Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for San Bernardino, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 339Number of bridges
  • 5,141ft / 1,567mTotal length
  • $23,924,000Total costs
  • 11,722,332Total average daily traffic
  • 875,180Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for San Bernardino
  • No street view available for this location

New bridges in San Bernardino, CA - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 111940-1949
  • 311950-1959
  • 931960-1969
  • 341970-1979
  • 341980-1989
  • 281990-1999
  • 272000-2009
  • 792010-2019
Reconstructed bridges in San Bernardino, CA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 31950-1959
  • 41960-1969
  • 11970-1979
  • 51980-1989
  • 41990-1999
  • 102000-2009
  • 112010-2019
Average Bridge Daily Traffic in San Bernardino, CA
Average Bridge Truck Traffic in San Bernardino, CA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 58.2%Good
  • 3.1%Satisfactory
  • 32.5%Fair
  • 6.2%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 74.4%Very good
  • 24.1%Good
  • 1.5%Satisfactory
  • 24.1%Fair
  • 0.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 85.1%Good
  • 1.0%Satisfactory
  • 13.3%Fair
  • 0.5%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 58.8%Excellent
  • 29.4%Very good
  • 9.8%Good
  • 2.0%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 65.4%Good
  • 30.8%Satisfactory
  • 3.8%Poor
Find on map >>   Show street view

Structure Number: 54 0826,  Location: 08-SBD-210-20.19-SBD (Lat: 34.135125,  Lng: -117.344544),  Route carried "under" structure: State highway 210,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 118,000 (year 2017),  Truck Traffic: 7%,  Features Intersected: STATE ROUTE 210,  Facility Carried by Structure: UP RR
Minimum Vertical Clearance: 6.71m (22.01ft),  Kilometerpoint: 20.190,  Lanes under structure: 8,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.7m (77.8ft)

Find on map >>   Show street view

Structure Number: 54 0943L,  Location: 08-SBD-210-20.96-SBD (Lat: 34.135292,  Lng: -117.331297),  Route carried "under" structure: City street ,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 2021),  Truck Traffic: 5%,  Features Intersected: CALIFORNIA STREET,  Facility Carried by Structure: STATE ROUTE 210 WB
Minimum Vertical Clearance: 5.92m (19.42ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 38.5m (126.3ft)

Find on map >>   Show street view

Structure Number: 54 0943R,  Location: 08-SBD-210-20.96-SBD (Lat: 34.134969,  Lng: -117.331289),  Route carried "under" structure: City street ,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 3,000 (year 2021),  Truck Traffic: 5%,  Features Intersected: CALIFORNIA STREET,  Facility Carried by Structure: STATE ROUTE 210 EB
Minimum Vertical Clearance: 7.31m (23.98ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 38.5m (126.3ft)

Find on map >>   Show street view

Structure Number: 54 0944L,  Location: 08-SBD-210-21.10-SBD (Lat: 34.135889,  Lng: -117.329747),  Route carried "under" structure: City street ,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 22,400 (year 2016),  Truck Traffic: 5%,  Features Intersected: HIGHLAND AVENUE,  Facility Carried by Structure: STATE ROUTE 210 WB
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 55.5m (182.1ft)

Find on map >>   Show street view

Structure Number: 54 0944R,  Location: 08-SBD-210-21.10-SBD (Lat: 34.135856,  Lng: -117.329061),  Route carried "under" structure: City street ,  Year Built: 2007,  Structure Length: 0. m,  Average Daily Traffic: 22,400 (year 2016),  Truck Traffic: 5%,  Features Intersected: HIGHLAND AVENUE,  Facility Carried by Structure: STATE ROUTE 210 EB
Minimum Vertical Clearance: 6.68m (21.92ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.6m (149.6ft)

Find on map >>   Show street view

Structure Number: 54 0946G,  Location: 08-SBD-210-R21.72-SBD (Lat: 34.141928,  Lng: -117.321167),  Route carried "under" structure: City street ,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 3,900 (year 2017),  Truck Traffic: 3%,  Features Intersected: CAJON BLVD / BNSF RR,  Facility Carried by Structure: E210-S215 CONNECTR
Minimum Vertical Clearance: 10.57m (34.68ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 49.1m (161.1ft)

Find on map >>   Show street view

Structure Number: 54 0946L,  Location: 08-SBD-210-R21.72-SBD (Lat: 34.142744,  Lng: -117.321875),  Route carried "under" structure: City street ,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 3,900 (year 2017),  Truck Traffic: 3%,  Features Intersected: CAJON BLVD & BNSF RY,  Facility Carried by Structure: STATE ROUTE 210 WB
Minimum Vertical Clearance: 9.19m (30.15ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 54 0946R,  Location: 08-SBD-210-R21.72-SBD (Lat: 34.142483,  Lng: -117.321622),  Route carried "under" structure: City street ,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 3,900 (year 2017),  Truck Traffic: 3%,  Features Intersected: CAJON BLVD & BNSF RY,  Facility Carried by Structure: STATE ROUTE 210 EB
Minimum Vertical Clearance: 8.94m (29.33ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 42.7m (140.1ft)

Find on map >>   Show street view

Structure Number: 54 0947L,  Location: 08-SBD-210-R21.84-SBD (Lat: 34.144308,  Lng: -117.319811),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 1,001 (year 2011),  Truck Traffic: 5%,  Features Intersected: INTERSTATE 215 & RAMPS,  Facility Carried by Structure: STATE ROUTE 210 WB
Minimum Vertical Clearance: 6.65m (21.82ft),  Kilometerpoint: 10.050,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>   Show street view

Structure Number: 54 0947L,  Location: 08-SBD-210-R21.84-SBD (Lat: 34.144308,  Lng: -117.319811),  Route carried "under" structure: Interstate 215,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 69,500 (year 2017),  Truck Traffic: 11%,  Features Intersected: INTERSTATE 215 & RAMPS,  Facility Carried by Structure: STATE ROUTE 210 WB
Minimum Vertical Clearance: 5.84m (19.16ft),  Kilometerpoint: 10.050,  Lanes on structure: 3,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>   Show street view

Structure Number: 54 0947L,  Location: 08-SBD-210-R21.84-SBD (Lat: 34.144308,  Lng: -117.319811),  Route carried "under" structure: Ramp State highway 210,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 1,001 (year 2011),  Truck Traffic: 5%,  Features Intersected: INTERSTATE 215 & RAMPS
Minimum Vertical Clearance: 6.15m (20.18ft),  Kilometerpoint: 21.880,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>   Show street view

Structure Number: 54 0947R,  Location: 08-SBD-210-R21.84-SBD (Lat: 34.143986,  Lng: -117.319617),  Route carried "under" structure: Ramp State highway 210,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 1,001 (year 2011),  Truck Traffic: 5%,  Features Intersected: INTERSTATE 215 & RAMPS
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 21.840,  Lanes on structure: 5,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>   Show street view

Structure Number: 54 0947R,  Location: 08-SBD-210-R21.84-SBD (Lat: 34.143986,  Lng: -117.319617),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 1,001 (year 2013),  Truck Traffic: 2%,  Features Intersected: INTERSTATE 215 & RAMPS,  Facility Carried by Structure: STATE ROUTE 210 EB
Minimum Vertical Clearance: 6.07m (19.91ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>   Show street view

Structure Number: 54 0947R,  Location: 08-SBD-210-R21.84-SBD (Lat: 34.143986,  Lng: -117.319617),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2013),  Truck Traffic: 2%,  Features Intersected: INTERSTATE 215 & RAMPS,  Facility Carried by Structure: STATE ROUTE 210 EB
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>   Show street view

Structure Number: 54 0947R,  Location: 08-SBD-210-R21.84-SBD (Lat: 34.143986,  Lng: -117.319617),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 1,001 (year 2011),  Truck Traffic: 5%,  Features Intersected: INTERSTATE 215 & RAMPS,  Facility Carried by Structure: STATE ROUTE 210 EB
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 10.050,  Lanes on structure: 5,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>   Show street view

Structure Number: 54 0947R,  Location: 08-SBD-210-R21.84-SBD (Lat: 34.143986,  Lng: -117.319617),  Route carried "under" structure: Interstate 215,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 69,500 (year 2017),  Truck Traffic: 11%,  Features Intersected: INTERSTATE 215 & RAMPS,  Facility Carried by Structure: STATE ROUTE 210 EB
Minimum Vertical Clearance: 5.41m (17.75ft),  Kilometerpoint: 10.050,  Lanes on structure: 5,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 39.9m (130.9ft)

Find on map >>   Show street view

Structure Number: 54 0948F,  Location: 08-SBD-210-R21.97-SBD (Lat: 34.145797,  Lng: -117.318036),  Route carried "under" structure: City street ,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 2017),  Truck Traffic: 2%,  Features Intersected: LITTLE MOUNTAIN DRIVE,  Facility Carried by Structure: W210-N215 CONNECTR
Minimum Vertical Clearance: 6.63m (21.75ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 57.3m (188.0ft)

Find on map >>   Show street view

Structure Number: 54 0948L,  Location: 08-SBD-210-R21.97-SBD (Lat: 34.145222,  Lng: -117.317739),  Route carried "under" structure: City street ,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 2017),  Truck Traffic: 2%,  Features Intersected: LITTLE MOUNTAIN DRIVE,  Facility Carried by Structure: STATE ROUTE 210 WB
Minimum Vertical Clearance: 8.03m (26.35ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 54 0948R,  Location: 08-SBD-210-R21.97-SBD (Lat: 34.144925,  Lng: -117.317589),  Route carried "under" structure: City street ,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 2017),  Truck Traffic: 2%,  Features Intersected: LITTLE MOUNTAIN DRIVE,  Facility Carried by Structure: STATE ROUTE 210 EB
Minimum Vertical Clearance: 7.77m (25.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.8m (160.1ft)

Find on map >>   Show street view

Structure Number: 54 0950L,  Location: 08-SBD-210-R22.55-SBD (Lat: 34.146036,  Lng: -117.307922),  Route carried "under" structure: State highway 210,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 106,000 (year 2017),  Truck Traffic: 6%,  Features Intersected: STATE ROUTE 210,  Facility Carried by Structure: MUSCUPIABE DR SB
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 22.550,  Lanes on structure: 1,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: 54 0950R,  Location: 08-SBD-210-R22.55-SBD (Lat: 34.146050,  Lng: -117.307703),  Route carried "under" structure: State highway 210,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 106,000 (year 2017),  Truck Traffic: 6%,  Features Intersected: STATE ROUTE 210,  Facility Carried by Structure: MUSCUPIABE DR NB
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 22.550,  Lanes on structure: 1,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.2m (122.0ft)

Find on map >>   Show street view

Structure Number: 54 0952,  Location: 08-SBD-210-R22.94-SBD (Lat: 34.146000,  Lng: -117.300967),  Route carried "under" structure: State highway 210,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 111,000 (year 2017),  Truck Traffic: 6%,  Features Intersected: STATE ROUTE 210,  Facility Carried by Structure: H STREET
Minimum Vertical Clearance: 5.15m (16.90ft),  Kilometerpoint: 22.940,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: 54 1074L,  Location: 08-SBD-210-R26.76-SBD (Lat: 34.136086,  Lng: -117.236328),  Route carried "under" structure: City street ,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 8,400 (year 2013),  Truck Traffic: 2%,  Features Intersected: HIGHLAND AVE & ARDEN AVE,  Facility Carried by Structure: STATE ROUTE 210 WB
Minimum Vertical Clearance: 4.92m (16.14ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.9m (157.2ft)

Find on map >>   Show street view

Structure Number: 54 1074L,  Location: 08-SBD-210-R26.76-SBD (Lat: 34.136086,  Lng: -117.236328),  Route carried "under" structure: City street ,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 27,000 (year 2012),  Truck Traffic: 2%,  Features Intersected: HIGHLAND AVE & ARDEN AVE,  Facility Carried by Structure: STATE ROUTE 210 WB
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.9m (157.2ft)

Find on map >>   Show street view

Structure Number: 54 1074R,  Location: 08-SBD-210-R26.73-SBD (Lat: 34.136092,  Lng: -117.237131),  Route carried "under" structure: City street ,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 8,400 (year 2013),  Truck Traffic: 2%,  Features Intersected: HIGHLAND AVE & ARDEN AVE,  Facility Carried by Structure: STATE ROUTE 210 EB
Minimum Vertical Clearance: 6.15m (20.18ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.9m (157.2ft)

Find on map >>   Show street view

Structure Number: 54 1074R,  Location: 08-SBD-210-R26.73-SBD (Lat: 34.136092,  Lng: -117.237131),  Route carried "under" structure: City street ,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 27,000 (year 2012),  Truck Traffic: 2%,  Features Intersected: HIGHLAND AVE & ARDEN AVE,  Facility Carried by Structure: STATE ROUTE 210 EB
Minimum Vertical Clearance: 6.10m (20.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.9m (157.2ft)

Find on map >>   Show street view

Structure Number: 54 1077,  Location: 08-SBD-210-R27.90-SBD (Lat: 34.132300,  Lng: -117.217644),  Route carried "under" structure: State highway 210,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 100,000 (year 2019),  Truck Traffic: 7%,  Features Intersected: STATE ROUTE 210,  Facility Carried by Structure: CENTRAL AVENUE
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 27.900,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 33.8m (110.9ft)

Find on map >>   Show street view

Structure Number: 54 1078,  Location: 08-SBD-210-R28.40-SBD (Lat: 34.131892,  Lng: -117.208892),  Route carried "under" structure: State highway 210,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 100,000 (year 2019),  Truck Traffic: 7%,  Features Intersected: STATE ROUTE 210,  Facility Carried by Structure: PALM AVENUE
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 28.400,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: 54 1088,  Location: 08-SBD-210-R28.15-SBD (Lat: 34.132231,  Lng: -117.213211),  Route carried "under" structure: State highway 210,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 100,000 (year 2019),  Truck Traffic: 7%,  Features Intersected: STATE ROUTE 210,  Facility Carried by Structure: ORANGE STREET
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 28.150,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 54 1097F,  Location: 08-SBD-330-R28.78-SBD (Lat: 34.129711,  Lng: -117.203461),  Route carried "under" structure: Ramp State highway 210,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2020),  Truck Traffic: 2%,  Features Intersected: E210-N330 CONNECTOR RAMP
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 28.720,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 54 1098F,  Location: 08-SBD-330-R28.70-SBD (Lat: 34.127953,  Lng: -117.203183),  Route carried "under" structure: State highway 210,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 72,000 (year 2017),  Truck Traffic: 5%,  Features Intersected: SR-210, PACIFIC AV POC
Minimum Vertical Clearance: 6.40m (21.00ft),  Kilometerpoint: 28.760,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 52.4m (171.9ft)

Find on map >>   Show street view

Structure Number: 54 1100G,  Location: 08-SBD-210-R28.66-SBD (Lat: 34.129914,  Lng: -117.205758),  Route carried "under" structure: State highway 210,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 100,000 (year 2019),  Truck Traffic: 7%,  Features Intersected: STATE ROUTE 210
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 28.660,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 52.7m (172.9ft)

Find on map >>   Show street view

Structure Number: 54 1221,  Location: 08-SBD-215-9.71-SBD (Lat: 34.139542,  Lng: -117.317028),  Route carried "under" structure: Interstate 215,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 92,000 (year 2019),  Truck Traffic: 7%,  Features Intersected: INTERSTATE 215,  Facility Carried by Structure: 27TH STREET
Minimum Vertical Clearance: 6.53m (21.42ft),  Kilometerpoint: 9.710,  Lanes on structure: 3,  Lanes under structure: 8,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.3m (119.1ft)

Find on map >>   Show street view

Structure Number: 54 1221,  Location: 08-SBD-215-9.71-SBD (Lat: 34.139542,  Lng: -117.317028),  Route carried "under" structure: Ramp State highway 210,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 1,001 (year 2013),  Truck Traffic: 3%,  Features Intersected: INTERSTATE 215,  Facility Carried by Structure: 27TH STREET
Minimum Vertical Clearance: 8.66m (28.41ft),  Kilometerpoint: 21.800,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.3m (119.1ft)

Find on map >>   Show street view

Structure Number: 54 1221,  Location: 08-SBD-215-9.71-SBD (Lat: 34.139542,  Lng: -117.317028),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 1,001 (year 2013),  Truck Traffic: 2%,  Features Intersected: INTERSTATE 215,  Facility Carried by Structure: 27TH STREET
Minimum Vertical Clearance: 5.77m (18.93ft),  Kilometerpoint: 9.710,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.3m (119.1ft)

Find on map >>   Show street view

Structure Number: 54 1222,  Location: 08-SBD-215-7.70-SBD (Lat: 34.115703,  Lng: -117.303397),  Route carried "under" structure: Interstate 215,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 175,000 (year 2019),  Truck Traffic: 7%,  Features Intersected: INTERSTATE 215 & BNSF RR,  Facility Carried by Structure: 9TH STREET
Minimum Vertical Clearance: 5.89m (19.32ft),  Kilometerpoint: 7.700,  Lanes on structure: 4,  Lanes under structure: 14,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 42.0m (137.8ft)

Find on map >>   Show street view

Structure Number: 54 1223,  Location: 08-SBD-215-8.08-SBD (Lat: 34.121439,  Lng: -117.303275),  Route carried "under" structure: Interstate 215,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 175,000 (year 2019),  Truck Traffic: 6%,  Features Intersected: INTERSTATE 215 / BNSF RR,  Facility Carried by Structure: BASELINE STREET
Minimum Vertical Clearance: 8.12m (26.64ft),  Kilometerpoint: 8.080,  Lanes on structure: 4,  Lanes under structure: 12,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 43.0m (141.1ft)

Find on map >>   Show street view

Structure Number: 54 1227,  Location: 08-SBD-215-6.06-SBD (Lat: 34.091978,  Lng: -117.301597),  Route carried "under" structure: City street R057,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 20,500 (year 2008),  Truck Traffic: 5%,  Features Intersected: MILL STREET,  Facility Carried by Structure: INTERSTATE 215
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 10,  Lanes under structure: 6,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 38.2m (125.3ft)

Find on map >>   Show street view

Structure Number: 54 1228,  Location: 08-SBD-215-5.58-SBD (Lat: 34.084864,  Lng: -117.301147),  Route carried "under" structure: Interstate 215,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 140,000 (year 2013),  Truck Traffic: 10%,  Features Intersected: INTERSTATE 215 & RAMPS,  Facility Carried by Structure: INLAND CENTER DR
Minimum Vertical Clearance: 6.45m (21.16ft),  Kilometerpoint: 5.580,  Lanes on structure: 7,  Lanes under structure: 10,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 37.7m (123.7ft)

Find on map >>   Show street view

Structure Number: 54 1229K,  Location: 08-SBD-215-5.39-SBD (Lat: 34.082589,  Lng: -117.299722),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2010),  Truck Traffic: 2%,  Features Intersected: S215-ORANGE SHOW OFFRAMP
Minimum Vertical Clearance: 6.10m (20.01ft),  Kilometerpoint: 5.370,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 57.2m (187.7ft)

Find on map >>   Show street view

Structure Number: 54 1230S,  Location: 08-SBD-215-5.21-SBD (Lat: 34.079444,  Lng: -117.296539),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 1,500 (year 2012),  Truck Traffic: 2%,  Features Intersected: N215-INLAND CNTR,WARM CR
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 5.210,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 67.7m (222.1ft)

Find on map >>   Show street view

Structure Number: 54 1234G,  Location: 08-SBD-215-10.00-SBD (Lat: 34.142689,  Lng: -117.317517),  Route carried "under" structure: Ramp State highway 210,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 2,000 (year 2012),  Truck Traffic: 5%,  Features Intersected: I215,SR210,CAJON BL,BNSF
Minimum Vertical Clearance: 6.17m (20.24ft),  Kilometerpoint: 21.850,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 55.0m (180.4ft)

Find on map >>   Show street view

Structure Number: 54 1234G,  Location: 08-SBD-215-10.00-SBD (Lat: 34.142689,  Lng: -117.317517),  Route carried "under" structure: City street ,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 2010),  Truck Traffic: 2%,  Features Intersected: I215,SR210,CAJON BL,BNSF,  Facility Carried by Structure: N215-W210 CONNECTR
Minimum Vertical Clearance: 15.39m (50.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 55.0m (180.4ft)

Find on map >>   Show street view

Structure Number: 54 1234G,  Location: 08-SBD-215-10.00-SBD (Lat: 34.142689,  Lng: -117.317517),  Route carried "under" structure: Interstate 215,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 68,000 (year 2008),  Truck Traffic: 5%,  Features Intersected: I215,SR210,CAJON BL,BNSF
Minimum Vertical Clearance: 10.54m (34.58ft),  Kilometerpoint: 10.070,  Lanes on structure: 2,  Lanes under structure: 7,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 55.0m (180.4ft)

Find on map >>   Show street view

Structure Number: 54 1234G,  Location: 08-SBD-215-10.00-SBD (Lat: 34.142689,  Lng: -117.317517),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2012),  Truck Traffic: 5%,  Features Intersected: I215,SR210,CAJON BL,BNSF
Minimum Vertical Clearance: 6.88m (22.57ft),  Kilometerpoint: 10.200,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 55.0m (180.4ft)

Find on map >>   Show street view

Structure Number: 54 1234G,  Location: 08-SBD-215-10.00-SBD (Lat: 34.142689,  Lng: -117.317517),  Route carried "under" structure: State highway 210,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 28,000 (year 2008),  Truck Traffic: 3%,  Features Intersected: I215,SR210,CAJON BL,BNSF
Minimum Vertical Clearance: 6.20m (20.34ft),  Kilometerpoint: 21.840,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 55.0m (180.4ft)

Find on map >>   Show street view

Structure Number: 54 1234G,  Location: 08-SBD-215-10.00-SBD (Lat: 34.142689,  Lng: -117.317517),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 100 (year 2012),  Truck Traffic: 1%,  Features Intersected: I215,SR210,CAJON BL,BNSF
Minimum Vertical Clearance: 9.14m (29.99ft),  Kilometerpoint: 10.030,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 55.0m (180.4ft)

Find on map >>   Show street view

Structure Number: 54 1239F,  Location: 08-SBD-259-L0.11-SBD (Lat: 34.126731,  Lng: -117.302906),  Route carried "under" structure: Interstate 215,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 146,000 (year 2020),  Truck Traffic: 4%,  Features Intersected: INTERSTATE 215
Minimum Vertical Clearance: 6.35m (20.83ft),  Kilometerpoint: 8.600,  Lanes on structure: 2,  Lanes under structure: 9,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 70.7m (232.0ft)

Find on map >>   Show street view

Structure Number: 54 1239F,  Location: 08-SBD-259-L0.11-SBD (Lat: 34.126731,  Lng: -117.302906),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 1,001 (year 2013),  Truck Traffic: 4%,  Features Intersected: INTERSTATE 215
Minimum Vertical Clearance: 6.68m (21.92ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 70.7m (232.0ft)

Find on map >>   Show street view

Structure Number: 54 1240G,  Location: 08-SBD-215-8.57-SBD (Lat: 34.127039,  Lng: -117.302286),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 1,001 (year 2013),  Truck Traffic: 3%,  Features Intersected: NB I-215 ON RAMP
Minimum Vertical Clearance: 5.89m (19.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 58.5m (191.9ft)

Find on map >>   Show street view

Structure Number: 54 1241,  Location: 08-SBD-215-8.58-SBD (Lat: 34.128403,  Lng: -117.303250),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 1,001 (year 2013),  Truck Traffic: 2%,  Features Intersected: I-215,SR259 CONNS,RAMPS,  Facility Carried by Structure: 16TH STREET
Minimum Vertical Clearance: 16.60m (54.46ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.5m (155.8ft)

Find on map >>   Show street view

Structure Number: 54 1241,  Location: 08-SBD-215-8.58-SBD (Lat: 34.128403,  Lng: -117.303250),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 1,001 (year 2013),  Truck Traffic: 3%,  Features Intersected: I-215,SR259 CONNS,RAMPS,  Facility Carried by Structure: 16TH STREET
Minimum Vertical Clearance: 5.97m (19.59ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.5m (155.8ft)

Find on map >>   Show street view

Structure Number: 54 1241,  Location: 08-SBD-215-8.58-SBD (Lat: 34.128403,  Lng: -117.303250),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 1,001 (year 2013),  Truck Traffic: 3%,  Features Intersected: I-215,SR259 CONNS,RAMPS,  Facility Carried by Structure: 16TH STREET
Minimum Vertical Clearance: 14.17m (46.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.5m (155.8ft)

Find on map >>   Show street view

Structure Number: 54 1241,  Location: 08-SBD-215-8.58-SBD (Lat: 34.128403,  Lng: -117.303250),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 1,001 (year 2013),  Truck Traffic: 3%,  Features Intersected: I-215,SR259 CONNS,RAMPS,  Facility Carried by Structure: 16TH STREET
Minimum Vertical Clearance: 5.89m (19.32ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.5m (155.8ft)

Find on map >>   Show street view

Structure Number: 54 1241,  Location: 08-SBD-215-8.58-SBD (Lat: 34.128403,  Lng: -117.303250),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 1,001 (year 2013),  Truck Traffic: 3%,  Features Intersected: I-215,SR259 CONNS,RAMPS,  Facility Carried by Structure: 16TH STREET
Minimum Vertical Clearance: 5.17m (16.96ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.5m (155.8ft)

Find on map >>   Show street view

Structure Number: 54 1241,  Location: 08-SBD-215-8.58-SBD (Lat: 34.128403,  Lng: -117.303250),  Route carried "under" structure: Interstate 215,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 160,000 (year 2019),  Truck Traffic: 7%,  Features Intersected: I-215,SR259 CONNS,RAMPS,  Facility Carried by Structure: 16TH STREET
Minimum Vertical Clearance: 14.63m (48.00ft),  Kilometerpoint: 8.580,  Lanes on structure: 2,  Lanes under structure: 9,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.5m (155.8ft)

Find on map >>   Show street view

Structure Number: 54 1249G,  Location: 08-SBD-210-R21.81-SBD (Lat: 34.141794,  Lng: -117.319022),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2012),  Truck Traffic: 5%,  Features Intersected: S215 OFF TO 27TH STREET
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 9.900,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 53.4m (175.2ft)

Find on map >>   Show street view

Structure Number: 54 125,  Location: 08-SBD-066-22.99-SBD (Lat: 34.108267,  Lng: -117.303886),  Route carried "under" structure: Interstate 215,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 125,000 (year 2017),  Truck Traffic: 10%,  Features Intersected: I-215, BNSF RY,  Facility Carried by Structure: SR 66 (5TH STREET)
Minimum Vertical Clearance: 6.35m (20.83ft),  Kilometerpoint: 7.150,  Lanes on structure: 6,  Lanes under structure: 12,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 40.0m (131.2ft)

Find on map >>   Show street view

Structure Number: 54 1251S,  Location: 08-SBD-215-6.98-SBD (Lat: 34.105381,  Lng: -117.301778),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 1,001 (year 2013),  Truck Traffic: 3%,  Features Intersected: THIRD ST TO N215 ON RAMP
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 6.990,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 38.0m (124.7ft)

Find on map >>   Show street view

Structure Number: 54 1252K,  Location: 08-SBD-215-7.01-SBD (Lat: 34.105753,  Lng: -117.302681),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 1,001 (year 2013),  Truck Traffic: 5%,  Features Intersected: S215 TO 3RD ST OFF RAMP
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 7.010,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 54 1255S,  Location: 08-SBD-215-6.66-SBD (Lat: 34.100728,  Lng: -117.301403),  Route carried "under" structure: City street R066,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 24,000 (year 2015),  Truck Traffic: 2%,  Features Intersected: RIALTO AVENUE,  Facility Carried by Structure: N215-2ND ST OFF RA
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 54 1256K,  Location: 08-SBD-215-6.66-SBD (Lat: 34.100728,  Lng: -117.302206),  Route carried "under" structure: City street R066,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 24,000 (year 2015),  Truck Traffic: 2%,  Features Intersected: RIALTO AVENUE,  Facility Carried by Structure: S215-2ND ST ON RMP
Minimum Vertical Clearance: 6.58m (21.59ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 54 1259,  Location: 08-SBD-215-6.79-SBD (Lat: 34.102503,  Lng: -117.301572),  Route carried "under" structure: City street ,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 25,000 (year 2015),  Truck Traffic: 5%,  Features Intersected: SECOND STREET,  Facility Carried by Structure: INTERSTATE 215
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 0.000,  Lanes on structure: 11,  Lanes under structure: 8,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 46.4m (152.2ft)

Find on map >>   Show street view

Structure Number: 54 126,  Location: 08-SBD-215-6.92-SBD (Lat: 34.104400,  Lng: -117.301717),  Route carried "under" structure: City street ,  Year Built: 2013,  Structure Length: 0. m,  Average Daily Traffic: 12,600 (year 2014),  Truck Traffic: 3%,  Features Intersected: THIRD STREET,  Facility Carried by Structure: INTERSTATE 215
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 0.000,  Lanes on structure: 13,  Lanes under structure: 6,  Material/Design: Concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.4m (135.8ft)

Find on map >>   Show street view

Structure Number: 54 1265,  Location: 08-SBD-215-9.03-SBD (Lat: 34.132433,  Lng: -117.308675),  Route carried "under" structure: Interstate 215,  Year Built: 2012,  Structure Length: 0. m,  Average Daily Traffic: 99,000 (year 2019),  Truck Traffic: 3%,  Features Intersected: INTERSTATE 215 & BNSF RY,  Facility Carried by Structure: MASSACHUSETTS AVE
Minimum Vertical Clearance: 8.18m (26.84ft),  Kilometerpoint: 9.030,  Lanes on structure: 2,  Lanes under structure: 10,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 30.4m (99.7ft)

Find on map >>   Show street view

Structure Number: 54 1266,  Location: 08-SBD-215-9.36-SBD (Lat: 34.135956,  Lng: -117.314547),  Route carried "under" structure: Interstate 215,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 96,000 (year 2019),  Truck Traffic: 13%,  Features Intersected: I-215, CAJON BL, BNSF RY,  Facility Carried by Structure: HIGHLAND AVENUE
Minimum Vertical Clearance: 6.75m (22.15ft),  Kilometerpoint: 9.360,  Lanes on structure: 4,  Lanes under structure: 11,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.2m (154.9ft)

Find on map >>   Show street view

Structure Number: 54 1266,  Location: 08-SBD-215-9.36-SBD (Lat: 34.135956,  Lng: -117.314547),  Route carried "under" structure: City street ,  Year Built: 2011,  Structure Length: 0. m,  Average Daily Traffic: 9,500 (year 2016),  Truck Traffic: 2%,  Features Intersected: I-215, CAJON BL, BNSF RY,  Facility Carried by Structure: HIGHLAND AVENUE
Minimum Vertical Clearance: 8.56m (28.08ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 47.2m (154.9ft)

Find on map >>   Show street view

Structure Number: 54 1307,  Location: 08-SBD-215-17.30-SBD (Lat: 34.221658,  Lng: -117.402567),  Route carried "under" structure: Interstate 215,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 71,000 (year 2019),  Truck Traffic: 9%,  Features Intersected: INTERSTATE 215,  Facility Carried by Structure: DEVORE ROAD
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 17.300,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.5m (149.3ft)

Find on map >>   Show street view

Structure Number: 54 1307,  Location: 08-SBD-215-17.30-SBD (Lat: 34.221658,  Lng: -117.402567),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 4,000 (year 2016),  Truck Traffic: 3%,  Features Intersected: INTERSTATE 215,  Facility Carried by Structure: DEVORE ROAD
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 17.300,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.5m (149.3ft)

Find on map >>   Show street view

Structure Number: 54 1307,  Location: 08-SBD-215-17.30-SBD (Lat: 34.221658,  Lng: -117.402567),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 4,000 (year 2016),  Truck Traffic: 3%,  Features Intersected: INTERSTATE 215,  Facility Carried by Structure: DEVORE ROAD
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 17.300,  Lanes on structure: 4,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 45.5m (149.3ft)

Find on map >>   Show street view

Structure Number: 54 1313K,  Location: 08-SBD-215-17.50 (Lat: 34.223361,  Lng: -117.406833),  Route carried "under" structure: Ramp Interstate 15,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 2017),  Truck Traffic: 5%,  Features Intersected: N15 TO S215 CONNECTOR
Minimum Vertical Clearance: 5.30m (17.39ft),  Kilometerpoint: 16.100,  Lanes on structure: 1,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 50.6m (166.0ft)

Find on map >>   Show street view

Structure Number: 54 1314R,  Location: 08-SBD-015-M16.44 (Lat: 34.224708,  Lng: -117.410083),  Route carried "under" structure: Ramp Interstate 215,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 3,301 (year 2021),  Truck Traffic: 14%,  Features Intersected: S215 & N215/S15 CONN,  Facility Carried by Structure: INTERSTATE 15 NB
Minimum Vertical Clearance: 14.10m (46.26ft),  Kilometerpoint: 17.850,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 66.7m (218.8ft)

Find on map >>   Show street view

Structure Number: 54 1314R,  Location: 08-SBD-015-M16.44 (Lat: 34.224708,  Lng: -117.410083),  Route carried "under" structure: Interstate 215,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 27,500 (year 2017),  Truck Traffic: 14%,  Features Intersected: S215 & N215/S15 CONN,  Facility Carried by Structure: INTERSTATE 15 NB
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 17.850,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 66.7m (218.8ft)

Find on map >>   Show street view

Structure Number: 54 1316L,  Location: 08-SBD-015-M16.84 (Lat: 34.230006,  Lng: -117.417111),  Route carried "under" structure: Interstate 215,  Year Built: 2016,  Structure Length: 0. m,  Average Daily Traffic: 27,500 (year 2017),  Truck Traffic: 9%,  Features Intersected: INTERSTATE 215 SB,  Facility Carried by Structure: INTERSTATE 15 SB
Minimum Vertical Clearance: 5.53m (18.14ft),  Kilometerpoint: 18.350,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 60.3m (197.8ft)

Find on map >>   Show street view

Structure Number: 54C0076,  Location: 0.11 MI SW OF I-215 (Lat: 34.138511,  Lng: -117.317697),  Route carried "under" structure: City street ,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 7,600 (year 2012),  Truck Traffic: 5%,  Features Intersected: BNSF,AMTRAK,UP RR,CAJON,  Facility Carried by Structure: MOUNT VERNON AVE
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: 54C0377,  Location: 2.3 MI W RTE I-215 (Lat: 34.099108,  Lng: -117.342733),  Route carried "under" structure: City street ,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 10,000 (year 2011),  Truck Traffic: 1%,  Features Intersected: UP RR,  Facility Carried by Structure: RIALTO AVE
Minimum Vertical Clearance: 6.48m (21.26ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 54C0714,  Location: 0.01 MI S OF CAJON BLVD (Lat: 34.156344,  Lng: -117.334711),  Route carried "under" structure: City street ,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 12,000 (year 2009),  Truck Traffic: 12%,  Features Intersected: BNSF RY & CAJON BLVD,  Facility Carried by Structure: UNIVERSITY PARKWAY
Minimum Vertical Clearance: 8.23m (27.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 44.6m (146.3ft)

Find on map >>   Show street view

Structure Number: 54C0767,  Location: 0.3 MI SW OF I-215 (Lat: 34.187906,  Lng: -117.364325),  Route carried "under" structure: City street ,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 4,000 (year 2014),  Truck Traffic: 2%,  Features Intersected: BNSF RR, CAJON BLVD,  Facility Carried by Structure: PALM AVENUE
Minimum Vertical Clearance: 7.88m (25.85ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 46.0m (150.9ft)

Find on map >>   Show street view

Structure Number: 54C0795,  Location: 0.5 MI E OF N. PEPPER AVE (Lat: 34.136233,  Lng: -117.344525),  Route carried "under" structure: City street ,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 20,000 (year 2015),  Truck Traffic: 7%,  Features Intersected: HIGHLAND AVE,  Facility Carried by Structure: UP RR
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 0.000,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.3m (83.0ft)

Discuss San Bernardino, California (CA) on our hugely popular California forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.