101-9.61-LA (Lat: 34.132839, Lng: -118.352450), Route carried "under" structure: US 101, Year Built: 1983, Structure Length: 0. m, Average Daily Traffic: 154,000 (year 2021), Truck Traffic: 10%, Features Intersected: US 101, Facility Carried by Structure: UNIVERSAL CENTER D
Minimum Vertical Clearance: 5.46m (17.91ft), Kilometerpoint: 9.610, Lanes on structure: 5, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 50.6m (166.0ft)
Structure Number: 53 2712, Location: 07-LA-101-9.61-LA (Lat: 34.132839, Lng: -118.352450), Route carried "under" structure: US 101, Year Built: 1983, Structure Length: 0. m, Average Daily Traffic: 154,000 (year 2021), Truck Traffic: 10%, Features Intersected: US 101, Facility Carried by Structure: UNIVERSAL CENTER D
Minimum Vertical Clearance: 5.46m (17.91ft), Kilometerpoint: 9.610, Lanes on structure: 5, Lanes under structure: 10, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 50.6m (166.0ft)
Find on map >> Show street view
Structure Number: 53 2715, Location: 07-LA-105-R7.48-LA (Lat: 33.928614, Lng: -118.278492), Route carried "under" structure: City street OL139, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 9,000 (year 2006), Truck Traffic: 1%, Features Intersected: EB 105 & BROADWAY, Facility Carried by Structure: EB LRT
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 53.3m (174.9ft)
Structure Number: 53 2715, Location: 07-LA-105-R7.48-LA (Lat: 33.928614, Lng: -118.278492), Route carried "under" structure: City street OL139, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 9,000 (year 2006), Truck Traffic: 1%, Features Intersected: EB 105 & BROADWAY, Facility Carried by Structure: EB LRT
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 53.3m (174.9ft)
Find on map >> Show street view
Structure Number: 53 2715, Location: 07-LA-105-R7.48-LA (Lat: 33.928614, Lng: -118.278492), Route carried "under" structure: Ramp Interstate 105, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 15,000 (year 2006), Truck Traffic: 1%, Features Intersected: EB 105 & BROADWAY, Facility Carried by Structure: EB LRT
Minimum Vertical Clearance: 5.72m (18.77ft), Kilometerpoint: 7.480, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 53.3m (174.9ft)
Structure Number: 53 2715, Location: 07-LA-105-R7.48-LA (Lat: 33.928614, Lng: -118.278492), Route carried "under" structure: Ramp Interstate 105, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 15,000 (year 2006), Truck Traffic: 1%, Features Intersected: EB 105 & BROADWAY, Facility Carried by Structure: EB LRT
Minimum Vertical Clearance: 5.72m (18.77ft), Kilometerpoint: 7.480, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 53.3m (174.9ft)
Find on map >> Show street view
Structure Number: 53 2723S, Location: 07-LA-405-24.69-LA (Lat: 33.974839, Lng: -118.386050), Route carried "under" structure: Ramp Interstate 405, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 2011), Truck Traffic: 1%, Features Intersected: I 405, ON-RAMPS
Minimum Vertical Clearance: 4.90m (16.08ft), Kilometerpoint: 24.690, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.1m (148.0ft)
Structure Number: 53 2723S, Location: 07-LA-405-24.69-LA (Lat: 33.974839, Lng: -118.386050), Route carried "under" structure: Ramp Interstate 405, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 10,000 (year 2011), Truck Traffic: 1%, Features Intersected: I 405, ON-RAMPS
Minimum Vertical Clearance: 4.90m (16.08ft), Kilometerpoint: 24.690, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.1m (148.0ft)
Find on map >> Show street view
Structure Number: 53 2723S, Location: 07-LA-405-24.69-LA (Lat: 33.974839, Lng: -118.386050), Route carried "under" structure: Interstate 405, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 283,000 (year 2011), Truck Traffic: 4%, Features Intersected: I 405, ON-RAMPS
Minimum Vertical Clearance: 6.42m (21.06ft), Kilometerpoint: 24.690, Lanes on structure: 2, Lanes under structure: 9, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.1m (148.0ft)
Structure Number: 53 2723S, Location: 07-LA-405-24.69-LA (Lat: 33.974839, Lng: -118.386050), Route carried "under" structure: Interstate 405, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 283,000 (year 2011), Truck Traffic: 4%, Features Intersected: I 405, ON-RAMPS
Minimum Vertical Clearance: 6.42m (21.06ft), Kilometerpoint: 24.690, Lanes on structure: 2, Lanes under structure: 9, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.1m (148.0ft)
Find on map >> Show street view
Structure Number: 53 2724S, Location: 07-LA-405-24.56-LA (Lat: 33.974719, Lng: -118.384394), Route carried "under" structure: Interstate 405, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 294,000 (year 2014), Truck Traffic: 4%, Features Intersected: I 405, & ON- RAMPS
Minimum Vertical Clearance: 6.07m (19.91ft), Kilometerpoint: 24.560, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 60.4m (198.2ft)
Structure Number: 53 2724S, Location: 07-LA-405-24.56-LA (Lat: 33.974719, Lng: -118.384394), Route carried "under" structure: Interstate 405, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 294,000 (year 2014), Truck Traffic: 4%, Features Intersected: I 405, & ON- RAMPS
Minimum Vertical Clearance: 6.07m (19.91ft), Kilometerpoint: 24.560, Lanes on structure: 2, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 60.4m (198.2ft)
Find on map >> Show street view
Structure Number: 53 2724S, Location: 07-LA-405-24.56-LA (Lat: 33.974719, Lng: -118.384394), Route carried "under" structure: Bypass Interstate 405, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2011), Truck Traffic: 1%, Features Intersected: I 405, & ON- RAMPS
Minimum Vertical Clearance: 5.87m (19.26ft), Kilometerpoint: 24.560, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 60.4m (198.2ft)
Structure Number: 53 2724S, Location: 07-LA-405-24.56-LA (Lat: 33.974719, Lng: -118.384394), Route carried "under" structure: Bypass Interstate 405, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 5,000 (year 2011), Truck Traffic: 1%, Features Intersected: I 405, & ON- RAMPS
Minimum Vertical Clearance: 5.87m (19.26ft), Kilometerpoint: 24.560, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 60.4m (198.2ft)
Find on map >> Show street view
Structure Number: 53 2725, Location: 07-LA-001-28.50-LA (Lat: 33.953642, Lng: -118.412897), Route carried "under" structure: State highway 1, Year Built: 1993, Structure Length: 0. m, Average Daily Traffic: 37,000 (year 2017), Truck Traffic: 2%, Features Intersected: SR 1 (LINCOLN BLVD), Facility Carried by Structure: WESTCHESTER PKWY
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 28.500, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 62.2m (204.1ft)
Structure Number: 53 2725, Location: 07-LA-001-28.50-LA (Lat: 33.953642, Lng: -118.412897), Route carried "under" structure: State highway 1, Year Built: 1993, Structure Length: 0. m, Average Daily Traffic: 37,000 (year 2017), Truck Traffic: 2%, Features Intersected: SR 1 (LINCOLN BLVD), Facility Carried by Structure: WESTCHESTER PKWY
Minimum Vertical Clearance: 5.28m (17.32ft), Kilometerpoint: 28.500, Lanes on structure: 6, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 62.2m (204.1ft)
Find on map >> Show street view
Structure Number: 53 2733, Location: 07-LA-110-9.80-LA (Lat: 33.871253, Lng: -118.289033), Route carried "under" structure: Interstate 110, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 264,000 (year 2020), Truck Traffic: 8%, Features Intersected: I 110,SR 91 & CONNECTORS
Minimum Vertical Clearance: 5.94m (19.49ft), Kilometerpoint: 9.800, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.9m (153.9ft)
Structure Number: 53 2733, Location: 07-LA-110-9.80-LA (Lat: 33.871253, Lng: -118.289033), Route carried "under" structure: Interstate 110, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 264,000 (year 2020), Truck Traffic: 8%, Features Intersected: I 110,SR 91 & CONNECTORS
Minimum Vertical Clearance: 5.94m (19.49ft), Kilometerpoint: 9.800, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.9m (153.9ft)
Find on map >> Show street view
Structure Number: 53 2733, Location: 07-LA-110-9.80-LA (Lat: 33.871253, Lng: -118.289033), Route carried "under" structure: City street Q814, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 8,680 (year 2020), Truck Traffic: 2%, Features Intersected: I 110,SR 91 & CONNECTORS, Facility Carried by Structure: NB&SB 110 HOV VIAD
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.9m (153.9ft)
Structure Number: 53 2733, Location: 07-LA-110-9.80-LA (Lat: 33.871253, Lng: -118.289033), Route carried "under" structure: City street Q814, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 8,680 (year 2020), Truck Traffic: 2%, Features Intersected: I 110,SR 91 & CONNECTORS, Facility Carried by Structure: NB&SB 110 HOV VIAD
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.9m (153.9ft)
Find on map >> Show street view
Structure Number: 53 2733, Location: 07-LA-110-9.80-LA (Lat: 33.871253, Lng: -118.289033), Route carried "under" structure: US 91, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 56,300 (year 2020), Truck Traffic: 6%, Features Intersected: I 110,SR 91 & CONNECTORS, Facility Carried by Structure: NB&SB 110 HOV VIAD
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 6.250, Lanes on structure: 4, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.9m (153.9ft)
Structure Number: 53 2733, Location: 07-LA-110-9.80-LA (Lat: 33.871253, Lng: -118.289033), Route carried "under" structure: US 91, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 56,300 (year 2020), Truck Traffic: 6%, Features Intersected: I 110,SR 91 & CONNECTORS, Facility Carried by Structure: NB&SB 110 HOV VIAD
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 6.250, Lanes on structure: 4, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.9m (153.9ft)
Find on map >> Show street view
Structure Number: 53 2733, Location: 07-LA-110-9.80-LA (Lat: 33.871253, Lng: -118.289033), Route carried "under" structure: State highway 91, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 56,300 (year 2020), Truck Traffic: 6%, Features Intersected: I 110,SR 91 & CONNECTORS, Facility Carried by Structure: NB&SB 110 HOV VIAD
Minimum Vertical Clearance: 5.64m (18.50ft), Kilometerpoint: 6.250, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.9m (153.9ft)
Structure Number: 53 2733, Location: 07-LA-110-9.80-LA (Lat: 33.871253, Lng: -118.289033), Route carried "under" structure: State highway 91, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 56,300 (year 2020), Truck Traffic: 6%, Features Intersected: I 110,SR 91 & CONNECTORS, Facility Carried by Structure: NB&SB 110 HOV VIAD
Minimum Vertical Clearance: 5.64m (18.50ft), Kilometerpoint: 6.250, Lanes on structure: 4, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.9m (153.9ft)
Find on map >> Show street view
Structure Number: 53 2733, Location: 07-LA-110-9.80-LA (Lat: 33.871253, Lng: -118.289033), Route carried "under" structure: Ramp State highway 91, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 5,630 (year 2020), Truck Traffic: 6%, Features Intersected: I 110,SR 91 & CONNECTORS, Facility Carried by Structure: NB&SB 110 HOV VIAD
Minimum Vertical Clearance: 7.32m (24.02ft), Kilometerpoint: 6.110, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.9m (153.9ft)
Structure Number: 53 2733, Location: 07-LA-110-9.80-LA (Lat: 33.871253, Lng: -118.289033), Route carried "under" structure: Ramp State highway 91, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 5,630 (year 2020), Truck Traffic: 6%, Features Intersected: I 110,SR 91 & CONNECTORS, Facility Carried by Structure: NB&SB 110 HOV VIAD
Minimum Vertical Clearance: 7.32m (24.02ft), Kilometerpoint: 6.110, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.9m (153.9ft)
Find on map >> Show street view
Structure Number: 53 2733, Location: 07-LA-110-9.80-LA (Lat: 33.871253, Lng: -118.289033), Route carried "under" structure: City street Q815, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 2,276 (year 2020), Truck Traffic: 2%, Features Intersected: I 110,SR 91 & CONNECTORS, Facility Carried by Structure: NB&SB 110 HOV VIAD
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.9m (153.9ft)
Structure Number: 53 2733, Location: 07-LA-110-9.80-LA (Lat: 33.871253, Lng: -118.289033), Route carried "under" structure: City street Q815, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 2,276 (year 2020), Truck Traffic: 2%, Features Intersected: I 110,SR 91 & CONNECTORS, Facility Carried by Structure: NB&SB 110 HOV VIAD
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.9m (153.9ft)
Find on map >> Show street view
Structure Number: 53 2733, Location: 07-LA-110-9.80-LA (Lat: 33.871253, Lng: -118.289033), Route carried "under" structure: Ramp Interstate 110, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 19,500 (year 2020), Truck Traffic: 6%, Features Intersected: I 110,SR 91 & CONNECTORS
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 10.190, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.9m (153.9ft)
Structure Number: 53 2733, Location: 07-LA-110-9.80-LA (Lat: 33.871253, Lng: -118.289033), Route carried "under" structure: Ramp Interstate 110, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 19,500 (year 2020), Truck Traffic: 6%, Features Intersected: I 110,SR 91 & CONNECTORS
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 10.190, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.9m (153.9ft)
Find on map >> Show street view
Structure Number: 53 2733, Location: 07-LA-110-9.80-LA (Lat: 33.871253, Lng: -118.289033), Route carried "under" structure: Ramp Interstate 110, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 21,880 (year 2020), Truck Traffic: 6%, Features Intersected: I 110,SR 91 & CONNECTORS
Minimum Vertical Clearance: 5.84m (19.16ft), Kilometerpoint: 9.060, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.9m (153.9ft)
Structure Number: 53 2733, Location: 07-LA-110-9.80-LA (Lat: 33.871253, Lng: -118.289033), Route carried "under" structure: Ramp Interstate 110, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 21,880 (year 2020), Truck Traffic: 6%, Features Intersected: I 110,SR 91 & CONNECTORS
Minimum Vertical Clearance: 5.84m (19.16ft), Kilometerpoint: 9.060, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.9m (153.9ft)
Find on map >> Show street view
Structure Number: 53 2733, Location: 07-LA-110-9.80-LA (Lat: 33.871253, Lng: -118.289033), Route carried "under" structure: Interstate 110, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 264,000 (year 2020), Truck Traffic: 8%, Features Intersected: I 110,SR 91 & CONNECTORS
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 9.800, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.9m (153.9ft)
Structure Number: 53 2733, Location: 07-LA-110-9.80-LA (Lat: 33.871253, Lng: -118.289033), Route carried "under" structure: Interstate 110, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 264,000 (year 2020), Truck Traffic: 8%, Features Intersected: I 110,SR 91 & CONNECTORS
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 9.800, Lanes on structure: 4, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.9m (153.9ft)
Find on map >> Show street view
Structure Number: 53 2734, Location: 07-LA-110-18.14-LA (Lat: 33.991258, Lng: -118.280303), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 27,500 (year 2020), Truck Traffic: 2%, Features Intersected: 42..47..54 & VERNON ST., Facility Carried by Structure: N&S110 HOV LANES
Minimum Vertical Clearance: 6.40m (21.00ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.2m (131.9ft)
Structure Number: 53 2734, Location: 07-LA-110-18.14-LA (Lat: 33.991258, Lng: -118.280303), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 27,500 (year 2020), Truck Traffic: 2%, Features Intersected: 42..47..54 & VERNON ST., Facility Carried by Structure: N&S110 HOV LANES
Minimum Vertical Clearance: 6.40m (21.00ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.2m (131.9ft)
Find on map >> Show street view
Structure Number: 53 2734, Location: 07-LA-110-18.14-LA (Lat: 33.991258, Lng: -118.280303), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 3,600 (year 2020), Truck Traffic: 2%, Features Intersected: 42..47..54 & VERNON ST., Facility Carried by Structure: N&S110 HOV LANES
Minimum Vertical Clearance: 6.25m (20.51ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.2m (131.9ft)
Structure Number: 53 2734, Location: 07-LA-110-18.14-LA (Lat: 33.991258, Lng: -118.280303), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 3,600 (year 2020), Truck Traffic: 2%, Features Intersected: 42..47..54 & VERNON ST., Facility Carried by Structure: N&S110 HOV LANES
Minimum Vertical Clearance: 6.25m (20.51ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.2m (131.9ft)
Find on map >> Show street view
Structure Number: 53 2734, Location: 07-LA-110-18.14-LA (Lat: 33.991258, Lng: -118.280303), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 2,400 (year 2020), Truck Traffic: 2%, Features Intersected: 42..47..54 & VERNON ST., Facility Carried by Structure: N&S110 HOV LANES
Minimum Vertical Clearance: 5.31m (17.42ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.2m (131.9ft)
Structure Number: 53 2734, Location: 07-LA-110-18.14-LA (Lat: 33.991258, Lng: -118.280303), Route carried "under" structure: City street , Year Built: 1992, Structure Length: 0. m, Average Daily Traffic: 2,400 (year 2020), Truck Traffic: 2%, Features Intersected: 42..47..54 & VERNON ST., Facility Carried by Structure: N&S110 HOV LANES
Minimum Vertical Clearance: 5.31m (17.42ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 40.2m (131.9ft)
Find on map >> Show street view
Structure Number: 53 2735, Location: 07-LA-110-20.33-LA (Lat: 34.021269, Lng: -118.277875), Route carried "under" structure: Interstate 110, Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 244,600 (year 2020), Truck Traffic: 5%, Features Intersected: I 110, 30TH, 28TH
Minimum Vertical Clearance: 5.25m (17.22ft), Kilometerpoint: 20.330, Lanes on structure: 2, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.6m (120.1ft)
Structure Number: 53 2735, Location: 07-LA-110-20.33-LA (Lat: 34.021269, Lng: -118.277875), Route carried "under" structure: Interstate 110, Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 244,600 (year 2020), Truck Traffic: 5%, Features Intersected: I 110, 30TH, 28TH
Minimum Vertical Clearance: 5.25m (17.22ft), Kilometerpoint: 20.330, Lanes on structure: 2, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.6m (120.1ft)
Find on map >> Show street view
Structure Number: 53 2735, Location: 07-LA-110-20.33-LA (Lat: 34.021269, Lng: -118.277875), Route carried "under" structure: City street , Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2020), Truck Traffic: 5%, Features Intersected: I 110, 30TH, 28TH, Facility Carried by Structure: I 110 HOV LANES
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.6m (120.1ft)
Structure Number: 53 2735, Location: 07-LA-110-20.33-LA (Lat: 34.021269, Lng: -118.277875), Route carried "under" structure: City street , Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 1,000 (year 2020), Truck Traffic: 5%, Features Intersected: I 110, 30TH, 28TH, Facility Carried by Structure: I 110 HOV LANES
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 36.6m (120.1ft)
Find on map >> Show street view
Structure Number: 53 2738S, Location: 07-LA-105-R1.20-LA (Lat: 33.929428, Lng: -118.385175), Route carried "under" structure: City street , Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 2,200 (year 2006), Truck Traffic: 2%, Features Intersected: IMPERIAL HWY EB, Facility Carried by Structure: ATWOOD-E105 ONRP
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 53 2738S, Location: 07-LA-105-R1.20-LA (Lat: 33.929428, Lng: -118.385175), Route carried "under" structure: City street , Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 2,200 (year 2006), Truck Traffic: 2%, Features Intersected: IMPERIAL HWY EB, Facility Carried by Structure: ATWOOD-E105 ONRP
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 53 2751, Location: 07-LA-110-11.89-LA (Lat: 33.901792, Lng: -118.287083), Route carried "under" structure: Interstate 110, Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 253,000 (year 2020), Truck Traffic: 7%, Features Intersected: INTERSTATE 110, Facility Carried by Structure: ROSECRANS AVE
Minimum Vertical Clearance: 5.38m (17.65ft), Kilometerpoint: 11.890, Lanes on structure: 6, Lanes under structure: 11, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 42.0m (137.8ft)
Structure Number: 53 2751, Location: 07-LA-110-11.89-LA (Lat: 33.901792, Lng: -118.287083), Route carried "under" structure: Interstate 110, Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 253,000 (year 2020), Truck Traffic: 7%, Features Intersected: INTERSTATE 110, Facility Carried by Structure: ROSECRANS AVE
Minimum Vertical Clearance: 5.38m (17.65ft), Kilometerpoint: 11.890, Lanes on structure: 6, Lanes under structure: 11, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 42.0m (137.8ft)
Find on map >> Show street view
Structure Number: 53 2752S, Location: 07-LA-110-11.90-LA (Lat: 33.902039, Lng: -118.286136), Route carried "under" structure: Interstate 110, Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 20,230 (year 2015), Truck Traffic: 6%, Features Intersected: TWO NB I-110 LANES
Minimum Vertical Clearance: 5.94m (19.49ft), Kilometerpoint: 11.900, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 21.3m (69.9ft)
Structure Number: 53 2752S, Location: 07-LA-110-11.90-LA (Lat: 33.902039, Lng: -118.286136), Route carried "under" structure: Interstate 110, Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 20,230 (year 2015), Truck Traffic: 6%, Features Intersected: TWO NB I-110 LANES
Minimum Vertical Clearance: 5.94m (19.49ft), Kilometerpoint: 11.900, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 21.3m (69.9ft)
Find on map >> Show street view
Structure Number: 53 2772, Location: 07-LA-001-27.40-LA (Lat: 33.949269, Lng: -118.396453), Route carried "under" structure: State highway 1, Year Built: 1993, Structure Length: 0. m, Average Daily Traffic: 37,000 (year 2017), Truck Traffic: 2%, Features Intersected: SR 1 (SEPULVEDA BLVD), Facility Carried by Structure: 96TH STREET
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 27.400, Lanes on structure: 4, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.4m (89.9ft)
Structure Number: 53 2772, Location: 07-LA-001-27.40-LA (Lat: 33.949269, Lng: -118.396453), Route carried "under" structure: State highway 1, Year Built: 1993, Structure Length: 0. m, Average Daily Traffic: 37,000 (year 2017), Truck Traffic: 2%, Features Intersected: SR 1 (SEPULVEDA BLVD), Facility Carried by Structure: 96TH STREET
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 27.400, Lanes on structure: 4, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 27.4m (89.9ft)
Find on map >> Show street view
Structure Number: 53 2773K, Location: 07-LA-110-19.60-LA (Lat: 34.011808, Lng: -118.281392), Route carried "under" structure: City street , Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 2012), Truck Traffic: 1%, Features Intersected: 39TH ST, S110-MLK OFFRMP, Facility Carried by Structure: 37TH ST-SB 110 ON
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.3m (151.9ft)
Structure Number: 53 2773K, Location: 07-LA-110-19.60-LA (Lat: 34.011808, Lng: -118.281392), Route carried "under" structure: City street , Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 2012), Truck Traffic: 1%, Features Intersected: 39TH ST, S110-MLK OFFRMP, Facility Carried by Structure: 37TH ST-SB 110 ON
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.3m (151.9ft)
Find on map >> Show street view
Structure Number: 53 2773K, Location: 07-LA-110-19.60-LA (Lat: 34.011808, Lng: -118.281392), Route carried "under" structure: Ramp Interstate 110, Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 4,000 (year 2020), Truck Traffic: 1%, Features Intersected: 39TH ST, S110-MLK OFFRMP
Minimum Vertical Clearance: 4.73m (15.52ft), Kilometerpoint: 19.600, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.3m (151.9ft)
Structure Number: 53 2773K, Location: 07-LA-110-19.60-LA (Lat: 34.011808, Lng: -118.281392), Route carried "under" structure: Ramp Interstate 110, Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 4,000 (year 2020), Truck Traffic: 1%, Features Intersected: 39TH ST, S110-MLK OFFRMP
Minimum Vertical Clearance: 4.73m (15.52ft), Kilometerpoint: 19.600, Lanes on structure: 2, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.3m (151.9ft)
Find on map >> Show street view
Structure Number: 53 2775, Location: 07-LA-101-27.36-LA (Lat: 34.159197, Lng: -118.636933), Route carried "under" structure: US 101, Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 196,000 (year 2018), Truck Traffic: 10%, Features Intersected: US 101, Facility Carried by Structure: VALLEY CIRCLE BLVD
Minimum Vertical Clearance: 5.63m (18.47ft), Kilometerpoint: 27.360, Lanes on structure: 6, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.9m (153.9ft)
Structure Number: 53 2775, Location: 07-LA-101-27.36-LA (Lat: 34.159197, Lng: -118.636933), Route carried "under" structure: US 101, Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 196,000 (year 2018), Truck Traffic: 10%, Features Intersected: US 101, Facility Carried by Structure: VALLEY CIRCLE BLVD
Minimum Vertical Clearance: 5.63m (18.47ft), Kilometerpoint: 27.360, Lanes on structure: 6, Lanes under structure: 10, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 46.9m (153.9ft)
Find on map >> Show street view
Structure Number: 53 2776R, Location: 07-LA-110-17.93-LA (Lat: 33.988436, Lng: -118.280561), Route carried "under" structure: Interstate 110, Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 300,000 (year 2011), Truck Traffic: 1%, Features Intersected: INTERSTATE 110 NB LANES, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.64m (18.50ft), Kilometerpoint: 17.930, Lanes under structure: 9, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 43.6m (143.0ft)
Structure Number: 53 2776R, Location: 07-LA-110-17.93-LA (Lat: 33.988436, Lng: -118.280561), Route carried "under" structure: Interstate 110, Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 300,000 (year 2011), Truck Traffic: 1%, Features Intersected: INTERSTATE 110 NB LANES, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.64m (18.50ft), Kilometerpoint: 17.930, Lanes under structure: 9, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 43.6m (143.0ft)
Find on map >> Show street view
Structure Number: 53 2789, Location: 07-LA-047-2.60-LA (Lat: 33.753411, Lng: -118.252647), Route carried "under" structure: Ramp State highway 47, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 9,000 (year 2020), Truck Traffic: 85%, Features Intersected: TRAIN TRACKS AT NAVY WAY
Minimum Vertical Clearance: 6.35m (20.83ft), Kilometerpoint: 2.600, Lanes on structure: 7, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.2m (154.9ft)
Structure Number: 53 2789, Location: 07-LA-047-2.60-LA (Lat: 33.753411, Lng: -118.252647), Route carried "under" structure: Ramp State highway 47, Year Built: 1995, Structure Length: 0. m, Average Daily Traffic: 9,000 (year 2020), Truck Traffic: 85%, Features Intersected: TRAIN TRACKS AT NAVY WAY
Minimum Vertical Clearance: 6.35m (20.83ft), Kilometerpoint: 2.600, Lanes on structure: 7, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.2m (154.9ft)
Find on map >> Show street view
Structure Number: 53 2791, Location: 07-LA-010-R8.83-LA (Lat: 34.036764, Lng: -118.377761), Route carried "under" structure: City street , Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 44,530 (year 2004), Truck Traffic: 2%, Features Intersected: SR 187(VENICE),LA CIENEG, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.6m (143.0ft)
Structure Number: 53 2791, Location: 07-LA-010-R8.83-LA (Lat: 34.036764, Lng: -118.377761), Route carried "under" structure: City street , Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 44,530 (year 2004), Truck Traffic: 2%, Features Intersected: SR 187(VENICE),LA CIENEG, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.6m (143.0ft)
Find on map >> Show street view
Structure Number: 53 2791, Location: 07-LA-010-R8.83-LA (Lat: 34.036764, Lng: -118.377761), Route carried "under" structure: State highway 187, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 42,250 (year 2009), Truck Traffic: 3%, Features Intersected: SR 187(VENICE),LA CIENEG, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 5.84m (19.16ft), Kilometerpoint: 8.000, Lanes on structure: 8, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.6m (143.0ft)
Structure Number: 53 2791, Location: 07-LA-010-R8.83-LA (Lat: 34.036764, Lng: -118.377761), Route carried "under" structure: State highway 187, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 42,250 (year 2009), Truck Traffic: 3%, Features Intersected: SR 187(VENICE),LA CIENEG, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 5.84m (19.16ft), Kilometerpoint: 8.000, Lanes on structure: 8, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.6m (143.0ft)
Find on map >> Show street view
Structure Number: 53 2791S, Location: 07-LA-010-R8.83-LA (Lat: 34.036658, Lng: -118.377789), Route carried "under" structure: State highway 187, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 49,820 (year 2009), Truck Traffic: 1%, Features Intersected: SR187(VENICE),LA CIENEGA, Facility Carried by Structure: E10-LA CIENEGA-E10
Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 8.780, Lanes on structure: 1, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.6m (143.0ft)
Structure Number: 53 2791S, Location: 07-LA-010-R8.83-LA (Lat: 34.036658, Lng: -118.377789), Route carried "under" structure: State highway 187, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 49,820 (year 2009), Truck Traffic: 1%, Features Intersected: SR187(VENICE),LA CIENEGA, Facility Carried by Structure: E10-LA CIENEGA-E10
Minimum Vertical Clearance: 4.83m (15.85ft), Kilometerpoint: 8.780, Lanes on structure: 1, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.6m (143.0ft)
Find on map >> Show street view
Structure Number: 53 2791S, Location: 07-LA-010-R8.83-LA (Lat: 34.036658, Lng: -118.377789), Route carried "under" structure: City street , Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 44,530 (year 2009), Truck Traffic: 2%, Features Intersected: SR187(VENICE),LA CIENEGA, Facility Carried by Structure: E10-LA CIENEGA-E10
Minimum Vertical Clearance: 4.47m (14.67ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.6m (143.0ft)
Structure Number: 53 2791S, Location: 07-LA-010-R8.83-LA (Lat: 34.036658, Lng: -118.377789), Route carried "under" structure: City street , Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 44,530 (year 2009), Truck Traffic: 2%, Features Intersected: SR187(VENICE),LA CIENEGA, Facility Carried by Structure: E10-LA CIENEGA-E10
Minimum Vertical Clearance: 4.47m (14.67ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 43.6m (143.0ft)
Find on map >> Show street view
Structure Number: 53 2792, Location: 07-LA-010-R9.31-LA (Lat: 34.035106, Lng: -118.369781), Route carried "under" structure: City street , Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2004), Truck Traffic: 2%, Features Intersected: FAIRFAX AV,WASHINGTON BL, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.3m (122.4ft)
Structure Number: 53 2792, Location: 07-LA-010-R9.31-LA (Lat: 34.035106, Lng: -118.369781), Route carried "under" structure: City street , Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 20,000 (year 2004), Truck Traffic: 2%, Features Intersected: FAIRFAX AV,WASHINGTON BL, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.3m (122.4ft)
Find on map >> Show street view
Structure Number: 53 2792, Location: 07-LA-010-R9.31-LA (Lat: 34.035106, Lng: -118.369781), Route carried "under" structure: City street , Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 40,550 (year 2004), Truck Traffic: 2%, Features Intersected: FAIRFAX AV,WASHINGTON BL, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 5.38m (17.65ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.3m (122.4ft)
Structure Number: 53 2792, Location: 07-LA-010-R9.31-LA (Lat: 34.035106, Lng: -118.369781), Route carried "under" structure: City street , Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 40,550 (year 2004), Truck Traffic: 2%, Features Intersected: FAIRFAX AV,WASHINGTON BL, Facility Carried by Structure: INTERSTATE 10
Minimum Vertical Clearance: 5.38m (17.65ft), Kilometerpoint: 0.000, Lanes on structure: 10, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 37.3m (122.4ft)
Find on map >> Show street view
Structure Number: 53 2795F, Location: 07-LA-014-R24.79-LA (Lat: 34.332764, Lng: -118.507919), Route carried "under" structure: Alternate Interstate 5, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 41,000 (year 2021), Truck Traffic: 13%, Features Intersected: I 5, S14-S5T, I 5 TRUCK
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 45.750, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 60.4m (198.2ft)
Structure Number: 53 2795F, Location: 07-LA-014-R24.79-LA (Lat: 34.332764, Lng: -118.507919), Route carried "under" structure: Alternate Interstate 5, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 41,000 (year 2021), Truck Traffic: 13%, Features Intersected: I 5, S14-S5T, I 5 TRUCK
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 45.750, Lanes on structure: 3, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 60.4m (198.2ft)
Find on map >> Show street view
Structure Number: 53 2795F, Location: 07-LA-014-R24.79-LA (Lat: 34.332764, Lng: -118.507919), Route carried "under" structure: County highway , Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 5,600 (year 2021), Truck Traffic: 2%, Features Intersected: I 5, S14-S5T, I 5 TRUCK, Facility Carried by Structure: S14-S5 CONNECTOR
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 60.4m (198.2ft)
Structure Number: 53 2795F, Location: 07-LA-014-R24.79-LA (Lat: 34.332764, Lng: -118.507919), Route carried "under" structure: County highway , Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 5,600 (year 2021), Truck Traffic: 2%, Features Intersected: I 5, S14-S5T, I 5 TRUCK, Facility Carried by Structure: S14-S5 CONNECTOR
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 60.4m (198.2ft)
Find on map >> Show street view
Structure Number: 53 2795F, Location: 07-LA-014-R24.79-LA (Lat: 34.332764, Lng: -118.507919), Route carried "under" structure: Ramp State highway 14, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 15,700 (year 2021), Truck Traffic: 95%, Features Intersected: I 5, S14-S5T, I 5 TRUCK
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 24.790, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 60.4m (198.2ft)
Structure Number: 53 2795F, Location: 07-LA-014-R24.79-LA (Lat: 34.332764, Lng: -118.507919), Route carried "under" structure: Ramp State highway 14, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 15,700 (year 2021), Truck Traffic: 95%, Features Intersected: I 5, S14-S5T, I 5 TRUCK
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 24.790, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 60.4m (198.2ft)
Find on map >> Show street view
Structure Number: 53 2795F, Location: 07-LA-014-R24.79-LA (Lat: 34.332764, Lng: -118.507919), Route carried "under" structure: Interstate 5, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 277,000 (year 2021), Truck Traffic: 9%, Features Intersected: I 5, S14-S5T, I 5 TRUCK
Minimum Vertical Clearance: 6.93m (22.74ft), Kilometerpoint: 45.580, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 60.4m (198.2ft)
Structure Number: 53 2795F, Location: 07-LA-014-R24.79-LA (Lat: 34.332764, Lng: -118.507919), Route carried "under" structure: Interstate 5, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 277,000 (year 2021), Truck Traffic: 9%, Features Intersected: I 5, S14-S5T, I 5 TRUCK
Minimum Vertical Clearance: 6.93m (22.74ft), Kilometerpoint: 45.580, Lanes on structure: 3, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 60.4m (198.2ft)
Find on map >> Show street view
Structure Number: 53 2795F, Location: 07-LA-014-R24.79-LA (Lat: 34.332764, Lng: -118.507919), Route carried "under" structure: Ramp Interstate 5, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 15,120 (year 2021), Truck Traffic: 90%, Features Intersected: I 5, S14-S5T, I 5 TRUCK
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 45.750, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 60.4m (198.2ft)
Structure Number: 53 2795F, Location: 07-LA-014-R24.79-LA (Lat: 34.332764, Lng: -118.507919), Route carried "under" structure: Ramp Interstate 5, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 15,120 (year 2021), Truck Traffic: 90%, Features Intersected: I 5, S14-S5T, I 5 TRUCK
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 45.750, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 60.4m (198.2ft)
Find on map >> Show street view
Structure Number: 53 2795G, Location: 07-LA-005-R45.58-LA (Lat: 34.333650, Lng: -118.507269), Route carried "under" structure: Bypass Interstate 5, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 73,501 (year 2011), Truck Traffic: 90%, Features Intersected: I 5 TRUCK BYPASS,S14-S5T
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 45.730, Lanes on structure: 3, Lanes under structure: 5, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 53.3m (174.9ft)
Structure Number: 53 2795G, Location: 07-LA-005-R45.58-LA (Lat: 34.333650, Lng: -118.507269), Route carried "under" structure: Bypass Interstate 5, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 73,501 (year 2011), Truck Traffic: 90%, Features Intersected: I 5 TRUCK BYPASS,S14-S5T
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 45.730, Lanes on structure: 3, Lanes under structure: 5, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 53.3m (174.9ft)
Find on map >> Show street view
Structure Number: 53 2795G, Location: 07-LA-005-R45.58-LA (Lat: 34.333650, Lng: -118.507269), Route carried "under" structure: Ramp State highway 14, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 18,128 (year 2011), Truck Traffic: 95%, Features Intersected: I 5 TRUCK BYPASS,S14-S5T
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 24.810, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 53.3m (174.9ft)
Structure Number: 53 2795G, Location: 07-LA-005-R45.58-LA (Lat: 34.333650, Lng: -118.507269), Route carried "under" structure: Ramp State highway 14, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 18,128 (year 2011), Truck Traffic: 95%, Features Intersected: I 5 TRUCK BYPASS,S14-S5T
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 24.810, Lanes on structure: 3, Lanes under structure: 2, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 53.3m (174.9ft)
Find on map >> Show street view
Structure Number: 53 2796F, Location: 07-LA-014-R24.92-LA (Lat: 34.336756, Lng: -118.511997), Route carried "under" structure: Alternate Interstate 5, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 22,680 (year 2021), Truck Traffic: 99%, Features Intersected: I 5 TRUCK BYPASS
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 45.790, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 50.6m (166.0ft)
Structure Number: 53 2796F, Location: 07-LA-014-R24.92-LA (Lat: 34.336756, Lng: -118.511997), Route carried "under" structure: Alternate Interstate 5, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 22,680 (year 2021), Truck Traffic: 99%, Features Intersected: I 5 TRUCK BYPASS
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 45.790, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 50.6m (166.0ft)
Find on map >> Show street view
Structure Number: 53 2797F, Location: 07-LA-005-R45.69-LA (Lat: 34.335053, Lng: -118.510789), Route carried "under" structure: Interstate 5, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 42,171 (year 2011), Truck Traffic: 2%, Features Intersected: I 5,SR 14,CONNS,THE OLD
Minimum Vertical Clearance: 5.68m (18.64ft), Kilometerpoint: 45.580, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 66.4m (217.8ft)
Structure Number: 53 2797F, Location: 07-LA-005-R45.69-LA (Lat: 34.335053, Lng: -118.510789), Route carried "under" structure: Interstate 5, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 42,171 (year 2011), Truck Traffic: 2%, Features Intersected: I 5,SR 14,CONNS,THE OLD
Minimum Vertical Clearance: 5.68m (18.64ft), Kilometerpoint: 45.580, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 66.4m (217.8ft)
Find on map >> Show street view
Structure Number: 53 2797F, Location: 07-LA-005-R45.69-LA (Lat: 34.335053, Lng: -118.510789), Route carried "under" structure: Alternate Interstate 5, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 73,501 (year 2011), Truck Traffic: 90%, Features Intersected: I 5,SR 14,CONNS,THE OLD
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 45.740, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 66.4m (217.8ft)
Structure Number: 53 2797F, Location: 07-LA-005-R45.69-LA (Lat: 34.335053, Lng: -118.510789), Route carried "under" structure: Alternate Interstate 5, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 73,501 (year 2011), Truck Traffic: 90%, Features Intersected: I 5,SR 14,CONNS,THE OLD
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 45.740, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 66.4m (217.8ft)
Find on map >> Show street view
Structure Number: 53 2797F, Location: 07-LA-005-R45.69-LA (Lat: 34.335053, Lng: -118.510789), Route carried "under" structure: Interstate 5, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 194,158 (year 2011), Truck Traffic: 11%, Features Intersected: I 5,SR 14,CONNS,THE OLD
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 45.690, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 66.4m (217.8ft)
Structure Number: 53 2797F, Location: 07-LA-005-R45.69-LA (Lat: 34.335053, Lng: -118.510789), Route carried "under" structure: Interstate 5, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 194,158 (year 2011), Truck Traffic: 11%, Features Intersected: I 5,SR 14,CONNS,THE OLD
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 45.690, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 66.4m (217.8ft)
Find on map >> Show street view
Structure Number: 53 2797F, Location: 07-LA-005-R45.69-LA (Lat: 34.335053, Lng: -118.510789), Route carried "under" structure: Ramp State highway 14, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 51,683 (year 2011), Truck Traffic: 4%, Features Intersected: I 5,SR 14,CONNS,THE OLD
Minimum Vertical Clearance: 5.72m (18.77ft), Kilometerpoint: 24.900, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 66.4m (217.8ft)
Structure Number: 53 2797F, Location: 07-LA-005-R45.69-LA (Lat: 34.335053, Lng: -118.510789), Route carried "under" structure: Ramp State highway 14, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 51,683 (year 2011), Truck Traffic: 4%, Features Intersected: I 5,SR 14,CONNS,THE OLD
Minimum Vertical Clearance: 5.72m (18.77ft), Kilometerpoint: 24.900, Lanes on structure: 2, Lanes under structure: 3, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 66.4m (217.8ft)
Find on map >> Show street view
Structure Number: 53 2800F, Location: 07-LA-105-R0.44-LA (Lat: 33.931831, Lng: -118.397172), Route carried "under" structure: State highway 1, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 110,000 (year 2018), Truck Traffic: 2%, Features Intersected: SR1 SEPULVEDA BLVD, Facility Carried by Structure: SEPULVEDA SB OFF
Minimum Vertical Clearance: 6.53m (21.42ft), Kilometerpoint: 25.990, Lanes on structure: 1, Lanes under structure: 9, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.7m (149.9ft)
Structure Number: 53 2800F, Location: 07-LA-105-R0.44-LA (Lat: 33.931831, Lng: -118.397172), Route carried "under" structure: State highway 1, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 110,000 (year 2018), Truck Traffic: 2%, Features Intersected: SR1 SEPULVEDA BLVD, Facility Carried by Structure: SEPULVEDA SB OFF
Minimum Vertical Clearance: 6.53m (21.42ft), Kilometerpoint: 25.990, Lanes on structure: 1, Lanes under structure: 9, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.7m (149.9ft)
Find on map >> Show street view
Structure Number: 53 2801F, Location: 07-LA-001-25.95-LA (Lat: 33.931681, Lng: -118.395433), Route carried "under" structure: State highway 1, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 53,000 (year 2017), Truck Traffic: 3%, Features Intersected: SR 1 (SEPULVEDA BLVD)
Minimum Vertical Clearance: 7.49m (24.57ft), Kilometerpoint: 25.950, Lanes on structure: 2, Lanes under structure: 9, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.7m (149.9ft)
Structure Number: 53 2801F, Location: 07-LA-001-25.95-LA (Lat: 33.931681, Lng: -118.395433), Route carried "under" structure: State highway 1, Year Built: 1990, Structure Length: 0. m, Average Daily Traffic: 53,000 (year 2017), Truck Traffic: 3%, Features Intersected: SR 1 (SEPULVEDA BLVD)
Minimum Vertical Clearance: 7.49m (24.57ft), Kilometerpoint: 25.950, Lanes on structure: 2, Lanes under structure: 9, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 45.7m (149.9ft)
Find on map >> Show street view
Structure Number: 53 2808, Location: 07-LA-105-R1.79-LA (Lat: 33.929942, Lng: -118.373947), Route carried "under" structure: Ramp Interstate 105, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 18,500 (year 2006), Truck Traffic: 8%, Features Intersected: NONE, Facility Carried by Structure: LRT
Minimum Vertical Clearance: 5.49m (18.01ft), Kilometerpoint: 1.790, Lanes under structure: 3, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Structure Number: 53 2808, Location: 07-LA-105-R1.79-LA (Lat: 33.929942, Lng: -118.373947), Route carried "under" structure: Ramp Interstate 105, Year Built: 1989, Structure Length: 0. m, Average Daily Traffic: 18,500 (year 2006), Truck Traffic: 8%, Features Intersected: NONE, Facility Carried by Structure: LRT
Minimum Vertical Clearance: 5.49m (18.01ft), Kilometerpoint: 1.790, Lanes under structure: 3, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 48.8m (160.1ft)
Find on map >> Show street view
Structure Number: 53 2829K, Location: 07-LA-405-R21.22-LA (Lat: 33.930650, Lng: -118.368761), Route carried "under" structure: City street L100, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 22,000 (year 2011), Truck Traffic: 1%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: LA CIENEGA-S405 ON
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 42.1m (138.1ft)
Structure Number: 53 2829K, Location: 07-LA-405-R21.22-LA (Lat: 33.930650, Lng: -118.368761), Route carried "under" structure: City street L100, Year Built: 1994, Structure Length: 0. m, Average Daily Traffic: 22,000 (year 2011), Truck Traffic: 1%, Features Intersected: IMPERIAL HWY, Facility Carried by Structure: LA CIENEGA-S405 ON
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 42.1m (138.1ft)
Find on map >> Show street view
Structure Number: 53 2856L, Location: 07-LA-110-20.59-LA (Lat: 34.026028, Lng: -118.275661), Route carried "under" structure: Interstate 110, Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 300,000 (year 2020), Truck Traffic: 6%, Features Intersected: INTERSTATE 110 SB LANE, Facility Carried by Structure: LRT
Minimum Vertical Clearance: 6.86m (22.51ft), Kilometerpoint: 20.590, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Slab, Length of Maximum Span: 2.4m (7.9ft)
Structure Number: 53 2856L, Location: 07-LA-110-20.59-LA (Lat: 34.026028, Lng: -118.275661), Route carried "under" structure: Interstate 110, Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 300,000 (year 2020), Truck Traffic: 6%, Features Intersected: INTERSTATE 110 SB LANE, Facility Carried by Structure: LRT
Minimum Vertical Clearance: 6.86m (22.51ft), Kilometerpoint: 20.590, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Slab, Length of Maximum Span: 2.4m (7.9ft)
Find on map >> Show street view
Structure Number: 53 2908, Location: 07-LA-101-10.56-LA (Lat: 34.139767, Lng: -118.365903), Route carried "under" structure: Interstate 101, Year Built: 2003, Structure Length: 0. m, Average Daily Traffic: 248,000 (year 2021), Truck Traffic: 10%, Features Intersected: U.S. HIGHWAY 101, Facility Carried by Structure: UNIVERSAL TERRACE
Minimum Vertical Clearance: 5.71m (18.73ft), Kilometerpoint: 10.560, Lanes on structure: 4, Lanes under structure: 9, Material/Design: Steel, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 39.7m (130.2ft)
Structure Number: 53 2908, Location: 07-LA-101-10.56-LA (Lat: 34.139767, Lng: -118.365903), Route carried "under" structure: Interstate 101, Year Built: 2003, Structure Length: 0. m, Average Daily Traffic: 248,000 (year 2021), Truck Traffic: 10%, Features Intersected: U.S. HIGHWAY 101, Facility Carried by Structure: UNIVERSAL TERRACE
Minimum Vertical Clearance: 5.71m (18.73ft), Kilometerpoint: 10.560, Lanes on structure: 4, Lanes under structure: 9, Material/Design: Steel, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 39.7m (130.2ft)
Find on map >> Show street view
Structure Number: 53 2973R, Location: 07-LA-405-39.05-LA (Lat: 34.151914, Lng: -118.467597), Route carried "under" structure: Ramp Interstate 101, Year Built: 2008, Structure Length: 0. m, Average Daily Traffic: 12,000 (year 2019), Truck Traffic: 1%, Features Intersected: GREENLEAF ST, Facility Carried by Structure: INTERSTATE 405 NB
Minimum Vertical Clearance: 5.72m (18.77ft), Kilometerpoint: 17.100, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 32.3m (106.0ft)
Structure Number: 53 2973R, Location: 07-LA-405-39.05-LA (Lat: 34.151914, Lng: -118.467597), Route carried "under" structure: Ramp Interstate 101, Year Built: 2008, Structure Length: 0. m, Average Daily Traffic: 12,000 (year 2019), Truck Traffic: 1%, Features Intersected: GREENLEAF ST, Facility Carried by Structure: INTERSTATE 405 NB
Minimum Vertical Clearance: 5.72m (18.77ft), Kilometerpoint: 17.100, Lanes on structure: 3, Lanes under structure: 1, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 32.3m (106.0ft)
Find on map >> Show street view
Structure Number: 53 2974E, Location: 07-LA-005-R45.26-LA (Lat: 34.329258, Lng: -118.505706), Route carried "under" structure: Interstate 5, Year Built: 2014, Structure Length: 0. m, Average Daily Traffic: 100,500 (year 2014), Truck Traffic: 7%, Features Intersected: NB 5, 5 TRUCK & RAMP
Minimum Vertical Clearance: 5.71m (18.73ft), Kilometerpoint: 45.500, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 2974E, Location: 07-LA-005-R45.26-LA (Lat: 34.329258, Lng: -118.505706), Route carried "under" structure: Interstate 5, Year Built: 2014, Structure Length: 0. m, Average Daily Traffic: 100,500 (year 2014), Truck Traffic: 7%, Features Intersected: NB 5, 5 TRUCK & RAMP
Minimum Vertical Clearance: 5.71m (18.73ft), Kilometerpoint: 45.500, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 2974E, Location: 07-LA-005-R45.26-LA (Lat: 34.329258, Lng: -118.505706), Route carried "under" structure: State highway 14, Year Built: 2014, Structure Length: 0. m, Average Daily Traffic: 15,747 (year 2011), Truck Traffic: 40%, Features Intersected: NB 5, 5 TRUCK & RAMP
Minimum Vertical Clearance: 13.62m (44.69ft), Kilometerpoint: 24.810, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Structure Number: 53 2974E, Location: 07-LA-005-R45.26-LA (Lat: 34.329258, Lng: -118.505706), Route carried "under" structure: State highway 14, Year Built: 2014, Structure Length: 0. m, Average Daily Traffic: 15,747 (year 2011), Truck Traffic: 40%, Features Intersected: NB 5, 5 TRUCK & RAMP
Minimum Vertical Clearance: 13.62m (44.69ft), Kilometerpoint: 24.810, Lanes on structure: 2, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 58.5m (191.9ft)
Find on map >> Show street view
Structure Number: 53 2975, Location: 07-LA-101-1.07 (Lat: 34.054314, Lng: -118.235228), Route carried "under" structure: US 101, Year Built: 2007, Structure Length: 0. m, Average Daily Traffic: 140,000 (year 2009), Truck Traffic: 5%, Features Intersected: US101, Facility Carried by Structure: RAIL
Minimum Vertical Clearance: 5.80m (19.03ft), Kilometerpoint: 1.070, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.1m (154.5ft)
Structure Number: 53 2975, Location: 07-LA-101-1.07 (Lat: 34.054314, Lng: -118.235228), Route carried "under" structure: US 101, Year Built: 2007, Structure Length: 0. m, Average Daily Traffic: 140,000 (year 2009), Truck Traffic: 5%, Features Intersected: US101, Facility Carried by Structure: RAIL
Minimum Vertical Clearance: 5.80m (19.03ft), Kilometerpoint: 1.070, Lanes under structure: 8, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 47.1m (154.5ft)
Find on map >> Show street view
Structure Number: 53 2976G, Location: 07-LA-170-R20.34-LA (Lat: 34.230183, Lng: -118.409431), Route carried "under" structure: Interstate 5, Year Built: 2015, Structure Length: 0. m, Average Daily Traffic: 183,000 (year 2017), Truck Traffic: 9%, Features Intersected: I-5
Minimum Vertical Clearance: 5.90m (19.36ft), Kilometerpoint: 36.350, Lanes on structure: 3, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 68.4m (224.4ft)
Structure Number: 53 2976G, Location: 07-LA-170-R20.34-LA (Lat: 34.230183, Lng: -118.409431), Route carried "under" structure: Interstate 5, Year Built: 2015, Structure Length: 0. m, Average Daily Traffic: 183,000 (year 2017), Truck Traffic: 9%, Features Intersected: I-5
Minimum Vertical Clearance: 5.90m (19.36ft), Kilometerpoint: 36.350, Lanes on structure: 3, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 68.4m (224.4ft)
Find on map >> Show street view
Structure Number: 53 2977E, Location: 07-LA-005-36.44-LA (Lat: 34.232064, Lng: -118.409767), Route carried "under" structure: Interstate 5, Year Built: 2015, Structure Length: 0. m, Average Daily Traffic: 145,357 (year 2011), Truck Traffic: 7%, Features Intersected: I-5
Minimum Vertical Clearance: 5.67m (18.60ft), Kilometerpoint: 36.540, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 42.8m (140.4ft)
Structure Number: 53 2977E, Location: 07-LA-005-36.44-LA (Lat: 34.232064, Lng: -118.409767), Route carried "under" structure: Interstate 5, Year Built: 2015, Structure Length: 0. m, Average Daily Traffic: 145,357 (year 2011), Truck Traffic: 7%, Features Intersected: I-5
Minimum Vertical Clearance: 5.67m (18.60ft), Kilometerpoint: 36.540, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 42.8m (140.4ft)
Find on map >> Show street view
Structure Number: 53 2981, Location: 07-LA-405-28.51-LA (Lat: 34.018653, Lng: -118.423925), Route carried "under" structure: Interstate 405, Year Built: 2009, Structure Length: 0. m, Average Daily Traffic: 278,000 (year 2019), Truck Traffic: 4%, Features Intersected: ROUTE 405, Facility Carried by Structure: PALMS BLVD
Minimum Vertical Clearance: 5.78m (18.96ft), Kilometerpoint: 28.510, Lanes on structure: 4, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 32.5m (106.6ft)
Structure Number: 53 2981, Location: 07-LA-405-28.51-LA (Lat: 34.018653, Lng: -118.423925), Route carried "under" structure: Interstate 405, Year Built: 2009, Structure Length: 0. m, Average Daily Traffic: 278,000 (year 2019), Truck Traffic: 4%, Features Intersected: ROUTE 405, Facility Carried by Structure: PALMS BLVD
Minimum Vertical Clearance: 5.78m (18.96ft), Kilometerpoint: 28.510, Lanes on structure: 4, Lanes under structure: 8, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 32.5m (106.6ft)
Find on map >> Show street view
Structure Number: 53 3021S, Location: 07-LA-405-31.46-LA (Lat: 34.055639, Lng: -118.450139), Route carried "under" structure: Ramp Interstate 405, Year Built: 2013, Structure Length: 0. m, Average Daily Traffic: 7,461 (year 2014), Truck Traffic: 5%, Features Intersected: SEPULVEDA, WILSHIRE BLVD
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 31.540, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 56.7m (186.0ft)
Structure Number: 53 3021S, Location: 07-LA-405-31.46-LA (Lat: 34.055639, Lng: -118.450139), Route carried "under" structure: Ramp Interstate 405, Year Built: 2013, Structure Length: 0. m, Average Daily Traffic: 7,461 (year 2014), Truck Traffic: 5%, Features Intersected: SEPULVEDA, WILSHIRE BLVD
Minimum Vertical Clearance: 5.33m (17.49ft), Kilometerpoint: 31.540, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 56.7m (186.0ft)
Find on map >> Show street view
Structure Number: 53 3021S, Location: 07-LA-405-31.46-LA (Lat: 34.055639, Lng: -118.450139), Route carried "under" structure: Business City street , Year Built: 2013, Structure Length: 0. m, Average Daily Traffic: 25,000 (year 2018), Truck Traffic: 5%, Features Intersected: SEPULVEDA, WILSHIRE BLVD, Facility Carried by Structure: NB 405 ONRAMP
Minimum Vertical Clearance: 7.87m (25.82ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 56.7m (186.0ft)
Structure Number: 53 3021S, Location: 07-LA-405-31.46-LA (Lat: 34.055639, Lng: -118.450139), Route carried "under" structure: Business City street , Year Built: 2013, Structure Length: 0. m, Average Daily Traffic: 25,000 (year 2018), Truck Traffic: 5%, Features Intersected: SEPULVEDA, WILSHIRE BLVD, Facility Carried by Structure: NB 405 ONRAMP
Minimum Vertical Clearance: 7.87m (25.82ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 5, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 56.7m (186.0ft)
Find on map >> Show street view
Structure Number: 53 3021T, Location: 07-LA-405-31.38-LA (Lat: 34.054081, Lng: -118.450000), Route carried "under" structure: Business City street , Year Built: 2013, Structure Length: 0. m, Average Daily Traffic: 25,000 (year 2018), Truck Traffic: 5%, Features Intersected: SOUTH SEPULVEDA BLVD, Facility Carried by Structure: NB 405 OFFRAMP
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 57.5m (188.6ft)
Structure Number: 53 3021T, Location: 07-LA-405-31.38-LA (Lat: 34.054081, Lng: -118.450000), Route carried "under" structure: Business City street , Year Built: 2013, Structure Length: 0. m, Average Daily Traffic: 25,000 (year 2018), Truck Traffic: 5%, Features Intersected: SOUTH SEPULVEDA BLVD, Facility Carried by Structure: NB 405 OFFRAMP
Minimum Vertical Clearance: 4.67m (15.32ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 4, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 57.5m (188.6ft)
Find on map >> Show street view
Structure Number: 53 3036S, Location: 07-LA-110-22.30-LA (Lat: 34.047775, Lng: -118.265758), Route carried "under" structure: Ramp State highway 110, Year Built: 2012, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 2013), Truck Traffic: 5%, Features Intersected: 9TH ST N/B ON-RAMP
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 22.300, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 21.5m (70.5ft)
Structure Number: 53 3036S, Location: 07-LA-110-22.30-LA (Lat: 34.047775, Lng: -118.265758), Route carried "under" structure: Ramp State highway 110, Year Built: 2012, Structure Length: 0. m, Average Daily Traffic: 2,000 (year 2013), Truck Traffic: 5%, Features Intersected: 9TH ST N/B ON-RAMP
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 22.300, Lanes on structure: 1, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 21.5m (70.5ft)
Find on map >> Show street view
Structure Number: 53 3048S, Location: 07-LA-110-2.68-LA (Lat: 33.770306, Lng: -118.279861), Route carried "under" structure: City street , Year Built: 2016, Structure Length: 0. m, Average Daily Traffic: 2,700 (year 2019), Truck Traffic: 10%, Features Intersected: JOHN S GIBSON BLVD, Facility Carried by Structure: HARRY BRIDGES BLVD
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 38.1m (125.0ft)
Structure Number: 53 3048S, Location: 07-LA-110-2.68-LA (Lat: 33.770306, Lng: -118.279861), Route carried "under" structure: City street , Year Built: 2016, Structure Length: 0. m, Average Daily Traffic: 2,700 (year 2019), Truck Traffic: 10%, Features Intersected: JOHN S GIBSON BLVD, Facility Carried by Structure: HARRY BRIDGES BLVD
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 38.1m (125.0ft)
Find on map >> Show street view
Structure Number: 53 3050K, Location: 07-LA-405-31.54-LA (Lat: 34.055433, Lng: -118.452339), Route carried "under" structure: Business City street , Year Built: 2013, Structure Length: 0. m, Average Daily Traffic: 80,000 (year 2014), Truck Traffic: 5%, Features Intersected: WILSHIRE BLVD, Facility Carried by Structure: S405-WILSHIRE OFF
Minimum Vertical Clearance: 10.38m (34.06ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 10, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 46.8m (153.5ft)
Structure Number: 53 3050K, Location: 07-LA-405-31.54-LA (Lat: 34.055433, Lng: -118.452339), Route carried "under" structure: Business City street , Year Built: 2013, Structure Length: 0. m, Average Daily Traffic: 80,000 (year 2014), Truck Traffic: 5%, Features Intersected: WILSHIRE BLVD, Facility Carried by Structure: S405-WILSHIRE OFF
Minimum Vertical Clearance: 10.38m (34.06ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 10, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 46.8m (153.5ft)
Find on map >> Show street view
Structure Number: 53 3051K, Location: 07-LA-405-31.57-LA (Lat: 34.056389, Lng: -118.453250), Route carried "under" structure: Ramp Interstate 405, Year Built: 2013, Structure Length: 0. m, Average Daily Traffic: 16,700 (year 2014), Truck Traffic: 5%, Features Intersected: WILSHIRE-S405 ON
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 31.570, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 50.4m (165.4ft)
Structure Number: 53 3051K, Location: 07-LA-405-31.57-LA (Lat: 34.056389, Lng: -118.453250), Route carried "under" structure: Ramp Interstate 405, Year Built: 2013, Structure Length: 0. m, Average Daily Traffic: 16,700 (year 2014), Truck Traffic: 5%, Features Intersected: WILSHIRE-S405 ON
Minimum Vertical Clearance: 5.08m (16.67ft), Kilometerpoint: 31.570, Lanes on structure: 1, Lanes under structure: 2, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 50.4m (165.4ft)
Find on map >> Show street view
Structure Number: 53 3052, Location: 07-LA-405-36.71-LA (Lat: 34.122369, Lng: -118.478961), Route carried "under" structure: Interstate 405, Year Built: 2013, Structure Length: 0. m, Average Daily Traffic: 288,000 (year 2016), Truck Traffic: 5%, Features Intersected: ROUTE 405, Facility Carried by Structure: SKIRBALL CENTER DR
Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 36.710, Lanes on structure: 5, Lanes under structure: 11, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.1m (118.4ft)
Structure Number: 53 3052, Location: 07-LA-405-36.71-LA (Lat: 34.122369, Lng: -118.478961), Route carried "under" structure: Interstate 405, Year Built: 2013, Structure Length: 0. m, Average Daily Traffic: 288,000 (year 2016), Truck Traffic: 5%, Features Intersected: ROUTE 405, Facility Carried by Structure: SKIRBALL CENTER DR
Minimum Vertical Clearance: 5.15m (16.90ft), Kilometerpoint: 36.710, Lanes on structure: 5, Lanes under structure: 11, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 36.1m (118.4ft)
Find on map >> Show street view
Structure Number: 53 3053, Location: 07-LA-405-37.03-LA (Lat: 34.126150, Lng: -118.476633), Route carried "under" structure: Interstate 405, Year Built: 2013, Structure Length: 0. m, Average Daily Traffic: 276,000 (year 2015), Truck Traffic: 4%, Features Intersected: ROUTE 405, Facility Carried by Structure: MULHOLLAND DR
Minimum Vertical Clearance: 15.24m (50.00ft), Kilometerpoint: 37.030, Lanes on structure: 3, Lanes under structure: 12, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 91.4m (299.9ft)
Structure Number: 53 3053, Location: 07-LA-405-37.03-LA (Lat: 34.126150, Lng: -118.476633), Route carried "under" structure: Interstate 405, Year Built: 2013, Structure Length: 0. m, Average Daily Traffic: 276,000 (year 2015), Truck Traffic: 4%, Features Intersected: ROUTE 405, Facility Carried by Structure: MULHOLLAND DR
Minimum Vertical Clearance: 15.24m (50.00ft), Kilometerpoint: 37.030, Lanes on structure: 3, Lanes under structure: 12, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 91.4m (299.9ft)
Find on map >> Show street view
Structure Number: 53 3054, Location: 07-LA-405-32.99-LA (Lat: 34.072361, Lng: -118.466836), Route carried "under" structure: Interstate 405, Year Built: 2013, Structure Length: 0. m, Average Daily Traffic: 284,000 (year 2016), Truck Traffic: 5%, Features Intersected: ROUTE 405, N SEPULVEDA, Facility Carried by Structure: SUNSET BLVD
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 32.990, Lanes on structure: 7, Lanes under structure: 11, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.6m (123.4ft)
Structure Number: 53 3054, Location: 07-LA-405-32.99-LA (Lat: 34.072361, Lng: -118.466836), Route carried "under" structure: Interstate 405, Year Built: 2013, Structure Length: 0. m, Average Daily Traffic: 284,000 (year 2016), Truck Traffic: 5%, Features Intersected: ROUTE 405, N SEPULVEDA, Facility Carried by Structure: SUNSET BLVD
Minimum Vertical Clearance: 5.05m (16.57ft), Kilometerpoint: 32.990, Lanes on structure: 7, Lanes under structure: 11, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.6m (123.4ft)
Find on map >> Show street view
Structure Number: 53 3054, Location: 07-LA-405-32.99-LA (Lat: 34.072361, Lng: -118.466836), Route carried "under" structure: Ramp Interstate 405, Year Built: 2013, Structure Length: 0. m, Average Daily Traffic: 15,000 (year 2016), Truck Traffic: 1%, Features Intersected: ROUTE 405, N SEPULVEDA, Facility Carried by Structure: SUNSET BLVD
Minimum Vertical Clearance: 4.98m (16.34ft), Kilometerpoint: 32.990, Lanes on structure: 7, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.6m (123.4ft)
Structure Number: 53 3054, Location: 07-LA-405-32.99-LA (Lat: 34.072361, Lng: -118.466836), Route carried "under" structure: Ramp Interstate 405, Year Built: 2013, Structure Length: 0. m, Average Daily Traffic: 15,000 (year 2016), Truck Traffic: 1%, Features Intersected: ROUTE 405, N SEPULVEDA, Facility Carried by Structure: SUNSET BLVD
Minimum Vertical Clearance: 4.98m (16.34ft), Kilometerpoint: 32.990, Lanes on structure: 7, Lanes under structure: 1, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.6m (123.4ft)
Find on map >> Show street view
Structure Number: 53 3054, Location: 07-LA-405-32.99-LA (Lat: 34.072361, Lng: -118.466836), Route carried "under" structure: Business City street , Year Built: 2013, Structure Length: 0. m, Average Daily Traffic: 12,000 (year 2018), Truck Traffic: 5%, Features Intersected: ROUTE 405, N SEPULVEDA, Facility Carried by Structure: SUNSET BLVD
Minimum Vertical Clearance: 6.17m (20.24ft), Kilometerpoint: 0.000, Lanes on structure: 7, Lanes under structure: 5, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.6m (123.4ft)
Structure Number: 53 3054, Location: 07-LA-405-32.99-LA (Lat: 34.072361, Lng: -118.466836), Route carried "under" structure: Business City street , Year Built: 2013, Structure Length: 0. m, Average Daily Traffic: 12,000 (year 2018), Truck Traffic: 5%, Features Intersected: ROUTE 405, N SEPULVEDA, Facility Carried by Structure: SUNSET BLVD
Minimum Vertical Clearance: 6.17m (20.24ft), Kilometerpoint: 0.000, Lanes on structure: 7, Lanes under structure: 5, Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 37.6m (123.4ft)
Find on map >> Show street view
Structure Number: 53 3073, Location: 07-LA-110-20.74-LA (Lat: 34.027917, Lng: -118.274500), Route carried "under" structure: Interstate 110, Year Built: 2012, Structure Length: 0. m, Average Daily Traffic: 300,000 (year 2019), Truck Traffic: 6%, Features Intersected: STATE ROUTE 110, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.64m (18.50ft), Kilometerpoint: 20.740, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 28.8m (94.5ft)
Structure Number: 53 3073, Location: 07-LA-110-20.74-LA (Lat: 34.027917, Lng: -118.274500), Route carried "under" structure: Interstate 110, Year Built: 2012, Structure Length: 0. m, Average Daily Traffic: 300,000 (year 2019), Truck Traffic: 6%, Features Intersected: STATE ROUTE 110, Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.64m (18.50ft), Kilometerpoint: 20.740, Lanes under structure: 5, Material/Design: Prestressed concrete, Design/Construction: Box Beam or Girders - Single/Spread, Length of Maximum Span: 28.8m (94.5ft)
Find on map >> Show street view
Structure Number: 53 3092S, Location: 07-LA-405-31.54-LA (Lat: 34.056250, Lng: -118.451864), Route carried "under" structure: Business City street , Year Built: 2013, Structure Length: 0. m, Average Daily Traffic: 25,000 (year 2018), Truck Traffic: 5%, Features Intersected: SOUTH SEPULVEDA BLVD, Facility Carried by Structure: NB 405 OFFRAMP
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 7, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 53 3092S, Location: 07-LA-405-31.54-LA (Lat: 34.056250, Lng: -118.451864), Route carried "under" structure: Business City street , Year Built: 2013, Structure Length: 0. m, Average Daily Traffic: 25,000 (year 2018), Truck Traffic: 5%, Features Intersected: SOUTH SEPULVEDA BLVD, Facility Carried by Structure: NB 405 OFFRAMP
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 7, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 53 3093S, Location: 07-LA-405-31.61-LA (Lat: 34.056556, Lng: -118.452092), Route carried "under" structure: Business City street , Year Built: 2013, Structure Length: 0. m, Average Daily Traffic: 25,000 (year 2018), Truck Traffic: 5%, Features Intersected: SOUTH SEPULVEDA BLVD, Facility Carried by Structure: NB 405 ONRAMP
Minimum Vertical Clearance: 4.74m (15.55ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 33.6m (110.2ft)
Structure Number: 53 3093S, Location: 07-LA-405-31.61-LA (Lat: 34.056556, Lng: -118.452092), Route carried "under" structure: Business City street , Year Built: 2013, Structure Length: 0. m, Average Daily Traffic: 25,000 (year 2018), Truck Traffic: 5%, Features Intersected: SOUTH SEPULVEDA BLVD, Facility Carried by Structure: NB 405 ONRAMP
Minimum Vertical Clearance: 4.74m (15.55ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 4, Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 33.6m (110.2ft)
Find on map >> Show street view
Structure Number: 53 3097, Location: 07-LA-110-13.81-LA (Lat: 33.928647, Lng: -118.281700), Route carried "under" structure: Ramp City street L100, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 14,700 (year 2005), Truck Traffic: 1%, Features Intersected: 105/110 TRANSIT STATION, Facility Carried by Structure: INTERSTATE 110 SB
Minimum Vertical Clearance: 5.89m (19.32ft), Kilometerpoint: 13.810, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.0m (91.9ft)
Structure Number: 53 3097, Location: 07-LA-110-13.81-LA (Lat: 33.928647, Lng: -118.281700), Route carried "under" structure: Ramp City street L100, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 14,700 (year 2005), Truck Traffic: 1%, Features Intersected: 105/110 TRANSIT STATION, Facility Carried by Structure: INTERSTATE 110 SB
Minimum Vertical Clearance: 5.89m (19.32ft), Kilometerpoint: 13.810, Lanes under structure: 2, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.0m (91.9ft)
Find on map >> Show street view
Structure Number: 53 3097, Location: 07-LA-110-13.81-LA (Lat: 33.928647, Lng: -118.281700), Route carried "under" structure: Interstate 110, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 136,880 (year 2005), Truck Traffic: 6%, Features Intersected: 105/110 TRANSIT STATION
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 13.810, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.0m (91.9ft)
Structure Number: 53 3097, Location: 07-LA-110-13.81-LA (Lat: 33.928647, Lng: -118.281700), Route carried "under" structure: Interstate 110, Year Built: 1991, Structure Length: 0. m, Average Daily Traffic: 136,880 (year 2005), Truck Traffic: 6%, Features Intersected: 105/110 TRANSIT STATION
Minimum Vertical Clearance: 7.62m (25.00ft), Kilometerpoint: 13.810, Lanes under structure: 6, Material/Design: Concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Length of Maximum Span: 28.0m (91.9ft)
Find on map >> Show street view
Structure Number: 53 3098, Location: 07-LA-110-11.88-LA (Lat: 33.901658, Lng: -118.286517), Route carried "under" structure: Interstate 110, Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 300 (year 2011), Truck Traffic: 4%, Features Intersected: WAITING AREA, Facility Carried by Structure: ROSECRANS BUS STN
Minimum Vertical Clearance: 5.79m (19.00ft), Kilometerpoint: 11.880, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Slab, Length of Maximum Span: 8.5m (27.9ft)
Structure Number: 53 3098, Location: 07-LA-110-11.88-LA (Lat: 33.901658, Lng: -118.286517), Route carried "under" structure: Interstate 110, Year Built: 1996, Structure Length: 0. m, Average Daily Traffic: 300 (year 2011), Truck Traffic: 4%, Features Intersected: WAITING AREA, Facility Carried by Structure: ROSECRANS BUS STN
Minimum Vertical Clearance: 5.79m (19.00ft), Kilometerpoint: 11.880, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Slab, Length of Maximum Span: 8.5m (27.9ft)
Find on map >> Show street view
Structure Number: 53C0011, Location: 0.6 MI NORTH OF FWY 10 (Lat: 34.064144, Lng: -118.197147), Route carried "under" structure: City street , Year Built: 1936, Structure Length: 0. m, Average Daily Traffic: 21,605 (year 2016), Truck Traffic: 1%, Features Intersected: VALLEY BLVD & UP RR, Facility Carried by Structure: SOTO STREET
Minimum Vertical Clearance: 5.30m (17.39ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 5, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Structure Number: 53C0011, Location: 0.6 MI NORTH OF FWY 10 (Lat: 34.064144, Lng: -118.197147), Route carried "under" structure: City street , Year Built: 1936, Structure Length: 0. m, Average Daily Traffic: 21,605 (year 2016), Truck Traffic: 1%, Features Intersected: VALLEY BLVD & UP RR, Facility Carried by Structure: SOTO STREET
Minimum Vertical Clearance: 5.30m (17.39ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 5, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Length of Maximum Span: 30.5m (100.1ft)
Find on map >> Show street view
Structure Number: 53C0035, Location: BETWEEN FW10-EXPO BLVD (Lat: 34.030358, Lng: -118.411014), Route carried "under" structure: City street , Year Built: 1965, Structure Length: 0. m, Average Daily Traffic: 37,500 (year 2009), Truck Traffic: 3%, Features Intersected: NATIONAL BLVD, Facility Carried by Structure: UP RR
Minimum Vertical Clearance: 4.60m (15.09ft), Kilometerpoint: 0.000, Lanes under structure: 5, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 31.7m (104.0ft)
Structure Number: 53C0035, Location: BETWEEN FW10-EXPO BLVD (Lat: 34.030358, Lng: -118.411014), Route carried "under" structure: City street , Year Built: 1965, Structure Length: 0. m, Average Daily Traffic: 37,500 (year 2009), Truck Traffic: 3%, Features Intersected: NATIONAL BLVD, Facility Carried by Structure: UP RR
Minimum Vertical Clearance: 4.60m (15.09ft), Kilometerpoint: 0.000, Lanes under structure: 5, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 31.7m (104.0ft)
Find on map >> Show street view
Structure Number: 53C0037, Location: 0.5 MI NW PASADENA AVE (Lat: 34.081228, Lng: -118.219981), Route carried "under" structure: City street , Year Built: 1930, Structure Length: 0. m, Average Daily Traffic: 32,700 (year 2004), Truck Traffic: 2%, Features Intersected: AVENUE 26, Facility Carried by Structure: METROLINK
Minimum Vertical Clearance: 4.29m (14.07ft), Kilometerpoint: 0.000, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 25.6m (84.0ft)
Structure Number: 53C0037, Location: 0.5 MI NW PASADENA AVE (Lat: 34.081228, Lng: -118.219981), Route carried "under" structure: City street , Year Built: 1930, Structure Length: 0. m, Average Daily Traffic: 32,700 (year 2004), Truck Traffic: 2%, Features Intersected: AVENUE 26, Facility Carried by Structure: METROLINK
Minimum Vertical Clearance: 4.29m (14.07ft), Kilometerpoint: 0.000, Lanes under structure: 4, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Length of Maximum Span: 25.6m (84.0ft)
Find on map >> Show street view
Structure Number: 53C0044, Location: OVER LA RIVER (Lat: 34.041411, Lng: -118.231125), Route carried "under" structure: City street , Year Built: 1930, Structure Length: 0. m, Average Daily Traffic: 2,935 (year 2016), Truck Traffic: 3%, Features Intersected: CITY STS,RR,LA RIVER, Facility Carried by Structure: FOURTH ST
Minimum Vertical Clearance: 4.65m (15.26ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 4, Material/Design: Concrete, Design/Construction: Arch - Deck, Length of Maximum Span: 85.0m (278.9ft)
Structure Number: 53C0044, Location: OVER LA RIVER (Lat: 34.041411, Lng: -118.231125), Route carried "under" structure: City street , Year Built: 1930, Structure Length: 0. m, Average Daily Traffic: 2,935 (year 2016), Truck Traffic: 3%, Features Intersected: CITY STS,RR,LA RIVER, Facility Carried by Structure: FOURTH ST
Minimum Vertical Clearance: 4.65m (15.26ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 4, Material/Design: Concrete, Design/Construction: Arch - Deck, Length of Maximum Span: 85.0m (278.9ft)
Find on map >> Show street view
Structure Number: 53C0044, Location: OVER LA RIVER (Lat: 34.041411, Lng: -118.231125), Route carried "under" structure: City street , Year Built: 1930, Structure Length: 0. m, Average Daily Traffic: 15,000 (year 2016), Truck Traffic: 5%, Features Intersected: CITY STS,RR,LA RIVER, Facility Carried by Structure: FOURTH ST
Minimum Vertical Clearance: 4.32m (14.17ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Arch - Deck, Length of Maximum Span: 85.0m (278.9ft)
Structure Number: 53C0044, Location: OVER LA RIVER (Lat: 34.041411, Lng: -118.231125), Route carried "under" structure: City street , Year Built: 1930, Structure Length: 0. m, Average Daily Traffic: 15,000 (year 2016), Truck Traffic: 5%, Features Intersected: CITY STS,RR,LA RIVER, Facility Carried by Structure: FOURTH ST
Minimum Vertical Clearance: 4.32m (14.17ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Arch - Deck, Length of Maximum Span: 85.0m (278.9ft)
Find on map >> Show street view
Structure Number: 53C0044, Location: OVER LA RIVER (Lat: 34.041411, Lng: -118.231125), Route carried "under" structure: City street , Year Built: 1930, Structure Length: 0. m, Average Daily Traffic: 10,218 (year 2016), Truck Traffic: 2%, Features Intersected: CITY STS,RR,LA RIVER, Facility Carried by Structure: FOURTH ST
Minimum Vertical Clearance: 4.30m (14.11ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Arch - Deck, Length of Maximum Span: 85.0m (278.9ft)
Structure Number: 53C0044, Location: OVER LA RIVER (Lat: 34.041411, Lng: -118.231125), Route carried "under" structure: City street , Year Built: 1930, Structure Length: 0. m, Average Daily Traffic: 10,218 (year 2016), Truck Traffic: 2%, Features Intersected: CITY STS,RR,LA RIVER, Facility Carried by Structure: FOURTH ST
Minimum Vertical Clearance: 4.30m (14.11ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 2, Material/Design: Concrete, Design/Construction: Arch - Deck, Length of Maximum Span: 85.0m (278.9ft)