Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Peoria, Illinois (IL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 203Number of bridges
  • 3,901ft / 1,189mTotal length
  • $72,193,000Total costs
  • 2,661,885Total average daily traffic
  • 197,549Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Peoria
  • No street view available for this location

New bridges in Peoria, IL - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 31900-1909
  • 21910-1919
  • 31920-1929
  • 61930-1939
  • 51940-1949
  • 61950-1959
  • 351960-1969
  • 251970-1979
  • 271980-1989
  • 161990-1999
  • 622000-2009
  • 122010-2019
Reconstructed bridges in Peoria, IL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41970-1979
  • 51980-1989
  • 31990-1999
  • 42000-2009
  • 12010-2019
Average Bridge Daily Traffic in Peoria, IL
Average Bridge Truck Traffic in Peoria, IL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.8%Excellent
  • 1.9%Very good
  • 40.4%Good
  • 36.5%Satisfactory
  • 9.6%Fair
  • 3.8%Poor
  • 1.9%Serious
  • 1.0%Critical
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Excellent
  • 13.9%Very good
  • 22.2%Good
  • 22.2%Satisfactory
  • 19.4%Fair
  • 9.3%Poor
  • 1.9%Serious
  • 0.9%Critical
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 0.9%Excellent
  • 13.9%Very good
  • 30.6%Good
  • 21.3%Satisfactory
  • 23.1%Fair
  • 8.3%Poor
  • 1.9%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 17.6%Very good
  • 19.8%Good
  • 28.6%Satisfactory
  • 16.5%Fair
  • 11.0%Poor
  • 6.6%Serious
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 2.7%Very good
  • 32.4%Good
  • 29.7%Satisfactory
  • 21.6%Fair
  • 8.1%Poor
  • 5.4%Serious
Find on map >>   Show street view

Structure Number: 720176,  Location: 0.75 MI W ILL RIVER (Lat: 40.702003,  Lng: -89.593233),  Route carried "under" structure: Other road ,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 5,200 (year 2017),  Truck Traffic: 4%,  Features Intersected: FAI 74 RP 24.11,  Facility Carried by Structure: NB KNOXVILLE
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.129,  Lanes on structure: 5,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 64.0m (210.0ft)

Find on map >>   Show street view

Structure Number: 720177,  Location: .75 MI W ILLINOIS R (Lat: 40.700608,  Lng: -89.593728),  Route carried "under" structure: Other road ,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 2017),  Truck Traffic: 9%,  Features Intersected: GLEN OAK AVE,  Facility Carried by Structure: EB I-74,RP F-2
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 8.207,  Lanes on structure: 5,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.3m (76.4ft)

Find on map >>   Show street view

Structure Number: 720178,  Location: .75 MI W ILLINOIS R (Lat: 40.700650,  Lng: -89.593606),  Route carried "under" structure: Other road ,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 7,000 (year 2017),  Truck Traffic: 9%,  Features Intersected: GLEN OAK AVE,  Facility Carried by Structure: WB I-74
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 8.191,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.3m (76.4ft)

Find on map >>   Show street view

Structure Number: 720179,  Location: SB US24 IN PEORIA (Lat: 40.694717,  Lng: -89.587472),  Route carried "under" structure: Interstate 74,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 50,000 (year 2021),  Truck Traffic: 6%,  Features Intersected: I-74,  Facility Carried by Structure: JEFFERSON ST-US 24
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 152.948,  Lanes on structure: 4,  Lanes under structure: 7,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.0m (88.6ft)

Find on map >>   Show street view

Structure Number: 72018,  Location: DOWNTOWN PEORIA (Lat: 40.694439,  Lng: -89.587428),  Route carried "under" structure: Other road ,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 5,100 (year 2017),  Truck Traffic: 4%,  Features Intersected: 74EB TO WASHINGTON,  Facility Carried by Structure: FAYETTE RP TO 74EB
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.290,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.4m (83.3ft)

Find on map >>   Show street view

Structure Number: 720181,  Location: DOWNTOWN PEORIA (Lat: 40.693072,  Lng: -89.585219),  Route carried "under" structure: Other road ,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 4,600 (year 2017),  Truck Traffic: 5%,  Features Intersected: WASHINGTON TO 74WB,  Facility Carried by Structure: WB74 TO ADAMS/WASH
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 76.0m (249.3ft)

Find on map >>   Show street view

Structure Number: 720182,  Location: OVER RMPS G-1,2,&3 (Lat: 40.693811,  Lng: -89.586425),  Route carried "under" structure: Interstate 74,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 50,000 (year 2021),  Truck Traffic: 6%,  Features Intersected: I-74,  Facility Carried by Structure: ADAMS ST
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 153.109,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.7m (117.1ft)

Find on map >>   Show street view

Structure Number: 720183,  Location: US 150 INTERCHANGE (Lat: 40.738467,  Lng: -89.623922),  Route carried "under" structure: Other road ,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 6,400 (year 2017),  Truck Traffic: 5%,  Features Intersected: FA 317 RP 19.99,  Facility Carried by Structure: I 74 RPS20.97,21.5
Minimum Vertical Clearance: 4.75m (15.58ft),  Kilometerpoint: 0.531,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.6m (126.6ft)

Find on map >>   Show street view

Structure Number: 720183,  Location: US 150 INTERCHANGE (Lat: 40.735311,  Lng: -89.623883),  Route carried "under" structure: Other road ,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 2,600 (year 2017),  Truck Traffic: 5%,  Features Intersected: FA 317 RP 19.99,  Facility Carried by Structure: I 74 RPS20.97,21.5
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.6m (126.6ft)

Find on map >>   Show street view

Structure Number: 720183,  Location: US 150 INTERCHANGE (Lat: 40.735072,  Lng: -89.624144),  Route carried "under" structure: Interstate 74,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 26,500 (year 2021),  Truck Traffic: 11%,  Features Intersected: FA 317 RP 19.99
Minimum Vertical Clearance: 5.31m (17.42ft),  Kilometerpoint: 146.462,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.6m (126.6ft)

Find on map >>   Show street view

Structure Number: 720184,  Location: .65 MI E UNIVERSITY (Lat: 40.706072,  Lng: -89.601817),  Route carried "under" structure: Interstate 74,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 47,300 (year 2021),  Truck Traffic: 7%,  Features Intersected: I-74,  Facility Carried by Structure: ELLIS AVE
Minimum Vertical Clearance: 5.56m (18.24ft),  Kilometerpoint: 151.081,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 720185,  Location: PERRY ST IN PEORIA (Lat: 40.697639,  Lng: -89.590606),  Route carried "under" structure: Interstate 74,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 50,000 (year 2021),  Truck Traffic: 6%,  Features Intersected: I-74,  Facility Carried by Structure: PERRY STREET
Minimum Vertical Clearance: 5.59m (18.34ft),  Kilometerpoint: 152.546,  Lanes on structure: 3,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 720186,  Location: MONROE ST IN PEORIA (Lat: 40.696683,  Lng: -89.589614),  Route carried "under" structure: Interstate 74,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 50,000 (year 2021),  Truck Traffic: 6%,  Features Intersected: I-74,  Facility Carried by Structure: MONROE STREET
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 152.690,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.7m (61.4ft)

Find on map >>   Show street view

Structure Number: 720187,  Location: MADISON AVE PEORIA (Lat: 40.695689,  Lng: -89.588617),  Route carried "under" structure: Interstate 74,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 50,000 (year 2021),  Truck Traffic: 6%,  Features Intersected: I-74,  Facility Carried by Structure: MADISON AVE
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 152.771,  Lanes on structure: 4,  Lanes under structure: 7,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.6m (57.7ft)

Find on map >>   Show street view

Structure Number: 720189,  Location: UNIVERSITY AVE INTER (Lat: 40.706911,  Lng: -89.613161),  Route carried "under" structure: Interstate 74,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 47,300 (year 2021),  Truck Traffic: 7%,  Features Intersected: I74 & DRY RUN CREEK,  Facility Carried by Structure: UNIVERSITY AVE
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 150.132,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.8m (117.5ft)

Find on map >>   Show street view

Structure Number: 72019,  Location: US 150 INTERCHANGE (Lat: 40.738578,  Lng: -89.623911),  Route carried "under" structure: Other road ,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 6,400 (year 2017),  Truck Traffic: 4%,  Features Intersected: WAR MEMORIAL DR,  Facility Carried by Structure: FA 317RP 19.99
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 0.547,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.1m (131.6ft)

Find on map >>   Show street view

Structure Number: 72019,  Location: US 150 INTERCHANGE (Lat: 40.738247,  Lng: -89.623364),  Route carried "under" structure: US 150,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 22,200 (year 2021),  Truck Traffic: 3%,  Features Intersected: WAR MEMORIAL DR,  Facility Carried by Structure: FA 317RP 19.99
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 136.823,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.1m (131.6ft)

Find on map >>   Show street view

Structure Number: 720191,  Location: .5 MI W US 150 INTER (Lat: 40.737644,  Lng: -89.631539),  Route carried "under" structure: Interstate 74,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 26,500 (year 2021),  Truck Traffic: 11%,  Features Intersected: I-74,  Facility Carried by Structure: STERLING AVE
Minimum Vertical Clearance: 4.11m (13.48ft),  Kilometerpoint: 145.754,  Lanes on structure: 6,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.3m (66.6ft)

Find on map >>   Show street view

Structure Number: 720192,  Location: .3 MI E UNIVERSITY (Lat: 40.706847,  Lng: -89.607056),  Route carried "under" structure: Interstate 74,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 47,300 (year 2021),  Truck Traffic: 7%,  Features Intersected: I-74 & DRY RUN CRK,  Facility Carried by Structure: BROADWAY ST
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 150.630,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.4m (119.4ft)

Find on map >>   Show street view

Structure Number: 720193,  Location: .5 MI E UNIVERSITY (Lat: 40.706411,  Lng: -89.603600),  Route carried "under" structure: Interstate 74,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 47,300 (year 2021),  Truck Traffic: 7%,  Features Intersected: I-74,  Facility Carried by Structure: SHERIDAN ROAD
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 150.952,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.8m (94.5ft)

Find on map >>   Show street view

Structure Number: 720194,  Location: .75 MI E UNIVERSITY (Lat: 40.704867,  Lng: -89.596553),  Route carried "under" structure: Interstate 74,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 47,300 (year 2021),  Truck Traffic: 7%,  Features Intersected: I-74,  Facility Carried by Structure: NORTH ST
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 151.516,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.9m (127.6ft)

Find on map >>   Show street view

Structure Number: 720195,  Location: GALE AVE INTERCHANGE (Lat: 40.720639,  Lng: -89.621431),  Route carried "under" structure: Interstate 74,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 42,200 (year 2021),  Truck Traffic: 6%,  Features Intersected: I-74,  Facility Carried by Structure: N GALE AVE
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 148.217,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.9m (121.1ft)

Find on map >>   Show street view

Structure Number: 720196,  Location: 3/8 MI N GALE INTER (Lat: 40.725261,  Lng: -89.619819),  Route carried "under" structure: Interstate 74,  Year Built: 2003,  Structure Length: 0. m,  Average Daily Traffic: 38,800 (year 2021),  Truck Traffic: 7%,  Features Intersected: I-74,  Facility Carried by Structure: FORREST HILL AVE
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 147.637,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.9m (91.5ft)

Find on map >>   Show street view

Structure Number: 720197,  Location: .5 MI W UNIVERSITY (Lat: 40.710353,  Lng: -89.620694),  Route carried "under" structure: Interstate 74,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 42,200 (year 2021),  Truck Traffic: 6%,  Features Intersected: I-74,  Facility Carried by Structure: NEBRASKA AVE
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 149.359,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.5m (86.9ft)

Find on map >>   Show street view

Structure Number: 726015,  Location: NE1/4Sec8 T18N R8E (Lat: 40.693439,  Lng: -89.608669),  Route carried "under" structure: Other road ,  Year Built: 2018,  Structure Length: 0. m,  Average Daily Traffic: 2,700 (year 2017),  Truck Traffic: 4%,  Features Intersected: R B GARRETT AVE,  Facility Carried by Structure: MACARTHUR HWY
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 0.145,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 729905,  Location: PEORIA JOURNAL BLDG. (Lat: 40.724656,  Lng: -89.560819),  Route carried "under" structure: US 150,  Year Built: 1950,  Structure Length: 0. m,  Average Daily Traffic: 25,800 (year 2021),  Truck Traffic: 4%,  Features Intersected: US 150,  Facility Carried by Structure: P&PU RR (604054B)
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 142.648,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 72992,  Location: MP 73.9 (Lat: 40.757614,  Lng: -89.647047),  Route carried "under" structure: Other road ,  Year Built: 2006,  Structure Length: 0. m,  Average Daily Traffic: 9,250 (year 2017),  Truck Traffic: 2%,  Features Intersected: CHARTER OAK ROAD,  Facility Carried by Structure: UP 748462K
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 3.717,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.7m (81.0ft)

Find on map >>   Show street view

Structure Number: 900001,  Location: I-74 OVR ILLINOIS R (Lat: 40.692483,  Lng: -89.585411),  Route carried "under" structure: Other road ,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 6,650 (year 2017),  Truck Traffic: 11%,  Features Intersected: ILL RIV (604034P),  Facility Carried by Structure: I-74
Minimum Vertical Clearance: 4.65m (15.26ft),  Kilometerpoint: 0.209,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Truss - Thru,  Length of Maximum Span: 182.9m (600.1ft)

Find on map >>   Show street view

Structure Number: 900122,  Location: Bob Michel Bridge (Lat: 40.687475,  Lng: -89.593825),  Route carried "under" structure: Other road ,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 6,850 (year 2017),  Truck Traffic: 8%,  Features Intersected: IL RIV,WASH.ST.&RR'S,  Facility Carried by Structure: IL 40
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 17.252,  Lanes on structure: 4,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 109.7m (359.9ft)

Find on map >>   Show street view

Structure Number: 900122,  Location: Bob Michel Bridge (Lat: 40.686492,  Lng: -89.593069),  Route carried "under" structure: City street ,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 1,250 (year 2017),  Truck Traffic: 5%,  Features Intersected: IL RIV,WASH.ST.&RR'S,  Facility Carried by Structure: IL 40
Minimum Vertical Clearance: 12.50m (41.01ft),  Kilometerpoint: 0.241,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 109.7m (359.9ft)

Discuss Peoria, Illinois (IL) on our hugely popular Illinois forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.