Bridge Statistics for New York, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs
- National Bridge Inventory (NBI) Statistics
- 2,992Number of bridges
- 68,865ft / 20,990mTotal length
- $41,847,025,000Total costs
- 106,047,317Total average daily traffic
- 3,057,321Total average daily truck traffic
- National Bridge Inventory (NBI) Registered Bridges for New York
- No street view available for this location
- New bridges - historical statistics
- 47Before 1900
- 1961900-1909
- 1711910-1919
- 1241920-1929
- 3951930-1939
- 2541940-1949
- 4641950-1959
- 7351960-1969
- 1551970-1979
- 881980-1989
- 731990-1999
- 1432000-2009
- 1242010-2019
- 232020-2022
- Reconstructed bridges - Historical Statistics
- 11920-1929
- 121930-1939
- 01940-1949
- 71950-1959
- 81960-1969
- 491970-1979
- 1441980-1989
- 1731990-1999
- 982000-2009
- 652010-2019
- 52020-2022
- Bridge Condition - Deck
- 9.4%Excellent
- 13.0%Very good
- 23.3%Good
- 29.7%Satisfactory
- 20.6%Fair
- 4.0%Poor
- Bridge Condition - Superstructure
- 9.1%Excellent
- 12.8%Very good
- 20.5%Good
- 34.5%Satisfactory
- 19.5%Fair
- 3.5%Poor
- Bridge Condition - Substructure
- 5.9%Excellent
- 9.8%Very good
- 24.0%Good
- 39.8%Satisfactory
- 18.9%Fair
- 1.7%Poor
- Bridge Condition - Channel
- 8.6%Excellent
- 19.0%Very good
- 24.5%Good
- 30.7%Satisfactory
- 10.4%Fair
- 4.9%Poor
- 1.8%Serious
- Bridge Condition - Culverts
- 9.5%Very good
- 14.3%Good
- 47.6%Satisfactory
- 28.6%Fair
Find on map >> Show street view
Structure Number: 223204, Location: 1.6MI NE FDR DR&BKLYN BR (Lat: 40.718742, Lng: -73.974969), Route carried "on" structure: City street , Year Built: 2017, Status: Open, Structure Length: 2.29m (7.51ft), Average Daily Traffic: 40,267 (year 2001), Truck Traffic: 5%, Average Future Daily Traffic: 56,374 (year 2021), Design Load: HL 93, Features Intersected: RTE 907L, RTE 907L, Facility Carried by Structure: HOUSTON STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 5, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 30.5m (100.1ft), Skew: 30 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 2, Length of Maximum Span: 11.3m (37.1ft), Curb or Sidewalk Widths: Left: 9.1m (29.9ft), Right: 9.4m (30.8ft), Curb-To-Curb Width: 15.2m (49.9ft), Out-to-Out Width: 45.4m (149.0ft)
Condition: Deck: Excellent, Superstructure: Very good, Substructure: Very good, Operating Rating: 80.6 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 2.28m (7.48ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: June 2021, Critical Feature Inspection Date: June 2021, Bridge Improvement Cost: $6,643,000, Roadway Improvement Cost: $3,890,000, Total Project Cost: $10,533,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Structure Number: 223204, Location: 1.6MI NE FDR DR&BKLYN BR (Lat: 40.718742, Lng: -73.974969), Route carried "on" structure: City street , Year Built: 2017, Status: Open, Structure Length: 2.29m (7.51ft), Average Daily Traffic: 40,267 (year 2001), Truck Traffic: 5%, Average Future Daily Traffic: 56,374 (year 2021), Design Load: HL 93, Features Intersected: RTE 907L, RTE 907L, Facility Carried by Structure: HOUSTON STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 5, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 30.5m (100.1ft), Skew: 30 degrees, Material/Design: Prestressed concrete continuous, Design/Construction: Box Beam or Girders - Multiple, Number Of Spans In Main Unit: 2, Length of Maximum Span: 11.3m (37.1ft), Curb or Sidewalk Widths: Left: 9.1m (29.9ft), Right: 9.4m (30.8ft), Curb-To-Curb Width: 15.2m (49.9ft), Out-to-Out Width: 45.4m (149.0ft)
Condition: Deck: Excellent, Superstructure: Very good, Substructure: Very good, Operating Rating: 80.6 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present desirable criteria, Deck Geometry: Superior to present desirable criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 2.28m (7.48ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: June 2021, Critical Feature Inspection Date: June 2021, Bridge Improvement Cost: $6,643,000, Roadway Improvement Cost: $3,890,000, Total Project Cost: $10,533,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >> Show street view
Structure Number: 223204A, Location: EAST RIVER PARK (Lat: 40.718514, Lng: -73.974767), Route carried "on" structure: Ramp City street 907L, Year Built: 1953, Status: Open, Structure Length: 9.08m (29.79ft), Truck Traffic: 2%, Features Intersected: RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 4, Length of Maximum Span: 26.5m (86.9ft), Curb or Sidewalk Widths: Left: 0.4m (1.3ft), Right: 0.4m (1.3ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 7.6m (24.9ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 64.8 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 25.2 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 9.08m (29.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2020, Bridge Improvement Cost: $2,553,000, Roadway Improvement Cost: $1,495,000, Total Project Cost: $4,047,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 223204A, Location: EAST RIVER PARK (Lat: 40.718514, Lng: -73.974767), Route carried "on" structure: Ramp City street 907L, Year Built: 1953, Status: Open, Structure Length: 9.08m (29.79ft), Truck Traffic: 2%, Features Intersected: RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 4, Length of Maximum Span: 26.5m (86.9ft), Curb or Sidewalk Widths: Left: 0.4m (1.3ft), Right: 0.4m (1.3ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 7.6m (24.9ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 64.8 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 25.2 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 9.08m (29.79ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2020, Bridge Improvement Cost: $2,553,000, Roadway Improvement Cost: $1,495,000, Total Project Cost: $4,047,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 223204B, Location: EAST RVR DRIVE N.B. RAMP (Lat: 40.719478, Lng: -73.974667), Route carried "on" structure: Ramp City street 907L, Year Built: 1953, Status: Open, Structure Length: 8.72m (28.61ft), Truck Traffic: 2%, Features Intersected: RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Skew: 4 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 4, Length of Maximum Span: 22.8m (74.8ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.8m (5.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 7.6m (24.9ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 61.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 23.9 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.71m (28.58ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2020, Bridge Improvement Cost: $2,456,000, Roadway Improvement Cost: $1,438,000, Total Project Cost: $3,894,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 223204B, Location: EAST RVR DRIVE N.B. RAMP (Lat: 40.719478, Lng: -73.974667), Route carried "on" structure: Ramp City street 907L, Year Built: 1953, Status: Open, Structure Length: 8.72m (28.61ft), Truck Traffic: 2%, Features Intersected: RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.000, Lanes on structure: 1, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Skew: 4 degrees, Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 4, Length of Maximum Span: 22.8m (74.8ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.8m (5.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 7.6m (24.9ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 61.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 23.9 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.71m (28.58ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2020, Bridge Improvement Cost: $2,456,000, Roadway Improvement Cost: $1,438,000, Total Project Cost: $3,894,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 223206, Location: 3.7 MI NE FDR DR+BKLYN BR (Lat: 40.732789, Lng: -73.974311), Route carried "on" structure: City street 907L, Year Built: 1947, Year Reconstructed: 1998, Status: Posted for load, Structure Length: 71.29m (233.89ft), Average Daily Traffic: 118,855 (year 2018), Truck Traffic: 1%, Average Future Daily Traffic: 146,548 (year 2040), Features Intersected: SERVICE ROAD, AVENUE C N
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 6.339, Lanes on structure: 6, Lanes under structure: 12, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 21.3m (69.9ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 32, Number Of Approach Spans: 14, Length of Maximum Span: 34.4m (112.9ft), Curb-To-Curb Width: 20.1m (65.9ft), Out-to-Out Width: 22.8m (74.8ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Fair, Operating Rating: 3.6 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 3.6 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: High priority of corrective action, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 74.73m (245.18ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: August 2021, Critical Feature Inspection Date: August 2021, Underwater Inspection Date: October 2021, Bridge Improvement Cost: $71,577,000, Roadway Improvement Cost: $41,915,000, Total Project Cost: $113,492,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 223206, Location: 3.7 MI NE FDR DR+BKLYN BR (Lat: 40.732789, Lng: -73.974311), Route carried "on" structure: City street 907L, Year Built: 1947, Year Reconstructed: 1998, Status: Posted for load, Structure Length: 71.29m (233.89ft), Average Daily Traffic: 118,855 (year 2018), Truck Traffic: 1%, Average Future Daily Traffic: 146,548 (year 2040), Features Intersected: SERVICE ROAD, AVENUE C N
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 6.339, Lanes on structure: 6, Lanes under structure: 12, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 21.3m (69.9ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 32, Number Of Approach Spans: 14, Length of Maximum Span: 34.4m (112.9ft), Curb-To-Curb Width: 20.1m (65.9ft), Out-to-Out Width: 22.8m (74.8ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Fair, Operating Rating: 3.6 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 3.6 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: High priority of corrective action, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 74.73m (245.18ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: August 2021, Critical Feature Inspection Date: August 2021, Underwater Inspection Date: October 2021, Bridge Improvement Cost: $71,577,000, Roadway Improvement Cost: $41,915,000, Total Project Cost: $113,492,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 223206A, Location: 3.7 MI NE FDR DR&BKLYN BR (Lat: 40.730944, Lng: -73.973869), Route carried "on" structure: Ramp Other road , Year Built: 1997, Status: Open, Structure Length: 8.66m (28.41ft), Truck Traffic: 2%, Design Load: HS 25 or greater, Features Intersected: TERRAIN, Facility Carried by Structure: AVE C TO FDR SB
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.064, Lanes on structure: 1, Owner: State Highway Agency, Approaching Roadway Width: 5.8m (19.0ft), Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 4, Length of Maximum Span: 36.6m (120.1ft), Curb-To-Curb Width: 5.8m (19.0ft), Out-to-Out Width: 6.7m (22.0ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 79.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.65m (28.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2020, Bridge Improvement Cost: $2,136,000, Roadway Improvement Cost: $1,251,000, Total Project Cost: $3,387,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 223206A, Location: 3.7 MI NE FDR DR&BKLYN BR (Lat: 40.730944, Lng: -73.973869), Route carried "on" structure: Ramp Other road , Year Built: 1997, Status: Open, Structure Length: 8.66m (28.41ft), Truck Traffic: 2%, Design Load: HS 25 or greater, Features Intersected: TERRAIN, Facility Carried by Structure: AVE C TO FDR SB
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.064, Lanes on structure: 1, Owner: State Highway Agency, Approaching Roadway Width: 5.8m (19.0ft), Material/Design: Concrete, Design/Construction: Slab, Number Of Spans In Main Unit: 4, Length of Maximum Span: 36.6m (120.1ft), Curb-To-Curb Width: 5.8m (19.0ft), Out-to-Out Width: 6.7m (22.0ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 79.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 40.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Better than present minimum criteria, Deck Geometry: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 8.65m (28.38ft), Designated Inspection Frequency: Every 24 months, Inspection Date: January 2020, Bridge Improvement Cost: $2,136,000, Roadway Improvement Cost: $1,251,000, Total Project Cost: $3,387,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 2232158, Location: 1.3 MI NE FDR DR & SH 25 (Lat: 40.773817, Lng: -73.944128), Route carried "on" structure: City street 907L, Year Built: 1942, Year Reconstructed: 1993, Status: Open, Structure Length: 43.65m (143.21ft), Average Daily Traffic: 131,860 (year 2018), Truck Traffic: 1%, Average Future Daily Traffic: 162,583 (year 2040), Features Intersected: RTE 907L, PROM BIN223216
Minimum Vertical Clearance: 3.86m (12.66ft), Kilometerpoint: 11.826, Lanes on structure: 3, Lanes under structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 9.8m (32.2ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 29, Number Of Approach Spans: 3, Length of Maximum Span: 14.0m (45.9ft), Curb-To-Curb Width: 9.8m (32.2ft), Out-to-Out Width: 11.6m (38.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 56.2 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 21.4 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 43.64m (143.18ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: June 2021, Critical Feature Inspection Date: June 2021, Bridge Improvement Cost: $21,658,000, Roadway Improvement Cost: $12,683,000, Total Project Cost: $34,341,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 2232158, Location: 1.3 MI NE FDR DR & SH 25 (Lat: 40.773817, Lng: -73.944128), Route carried "on" structure: City street 907L, Year Built: 1942, Year Reconstructed: 1993, Status: Open, Structure Length: 43.65m (143.21ft), Average Daily Traffic: 131,860 (year 2018), Truck Traffic: 1%, Average Future Daily Traffic: 162,583 (year 2040), Features Intersected: RTE 907L, PROM BIN223216
Minimum Vertical Clearance: 3.86m (12.66ft), Kilometerpoint: 11.826, Lanes on structure: 3, Lanes under structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 9.8m (32.2ft), Material/Design: Steel, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 29, Number Of Approach Spans: 3, Length of Maximum Span: 14.0m (45.9ft), Curb-To-Curb Width: 9.8m (32.2ft), Out-to-Out Width: 11.6m (38.1ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 56.2 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 21.4 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present minimum criteria, Length Of Structure Improvement: 43.64m (143.18ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: June 2021, Critical Feature Inspection Date: June 2021, Bridge Improvement Cost: $21,658,000, Roadway Improvement Cost: $12,683,000, Total Project Cost: $34,341,000 ( Estimate for 2021), Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 2232179, Location: FDR DR AND E96 STREET (Lat: 40.782917, Lng: -73.943967), Route carried "on" structure: State highway 907L, Year Built: 1954, Year Reconstructed: 1992, Status: Open, Structure Length: 19.11m (62.70ft), Average Daily Traffic: 137,129 (year 2018), Truck Traffic: 1%, Average Future Daily Traffic: 169,080 (year 2040), Design Load: H 20, Features Intersected: EAST 96TH STREET, YORK A
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 12.969, Lanes on structure: 6, Lanes under structure: 6, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 22.6m (74.1ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 14, Length of Maximum Span: 25.9m (85.0ft), Curb-To-Curb Width: 22.5m (73.8ft), Out-to-Out Width: 24.2m (79.4ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 43.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 19.11m (62.70ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: April 2020, Critical Feature Inspection Date: April 2020, Bridge Improvement Cost: $20,834,000, Roadway Improvement Cost: $12,200,000, Total Project Cost: $33,034,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 2232179, Location: FDR DR AND E96 STREET (Lat: 40.782917, Lng: -73.943967), Route carried "on" structure: State highway 907L, Year Built: 1954, Year Reconstructed: 1992, Status: Open, Structure Length: 19.11m (62.70ft), Average Daily Traffic: 137,129 (year 2018), Truck Traffic: 1%, Average Future Daily Traffic: 169,080 (year 2040), Design Load: H 20, Features Intersected: EAST 96TH STREET, YORK A
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 12.969, Lanes on structure: 6, Lanes under structure: 6, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 22.6m (74.1ft), Skew: 20 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 14, Length of Maximum Span: 25.9m (85.0ft), Curb-To-Curb Width: 22.5m (73.8ft), Out-to-Out Width: 24.2m (79.4ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 43.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 19.11m (62.70ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: April 2020, Critical Feature Inspection Date: April 2020, Bridge Improvement Cost: $20,834,000, Roadway Improvement Cost: $12,200,000, Total Project Cost: $33,034,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 2233038, Location: .2 MI SW JCT FDR DR.&SH25 (Lat: 40.760153, Lng: -73.957522), Route carried "on" structure: State highway 907L, Year Built: 1941, Year Reconstructed: 2006, Status: Open, Structure Length: 48.31m (158.50ft), Average Daily Traffic: 131,860 (year 2018), Truck Traffic: 1%, Average Future Daily Traffic: 162,583 (year 2040), Design Load: HS 20, Features Intersected: EAST 61ST STREET, RTE 90
Minimum Vertical Clearance: 3.76m (12.34ft), Kilometerpoint: 10.008, Lanes on structure: 3, Lanes under structure: 11, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 9.9m (32.5ft), Skew: 22 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 34, Length of Maximum Span: 18.3m (60.0ft), Curb-To-Curb Width: 9.9m (32.5ft), Out-to-Out Width: 10.5m (34.4ft)
Condition: Deck: Satisfactory, Superstructure: Very good, Substructure: Very good, Operating Rating: 56.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 48.31m (158.50ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Bridge Improvement Cost: $22,354,000, Roadway Improvement Cost: $13,091,000, Total Project Cost: $35,445,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 2233038, Location: .2 MI SW JCT FDR DR.&SH25 (Lat: 40.760153, Lng: -73.957522), Route carried "on" structure: State highway 907L, Year Built: 1941, Year Reconstructed: 2006, Status: Open, Structure Length: 48.31m (158.50ft), Average Daily Traffic: 131,860 (year 2018), Truck Traffic: 1%, Average Future Daily Traffic: 162,583 (year 2040), Design Load: HS 20, Features Intersected: EAST 61ST STREET, RTE 90
Minimum Vertical Clearance: 3.76m (12.34ft), Kilometerpoint: 10.008, Lanes on structure: 3, Lanes under structure: 11, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 9.9m (32.5ft), Skew: 22 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 34, Length of Maximum Span: 18.3m (60.0ft), Curb-To-Curb Width: 9.9m (32.5ft), Out-to-Out Width: 10.5m (34.4ft)
Condition: Deck: Satisfactory, Superstructure: Very good, Substructure: Very good, Operating Rating: 56.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 48.31m (158.50ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Bridge Improvement Cost: $22,354,000, Roadway Improvement Cost: $13,091,000, Total Project Cost: $35,445,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 223304, Location: NORTH OF QUEENSBORO BR (Lat: 40.758947, Lng: -73.958478), Route carried "on" structure: City street , Year Built: 1941, Year Reconstructed: 2004, Status: Posted for load, Structure Length: 22.19m (72.80ft), Average Daily Traffic: 36 (year 2001), Truck Traffic: 4%, Average Future Daily Traffic: 50 (year 2021), Features Intersected: RTE 907L, Facility Carried by Structure: E.60thST toFDR NB
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 3, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 12, Length of Maximum Span: 17.6m (57.7ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.5m (4.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 10.4m (34.1ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Operating Rating: 6.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 6.4 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: High priority of corrective action, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 22.18m (72.77ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: May 2021, Critical Feature Inspection Date: May 2021, Bridge Improvement Cost: $8,514,000, Roadway Improvement Cost: $4,986,000, Total Project Cost: $13,500,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 223304, Location: NORTH OF QUEENSBORO BR (Lat: 40.758947, Lng: -73.958478), Route carried "on" structure: City street , Year Built: 1941, Year Reconstructed: 2004, Status: Posted for load, Structure Length: 22.19m (72.80ft), Average Daily Traffic: 36 (year 2001), Truck Traffic: 4%, Average Future Daily Traffic: 50 (year 2021), Features Intersected: RTE 907L, Facility Carried by Structure: E.60thST toFDR NB
Minimum Vertical Clearance: 4.57m (14.99ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 3, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Prestressed concrete, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 5, Number Of Approach Spans: 12, Length of Maximum Span: 17.6m (57.7ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 1.5m (4.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 10.4m (34.1ft)
Condition: Deck: Fair, Superstructure: Fair, Substructure: Fair, Operating Rating: 6.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 6.4 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: High priority of corrective action, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 22.18m (72.77ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: May 2021, Critical Feature Inspection Date: May 2021, Bridge Improvement Cost: $8,514,000, Roadway Improvement Cost: $4,986,000, Total Project Cost: $13,500,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 2233051, Location: 3.6 MI NE JCT FDR & SH 25 (Lat: 40.803992, Lng: -73.930936), Route carried "on" structure: City street 907, Year Built: 2018, Status: Open, Structure Length: 29.96m (98.29ft), Average Daily Traffic: 42,984 (year 2019), Truck Traffic: 1%, Average Future Daily Traffic: 52,998 (year 2040), Design Load: HL 93, Features Intersected: 127 ST TO NB HRD, SB HRD
Minimum Vertical Clearance: 6.02m (19.75ft), Kilometerpoint: 0.225, Lanes on structure: 4, Lanes under structure: 3, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 16.5m (54.1ft), Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 9, Length of Maximum Span: 38.4m (126.0ft), Curb-To-Curb Width: 16.5m (54.1ft), Out-to-Out Width: 17.4m (57.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 99.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 29.96m (98.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2020, Bridge Improvement Cost: $22,861,000, Roadway Improvement Cost: $13,387,000, Total Project Cost: $36,249,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 2233051, Location: 3.6 MI NE JCT FDR & SH 25 (Lat: 40.803992, Lng: -73.930936), Route carried "on" structure: City street 907, Year Built: 2018, Status: Open, Structure Length: 29.96m (98.29ft), Average Daily Traffic: 42,984 (year 2019), Truck Traffic: 1%, Average Future Daily Traffic: 52,998 (year 2040), Design Load: HL 93, Features Intersected: 127 ST TO NB HRD, SB HRD
Minimum Vertical Clearance: 6.02m (19.75ft), Kilometerpoint: 0.225, Lanes on structure: 4, Lanes under structure: 3, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 16.5m (54.1ft), Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 9, Length of Maximum Span: 38.4m (126.0ft), Curb-To-Curb Width: 16.5m (54.1ft), Out-to-Out Width: 17.4m (57.1ft)
Condition: Deck: Excellent, Superstructure: Excellent, Substructure: Excellent, Operating Rating: 99.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 34.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Superior to present desirable criteria, Deck Geometry: Meets minimum limits, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 29.96m (98.29ft), Designated Inspection Frequency: Every 24 months, Inspection Date: May 2020, Bridge Improvement Cost: $22,861,000, Roadway Improvement Cost: $13,387,000, Total Project Cost: $36,249,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 2233052, Location: Harlem River Dr NB / Ramp (Lat: 40.803722, Lng: -73.930556), Route carried "on" structure: State highway , Year Built: 2019, Status: Open, Structure Length: 31.64m (103.81ft), Truck Traffic: 2%, Design Load: HL 93, Features Intersected: 127 ST TO NB HRD, NB HRD, Facility Carried by Structure: 907 907PX4M11003
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.048, Lanes on structure: 3, Lanes under structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 10.4m (34.1ft), Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 10, Length of Maximum Span: 36.0m (118.1ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 11.3m (37.1ft)
Condition: Deck: Very good, Superstructure: Very good, Substructure: Excellent, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 50.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: High priority of replacement, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 31.63m (103.77ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2020, Bridge Improvement Cost: $15,773,000, Roadway Improvement Cost: $9,237,000, Total Project Cost: $25,010,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 2233052, Location: Harlem River Dr NB / Ramp (Lat: 40.803722, Lng: -73.930556), Route carried "on" structure: State highway , Year Built: 2019, Status: Open, Structure Length: 31.64m (103.81ft), Truck Traffic: 2%, Design Load: HL 93, Features Intersected: 127 ST TO NB HRD, NB HRD, Facility Carried by Structure: 907 907PX4M11003
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.048, Lanes on structure: 3, Lanes under structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 10.4m (34.1ft), Material/Design: Prestressed concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 10, Length of Maximum Span: 36.0m (118.1ft), Curb-To-Curb Width: 10.4m (34.1ft), Out-to-Out Width: 11.3m (37.1ft)
Condition: Deck: Very good, Superstructure: Very good, Substructure: Excellent, Operating Rating: 89.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 50.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present desirable criteria, Deck Geometry: High priority of replacement, Underclear: Somewhat better than minimum adequacy, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 31.63m (103.77ft), Designated Inspection Frequency: Every 24 months, Inspection Date: October 2020, Bridge Improvement Cost: $15,773,000, Roadway Improvement Cost: $9,237,000, Total Project Cost: $25,010,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 223306, Location: 1 MI N OF GEO WASH BRIDGE (Lat: 40.857889, Lng: -73.938536), Route carried "on" structure: City street 907V, Year Built: 1939, Year Reconstructed: 2005, Status: Open, Structure Length: 42.73m (140.19ft), Average Daily Traffic: 67,091 (year 2020), Truck Traffic: 1%, Average Future Daily Traffic: 82,723 (year 2040), Design Load: H 20, Features Intersected: OTHER
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 18.021, Lanes on structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 14.0m (45.9ft), Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 28, Length of Maximum Span: 15.2m (49.9ft), Curb-To-Curb Width: 13.9m (45.6ft), Out-to-Out Width: 14.9m (48.9ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 43.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 42.73m (140.19ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: March 2020, Critical Feature Inspection Date: March 2020, Bridge Improvement Cost: $27,357,000, Roadway Improvement Cost: $16,020,000, Total Project Cost: $43,377,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 223306, Location: 1 MI N OF GEO WASH BRIDGE (Lat: 40.857889, Lng: -73.938536), Route carried "on" structure: City street 907V, Year Built: 1939, Year Reconstructed: 2005, Status: Open, Structure Length: 42.73m (140.19ft), Average Daily Traffic: 67,091 (year 2020), Truck Traffic: 1%, Average Future Daily Traffic: 82,723 (year 2040), Design Load: H 20, Features Intersected: OTHER
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 18.021, Lanes on structure: 3, Base Highway Network: Yes, Owner: State Highway Agency, Approaching Roadway Width: 14.0m (45.9ft), Material/Design: Steel continuous, Design/Construction: Girder and Floorbeam System, Number Of Spans In Main Unit: 28, Length of Maximum Span: 15.2m (49.9ft), Curb-To-Curb Width: 13.9m (45.6ft), Out-to-Out Width: 14.9m (48.9ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 43.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 26.3 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Meets minimum limits, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 42.73m (140.19ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: March 2020, Critical Feature Inspection Date: March 2020, Bridge Improvement Cost: $27,357,000, Roadway Improvement Cost: $16,020,000, Total Project Cost: $43,377,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 2240019, Location: BROOKLYN BR OVER EAST RVR (Lat: 40.708097, Lng: -73.999506), Route carried "on" structure: City street , Year Built: 1883, Year Reconstructed: 2016, Status: Posted for load, Structure Length: 182.54m (598.88ft), Average Daily Traffic: 97,037 (year 2019), Average Future Daily Traffic: 119,646 (year 2040), Features Intersected: I278 BKN-QNS EXP WB, FDR, Facility Carried by Structure: BROOKLYN BRIDGE
Minimum Vertical Clearance: 3.66m (12.01ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 45, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 21.3m (69.9ft), Skew: 21 degrees, Navigation Control: Yes ( Vertical Clearance: 999.9m (3,280.5ft), Horizontal Clearance: 304.8m (1,000.0ft)), Material/Design: Steel, Design/Construction: Suspension, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 72, Length of Maximum Span: 486.4m (1,595.8ft), Curb or Sidewalk Widths: Left: 4.8m (15.7ft), Right: 0.0m, Curb-To-Curb Width: 18.3m (60.0ft), Out-to-Out Width: 26.2m (86.0ft)
Condition: Deck: Very good, Superstructure: Poor, Substructure: Poor, Channel: Excellent, Operating Rating: 2.7 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 2.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: High priority of corrective action, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: High priority of corrective action, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 182.54m (598.88ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: November 2020, Critical Feature Inspection Date: November 2020, Underwater Inspection Date: October 2018, Bridge Improvement Cost: $487,836,000, Roadway Improvement Cost: $285,676,000, Total Project Cost: $773,512,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Other, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 2240019, Location: BROOKLYN BR OVER EAST RVR (Lat: 40.708097, Lng: -73.999506), Route carried "on" structure: City street , Year Built: 1883, Year Reconstructed: 2016, Status: Posted for load, Structure Length: 182.54m (598.88ft), Average Daily Traffic: 97,037 (year 2019), Average Future Daily Traffic: 119,646 (year 2040), Features Intersected: I278 BKN-QNS EXP WB, FDR, Facility Carried by Structure: BROOKLYN BRIDGE
Minimum Vertical Clearance: 3.66m (12.01ft), Kilometerpoint: 0.000, Lanes on structure: 6, Lanes under structure: 45, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 21.3m (69.9ft), Skew: 21 degrees, Navigation Control: Yes ( Vertical Clearance: 999.9m (3,280.5ft), Horizontal Clearance: 304.8m (1,000.0ft)), Material/Design: Steel, Design/Construction: Suspension, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 72, Length of Maximum Span: 486.4m (1,595.8ft), Curb or Sidewalk Widths: Left: 4.8m (15.7ft), Right: 0.0m, Curb-To-Curb Width: 18.3m (60.0ft), Out-to-Out Width: 26.2m (86.0ft)
Condition: Deck: Very good, Superstructure: Poor, Substructure: Poor, Channel: Excellent, Operating Rating: 2.7 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 2.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: High priority of corrective action, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: Equal to present desirable criteria, Approach Roadway Alignment: High priority of corrective action, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 182.54m (598.88ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: November 2020, Critical Feature Inspection Date: November 2020, Underwater Inspection Date: October 2018, Bridge Improvement Cost: $487,836,000, Roadway Improvement Cost: $285,676,000, Total Project Cost: $773,512,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Other, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 224001A, Location: BROOKLYN BR OVER EAST RVR (Lat: 40.711758, Lng: -74.004433), Route carried "on" structure: City street , Year Built: 1956, Year Reconstructed: 2013, Status: Posted for load, Structure Length: 9.69m (31.79ft), Average Daily Traffic: 10,845 (year 1999), Truck Traffic: 5%, Average Future Daily Traffic: 15,183 (year 2019), Design Load: H 20, Features Intersected: WILLIAM ST - N B, Facility Carried by Structure: PARK ROW TO BKLN
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.4m (24.3ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 1, Length of Maximum Span: 35.7m (117.1ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.9m (29.2ft)
Condition: Deck: Very good, Superstructure: Fair, Substructure: Fair, Operating Rating: 2.7 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 2.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: High priority of corrective action, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 9.69m (31.79ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: June 2021, Critical Feature Inspection Date: June 2021, Bridge Improvement Cost: $4,264,000, Roadway Improvement Cost: $2,497,000, Total Project Cost: $6,761,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 224001A, Location: BROOKLYN BR OVER EAST RVR (Lat: 40.711758, Lng: -74.004433), Route carried "on" structure: City street , Year Built: 1956, Year Reconstructed: 2013, Status: Posted for load, Structure Length: 9.69m (31.79ft), Average Daily Traffic: 10,845 (year 1999), Truck Traffic: 5%, Average Future Daily Traffic: 15,183 (year 2019), Design Load: H 20, Features Intersected: WILLIAM ST - N B, Facility Carried by Structure: PARK ROW TO BKLN
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 0.000, Lanes on structure: 1, Lanes under structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.4m (24.3ft), Skew: 3 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 1, Length of Maximum Span: 35.7m (117.1ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.9m (29.2ft)
Condition: Deck: Very good, Superstructure: Fair, Substructure: Fair, Operating Rating: 2.7 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 2.7 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: High priority of corrective action, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 9.69m (31.79ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: June 2021, Critical Feature Inspection Date: June 2021, Bridge Improvement Cost: $4,264,000, Roadway Improvement Cost: $2,497,000, Total Project Cost: $6,761,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 224001B, Location: BROOKLYN BR OVER EAST RVR (Lat: 40.711414, Lng: -74.004333), Route carried "on" structure: City street 907L, Year Built: 1964, Year Reconstructed: 2014, Status: Open, Structure Length: 57.76m (189.50ft), Truck Traffic: 1%, Design Load: H 20, Features Intersected: Pearl Street to South St
Minimum Vertical Clearance: 4.31m (14.14ft), Kilometerpoint: 0.692, Lanes on structure: 2, Lanes under structure: 10, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 31, Length of Maximum Span: 28.9m (94.8ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.4m (27.6ft)
Condition: Deck: Very good, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 32.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 19.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 57.75m (189.47ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2020, Critical Feature Inspection Date: August 2020, Bridge Improvement Cost: $20,850,000, Roadway Improvement Cost: $12,210,000, Total Project Cost: $33,060,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 224001B, Location: BROOKLYN BR OVER EAST RVR (Lat: 40.711414, Lng: -74.004333), Route carried "on" structure: City street 907L, Year Built: 1964, Year Reconstructed: 2014, Status: Open, Structure Length: 57.76m (189.50ft), Truck Traffic: 1%, Design Load: H 20, Features Intersected: Pearl Street to South St
Minimum Vertical Clearance: 4.31m (14.14ft), Kilometerpoint: 0.692, Lanes on structure: 2, Lanes under structure: 10, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 4 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 31, Length of Maximum Span: 28.9m (94.8ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.4m (27.6ft)
Condition: Deck: Very good, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 32.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 19.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 57.75m (189.47ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: August 2020, Critical Feature Inspection Date: August 2020, Bridge Improvement Cost: $20,850,000, Roadway Improvement Cost: $12,210,000, Total Project Cost: $33,060,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 224001C, Location: AT BROOKLYN BR.OVER E.RVR (Lat: 40.710311, Lng: -74.002464), Route carried "on" structure: City street , Year Built: 1964, Year Reconstructed: 2013, Status: Posted for load, Structure Length: 9.45m (31.00ft), Truck Traffic: 1%, Design Load: H 20, Features Intersected: TO PARK DEPT YARD, Facility Carried by Structure: PEARL ST TO BKLYN
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 0.080, Lanes on structure: 1, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 4.9m (16.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 6, Length of Maximum Span: 22.5m (73.8ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 4.9m (16.1ft), Out-to-Out Width: 6.3m (20.7ft)
Condition: Deck: Poor, Superstructure: Poor, Substructure: Fair, Operating Rating: 49.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 30.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 9.44m (30.97ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: June 2021, Critical Feature Inspection Date: June 2021, Bridge Improvement Cost: $2,479,000, Roadway Improvement Cost: $1,452,000, Total Project Cost: $3,931,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 224001C, Location: AT BROOKLYN BR.OVER E.RVR (Lat: 40.710311, Lng: -74.002464), Route carried "on" structure: City street , Year Built: 1964, Year Reconstructed: 2013, Status: Posted for load, Structure Length: 9.45m (31.00ft), Truck Traffic: 1%, Design Load: H 20, Features Intersected: TO PARK DEPT YARD, Facility Carried by Structure: PEARL ST TO BKLYN
Minimum Vertical Clearance: 4.80m (15.75ft), Kilometerpoint: 0.080, Lanes on structure: 1, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 4.9m (16.1ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 6, Length of Maximum Span: 22.5m (73.8ft), Curb or Sidewalk Widths: Left: 0.5m (1.6ft), Right: 0.5m (1.6ft), Curb-To-Curb Width: 4.9m (16.1ft), Out-to-Out Width: 6.3m (20.7ft)
Condition: Deck: Poor, Superstructure: Poor, Substructure: Fair, Operating Rating: 49.9 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 30.8 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 9.44m (30.97ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: June 2021, Critical Feature Inspection Date: June 2021, Bridge Improvement Cost: $2,479,000, Roadway Improvement Cost: $1,452,000, Total Project Cost: $3,931,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 224001D, Location: BROOKLYN BR OVER EAST RVR (Lat: 40.708481, Lng: -74.000158), Route carried "on" structure: City street , Year Built: 1955, Year Reconstructed: 1992, Status: Open, Structure Length: 55.75m (182.91ft), Design Load: H 20, Features Intersected: TO BKLN FRM FDR, TO PARK, Facility Carried by Structure: TO FDR DR N BND
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 30, Length of Maximum Span: 23.1m (75.8ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.2m (26.9ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 18.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 10.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of corrective action, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 55.74m (182.87ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2021, Critical Feature Inspection Date: July 2021, Bridge Improvement Cost: $20,095,000, Roadway Improvement Cost: $11,768,000, Total Project Cost: $31,863,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 224001D, Location: BROOKLYN BR OVER EAST RVR (Lat: 40.708481, Lng: -74.000158), Route carried "on" structure: City street , Year Built: 1955, Year Reconstructed: 1992, Status: Open, Structure Length: 55.75m (182.91ft), Design Load: H 20, Features Intersected: TO BKLN FRM FDR, TO PARK, Facility Carried by Structure: TO FDR DR N BND
Minimum Vertical Clearance: 4.52m (14.83ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 6, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 30, Length of Maximum Span: 23.1m (75.8ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.2m (26.9ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 18.1 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 10.9 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of corrective action, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 55.74m (182.87ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: July 2021, Critical Feature Inspection Date: July 2021, Bridge Improvement Cost: $20,095,000, Roadway Improvement Cost: $11,768,000, Total Project Cost: $31,863,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 224001E, Location: BROOKLYN BR OVER EAST RVR (Lat: 40.710831, Lng: -74.002147), Route carried "on" structure: City street , Year Built: 1968, Year Reconstructed: 1992, Status: Open, Structure Length: 6.22m (20.41ft), Design Load: H 20, Features Intersected: LAND ADJ TO BRDG, Facility Carried by Structure: TO PEARL STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.016, Lanes on structure: 1, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 21.3m (69.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.2m (26.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 24.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 14.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of corrective action, Deck Geometry: Equal to present minimum criteria, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 6.21m (20.37ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: April 2020, Critical Feature Inspection Date: April 2020, Bridge Improvement Cost: $2,411,000, Roadway Improvement Cost: $1,412,000, Total Project Cost: $3,823,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Other
Structure Number: 224001E, Location: BROOKLYN BR OVER EAST RVR (Lat: 40.710831, Lng: -74.002147), Route carried "on" structure: City street , Year Built: 1968, Year Reconstructed: 1992, Status: Open, Structure Length: 6.22m (20.41ft), Design Load: H 20, Features Intersected: LAND ADJ TO BRDG, Facility Carried by Structure: TO PEARL STREET
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.016, Lanes on structure: 1, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 21.3m (69.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.2m (26.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 24.5 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 14.5 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of corrective action, Deck Geometry: Equal to present minimum criteria, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 6.21m (20.37ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: April 2020, Critical Feature Inspection Date: April 2020, Bridge Improvement Cost: $2,411,000, Roadway Improvement Cost: $1,412,000, Total Project Cost: $3,823,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Other
Find on map >> Show street view
Structure Number: 224001F, Location: BROOKLYN BR OVER EAST RVR (Lat: 40.709411, Lng: -74.000675), Route carried "on" structure: City street , Year Built: 1955, Year Reconstructed: 1992, Status: Posted for load, Structure Length: 5.88m (19.29ft), Design Load: H 20, Features Intersected: PARKING LOT, Facility Carried by Structure: PEARL ST TO FDR D
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.048, Lanes on structure: 1, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 20.4m (66.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 8.2m (26.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 23.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 13.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of corrective action, Deck Geometry: Somewhat better than minimum adequacy, Approach Roadway Alignment: High priority of corrective action, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 5.88m (19.29ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: June 2021, Critical Feature Inspection Date: June 2021, Bridge Improvement Cost: $2,191,000, Roadway Improvement Cost: $1,283,000, Total Project Cost: $3,474,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Other
Structure Number: 224001F, Location: BROOKLYN BR OVER EAST RVR (Lat: 40.709411, Lng: -74.000675), Route carried "on" structure: City street , Year Built: 1955, Year Reconstructed: 1992, Status: Posted for load, Structure Length: 5.88m (19.29ft), Design Load: H 20, Features Intersected: PARKING LOT, Facility Carried by Structure: PEARL ST TO FDR D
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.048, Lanes on structure: 1, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 3, Length of Maximum Span: 20.4m (66.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 8.2m (26.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 23.6 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 13.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: High priority of corrective action, Deck Geometry: Somewhat better than minimum adequacy, Approach Roadway Alignment: High priority of corrective action, Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below), Length Of Structure Improvement: 5.88m (19.29ft), Designated Inspection Frequency: Every 12 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: June 2021, Critical Feature Inspection Date: June 2021, Bridge Improvement Cost: $2,191,000, Roadway Improvement Cost: $1,283,000, Total Project Cost: $3,474,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Other
Find on map >> Show street view
Structure Number: 224001G, Location: BROOKLYN BR OVER EAST RVR (Lat: 40.711442, Lng: -74.003025), Route carried "on" structure: City street , Year Built: 1970, Year Reconstructed: 1991, Status: Open, Structure Length: 24.66m (80.91ft), Truck Traffic: 5%, Design Load: H 15, Features Intersected: ROSE STREET, Facility Carried by Structure: TO PARK ROW
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.048, Lanes on structure: 1, Lanes under structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 8, Length of Maximum Span: 32.9m (107.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 8.2m (26.9ft)
Condition: Deck: Very good, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 48.8 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 20.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 18.71m (61.38ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: August 2020, Critical Feature Inspection Date: August 2020, Bridge Improvement Cost: $6,604,000, Roadway Improvement Cost: $3,867,000, Total Project Cost: $10,471,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Structure Number: 224001G, Location: BROOKLYN BR OVER EAST RVR (Lat: 40.711442, Lng: -74.003025), Route carried "on" structure: City street , Year Built: 1970, Year Reconstructed: 1991, Status: Open, Structure Length: 24.66m (80.91ft), Truck Traffic: 5%, Design Load: H 15, Features Intersected: ROSE STREET, Facility Carried by Structure: TO PARK ROW
Minimum Vertical Clearance: 32.69m (107.25ft), Kilometerpoint: 0.048, Lanes on structure: 1, Lanes under structure: 2, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 6.7m (22.0ft), Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 8, Length of Maximum Span: 32.9m (107.9ft), Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 8.2m (26.9ft)
Condition: Deck: Very good, Superstructure: Fair, Substructure: Satisfactory, Operating Rating: 48.8 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 20.8 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 18.71m (61.38ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: August 2020, Critical Feature Inspection Date: August 2020, Bridge Improvement Cost: $6,604,000, Roadway Improvement Cost: $3,867,000, Total Project Cost: $10,471,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Integral Concrete, Deck Protection: Epoxy Coated Reinforcing
Find on map >> Show street view
Structure Number: 2240027, Location: RTE 27 OVER EAST RIVER (Lat: 40.709589, Lng: -73.991942), Route carried "on" structure: City street 27, Year Built: 1909, Year Reconstructed: 1992, Status: Open, Structure Length: 177.24m (581.50ft), Truck Traffic: 7%, Features Intersected: 278IX WB, CHERRY ST, DIV
Minimum Vertical Clearance: 4.26m (13.98ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 37, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 10.7m (35.1ft), Navigation Control: Yes ( Vertical Clearance: 41.1m (134.8ft), Horizontal Clearance: 374.9m (1,230.0ft)), Material/Design: Steel, Design/Construction: Suspension, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 20, Length of Maximum Span: 448.0m (1,469.8ft), Curb or Sidewalk Widths: Left: 3.7m (12.1ft), Right: 3.7m (12.1ft), Curb-To-Curb Width: 10.7m (35.1ft), Out-to-Out Width: 32.3m (106.0ft)
Condition: Deck: Good, Superstructure: Fair, Substructure: Good, Channel: Very good, Operating Rating: 45.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: High priority of replacement, Length Of Structure Improvement: 177.24m (581.50ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 12 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: November 2020, Critical Feature Inspection Date: November 2020, Underwater Inspection Date: July 2018, Bridge Improvement Cost: $500,000,000, Roadway Improvement Cost: $292,800,000, Total Project Cost: $792,800,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Other
Structure Number: 2240027, Location: RTE 27 OVER EAST RIVER (Lat: 40.709589, Lng: -73.991942), Route carried "on" structure: City street 27, Year Built: 1909, Year Reconstructed: 1992, Status: Open, Structure Length: 177.24m (581.50ft), Truck Traffic: 7%, Features Intersected: 278IX WB, CHERRY ST, DIV
Minimum Vertical Clearance: 4.26m (13.98ft), Kilometerpoint: 0.000, Lanes on structure: 3, Lanes under structure: 37, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 10.7m (35.1ft), Navigation Control: Yes ( Vertical Clearance: 41.1m (134.8ft), Horizontal Clearance: 374.9m (1,230.0ft)), Material/Design: Steel, Design/Construction: Suspension, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 20, Length of Maximum Span: 448.0m (1,469.8ft), Curb or Sidewalk Widths: Left: 3.7m (12.1ft), Right: 3.7m (12.1ft), Curb-To-Curb Width: 10.7m (35.1ft), Out-to-Out Width: 32.3m (106.0ft)
Condition: Deck: Good, Superstructure: Fair, Substructure: Good, Channel: Very good, Operating Rating: 45.4 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 33.6 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: High priority of replacement, Length Of Structure Improvement: 177.24m (581.50ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 12 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: November 2020, Critical Feature Inspection Date: November 2020, Underwater Inspection Date: July 2018, Bridge Improvement Cost: $500,000,000, Roadway Improvement Cost: $292,800,000, Total Project Cost: $792,800,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Bituminous, Membrane: Other
Find on map >> Show street view
Structure Number: 2240028, Location: RTE 27 OVER EAST RIVER (Lat: 40.709678, Lng: -73.992133), Route carried "on" structure: State highway 27, Year Built: 1909, Year Reconstructed: 2004, Status: Open, Structure Length: 186.51m (611.91ft), Average Daily Traffic: 38,733 (year 2019), Truck Traffic: 8%, Average Future Daily Traffic: 38,915 (year 2040), Features Intersected: 278IX WB, CHERRY ST, DIV
Minimum Vertical Clearance: 4.99m (16.37ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 37, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 14.0m (45.9ft), Skew: 10 degrees, Navigation Control: Yes ( Vertical Clearance: 41.1m (134.8ft), Horizontal Clearance: 374.9m (1,230.0ft)), Material/Design: Steel, Design/Construction: Suspension, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 40, Length of Maximum Span: 448.0m (1,469.8ft), Curb-To-Curb Width: 14.0m (45.9ft), Out-to-Out Width: 29.3m (96.1ft)
Condition: Deck: Good, Superstructure: Fair, Substructure: Fair, Operating Rating: 41.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: High priority of replacement, Length Of Structure Improvement: 186.50m (611.88ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: November 2020, Critical Feature Inspection Date: November 2020, Bridge Improvement Cost: $500,000,000, Roadway Improvement Cost: $292,800,000, Total Project Cost: $792,800,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 2240028, Location: RTE 27 OVER EAST RIVER (Lat: 40.709678, Lng: -73.992133), Route carried "on" structure: State highway 27, Year Built: 1909, Year Reconstructed: 2004, Status: Open, Structure Length: 186.51m (611.91ft), Average Daily Traffic: 38,733 (year 2019), Truck Traffic: 8%, Average Future Daily Traffic: 38,915 (year 2040), Features Intersected: 278IX WB, CHERRY ST, DIV
Minimum Vertical Clearance: 4.99m (16.37ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 37, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 14.0m (45.9ft), Skew: 10 degrees, Navigation Control: Yes ( Vertical Clearance: 41.1m (134.8ft), Horizontal Clearance: 374.9m (1,230.0ft)), Material/Design: Steel, Design/Construction: Suspension, Number Of Spans In Main Unit: 3, Number Of Approach Spans: 40, Length of Maximum Span: 448.0m (1,469.8ft), Curb-To-Curb Width: 14.0m (45.9ft), Out-to-Out Width: 29.3m (96.1ft)
Condition: Deck: Good, Superstructure: Fair, Substructure: Fair, Operating Rating: 41.7 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 29.0 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: High priority of replacement, Length Of Structure Improvement: 186.50m (611.88ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: November 2020, Critical Feature Inspection Date: November 2020, Bridge Improvement Cost: $500,000,000, Roadway Improvement Cost: $292,800,000, Total Project Cost: $792,800,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >> Show street view
Structure Number: 2240039, Location: WILLIAMSBURG BR EAST RVR (Lat: 40.714783, Lng: -73.976556), Route carried "on" structure: City street , Year Built: 1903, Year Reconstructed: 2002, Status: Open, Structure Length: 203.30m (666.99ft), Average Daily Traffic: 71,310 (year 2019), Truck Traffic: 6%, Average Future Daily Traffic: 87,925 (year 2040), Features Intersected: FDR DRIVE SB, BARUCH DRI, Facility Carried by Structure: Williamsburg Bridg
Minimum Vertical Clearance: 4.27m (14.01ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 25, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 29.9m (98.1ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 41.1m (134.8ft), Horizontal Clearance: 396.2m (1,299.9ft)), Material/Design: Steel, Design/Construction: Suspension, Number Of Spans In Main Unit: 9, Number Of Approach Spans: 44, Length of Maximum Span: 487.6m (1,599.7ft), Curb or Sidewalk Widths: Left: 3.7m (12.1ft), Right: 3.7m (12.1ft), Curb-To-Curb Width: 23.3m (76.4ft), Out-to-Out Width: 35.7m (117.1ft)
Condition: Deck: Good, Superstructure: Fair, Substructure: Satisfactory, Channel: Very good, Operating Rating: 51.6 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 203.30m (666.99ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 12 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Underwater Inspection Date: October 2020, Bridge Improvement Cost: $500,000,000, Roadway Improvement Cost: $292,800,000, Total Project Cost: $792,800,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 2240039, Location: WILLIAMSBURG BR EAST RVR (Lat: 40.714783, Lng: -73.976556), Route carried "on" structure: City street , Year Built: 1903, Year Reconstructed: 2002, Status: Open, Structure Length: 203.30m (666.99ft), Average Daily Traffic: 71,310 (year 2019), Truck Traffic: 6%, Average Future Daily Traffic: 87,925 (year 2040), Features Intersected: FDR DRIVE SB, BARUCH DRI, Facility Carried by Structure: Williamsburg Bridg
Minimum Vertical Clearance: 4.27m (14.01ft), Kilometerpoint: 0.000, Lanes on structure: 8, Lanes under structure: 25, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 29.9m (98.1ft), Skew: 20 degrees, Navigation Control: Yes ( Vertical Clearance: 41.1m (134.8ft), Horizontal Clearance: 396.2m (1,299.9ft)), Material/Design: Steel, Design/Construction: Suspension, Number Of Spans In Main Unit: 9, Number Of Approach Spans: 44, Length of Maximum Span: 487.6m (1,599.7ft), Curb or Sidewalk Widths: Left: 3.7m (12.1ft), Right: 3.7m (12.1ft), Curb-To-Curb Width: 23.3m (76.4ft), Out-to-Out Width: 35.7m (117.1ft)
Condition: Deck: Good, Superstructure: Fair, Substructure: Satisfactory, Channel: Very good, Operating Rating: 51.6 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Waterway Adequacy: Equal to present minimum criteria, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 203.30m (666.99ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 12 months, Underwater Inspection Frequency: Every 60 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Underwater Inspection Date: October 2020, Bridge Improvement Cost: $500,000,000, Roadway Improvement Cost: $292,800,000, Total Project Cost: $792,800,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 2240047, Location: QUEENSBORO BR OVR EAST RV (Lat: 40.759072, Lng: -73.959400), Route carried "on" structure: State highway 25, Year Built: 1909, Year Reconstructed: 1985, Status: Open, Structure Length: 205.74m (675.00ft), Average Daily Traffic: 96,345 (year 2017), Truck Traffic: 7%, Average Future Daily Traffic: 96,797 (year 2040), Features Intersected: 21ST STREET, 22ND STREET
Minimum Vertical Clearance: 4.49m (14.73ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 29, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 27.7m (90.9ft), Skew: 22 degrees, Navigation Control: Yes ( Vertical Clearance: 41.1m (134.8ft), Horizontal Clearance: 241.7m (793.0ft)), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 7, Number Of Approach Spans: 46, Length of Maximum Span: 192.0m (629.9ft), Curb-To-Curb Width: 27.7m (90.9ft), Out-to-Out Width: 28.3m (92.8ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Channel: Good, Operating Rating: 53.7 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 205.74m (675.00ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Bridge Improvement Cost: $416,763,000, Roadway Improvement Cost: $244,057,000, Total Project Cost: $660,820,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 2240047, Location: QUEENSBORO BR OVR EAST RV (Lat: 40.759072, Lng: -73.959400), Route carried "on" structure: State highway 25, Year Built: 1909, Year Reconstructed: 1985, Status: Open, Structure Length: 205.74m (675.00ft), Average Daily Traffic: 96,345 (year 2017), Truck Traffic: 7%, Average Future Daily Traffic: 96,797 (year 2040), Features Intersected: 21ST STREET, 22ND STREET
Minimum Vertical Clearance: 4.49m (14.73ft), Kilometerpoint: 0.000, Lanes on structure: 5, Lanes under structure: 29, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 27.7m (90.9ft), Skew: 22 degrees, Navigation Control: Yes ( Vertical Clearance: 41.1m (134.8ft), Horizontal Clearance: 241.7m (793.0ft)), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 7, Number Of Approach Spans: 46, Length of Maximum Span: 192.0m (629.9ft), Curb-To-Curb Width: 27.7m (90.9ft), Out-to-Out Width: 28.3m (92.8ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Channel: Good, Operating Rating: 53.7 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Waterway Adequacy: Somewhat better than minimum adequacy, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 205.74m (675.00ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 12 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Bridge Improvement Cost: $416,763,000, Roadway Improvement Cost: $244,057,000, Total Project Cost: $660,820,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 2240048, Location: QUEENSBORO BR OVER EAST R (Lat: 40.756267, Lng: -73.953358), Route carried "on" structure: State highway 25, Year Built: 1909, Year Reconstructed: 1989, Status: Open, Structure Length: 163.71m (537.11ft), Average Daily Traffic: 76,704 (year 2010), Truck Traffic: 7%, Average Future Daily Traffic: 77,064 (year 2040), Features Intersected: EAST MAIN STREET, FDR DR
Minimum Vertical Clearance: 5.25m (17.22ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 20, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 13.7m (44.9ft), Skew: 22 degrees, Navigation Control: Yes ( Vertical Clearance: 41.1m (134.8ft), Horizontal Clearance: 241.7m (793.0ft)), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 7, Number Of Approach Spans: 30, Length of Maximum Span: 192.0m (629.9ft), Curb-To-Curb Width: 15.5m (50.9ft), Out-to-Out Width: 18.3m (60.0ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 51.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 163.70m (537.07ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Bridge Improvement Cost: $219,437,000, Roadway Improvement Cost: $128,502,000, Total Project Cost: $347,939,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 2240048, Location: QUEENSBORO BR OVER EAST R (Lat: 40.756267, Lng: -73.953358), Route carried "on" structure: State highway 25, Year Built: 1909, Year Reconstructed: 1989, Status: Open, Structure Length: 163.71m (537.11ft), Average Daily Traffic: 76,704 (year 2010), Truck Traffic: 7%, Average Future Daily Traffic: 77,064 (year 2040), Features Intersected: EAST MAIN STREET, FDR DR
Minimum Vertical Clearance: 5.25m (17.22ft), Kilometerpoint: 0.000, Lanes on structure: 4, Lanes under structure: 20, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 13.7m (44.9ft), Skew: 22 degrees, Navigation Control: Yes ( Vertical Clearance: 41.1m (134.8ft), Horizontal Clearance: 241.7m (793.0ft)), Material/Design: Steel, Design/Construction: Truss - Thru, Number Of Spans In Main Unit: 7, Number Of Approach Spans: 30, Length of Maximum Span: 192.0m (629.9ft), Curb-To-Curb Width: 15.5m (50.9ft), Out-to-Out Width: 18.3m (60.0ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Good, Operating Rating: 51.4 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 24.5 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Equal to present minimum criteria, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Waterway Adequacy: Superior to present desirable criteria, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 163.70m (537.07ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Bridge Improvement Cost: $219,437,000, Roadway Improvement Cost: $128,502,000, Total Project Cost: $347,939,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 224004A, Location: QUEENSBORO BR OVR EAST RV (Lat: 40.759994, Lng: -73.961692), Route carried "on" structure: Ramp State highway 25, Year Built: 1909, Year Reconstructed: 1995, Status: Open, Structure Length: 15.06m (49.41ft), Average Daily Traffic: 76,704 (year 2010), Truck Traffic: 7%, Average Future Daily Traffic: 77,064 (year 2040), Features Intersected: FIRST AVENUE
Minimum Vertical Clearance: 4.90m (16.08ft), Kilometerpoint: 0.161, Lanes on structure: 1, Lanes under structure: 7, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Steel, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 12, Length of Maximum Span: 44.1m (144.7ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 2.5m (8.2ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 9.1m (29.9ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 79.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 47.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 15.05m (49.38ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: March 2020, Critical Feature Inspection Date: March 2020, Bridge Improvement Cost: $14,086,000, Roadway Improvement Cost: $8,249,000, Total Project Cost: $22,334,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 224004A, Location: QUEENSBORO BR OVR EAST RV (Lat: 40.759994, Lng: -73.961692), Route carried "on" structure: Ramp State highway 25, Year Built: 1909, Year Reconstructed: 1995, Status: Open, Structure Length: 15.06m (49.41ft), Average Daily Traffic: 76,704 (year 2010), Truck Traffic: 7%, Average Future Daily Traffic: 77,064 (year 2040), Features Intersected: FIRST AVENUE
Minimum Vertical Clearance: 4.90m (16.08ft), Kilometerpoint: 0.161, Lanes on structure: 1, Lanes under structure: 7, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Steel, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 12, Length of Maximum Span: 44.1m (144.7ft), Curb or Sidewalk Widths: Left: 0.0m, Right: 2.5m (8.2ft), Curb-To-Curb Width: 6.4m (21.0ft), Out-to-Out Width: 9.1m (29.9ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 79.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 47.2 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Somewhat better than minimum adequacy, Underclear: Equal to present minimum criteria, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 15.05m (49.38ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: March 2020, Critical Feature Inspection Date: March 2020, Bridge Improvement Cost: $14,086,000, Roadway Improvement Cost: $8,249,000, Total Project Cost: $22,334,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 224004B, Location: QUEENSBORO BR OVR EAST RV (Lat: 40.759925, Lng: -73.961742), Route carried "on" structure: Ramp State highway 25, Year Built: 1909, Year Reconstructed: 1995, Status: Open, Structure Length: 15.06m (49.41ft), Average Daily Traffic: 76,704 (year 2010), Truck Traffic: 7%, Average Future Daily Traffic: 77,064 (year 2040), Features Intersected: FIRST AVENUE
Minimum Vertical Clearance: 4.88m (16.01ft), Kilometerpoint: 0.161, Lanes on structure: 1, Lanes under structure: 5, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Steel, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 12, Length of Maximum Span: 44.1m (144.7ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 0.0m, Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 9.1m (29.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 79.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 48.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 15.05m (49.38ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: March 2020, Critical Feature Inspection Date: March 2020, Bridge Improvement Cost: $14,086,000, Roadway Improvement Cost: $8,249,000, Total Project Cost: $22,334,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 224004B, Location: QUEENSBORO BR OVR EAST RV (Lat: 40.759925, Lng: -73.961742), Route carried "on" structure: Ramp State highway 25, Year Built: 1909, Year Reconstructed: 1995, Status: Open, Structure Length: 15.06m (49.41ft), Average Daily Traffic: 76,704 (year 2010), Truck Traffic: 7%, Average Future Daily Traffic: 77,064 (year 2040), Features Intersected: FIRST AVENUE
Minimum Vertical Clearance: 4.88m (16.01ft), Kilometerpoint: 0.161, Lanes on structure: 1, Lanes under structure: 5, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 6.1m (20.0ft), Material/Design: Steel, Design/Construction: Arch - Deck, Number Of Spans In Main Unit: 1, Number Of Approach Spans: 12, Length of Maximum Span: 44.1m (144.7ft), Curb or Sidewalk Widths: Left: 0.9m (3.0ft), Right: 0.0m, Curb-To-Curb Width: 6.7m (22.0ft), Out-to-Out Width: 9.1m (29.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Good, Operating Rating: 79.8 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 48.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Better than present minimum criteria, Deck Geometry: Equal to present minimum criteria, Underclear: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 15.05m (49.38ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: March 2020, Critical Feature Inspection Date: March 2020, Bridge Improvement Cost: $14,086,000, Roadway Improvement Cost: $8,249,000, Total Project Cost: $22,334,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 224004C, Location: QUEENSBORO BR OVR EAST RV (Lat: 40.760733, Lng: -73.962669), Route carried "on" structure: Ramp State highway 25, Year Built: 1952, Year Reconstructed: 1990, Status: Open, Structure Length: 16.18m (53.08ft), Average Daily Traffic: 24,340 (year 2019), Average Future Daily Traffic: 24,454 (year 2040), Features Intersected: EAST 60TH STREET, 60&61S
Minimum Vertical Clearance: 4.87m (15.98ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 9, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 9.8m (32.2ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 9, Number Of Approach Spans: 1, Length of Maximum Span: 22.9m (75.1ft), Curb-To-Curb Width: 9.8m (32.2ft), Out-to-Out Width: 10.8m (35.4ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 54.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 23.9 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 16.18m (53.08ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: April 2020, Critical Feature Inspection Date: April 2020, Bridge Improvement Cost: $7,716,000, Roadway Improvement Cost: $4,518,000, Total Project Cost: $12,234,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Other
Structure Number: 224004C, Location: QUEENSBORO BR OVR EAST RV (Lat: 40.760733, Lng: -73.962669), Route carried "on" structure: Ramp State highway 25, Year Built: 1952, Year Reconstructed: 1990, Status: Open, Structure Length: 16.18m (53.08ft), Average Daily Traffic: 24,340 (year 2019), Average Future Daily Traffic: 24,454 (year 2040), Features Intersected: EAST 60TH STREET, 60&61S
Minimum Vertical Clearance: 4.87m (15.98ft), Kilometerpoint: 0.000, Lanes on structure: 2, Lanes under structure: 9, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 9.8m (32.2ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 9, Number Of Approach Spans: 1, Length of Maximum Span: 22.9m (75.1ft), Curb-To-Curb Width: 9.8m (32.2ft), Out-to-Out Width: 10.8m (35.4ft)
Condition: Deck: Good, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 54.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 23.9 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of corrective action, Underclear: High priority of corrective action, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 16.18m (53.08ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: April 2020, Critical Feature Inspection Date: April 2020, Bridge Improvement Cost: $7,716,000, Roadway Improvement Cost: $4,518,000, Total Project Cost: $12,234,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Other
Find on map >> Show street view
Structure Number: 224004D, Location: QUEENSBORO BR OVR EAST RV (Lat: 40.760272, Lng: -73.963569), Route carried "on" structure: Ramp State highway 25, Year Built: 1929, Year Reconstructed: 1985, Status: Open, Structure Length: 11.83m (38.81ft), Average Daily Traffic: 30,059 (year 2019), Truck Traffic: 2%, Average Future Daily Traffic: 30,200 (year 2040), Design Load: H 15, Features Intersected: EAST 59TH STREET, BRIDGE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.097, Lanes on structure: 2, Lanes under structure: 3, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 9, Number Of Approach Spans: 3, Length of Maximum Span: 15.5m (50.9ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 8.9m (29.2ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 34.8 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 17.2 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 11.82m (38.78ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: April 2020, Critical Feature Inspection Date: April 2020, Bridge Improvement Cost: $4,414,000, Roadway Improvement Cost: $2,585,000, Total Project Cost: $6,999,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Bituminous
Structure Number: 224004D, Location: QUEENSBORO BR OVR EAST RV (Lat: 40.760272, Lng: -73.963569), Route carried "on" structure: Ramp State highway 25, Year Built: 1929, Year Reconstructed: 1985, Status: Open, Structure Length: 11.83m (38.81ft), Average Daily Traffic: 30,059 (year 2019), Truck Traffic: 2%, Average Future Daily Traffic: 30,200 (year 2040), Design Load: H 15, Features Intersected: EAST 59TH STREET, BRIDGE
Minimum Vertical Clearance: 30+ m (98+ ft), Kilometerpoint: 0.097, Lanes on structure: 2, Lanes under structure: 3, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.9m (25.9ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 9, Number Of Approach Spans: 3, Length of Maximum Span: 15.5m (50.9ft), Curb-To-Curb Width: 7.9m (25.9ft), Out-to-Out Width: 8.9m (29.2ft)
Condition: Deck: Fair, Superstructure: Satisfactory, Substructure: Satisfactory, Operating Rating: 34.8 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 17.2 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Meets minimum limits, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: Equal to present desirable criteria, Length Of Structure Improvement: 11.82m (38.78ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: April 2020, Critical Feature Inspection Date: April 2020, Bridge Improvement Cost: $4,414,000, Roadway Improvement Cost: $2,585,000, Total Project Cost: $6,999,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >> Show street view
Structure Number: 224004E, Location: QUEENSBORO BR OVR EAST RV (Lat: 40.752508, Lng: -73.944361), Route carried "on" structure: Ramp State highway 25, Year Built: 1957, Year Reconstructed: 1990, Status: Open, Structure Length: 110.43m (362.30ft), Average Daily Traffic: 96,345 (year 2019), Truck Traffic: 7%, Average Future Daily Traffic: 96,797 (year 2040), Design Load: H 15, Features Intersected: JACKSON AVENUE, AMTRAK-L
Minimum Vertical Clearance: 4.27m (14.01ft), Kilometerpoint: 0.563, Lanes on structure: 2, Lanes under structure: 12, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 2 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 94, Length of Maximum Span: 31.6m (103.7ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.8m (28.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 41.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 20.4 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 110.42m (362.27ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: December 2020, Critical Feature Inspection Date: December 2020, Bridge Improvement Cost: $40,792,000, Roadway Improvement Cost: $23,888,000, Total Project Cost: $64,680,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Structure Number: 224004E, Location: QUEENSBORO BR OVR EAST RV (Lat: 40.752508, Lng: -73.944361), Route carried "on" structure: Ramp State highway 25, Year Built: 1957, Year Reconstructed: 1990, Status: Open, Structure Length: 110.43m (362.30ft), Average Daily Traffic: 96,345 (year 2019), Truck Traffic: 7%, Average Future Daily Traffic: 96,797 (year 2040), Design Load: H 15, Features Intersected: JACKSON AVENUE, AMTRAK-L
Minimum Vertical Clearance: 4.27m (14.01ft), Kilometerpoint: 0.563, Lanes on structure: 2, Lanes under structure: 12, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 2 degrees, Material/Design: Steel continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 94, Length of Maximum Span: 31.6m (103.7ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.8m (28.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 41.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 20.4 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 110.42m (362.27ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: December 2020, Critical Feature Inspection Date: December 2020, Bridge Improvement Cost: $40,792,000, Roadway Improvement Cost: $23,888,000, Total Project Cost: $64,680,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >> Show street view
Structure Number: 224004F, Location: QUEENSBORO BR OVR EAST RV (Lat: 40.752386, Lng: -73.943969), Route carried "on" structure: Ramp State highway 25, Year Built: 1957, Year Reconstructed: 1990, Status: Open, Structure Length: 66.60m (218.50ft), Design Load: H 15, Features Intersected: 21ST STREET, 13TH STREET
Minimum Vertical Clearance: 3.88m (12.73ft), Kilometerpoint: 0.290, Lanes on structure: 2, Lanes under structure: 6, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 63, Length of Maximum Span: 30.4m (99.7ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.8m (28.9ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 40.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 20.0 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 66.59m (218.47ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: December 2020, Critical Feature Inspection Date: December 2020, Bridge Improvement Cost: $24,759,000, Roadway Improvement Cost: $14,499,000, Total Project Cost: $39,258,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Structure Number: 224004F, Location: QUEENSBORO BR OVR EAST RV (Lat: 40.752386, Lng: -73.943969), Route carried "on" structure: Ramp State highway 25, Year Built: 1957, Year Reconstructed: 1990, Status: Open, Structure Length: 66.60m (218.50ft), Design Load: H 15, Features Intersected: 21ST STREET, 13TH STREET
Minimum Vertical Clearance: 3.88m (12.73ft), Kilometerpoint: 0.290, Lanes on structure: 2, Lanes under structure: 6, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 63, Length of Maximum Span: 30.4m (99.7ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.8m (28.9ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 40.3 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 20.0 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 66.59m (218.47ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: December 2020, Critical Feature Inspection Date: December 2020, Bridge Improvement Cost: $24,759,000, Roadway Improvement Cost: $14,499,000, Total Project Cost: $39,258,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >> Show street view
Structure Number: 224004G, Location: QUEENSBORO BR OVR EAST RV (Lat: 40.756408, Lng: -73.953214), Route carried "on" structure: Ramp State highway 25, Year Built: 1957, Status: Open, Structure Length: 8.84m (29.00ft), Average Daily Traffic: 76,704 (year 2010), Truck Traffic: 7%, Average Future Daily Traffic: 77,064 (year 2040), Design Load: H 15, Features Intersected: Queensboro Bridge
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.531, Lanes on structure: 1, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 36, Length of Maximum Span: 2.4m (7.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.8m (28.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 47.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 28.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 8.83m (28.97ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $3,828,000, Roadway Improvement Cost: $2,242,000, Total Project Cost: $6,070,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 224004G, Location: QUEENSBORO BR OVR EAST RV (Lat: 40.756408, Lng: -73.953214), Route carried "on" structure: Ramp State highway 25, Year Built: 1957, Status: Open, Structure Length: 8.84m (29.00ft), Average Daily Traffic: 76,704 (year 2010), Truck Traffic: 7%, Average Future Daily Traffic: 77,064 (year 2040), Design Load: H 15, Features Intersected: Queensboro Bridge
Minimum Vertical Clearance: 5.18m (16.99ft), Kilometerpoint: 0.531, Lanes on structure: 1, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Concrete continuous, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 36, Length of Maximum Span: 2.4m (7.9ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.8m (28.9ft)
Condition: Deck: Good, Superstructure: Good, Substructure: Satisfactory, Operating Rating: 47.2 metric tons, Method Used To Determine Operating Rating: Load Factor (LF), Inventory Rating: 28.1 metric tons, Method Used To Determine Inventory Rating: Load Factor (LF), Structural Evaluation: Equal to present minimum criteria, Deck Geometry: Equal to present minimum criteria, Approach Roadway Alignment: Meets minimum limits, Length Of Structure Improvement: 8.83m (28.97ft), Designated Inspection Frequency: Every 24 months, Inspection Date: August 2020, Bridge Improvement Cost: $3,828,000, Roadway Improvement Cost: $2,242,000, Total Project Cost: $6,070,000 ( Estimate for 2021), Deck Structure Type: Concrete Cast-file-Place, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >> Show street view
Structure Number: 224004H, Location: QUEENSBORO BR OVR EAST RV (Lat: 40.751739, Lng: -73.942989), Route carried "on" structure: Ramp State highway 25, Year Built: 1929, Year Reconstructed: 1980, Status: Open, Structure Length: 52.30m (171.59ft), Average Daily Traffic: 96,345 (year 2017), Truck Traffic: 7%, Average Future Daily Traffic: 96,797 (year 2040), Features Intersected: 25 X, 22ND STREET, QUEEN
Minimum Vertical Clearance: 5.46m (17.91ft), Kilometerpoint: 0.563, Lanes on structure: 2, Lanes under structure: 10, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 43, Length of Maximum Span: 32.0m (105.0ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.5m (27.9ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 42.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 20.5 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 52.30m (171.59ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: November 2020, Critical Feature Inspection Date: November 2020, Bridge Improvement Cost: $19,046,000, Roadway Improvement Cost: $11,153,000, Total Project Cost: $30,199,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Structure Number: 224004H, Location: QUEENSBORO BR OVR EAST RV (Lat: 40.751739, Lng: -73.942989), Route carried "on" structure: Ramp State highway 25, Year Built: 1929, Year Reconstructed: 1980, Status: Open, Structure Length: 52.30m (171.59ft), Average Daily Traffic: 96,345 (year 2017), Truck Traffic: 7%, Average Future Daily Traffic: 96,797 (year 2040), Features Intersected: 25 X, 22ND STREET, QUEEN
Minimum Vertical Clearance: 5.46m (17.91ft), Kilometerpoint: 0.563, Lanes on structure: 2, Lanes under structure: 10, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 43, Length of Maximum Span: 32.0m (105.0ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.5m (27.9ft)
Condition: Deck: Satisfactory, Superstructure: Satisfactory, Substructure: Fair, Operating Rating: 42.5 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 20.5 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 52.30m (171.59ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: November 2020, Critical Feature Inspection Date: November 2020, Bridge Improvement Cost: $19,046,000, Roadway Improvement Cost: $11,153,000, Total Project Cost: $30,199,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >> Show street view
Structure Number: 224004I, Location: QUEENSBORO BR OVR EAST RV (Lat: 40.750539, Lng: -73.943436), Route carried "on" structure: Ramp City street 25, Year Built: 1957, Year Reconstructed: 1983, Status: Open, Structure Length: 62.76m (205.91ft), Average Daily Traffic: 96,345 (year 2019), Truck Traffic: 7%, Average Future Daily Traffic: 96,797 (year 2040), Design Load: H 15, Features Intersected: 24TH STREET, JACKSON AVE
Minimum Vertical Clearance: 3.96m (12.99ft), Kilometerpoint: 0.869, Lanes on structure: 2, Lanes under structure: 13, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 39, Length of Maximum Span: 31.7m (104.0ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.7m (28.5ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 41.8 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 20.4 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 62.75m (205.87ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Bridge Improvement Cost: $22,943,000, Roadway Improvement Cost: $13,435,000, Total Project Cost: $36,378,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Other
Structure Number: 224004I, Location: QUEENSBORO BR OVR EAST RV (Lat: 40.750539, Lng: -73.943436), Route carried "on" structure: Ramp City street 25, Year Built: 1957, Year Reconstructed: 1983, Status: Open, Structure Length: 62.76m (205.91ft), Average Daily Traffic: 96,345 (year 2019), Truck Traffic: 7%, Average Future Daily Traffic: 96,797 (year 2040), Design Load: H 15, Features Intersected: 24TH STREET, JACKSON AVE
Minimum Vertical Clearance: 3.96m (12.99ft), Kilometerpoint: 0.869, Lanes on structure: 2, Lanes under structure: 13, Base Highway Network: Yes, Owner: City or Municipal Highway Agency, Approaching Roadway Width: 7.3m (24.0ft), Skew: 2 degrees, Material/Design: Steel, Design/Construction: Stringer/Multi-beam, Number Of Spans In Main Unit: 39, Length of Maximum Span: 31.7m (104.0ft), Curb-To-Curb Width: 7.3m (24.0ft), Out-to-Out Width: 8.7m (28.5ft)
Condition: Deck: Satisfactory, Superstructure: Good, Substructure: Good, Operating Rating: 41.8 metric tons, Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment, Inventory Rating: 20.4 metric tons, Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment, Structural Evaluation: Somewhat better than minimum adequacy, Deck Geometry: High priority of replacement, Underclear: High priority of corrective action, Approach Roadway Alignment: High priority of corrective action, Length Of Structure Improvement: 62.75m (205.87ft), Designated Inspection Frequency: Every 24 months, Critical Feature Inspection Frequency: Every 24 months, Inspection Date: October 2020, Critical Feature Inspection Date: October 2020, Bridge Improvement Cost: $22,943,000, Roadway Improvement Cost: $13,435,000, Total Project Cost: $36,378,000 ( Estimate for 2021), Deck Structure Type: Closed Grating, Wearing Surface/Protective System: Wearing Surface: Other