  • National Bridge Inventory (NBI) Statistics
  • 43Number of bridges
  • 1,348ft / 411mTotal length
  • $321,895,000Total costs
  • 639,268Total average daily traffic
  • 126,252Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Snoqualmie Pass
  • No street view available for this location

New bridges in Snoqualmie Pass, WA - historical statistics
  • New bridges - historical statistics
  • 31920-1929
  • 21950-1959
  • 71960-1969
  • 111970-1979
  • 11980-1989
  • 21990-1999
  • 12000-2009
  • 162010-2019
Reconstructed bridges in Snoqualmie Pass, WA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31960-1969
  • 01970-1979
  • 01980-1989
  • 01990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Snoqualmie Pass, WA
Average Bridge Truck Traffic in Snoqualmie Pass, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 27.3%Very good
  • 27.3%Good
  • 24.2%Satisfactory
  • 9.1%Fair
  • 12.1%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 45.5%Very good
  • 33.3%Good
  • 18.2%Satisfactory
  • 3.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 42.4%Very good
  • 33.3%Good
  • 18.2%Satisfactory
  • 3.0%Fair
  • 3.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 68.8%Very good
  • 15.6%Good
  • 15.6%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 42.9%Very good
  • 28.6%Satisfactory
  • 28.6%Fair
Find on map >>   Show street view

Structure Number: 1140A,  Location: 2.5 E KING CO (Lat: 47.392944,  Lng: -121.389444),  Route carried "on" structure: Interstate 90,  Year Built: 1928,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 17,127 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 22,265 (year 2039),  Design Load: H 20,  Features Intersected: COAL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 88.755,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $562,000,  Roadway Improvement Cost: $112,000,  Total Project Cost: $1,123,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 1140B,  Location: 1.7 E KING CO (Lat: 47.400917,  Lng: -121.404917),  Route carried "on" structure: State highway 906,  Year Built: 1928,  Status: Posted for load,  Structure Length: 5.67m (18.60ft),  Average Daily Traffic: 515 (year 2019),  Truck Traffic: 19%,  Average Future Daily Traffic: 669 (year 2039),  Design Load: H 20,  Features Intersected: HYAK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.235,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 3,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 26.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 20.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 5.67m (18.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,265,000,  Roadway Improvement Cost: $253,000,  Total Project Cost: $2,530,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 4074A,  Location: 2.0 E KING CO (Lat: 47.398236,  Lng: -121.398850),  Route carried "on" structure: Interstate 90,  Year Built: 1950,  Year Reconstructed: 1968,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 33,544 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 43,607 (year 2039),  Design Load: HS 20,  Features Intersected: COAL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 87.806,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $277,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $554,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 5203A,  Location: 2.5 E KING CO (Lat: 47.393194,  Lng: -121.389472),  Route carried "on" structure: Interstate 90,  Year Built: 1956,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 17,127 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 22,265 (year 2039),  Design Load: HS 20,  Features Intersected: COAL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 88.755,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.74m (5.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $616,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $1,231,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8447A,  Location: 21.6 E JCT SR 202 (Lat: 47.427047,  Lng: -121.415817),  Route carried "on" structure: Interstate 90,  Year Built: 1969,  Status: Open,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 33,645 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 47,506 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 906 W-W RAMP
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 84.072,  Lanes on structure: 8,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 31.7m (104.0ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 41.5m (136.2ft),  Out-to-Out Width: 42.7m (140.1ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 20.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 15.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of corrective action,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.28m (20.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $4,367,000,  Roadway Improvement Cost: $873,000,  Total Project Cost: $8,734,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8447B,  Location: 0.3 E KING CO (Lat: 47.418333,  Lng: -121.410000),  Route carried "on" structure: Interstate 90,  Year Built: 1969,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 32,881 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 42,745 (year 2039),  Design Load: HS 20,  Features Intersected: YELLOWSTONE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 85.215,  Lanes on structure: 7,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 38.4m (126.0ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 37.8m (124.0ft),  Out-to-Out Width: 39.0m (128.0ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.94m (19.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $4,992,000,  Roadway Improvement Cost: $998,000,  Total Project Cost: $9,984,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8447C,  Location: 2.1 E KING CO (Lat: 47.396694,  Lng: -121.397500),  Route carried "on" structure: Interstate 90,  Year Built: 1969,  Status: Open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 33,544 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 43,607 (year 2039),  Design Load: HS 20,  Features Intersected: SR 906
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 88.015,  Lanes on structure: 8,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 31.7m (104.0ft),  Skew: 39 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.3m (83.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 46.1m (151.2ft),  Out-to-Out Width: 47.0m (154.2ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.55m (18.21ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $3,858,000,  Roadway Improvement Cost: $772,000,  Total Project Cost: $7,717,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8844A,  Location: 20.5 E JCT SR 202 (Lat: 47.425392,  Lng: -121.434111),  Route carried "on" structure: Interstate 90,  Year Built: 1971,  Status: Open,  Structure Length: 21.34m (70.01ft),  Average Daily Traffic: 18,078 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 25,526 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: AVALANCHE PATH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 82.382,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 106.7m (350.1ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 21.34m (70.01ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: September 2018,  Other Special Inspection Date: September 2018,  Bridge Improvement Cost: $7,840,000,  Roadway Improvement Cost: $1,568,000,  Total Project Cost: $15,680,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 8916A,  Location: 21.2 E JCT SR 202 (Lat: 47.429194,  Lng: -121.421389),  Route carried "on" structure: Interstate 90,  Year Built: 1971,  Status: Open,  Structure Length: 12.01m (39.40ft),  Average Daily Traffic: 16,823 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 23,754 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SO FK SNOQULMIE R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 83.573,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 34.4m (112.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 21.5m (70.5ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 66.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.01m (39.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $5,201,000,  Roadway Improvement Cost: $1,040,000,  Total Project Cost: $10,402,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 9092A,  Location: 17.1 E JCT SR 202 (Lat: 47.395583,  Lng: -121.480500),  Route carried "on" structure: Federal lands road ,  Year Built: 1971,  Status: Open,  Structure Length: 8.02m (26.31ft),  Average Daily Traffic: 83 (year 2012),  Truck Traffic: 1%,  Design Load: HS 20+Mod,  Features Intersected: I-90,  Facility Carried by Structure: HANSEN CR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 41.1m (134.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.02m (26.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,683,000,  Roadway Improvement Cost: $337,000,  Total Project Cost: $3,366,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 9092C,  Location: 17.3 E JCT SR 202 (Lat: 47.394417,  Lng: -121.475917),  Route carried "on" structure: Interstate 90,  Year Built: 1971,  Status: Open,  Structure Length: 6.52m (21.39ft),  Average Daily Traffic: 17,912 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 25,291 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: S FK SNOQUALMIE R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 77.152,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.5m (77.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 23.4m (76.8ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.52m (21.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $3,381,000,  Roadway Improvement Cost: $676,000,  Total Project Cost: $6,762,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete
Find on map >>   Show street view

Structure Number: 9092D,  Location: 17.3 E JCT SR 202 (Lat: 47.395472,  Lng: -121.475639),  Route carried "on" structure: Interstate 90,  Year Built: 1971,  Status: Open,  Structure Length: 7.44m (24.41ft),  Average Daily Traffic: 17,912 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 25,291 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: COUNTY ROAD(OLD I-90)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 77.136,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 69.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.44m (24.41ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018,  Bridge Improvement Cost: $2,635,000,  Roadway Improvement Cost: $527,000,  Total Project Cost: $5,270,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 10200A,  Location: 19.8 E JCT SR 202 (Lat: 47.417861,  Lng: -121.445297),  Route carried "on" structure: Interstate 90,  Year Built: 1981,  Status: Open,  Structure Length: 110.34m (362.01ft),  Average Daily Traffic: 18,078 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 25,526 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: DENNY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 81.272,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Segmental Box Girder,  Number Of Spans In Main Unit: 20,  Number Of Approach Spans: 1,  Length of Maximum Span: 57.3m (188.0ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 43.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 41.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 110.34m (362.01ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Other Special Inspection Date: September 2020,  Bridge Improvement Cost: $39,096,000,  Roadway Improvement Cost: $7,819,000,  Total Project Cost: $78,192,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 14923A,  Location: HYAK MAINTENANCE (Lat: 47.389911,  Lng: -121.389261),  Route carried "on" structure: ServiceState highway 906,  Year Built: 1996,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 58 (year 2009),  Truck Traffic: 5%,  Average Future Daily Traffic: 67 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: COAL CREEK,  Facility Carried by Structure: PARK RD HYAK DORM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.4m (17.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 68.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.81m (12.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $450,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $900,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17852A,  Location: 0.5 E JCT SR 906 (Lat: 47.391897,  Lng: -121.386372),  Route carried "on" structure: Interstate 90,  Year Built: 2010,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 17,127 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 22,265 (year 2039),  Design Load: HL 93,  Features Intersected: ANIMAL CROSSING
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 88.997,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.7m (113.8ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.63m (11.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,380,000,  Roadway Improvement Cost: $276,000,  Total Project Cost: $2,761,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17852B,  Location: 0.5 E JCT SR 906 (Lat: 47.392083,  Lng: -121.386417),  Route carried "on" structure: Interstate 90,  Year Built: 2012,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 17,127 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 22,265 (year 2039),  Design Load: HL 93,  Features Intersected: ANIMAL CROSSING
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 88.997,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 64.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,392,000,  Roadway Improvement Cost: $278,000,  Total Project Cost: $2,784,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17852C,  Location: 2.8 E KING CO (Lat: 47.391356,  Lng: -121.385467),  Route carried "on" structure: Interstate 90,  Year Built: 2011,  Status: Open,  Structure Length: 33.07m (108.50ft),  Average Daily Traffic: 17,127 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 22,265 (year 2039),  Design Load: HL 93,  Features Intersected: GOLD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 89.302,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 47.2m (154.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 33.07m (108.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $12,586,000,  Roadway Improvement Cost: $2,517,000,  Total Project Cost: $25,172,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17852D,  Location: 2.8 E KING CO (Lat: 47.390833,  Lng: -121.383861),  Route carried "on" structure: Interstate 90,  Year Built: 2012,  Status: Open,  Structure Length: 28.35m (93.01ft),  Average Daily Traffic: 17,127 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 22,265 (year 2039),  Design Load: HL 93,  Features Intersected: GOLD CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 89.302,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 47.2m (154.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 50.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 28.35m (93.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $10,788,000,  Roadway Improvement Cost: $2,158,000,  Total Project Cost: $21,576,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17852E,  Location: 4.3 E KING CO (Lat: 47.372792,  Lng: -121.376903),  Route carried "on" structure: Interstate 90,  Year Built: 2011,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 17,127 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 22,265 (year 2039),  Design Load: HL 93,  Features Intersected: ROCKY RUN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 91.411,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 47.2m (154.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.88m (16.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,856,000,  Roadway Improvement Cost: $371,000,  Total Project Cost: $3,712,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17852F,  Location: 4.3 E KING CO (Lat: 47.372619,  Lng: -121.376331),  Route carried "on" structure: Interstate 90,  Year Built: 2012,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 17,127 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 22,265 (year 2039),  Design Load: HL 93,  Features Intersected: ROCKY RUN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 91.411,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 35.4m (116.1ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 23.8m (78.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 57.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,872,000,  Roadway Improvement Cost: $374,000,  Total Project Cost: $3,744,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 17852G,  Location: 4.5 E KING CO (Lat: 47.367469,  Lng: -121.372850),  Route carried "on" structure: Interstate 90,  Year Built: 2011,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 17,127 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 22,265 (year 2039),  Design Load: HL 93,  Features Intersected: WOLFE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 92.038,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 17.7m (58.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $600,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 17852H,  Location: 4.5 E KING CO (Lat: 47.367597,  Lng: -121.372406),  Route carried "on" structure: Interstate 90,  Year Built: 2012,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 17,127 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 22,265 (year 2039),  Design Load: HL 93,  Features Intersected: WOLFE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 92.038,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.8m (78.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 23.8m (78.1ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $800,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 18127A,  Location: 3.4 E SR 906 JCT (Lat: 47.357081,  Lng: -121.367425),  Route carried "on" structure: Interstate 90,  Year Built: 2016,  Status: Open,  Structure Length: 36.76m (120.60ft),  Average Daily Traffic: 17,127 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 22,265 (year 2039),  Design Load: HL 93,  Features Intersected: AVALANCHE RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 93.760,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 51.8m (169.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 36.76m (120.60ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $13,990,000,  Roadway Improvement Cost: $2,798,000,  Total Project Cost: $27,979,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18127C,  Location: 4.8 E JCT SR 906 (Lat: 47.340325,  Lng: -121.356317),  Route carried "on" structure: Interstate 90,  Year Built: 2012,  Status: Open,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 17,127 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 22,265 (year 2039),  Design Load: HL 93,  Features Intersected: RESORT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 95.708,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 74.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 52.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.42m (14.50ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $1,682,000,  Roadway Improvement Cost: $336,000,  Total Project Cost: $3,364,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18127D,  Location: 4.8 E JCT SR 906 (Lat: 47.340594,  Lng: -121.356261),  Route carried "on" structure: Interstate 90,  Year Built: 2015,  Status: Open,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 17,127 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 22,265 (year 2039),  Design Load: HL 93,  Features Intersected: RESORT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 95.708,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 74.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 52.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.42m (14.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,682,000,  Roadway Improvement Cost: $336,000,  Total Project Cost: $3,364,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18127F,  Location: 5.5 E KING CO (Lat: 47.356872,  Lng: -121.367439),  Route carried "on" structure: Interstate 90,  Year Built: 2016,  Status: Open,  Structure Length: 36.76m (120.60ft),  Average Daily Traffic: 17,127 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 22,265 (year 2039),  Design Load: HL 93,  Features Intersected: AVALANCHE RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 93.406,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 51.8m (169.9ft),  Curb-To-Curb Width: 17.7m (58.1ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 37.06m (121.59ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2018,  Bridge Improvement Cost: $30,157,000,  Roadway Improvement Cost: $6,031,000,  Total Project Cost: $60,314,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18715C,  Location: 5.8 E JCT SR 906 (Lat: 47.329461,  Lng: -121.340547),  Route carried "on" structure: Interstate 90,  Year Built: 2016,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 34,254 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 44,530 (year 2039),  Features Intersected: TOWNSEND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 97.510,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 37.2m (122.0ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $620,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $1,240,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 18715D,  Location: 6.2 E JCT SR 906 (Lat: 47.329350,  Lng: -121.340744),  Route carried "on" structure: Interstate 90,  Year Built: 2017,  Status: Open,  Structure Length: 5.73m (18.80ft),  Average Daily Traffic: 17,127 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 22,265 (year 2039),  Design Load: HL 93,  Features Intersected: UNNAMED CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 97.929,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 55.8m (183.1ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 57.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.73m (18.80ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $2,181,000,  Roadway Improvement Cost: $436,000,  Total Project Cost: $4,362,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 18715E,  Location: 6.2 E JCT SR 906 (Lat: 47.329669,  Lng: -121.340408),  Route carried "on" structure: Interstate 90,  Year Built: 2016,  Status: Open,  Structure Length: 5.73m (18.80ft),  Average Daily Traffic: 17,127 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 22,265 (year 2039),  Design Load: HL 93,  Features Intersected: UNNAMED CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 97.929,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 55.8m (183.1ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 20.8m (68.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 78.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 55.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.73m (18.80ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: October 2018,  Bridge Improvement Cost: $2,557,000,  Roadway Improvement Cost: $511,000,  Total Project Cost: $5,114,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 200017,  Location: 17.5 E JCT SR 202 (Lat: 47.393333,  Lng: -121.473333),  Route carried "on" structure: Interstate 90,  Year Built: 1972,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 18,078 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 25,526 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: HUMPBACK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 77.377,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 22.3m (73.2ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 70.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $390,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $780,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 20002,  Location: 1.5 E KING CO (Lat: 47.402600,  Lng: -121.404039),  Route carried "on" structure: Interstate 90,  Year Built: 1972,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 33,699 (year 2019),  Truck Traffic: 21%,  Average Future Daily Traffic: 43,808 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: COAL CR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 87.146,  Lanes on structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 37.8m (124.0ft),  Skew: 11 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2018,  Bridge Improvement Cost: $580,000,  Roadway Improvement Cost: $116,000,  Total Project Cost: $1,159,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 60505000001275,  Location: .2 MI S OF I-90/9035 JCT (Lat: 47.394325,  Lng: -121.473678),  Route carried "on" structure: Federal lands road 90350,  Year Built: 1927,  Status: Open,  Structure Length: 6.43m (21.10ft),  Average Daily Traffic: 50 (year 1995),  Average Future Daily Traffic: 75 (year 2042),  Design Load: HS 20,  Features Intersected: S FK SNOQUALMIE RIVER,  Facility Carried by Structure: ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.320,  Lanes on structure: 2,  Owner: U.S. Forest Service,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 5,  Length of Maximum Span: 24.1m (79.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 60505000001348,  Location: 0.1 MI W OF 58/5830 JCT (Lat: 47.413067,  Lng: -121.442950),  Route carried "on" structure: Federal lands road 58300,  Year Built: 1964,  Year Reconstructed: 2010,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 50 (year 1995),  Average Future Daily Traffic: 75 (year 2042),  Design Load: H 20,  Features Intersected: S FK SNOQUALMIE RIVER,  Facility Carried by Structure: ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.160,  Lanes on structure: 1,  Owner: U.S. Forest Service,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 1.1m (3.6ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 5.7m (18.7ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 60505000001553,  Location: NO DATA ENTERED (Lat: 47.391328,  Lng: -121.382086),  Route carried "on" structure: Federal lands road 48320,  Year Built: 1960,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 60 (year 1995),  Average Future Daily Traffic: 90 (year 2042),  Design Load: HS 20,  Features Intersected: GOLD CREEK,  Facility Carried by Structure: ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.254,  Lanes on structure: 2,  Owner: U.S. Forest Service,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 26.4m (86.6ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 0.7m (2.3ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 60505000001554,  Location: 1.4 MI S OF I-90/9060 JCT (Lat: 47.393403,  Lng: -121.389211),  Route carried "on" structure: Federal lands road 48320,  Year Built: 1973,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 60 (year 1995),  Average Future Daily Traffic: 90 (year 2042),  Design Load: HS 20,  Features Intersected: COAL CREEK,  Facility Carried by Structure: ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.670,  Lanes on structure: 2,  Owner: U.S. Forest Service,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.1m (69.2ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.1m (26.6ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 52.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 60505000003173,  Location: 2 MI NE OF 58/9035 JCT (Lat: 47.406264,  Lng: -121.443425),  Route carried "on" structure: Federal lands road 58000,  Year Built: 2004,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 232 (year 1993),  Truck Traffic: 20%,  Average Future Daily Traffic: 348 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: S FK SNOQUALMIE RIVER,  Facility Carried by Structure: ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.200,  Lanes on structure: 2,  Owner: U.S. Forest Service,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.0m (124.7ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 68.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: December 2021,  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 60505000032684,  Location: I90 EAST EXIT 47 (Lat: 47.394314,  Lng: -121.481275),  Route carried "on" structure: Federal lands road 55000,  Year Built: 1972,  Status: Open,  Structure Length: 14.94m (49.02ft),  Average Daily Traffic: 120 (year 2017),  Truck Traffic: 20%,  Average Future Daily Traffic: 180 (year 2042),  Design Load: HS 20,  Features Intersected: S.FK. SNOQUALMIE RIVER,  Facility Carried by Structure: TINKHAM ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.440,  Lanes on structure: 2,  Owner: U.S. Forest Service,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 65.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6170300000314,  Location: NO DATA ENTERED (Lat: 47.373056,  Lng: -121.375833),  Route carried "on" structure: Federal lands road 48320,  Year Built: 1993,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 60 (year 2017),  Average Future Daily Traffic: 90 (year 2042),  Design Load: HS 25 or greater,  Features Intersected: ROCKY RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.880,  Lanes on structure: 1,  Owner: U.S. Forest Service,  Approaching Roadway Width: 5.9m (19.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 65.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Snoqualmie Pass, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.