  • National Bridge Inventory (NBI) Statistics
  • 67Number of bridges
  • 1,499ft / 457mTotal length
  • $299,466,000Total costs
  • 1,325,085Total average daily traffic
  • 101,490Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Richland
  • No street view available for this location

New bridges in Richland, WA - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 41950-1959
  • 51960-1969
  • 31970-1979
  • 451980-1989
  • 21990-1999
  • 52000-2009
  • 12010-2019
  • 12020-2022
Reconstructed bridges in Richland, WA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 11970-1979
  • 11980-1989
  • 01990-1999
  • 22000-2009
Average Bridge Daily Traffic in Richland, WA
Average Bridge Truck Traffic in Richland, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.5%Very good
  • 68.2%Good
  • 11.4%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.4%Very good
  • 77.3%Good
  • 11.4%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.5%Very good
  • 75.0%Good
  • 4.5%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 90.9%Very good
  • 9.1%Good
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Very good
  • 33.3%Good
Find on map >>   Show street view

Structure Number: 11PECL056,  Location: NR PASCO WA (Lat: 46.358378,  Lng: -119.251164),  Route carried "on" structure: ServiceOther road ,  Year Built: 1958,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 5 (year 2021),  Truck Traffic: 30%,  Average Future Daily Traffic: 5 (year 2041),  Features Intersected: ESQUATZEL DIVERS CHANNEL,  Facility Carried by Structure: CHUTE ACCESS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: Bureau of Reclamation,  Maintenance Responsibility: Local Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 49.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1281A,  Location: 1.2 NW JCT N STEPTOE ST (Lat: 46.244475,  Lng: -119.270056),  Route carried "on" structure: City street 1080,  Year Built: 1929,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 2,000 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,000 (year 2040),  Design Load: H 15,  Features Intersected: COLUMBIA IRR DIST CANAL,  Facility Carried by Structure: COLUMBIA PRK TRAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 41.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 24.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $277,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $554,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: 6279A,  Location: 4.1 E JCT I-182 (Lat: 46.232942,  Lng: -119.223422),  Route carried "on" structure: City street ,  Year Built: 1960,  Year Reconstructed: 1970,  Status: Open,  Structure Length: 7.44m (24.41ft),  Average Daily Traffic: 10,770 (year 2012),  Truck Traffic: 2%,  Design Load: HS 20,  Features Intersected: SR 240,  Facility Carried by Structure: COLUMBIA CNTR BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.44m (24.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $1,708,000,  Roadway Improvement Cost: $342,000,  Total Project Cost: $3,416,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 8686A,  Location: 4.1 E JCT I-182 (Lat: 46.232939,  Lng: -119.223275),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 7.41m (24.31ft),  Average Daily Traffic: 10,770 (year 2012),  Truck Traffic: 2%,  Design Load: HS 20+Mod,  Features Intersected: SR 240,  Facility Carried by Structure: COLUMBIA CTR BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.41m (24.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $1,555,000,  Roadway Improvement Cost: $311,000,  Total Project Cost: $3,110,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 11950A,  Location: 3.6 E JCT I-82 (Lat: 46.258097,  Lng: -119.291961),  Route carried "on" structure: Interstate 182,  Year Built: 1983,  Status: Open,  Structure Length: 25.15m (82.51ft),  Average Daily Traffic: 29,525 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 37,555 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: YAKIMA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.713,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 62.8m (206.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 25.15m (82.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $6,600,000,  Roadway Improvement Cost: $1,320,000,  Total Project Cost: $13,200,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 11950B,  Location: 3.6 E JCT I-82 (Lat: 46.258369,  Lng: -119.292258),  Route carried "on" structure: Interstate 182,  Year Built: 1983,  Status: Open,  Structure Length: 25.15m (82.51ft),  Average Daily Traffic: 29,525 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 37,555 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: YAKIMA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.697,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 62.8m (206.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 25.15m (82.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $6,600,000,  Roadway Improvement Cost: $1,320,000,  Total Project Cost: $13,200,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12042A,  Location: 2.1 E JCT SR 240 (Lat: 46.262806,  Lng: -119.245250),  Route carried "on" structure: Interstate 182,  Year Built: 1984,  Status: Open,  Structure Length: 59.44m (195.01ft),  Average Daily Traffic: 35,696 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 45,405 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: COLUMBIA R, CITY STREETS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.463,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Navigation Control: Yes ( Vertical Clearance: 17.1m (56.1ft), Horizontal Clearance: 121.9m (399.9ft)),  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 2,  Length of Maximum Span: 137.2m (450.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.4m (63.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 59.44m (195.01ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: May 2018,  Underwater Inspection Date: August 2017,  Other Special Inspection Date: July 2020,  Bridge Improvement Cost: $21,060,000,  Roadway Improvement Cost: $4,212,000,  Total Project Cost: $42,120,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12042B,  Location: 2.1 E JCT SR 240 (Lat: 46.262972,  Lng: -119.245639),  Route carried "on" structure: Interstate 182,  Year Built: 1984,  Status: Open,  Structure Length: 59.44m (195.01ft),  Average Daily Traffic: 35,696 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 45,405 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: COLUMBIA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.447,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Navigation Control: Yes ( Vertical Clearance: 17.1m (56.1ft), Horizontal Clearance: 121.9m (399.9ft)),  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Number Of Spans In Main Unit: 5,  Number Of Approach Spans: 2,  Length of Maximum Span: 137.2m (450.1ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 0.0m,  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.4m (63.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 59.44m (195.01ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: May 2018,  Underwater Inspection Date: August 2017,  Other Special Inspection Date: July 2020,  Bridge Improvement Cost: $21,060,000,  Roadway Improvement Cost: $4,212,000,  Total Project Cost: $42,120,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12207A,  Location: 1.0 E JCT SR 240 (Lat: 46.257175,  Lng: -119.261972),  Route carried "on" structure: Ramp Interstate 182,  Year Built: 1983,  Status: Open,  Structure Length: 11.22m (36.81ft),  Average Daily Traffic: 8,925 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 11,352 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 240/GEO WASH WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.756,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 57.3m (188.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.22m (36.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,944,000,  Roadway Improvement Cost: $589,000,  Total Project Cost: $5,888,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12207C,  Location: 0.5 E JCT SR 240 (Lat: 46.258444,  Lng: -119.275083),  Route carried "on" structure: City street ,  Year Built: 1983,  Status: Open,  Structure Length: 9.45m (31.00ft),  Average Daily Traffic: 1,715 (year 2021),  Truck Traffic: 20%,  Average Future Daily Traffic: 1,910 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: I-182,  Facility Carried by Structure: JADWIN AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 45.7m (149.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.45m (31.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,984,000,  Roadway Improvement Cost: $397,000,  Total Project Cost: $3,968,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12207D,  Location: 2.8 E JCT 224 (Lat: 46.259250,  Lng: -119.287111),  Route carried "on" structure: State highway 240,  Year Built: 1983,  Status: Open,  Structure Length: 11.77m (38.62ft),  Average Daily Traffic: 31,455 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 40,010 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: I-182
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.005,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.9m (75.1ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 49.4m (162.1ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 22.9m (75.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.77m (38.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $5,944,000,  Roadway Improvement Cost: $1,189,000,  Total Project Cost: $11,889,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12207E,  Location: 3.9 E JCT I-82 (Lat: 46.259750,  Lng: -119.287389),  Route carried "on" structure: City street 182,  Year Built: 1983,  Status: Open,  Structure Length: 6.04m (19.82ft),  Average Daily Traffic: 14,194 (year 2002),  Truck Traffic: 5%,  Average Future Daily Traffic: 20,950 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: I-182 W-W RAMP,  Facility Carried by Structure: AARON DR OLDSR240
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 3,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.7m (104.0ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 34.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.04m (19.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $2,138,000,  Roadway Improvement Cost: $428,000,  Total Project Cost: $4,277,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12207F,  Location: 4.0 E JCT SR 224 (Lat: 46.258306,  Lng: -119.262500),  Route carried "on" structure: State highway 240,  Year Built: 1983,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 12.56m (41.21ft),  Average Daily Traffic: 28,791 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 36,622 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: I-182
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 58.017,  Lanes on structure: 6,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 55.2m (181.1ft),  Curb-To-Curb Width: 29.4m (96.5ft),  Out-to-Out Width: 31.9m (104.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.56m (41.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $6,098,000,  Roadway Improvement Cost: $1,220,000,  Total Project Cost: $12,195,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12217A,  Location: 2.4 E JCT I-82 (Lat: 46.251133,  Lng: -119.313453),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 10.91m (35.79ft),  Average Daily Traffic: 6,781 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,595 (year 2038),  Design Load: HS 20,  Features Intersected: I-182,  Facility Carried by Structure: KEENE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.167,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 45.7m (149.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.91m (35.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Bridge Improvement Cost: $2,220,000,  Roadway Improvement Cost: $444,000,  Total Project Cost: $4,439,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12217B,  Location: 2.5 E JCT I-82 (Lat: 46.251206,  Lng: -119.312836),  Route carried "on" structure: County highway ,  Year Built: 1982,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 12.77m (41.90ft),  Average Daily Traffic: 9,593 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,744 (year 2038),  Design Load: HL 93,  Features Intersected: I-182,  Facility Carried by Structure: KEENE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.418,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 36.3m (119.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 3.7m (12.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 49.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.77m (41.90ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Critical Feature Inspection Date: November 2020,  Bridge Improvement Cost: $2,346,000,  Roadway Improvement Cost: $469,000,  Total Project Cost: $4,693,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12217C,  Location: 2.9 E JCT I-82 (Lat: 46.254250,  Lng: -119.303639),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 8.96m (29.40ft),  Average Daily Traffic: 16,444 (year 2012),  Truck Traffic: 5%,  Design Load: HS 20,  Features Intersected: I-182,  Facility Carried by Structure: QUEENSGATE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 16.8m (55.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 44.8m (147.0ft),  Curb-To-Curb Width: 16.8m (55.1ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.96m (29.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,352,000,  Roadway Improvement Cost: $670,000,  Total Project Cost: $6,703,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12451A,  Location: 0.8 E JCT I-82 (Lat: 46.245750,  Lng: -119.344972),  Route carried "on" structure: Interstate 182,  Year Built: 1984,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 12,641 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 16,079 (year 2039),  Design Load: HS 20,  Features Intersected: N DALLAS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.352,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 41.5m (136.2ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.15m (13.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,088,000,  Roadway Improvement Cost: $218,000,  Total Project Cost: $2,176,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12451B,  Location: 0.8 E JCT I-82 (Lat: 46.246028,  Lng: -119.344944),  Route carried "on" structure: Interstate 182,  Year Built: 1984,  Status: Open,  Structure Length: 4.36m (14.30ft),  Average Daily Traffic: 12,641 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 16,079 (year 2039),  Design Load: HS 20,  Features Intersected: N DALLAS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.368,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 43.6m (143.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.36m (14.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,144,000,  Roadway Improvement Cost: $229,000,  Total Project Cost: $2,288,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12463A,  Location: 2.0 E JCT I-182 (Lat: 46.217250,  Lng: -119.348056),  Route carried "on" structure: Interstate 82,  Year Built: 1985,  Status: Open,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 5,015 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 6,379 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: DALLAS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 168.209,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 43.0m (141.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.42m (14.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,160,000,  Roadway Improvement Cost: $232,000,  Total Project Cost: $2,320,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12463B,  Location: 2.0 E JCT I-182 (Lat: 46.217472,  Lng: -119.347750),  Route carried "on" structure: Interstate 82,  Year Built: 1985,  Status: Open,  Structure Length: 3.99m (13.09ft),  Average Daily Traffic: 5,015 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 6,379 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: DALLAS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 168.193,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.7m (127.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.99m (13.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,048,000,  Roadway Improvement Cost: $210,000,  Total Project Cost: $2,096,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12463C,  Location: 4.8 E JCT I-182 (Lat: 46.197417,  Lng: -119.302306),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 7.41m (24.31ft),  Average Daily Traffic: 918 (year 2010),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,037 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: I-82,  Facility Carried by Structure: S BERMUDA RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 37.8m (124.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.41m (24.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,652,000,  Roadway Improvement Cost: $330,000,  Total Project Cost: $3,305,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12463D,  Location: 4.3 E JCT I-182 (Lat: 46.201222,  Lng: -119.328611),  Route carried "on" structure: County highway ,  Year Built: 1983,  Status: Open,  Structure Length: 12.50m (41.01ft),  Average Daily Traffic: 816 (year 2010),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,113 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: I-82,  Facility Carried by Structure: REATA RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.50m (41.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,214,000,  Roadway Improvement Cost: $443,000,  Total Project Cost: $4,428,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12463E,  Location: 6.4 E JCT I-182 (Lat: 46.194361,  Lng: -119.268944),  Route carried "on" structure: Interstate 82,  Year Built: 1984,  Status: Open,  Structure Length: 11.73m (38.48ft),  Average Daily Traffic: 6,843 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 8,704 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: BADGER ROAD & BN1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 175.322,  Lanes on structure: 3,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.0m (128.0ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.73m (38.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $3,388,000,  Roadway Improvement Cost: $678,000,  Total Project Cost: $6,776,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12463F,  Location: 6.4 E JCT I-182 (Lat: 46.194639,  Lng: -119.268750),  Route carried "on" structure: Interstate 82,  Year Built: 1984,  Status: Open,  Structure Length: 12.07m (39.60ft),  Average Daily Traffic: 6,843 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 8,704 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: BADGER RD & BNSF RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 175.306,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 17.2m (56.4ft),  Out-to-Out Width: 19.3m (63.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.07m (39.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $5,227,000,  Roadway Improvement Cost: $1,045,000,  Total Project Cost: $10,454,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12558A,  Location: 1.0 E JCT SR 240 (Lat: 46.259083,  Lng: -119.266139),  Route carried "on" structure: Ramp Interstate 182,  Year Built: 1984,  Status: Open,  Structure Length: 13.26m (43.50ft),  Average Daily Traffic: 8,925 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 11,352 (year 2039),  Design Load: HS 20,  Features Intersected: I-182,  Facility Carried by Structure: S-E RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 2,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 52.1m (170.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.26m (43.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,480,000,  Roadway Improvement Cost: $696,000,  Total Project Cost: $6,960,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12558B,  Location: 1.0 E JCT SR 240 (Lat: 46.257256,  Lng: -119.259922),  Route carried "on" structure: Ramp Interstate 182,  Year Built: 1984,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 8,925 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 11,352 (year 2039),  Design Load: HS 20,  Features Intersected: SR 240 W-W RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.917,  Lanes on structure: 2,  Lanes under structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.4m (126.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.84m (12.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,008,000,  Roadway Improvement Cost: $202,000,  Total Project Cost: $2,016,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12558C,  Location: 4.0 E JCT SR 224 (Lat: 46.260167,  Lng: -119.266361),  Route carried "on" structure: Ramp State highway 240,  Year Built: 1984,  Status: Open,  Structure Length: 4.36m (14.30ft),  Average Daily Traffic: 15,569 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 19,803 (year 2039),  Design Load: HS 20,  Features Intersected: I-182 RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.030,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 85.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.36m (14.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $801,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $1,602,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12558D,  Location: 4.0 E JCT SR 224 (Lat: 46.260472,  Lng: -119.264389),  Route carried "on" structure: Ramp Interstate 240,  Year Built: 1984,  Status: Open,  Structure Length: 7.56m (24.80ft),  Average Daily Traffic: 15,569 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 19,803 (year 2039),  Design Load: HS 20,  Features Intersected: GEO. WASHINGTON WAY,  Facility Carried by Structure: I-182 W-W RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.869,  Lanes on structure: 1,  Lanes under structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 51.2m (168.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 67.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.56m (24.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,389,000,  Roadway Improvement Cost: $278,000,  Total Project Cost: $2,778,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 12558E,  Location: 4.0 E JCT SR 224 (Lat: 46.258472,  Lng: -119.260222),  Route carried "on" structure: Ramp Interstate 240,  Year Built: 1984,  Status: Open,  Structure Length: 10.30m (33.79ft),  Average Daily Traffic: 15,569 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 19,803 (year 2039),  Design Load: HS 20,  Features Intersected: I-182
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.451,  Lanes on structure: 1,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.30m (33.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,960,000,  Roadway Improvement Cost: $392,000,  Total Project Cost: $3,921,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 14085C,  Location: 9.4 E JCT I-82 (Lat: 46.293083,  Lng: -119.314917),  Route carried "on" structure: State highway 224,  Year Built: 1993,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 18,060 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 22,972 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.176,  Lanes on structure: 5,  Owner: State Highway Agency,  Approaching Roadway Width: 21.6m (70.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 22.9m (75.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,168,000,  Roadway Improvement Cost: $234,000,  Total Project Cost: $2,336,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16522A,  Location: 4.3 E JCT SR 224 (Lat: 46.254333,  Lng: -119.258083),  Route carried "on" structure: State highway 240,  Year Built: 2005,  Status: Open,  Structure Length: 21.18m (69.49ft),  Average Daily Traffic: 14,396 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 18,311 (year 2039),  Design Load: HL 93,  Features Intersected: YAKIMA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 58.693,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.4m (66.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 1,  Length of Maximum Span: 52.1m (170.9ft),  Curb or Sidewalk Widths: Left: 3.8m (12.5ft),  Right: 0.0m,  Curb-To-Curb Width: 20.4m (66.9ft),  Out-to-Out Width: 22.2m (72.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 21.18m (69.49ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 72 months,  Inspection Date: May 2021,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $9,591,000,  Roadway Improvement Cost: $1,918,000,  Total Project Cost: $19,182,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16522B,  Location: 4.1 E JCT SR 224 (Lat: 46.254333,  Lng: -119.258333),  Route carried "on" structure: State highway 240,  Year Built: 2004,  Status: Open,  Structure Length: 21.18m (69.49ft),  Average Daily Traffic: 14,396 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 18,311 (year 2039),  Design Load: HL 93,  Features Intersected: YAKIMA RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 58.693,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Number Of Approach Spans: 1,  Length of Maximum Span: 52.1m (170.9ft),  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.7m (71.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 21.18m (69.49ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 72 months,  Inspection Date: May 2021,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $9,730,000,  Roadway Improvement Cost: $1,946,000,  Total Project Cost: $19,460,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16895A,  Location: 5.5 E JCT SR 224 (Lat: 46.238639,  Lng: -119.243556),  Route carried "on" structure: State highway 240,  Year Built: 2006,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 50,384 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 64,088 (year 2039),  Design Load: HL 93,  Features Intersected: OLD SR 12/COLUMBIA PK TR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 60.769,  Lanes on structure: 7,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 37.2m (122.0ft),  Skew: 35 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.1m (138.1ft),  Curb-To-Curb Width: 38.0m (124.7ft),  Out-to-Out Width: 40.2m (131.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.48m (14.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $3,646,000,  Roadway Improvement Cost: $729,000,  Total Project Cost: $7,291,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 16895B,  Location: 4.5 E JCT SR 224 (Lat: 46.249389,  Lng: -119.253694),  Route carried "on" structure: State highway 240,  Year Built: 2007,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 79,517 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 101,145 (year 2039),  Features Intersected: WETLAND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 59.385,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 38.4m (126.0ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft)

Condition: Culverts: Very good,  Operating Rating: 96.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 96.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $768,000,  Roadway Improvement Cost: $154,000,  Total Project Cost: $1,536,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 200052,  Location: 7.0 E JCT I-182 (Lat: 46.194944,  Lng: -119.269889),  Route carried "on" structure: Interstate 82,  Year Built: 1983,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 13,686 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 17,408 (year 2039),  Features Intersected: FLASH FLOOD CHANNEL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 175.016,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 31.7m (104.0ft),  Skew: 10 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2018,  Bridge Improvement Cost: $572,000,  Roadway Improvement Cost: $114,000,  Total Project Cost: $1,145,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 79675,  Location: 0.77W SAGEMOOR 908 (Lat: 46.387794,  Lng: -119.241839),  Route carried "on" structure: ServiceCounty highway 9350,  Year Built: 1953,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 430 (year 2019),  Truck Traffic: 28%,  Average Future Daily Traffic: 650 (year 2039),  Design Load: HS 20,  Features Intersected: POTHOLES EAST CANAL,  Facility Carried by Structure: COUNTY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $638,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $1,277,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 80689,  Location: 0.30 W BADGER ROAD (Lat: 46.198350,  Lng: -119.365847),  Route carried "on" structure: County highway 19910,  Year Built: 1981,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 339 (year 2019),  Truck Traffic: 58%,  Average Future Daily Traffic: 400 (year 2038),  Design Load: HS 20,  Features Intersected: KID CANAL,  Facility Carried by Structure: BADGER CANYON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 71.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF) rating reported by rating factor (RF) method using MS18 loading,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous