Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Topeka, Kansas (KS)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 440Number of bridges
  • 8,222ft / 2,506mTotal length
  • $3,528,000Total costs
  • 3,170,851Total average daily traffic
  • 301,084Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Topeka
  • No street view available for this location

New bridges in Topeka, KS - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 31910-1919
  • 61920-1929
  • 161930-1939
  • 71940-1949
  • 611950-1959
  • 731960-1969
  • 591970-1979
  • 311980-1989
  • 751990-1999
  • 692000-2009
  • 332010-2019
  • 62020-2022
Reconstructed bridges in Topeka, KS - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 91970-1979
  • 201980-1989
  • 181990-1999
  • 52000-2009
  • 52010-2019
  • 22020-2022
Average Bridge Daily Traffic in Topeka, KS
Average Bridge Truck Traffic in Topeka, KS
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 18.5%Very good
  • 55.2%Good
  • 17.8%Satisfactory
  • 6.7%Fair
  • 1.9%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 32.2%Very good
  • 42.2%Good
  • 19.6%Satisfactory
  • 5.2%Fair
  • 0.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 34.8%Very good
  • 47.4%Good
  • 10.4%Satisfactory
  • 5.9%Fair
  • 1.5%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 11.3%Very good
  • 38.5%Good
  • 38.9%Satisfactory
  • 10.0%Fair
  • 1.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 14.4%Very good
  • 44.2%Good
  • 31.7%Satisfactory
  • 7.7%Fair
  • 1.9%Poor
Find on map >>   Show street view

Structure Number: 999947000892461,  Location: JCT BURLINGAME /470/75 (Lat: 38.997778,  Lng: -95.705833),  Route carried "on" structure: City street 5391,  Year Built: 1997,  Status: Open,  Structure Length: 7.85m (25.75ft),  Average Daily Traffic: 6,050 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 7,095 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: I-470 HWY NL-SL,  Facility Carried by Structure: BURLINGAME SB
Minimum Vertical Clearance: 5.07m (16.63ft),  Kilometerpoint: 5.628,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 21 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.6m (129.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 25.75m (84.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999947000892471,  Location: BURLINGAME RD/470/75NB (Lat: 38.997500,  Lng: -95.705556),  Route carried "on" structure: City street 5391,  Year Built: 1997,  Status: Open,  Structure Length: 7.85m (25.75ft),  Average Daily Traffic: 6,050 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 7,095 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: I-470 HWY NL-SL,  Facility Carried by Structure: BURLINGAME NB
Minimum Vertical Clearance: 5.10m (16.73ft),  Kilometerpoint: 5.621,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 21 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.6m (129.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 25.75m (84.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Wearing Surface/Protective System: Wearing Surface: Low Slump Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 999947000892513,  Location: JCT CROCO RD/I470 (Lat: 39.030278,  Lng: -95.613889),  Route carried "on" structure: County highway 5651,  Year Built: 2002,  Status: Open,  Structure Length: 15.65m (51.35ft),  Average Daily Traffic: 9,678 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,693 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: I-470 AND CONNECTORS,  Facility Carried by Structure: CROCO ROAD
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 4.910,  Lanes on structure: 4,  Lanes under structure: 7,  Owner: State Toll Authority,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 20.3m (66.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 70.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 51.33m (168.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 999947000893163,  Location: 3.85 ME NE TOPEKA AVE (Lat: 39.022778,  Lng: -95.631667),  Route carried "on" structure: City street 5289,  Year Built: 2015,  Status: Open,  Structure Length: 5.28m (17.32ft),  Average Daily Traffic: 2,168 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,669 (year 2041),  Design Load: HL 93,  Features Intersected: I-470 HWY (KTA),  Facility Carried by Structure: WITTENBERG ROAD
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.916,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 91.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 70.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 17.32m (56.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9999470C0892535,  Location: .22 M E CROCO RD OVRPS (Lat: 39.030833,  Lng: -95.610000),  Route carried "on" structure: Ramp State highway 30,  Year Built: 2002,  Status: Open,  Structure Length: 23.95m (78.58ft),  Average Daily Traffic: 6,290 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 9,630 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: I-470 HWY,  Facility Carried by Structure: CONN I-470/U-40N
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 1.254,  Lanes on structure: 1,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 58.5m (191.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Inventory Rating: 83.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 78.58m (257.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 999900400892611,  Location: EJCT U40/K4 (Lat: 39.044167,  Lng: -95.601944),  Route carried "under" structure: US 40,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 3,920 (year 2020),  Truck Traffic: 6%,  Features Intersected: US-40 HWY,  Facility Carried by Structure: K-4 HWY WB
Minimum Vertical Clearance: 5.69m (18.67ft),  Kilometerpoint: 0.183,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 999900400892621,  Location: EJCT U40/K4 (Lat: 39.044167,  Lng: -95.601667),  Route carried "under" structure: US 40,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 3,920 (year 2020),  Truck Traffic: 6%,  Features Intersected: US-40 HWY,  Facility Carried by Structure: K-4 HWY EB
Minimum Vertical Clearance: 4.99m (16.37ft),  Kilometerpoint: 0.212,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 999902400891041,  Location: E JCT US24/OLD US75 (Lat: 39.090556,  Lng: -95.719722),  Route carried "under" structure: US 24,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 8,081 (year 2020),  Truck Traffic: 9%,  Features Intersected: US24 HWY,  Facility Carried by Structure: OLD US 75 HWY SB
Minimum Vertical Clearance: 4.91m (16.11ft),  Kilometerpoint: 30.835,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 999902400891051,  Location: E JCT US24/OLD US75 (Lat: 39.090556,  Lng: -95.719444),  Route carried "under" structure: US 24,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 8,081 (year 2020),  Truck Traffic: 9%,  Features Intersected: US24HWY,  Facility Carried by Structure: OLD US 75 HWY NB
Minimum Vertical Clearance: 4.91m (16.11ft),  Kilometerpoint: 30.854,  Lanes on structure: 1,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 999902400892341,  Location: US-24/K4 INTERCHANGE, EB (Lat: 39.093333,  Lng: -95.607778),  Route carried "under" structure: State highway 4,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 4,306 (year 2020),  Truck Traffic: 7%,  Features Intersected: K-4 HWY
Minimum Vertical Clearance: 6.05m (19.85ft),  Kilometerpoint: 47.855,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.2m (131.9ft)

Find on map >>   Show street view

Structure Number: 999902400892351,  Location: US-24/K4 INTERCHANGE, WB (Lat: 39.093611,  Lng: -95.607778),  Route carried "under" structure: State highway 4,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 8,612 (year 2020),  Truck Traffic: 7%,  Features Intersected: K-4 HWY
Minimum Vertical Clearance: 5.53m (18.14ft),  Kilometerpoint: 47.876,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.1m (131.6ft)

Find on map >>   Show street view

Structure Number: 999902400893021,  Location: JCT US24/TOPEKA BLVD (Lat: 39.090833,  Lng: -95.664444),  Route carried "under" structure: City street 5551,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 7,607 (year 2020),  Truck Traffic: 5%,  Features Intersected: US75 ALT HWY/TOPEKA BLVD,  Facility Carried by Structure: US24 HWY
Minimum Vertical Clearance: 4.74m (15.55ft),  Kilometerpoint: 11.042,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 999904000892521,  Location: JCT U40/I70 (Lat: 39.035000,  Lng: -95.610000),  Route carried "under" structure: US 40,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 15,217 (year 2020),  Truck Traffic: 14%,  Features Intersected: I-70, RAMPS
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 32.362,  Lanes on structure: 1,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 999904000892551,  Location: JCT U40/I70 (Lat: 39.034722,  Lng: -95.606389),  Route carried "under" structure: Interstate 70,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 15,217 (year 2020),  Truck Traffic: 13%,  Features Intersected: I-70 HWY
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 32.678,  Lanes on structure: 1,  Lanes under structure: 5,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 999907000890141,  Location: 2.01 MI E K4 (Lat: 39.053333,  Lng: -95.780278),  Route carried "under" structure: Interstate 470,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 14,829 (year 2020),  Truck Traffic: 22%,  Features Intersected: I70 HWY EB/ WB,  Facility Carried by Structure: URISH ROAD
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 14.595,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 999907000890141,  Location: 2.01 MI E K4 (Lat: 39.053333,  Lng: -95.780278),  Route carried "under" structure: Interstate 470,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 14,829 (year 2020),  Truck Traffic: 22%,  Features Intersected: I70 HWY EB/ WB,  Facility Carried by Structure: URISH ROAD
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 14.595,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 999907000890261,  Location: 0.14 MI E TOPEKA AVE (Lat: 39.058056,  Lng: -95.674167),  Route carried "under" structure: ServiceCity street 2064,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 18,284 (year 2020),  Truck Traffic: 7%,  Features Intersected: 8 STREETS, 3 RR,  Facility Carried by Structure: I70 HWY, NL-SL
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 7.348,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 999907000890291,  Location: 0.87 MI E TOPEKA AVE (Lat: 39.050556,  Lng: -95.669444),  Route carried "under" structure: Interstate 70,  Year Built: 1963,  Structure Length: 0. m,  Average Daily Traffic: 17,394 (year 2020),  Truck Traffic: 14%,  Features Intersected: I70 HWY, NL-SL,  Facility Carried by Structure: URB5290, 6TH ST
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 25.872,  Lanes on structure: 5,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 999907000890301,  Location: 1.08 MI E TOPEKA AVE (Lat: 39.047778,  Lng: -95.670556),  Route carried "under" structure: Interstate 70,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 17,161 (year 2020),  Truck Traffic: 14%,  Features Intersected: I70 HWY, NL-SL,  Facility Carried by Structure: 8TH ST.
Minimum Vertical Clearance: 4.74m (15.55ft),  Kilometerpoint: 26.210,  Lanes on structure: 7,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 999907000890311,  Location: JCT 10TH ST/I70 (Lat: 39.044722,  Lng: -95.671667),  Route carried "under" structure: Interstate 70,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 20,761 (year 2020),  Truck Traffic: 11%,  Features Intersected: I70 HWY, NL-SL,  Facility Carried by Structure: URB5330, 10TH ST
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 26.549,  Lanes on structure: 7,  Lanes under structure: 7,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 21.0m (68.9ft)

Find on map >>   Show street view

Structure Number: 999907000890381,  Location: 0.89 MI SE 10TH ST (Lat: 39.036944,  Lng: -95.660278),  Route carried "under" structure: Interstate 70,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 19,405 (year 2020),  Truck Traffic: 12%,  Features Intersected: I70 HWY, NL-SL,  Facility Carried by Structure: INDIANA ST.
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 27.970,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 999907000890391,  Location: JCT CALIFORNIA AVE/I70 (Lat: 39.034722,  Lng: -95.650833),  Route carried "under" structure: Interstate 70,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 19,031 (year 2020),  Truck Traffic: 12%,  Features Intersected: I70 HWY, NL-SL,  Facility Carried by Structure: URB5561, CALIF
Minimum Vertical Clearance: 4.70m (15.42ft),  Kilometerpoint: 28.817,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 18.0m (59.1ft)

Find on map >>   Show street view

Structure Number: 999907000890401,  Location: 0.37 MI E CALIFORNIA AVE (Lat: 39.034167,  Lng: -95.643889),  Route carried "under" structure: Interstate 70,  Year Built: 1964,  Structure Length: 0. m,  Average Daily Traffic: 19,031 (year 2020),  Truck Traffic: 12%,  Features Intersected: I70 HWY, NL-SL,  Facility Carried by Structure: GOLDEN ST.
Minimum Vertical Clearance: 4.59m (15.06ft),  Kilometerpoint: 29.420,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 999907000891901,  Location: JCT 6TH STREET/I-70 (Lat: 39.058056,  Lng: -95.745833),  Route carried "under" structure: Interstate 70,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 27,120 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-70 HWY NL-SL,  Facility Carried by Structure: 6TH STREET
Minimum Vertical Clearance: 5.22m (17.13ft),  Kilometerpoint: 17.708,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 999907000891911,  Location: JCT I-70 / FAIRLAWN RD (Lat: 39.060000,  Lng: -95.743056),  Route carried "under" structure: Interstate 70,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 27,120 (year 2020),  Truck Traffic: 12%,  Features Intersected: I-70 HWY EB-WB,  Facility Carried by Structure: FAIRLAWN
Minimum Vertical Clearance: 5.04m (16.54ft),  Kilometerpoint: 18.018,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 999907000892021,  Location: JCT WANAMAKER RD & I-70 (Lat: 39.053611,  Lng: -95.761667),  Route carried "under" structure: Ramp State highway 15,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 21,930 (year 2020),  Truck Traffic: 15%,  Features Intersected: I-70 HWY EB - WB,  Facility Carried by Structure: WANAMAKER
Minimum Vertical Clearance: 4.92m (16.14ft),  Kilometerpoint: 16.195,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 999907000892491,  Location: JCT RICE RD/I70 (Lat: 39.034167,  Lng: -95.623056),  Route carried "under" structure: Interstate 70,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 15,711 (year 2020),  Truck Traffic: 15%,  Features Intersected: I-70 HWY,  Facility Carried by Structure: RICE ROAD
Minimum Vertical Clearance: 5.32m (17.45ft),  Kilometerpoint: 31.236,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.0m (82.0ft)

Find on map >>   Show street view

Structure Number: 999907000892501,  Location: JCT CROCO RD/I70 (Lat: 39.035000,  Lng: -95.613611),  Route carried "under" structure: State highway 30,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 15,217 (year 2020),  Truck Traffic: 14%,  Features Intersected: I-70 & RAMPS,  Facility Carried by Structure: CROCO ROAD
Minimum Vertical Clearance: 6.05m (19.85ft),  Kilometerpoint: 32.061,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.5m (146.0ft)

Find on map >>   Show street view

Structure Number: 999907000892501,  Location: JCT CROCO RD/I70 (Lat: 39.035000,  Lng: -95.613611),  Route carried "under" structure: State highway 30,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 15,217 (year 2020),  Truck Traffic: 14%,  Features Intersected: I-70 & RAMPS,  Facility Carried by Structure: CROCO ROAD
Minimum Vertical Clearance: 5.19m (17.03ft),  Kilometerpoint: 32.061,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.5m (146.0ft)

Find on map >>   Show street view

Structure Number: 999907000892541,  Location: 0.29 MI E CROCO RD (Lat: 39.035000,  Lng: -95.608333),  Route carried "under" structure: Interstate 70,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 15,217 (year 2020),  Truck Traffic: 13%,  Features Intersected: I-70 HWY
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 32.544,  Lanes on structure: 1,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 54.6m (179.1ft)

Find on map >>   Show street view

Structure Number: 999907000892561,  Location: 0.04 M N JCT I70/U40 (Lat: 39.035278,  Lng: -95.606389),  Route carried "under" structure: State highway 30,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 15,217 (year 2020),  Truck Traffic: 14%,  Features Intersected: EB K4/ I-70 RAMP,  Facility Carried by Structure: RAMP K4W TO I-70E
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 32.752,  Lanes on structure: 1,  Lanes under structure: 8,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.0m (164.0ft)

Find on map >>   Show street view

Structure Number: 999907000892561,  Location: 0.04 M N JCT I70/U40 (Lat: 39.035278,  Lng: -95.606389),  Route carried "under" structure: State highway 30,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 15,217 (year 2020),  Truck Traffic: 14%,  Features Intersected: EB K4/ I-70 RAMP,  Facility Carried by Structure: RAMP K4W TO I-70E
Minimum Vertical Clearance: 4.99m (16.37ft),  Kilometerpoint: 32.752,  Lanes on structure: 1,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 50.0m (164.0ft)

Find on map >>   Show street view

Structure Number: 999907000892583,  Location: JCT EB I70/WB I470 (Lat: 39.031389,  Lng: -95.589444),  Route carried "under" structure: Interstate 470,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 7,640 (year 2020),  Truck Traffic: 19%,  Features Intersected: I-470 HWY, SB,  Facility Carried by Structure: I-70 HWY, NB
Minimum Vertical Clearance: 5.25m (17.22ft),  Kilometerpoint: 21.903,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.9m (153.9ft)

Find on map >>   Show street view

Structure Number: 999907000892593,  Location: TECUMSEH RD/WB I70 & I470 (Lat: 39.031111,  Lng: -95.585556),  Route carried "under" structure: Interstate 470,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 15,217 (year 2020),  Truck Traffic: 14%,  Features Intersected: NL I-70 AND NL I-470,  Facility Carried by Structure: TECUMSEH ROAD
Minimum Vertical Clearance: 8.78m (28.81ft),  Kilometerpoint: 34.522,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>   Show street view

Structure Number: 999907000892593,  Location: TECUMSEH RD/WB I70 & I470 (Lat: 39.031111,  Lng: -95.585556),  Route carried "under" structure: Interstate 470,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 15,217 (year 2020),  Truck Traffic: 14%,  Features Intersected: NL I-70 AND NL I-470,  Facility Carried by Structure: TECUMSEH ROAD
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 34.522,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>   Show street view

Structure Number: 999907000892603,  Location: TECUMSEH RD / EB 70&470 (Lat: 39.031111,  Lng: -95.585556),  Route carried "under" structure: Interstate 470,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 15,217 (year 2020),  Truck Traffic: 14%,  Features Intersected: I-70 EB AND I-470 EB,  Facility Carried by Structure: TECUMSEH ROAD
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 34.541,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 999907000892603,  Location: TECUMSEH RD / EB 70&470 (Lat: 39.031111,  Lng: -95.585556),  Route carried "under" structure: Interstate 470,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 15,217 (year 2020),  Truck Traffic: 14%,  Features Intersected: I-70 EB AND I-470 EB,  Facility Carried by Structure: TECUMSEH ROAD
Minimum Vertical Clearance: 5.01m (16.44ft),  Kilometerpoint: 34.541,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 999907500891571,  Location: JCT US24/US75 (Lat: 39.090556,  Lng: -95.727500),  Route carried "under" structure: US 24,  Year Built: 1978,  Structure Length: 0. m,  Average Daily Traffic: 4,533 (year 2020),  Truck Traffic: 10%,  Features Intersected: US24 HWY,  Facility Carried by Structure: US75 HWY SB
Minimum Vertical Clearance: 4.84m (15.88ft),  Kilometerpoint: 30.153,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 999907500891581,  Location: JCT US24/US75 (Lat: 39.090556,  Lng: -95.726944),  Route carried "under" structure: US 24,  Year Built: 1978,  Structure Length: 0. m,  Average Daily Traffic: 4,533 (year 2020),  Truck Traffic: 10%,  Features Intersected: US24 HWY,  Facility Carried by Structure: US75 HWY NB
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 30.188,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.0m (105.0ft)

Find on map >>   Show street view

Structure Number: 999907500891611,  Location: E JCT I70-75 S END W-GATE (Lat: 39.066667,  Lng: -95.731389),  Route carried "under" structure: Interstate 70,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 23,941 (year 2020),  Truck Traffic: 12%,  Features Intersected: N-S LANES I70
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 19.278,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: 999907500891621,  Location: E JCT I70-75 S END W GATE (Lat: 39.066667,  Lng: -95.731389),  Route carried "under" structure: US 75,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 23,941 (year 2020),  Truck Traffic: 12%,  Features Intersected: N-S LNS I70 N BND US75
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 27.912,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.4m (93.2ft)

Find on map >>   Show street view

Structure Number: 999907500891951,  Location: US-75 E-S OVER TENTH ST (Lat: 39.052778,  Lng: -95.771944),  Route carried "under" structure: City street 5330,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 11,587 (year 2020),  Truck Traffic: 29%,  Features Intersected: I-70 AND I-470,  Facility Carried by Structure: US75 HWY
Minimum Vertical Clearance: 5.07m (16.63ft),  Kilometerpoint: 15.385,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 53.9m (176.8ft)

Find on map >>   Show street view

Structure Number: 999907500891951,  Location: US-75 E-S OVER TENTH ST (Lat: 39.052778,  Lng: -95.771944),  Route carried "under" structure: City street 5330,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 11,587 (year 2020),  Truck Traffic: 29%,  Features Intersected: I-70 AND I-470,  Facility Carried by Structure: US75 HWY
Minimum Vertical Clearance: 7.62m (25.00ft),  Kilometerpoint: 15.385,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 53.9m (176.8ft)

Find on map >>   Show street view

Structure Number: 999907500892121,  Location: 5.44 MI N OSAGE COLN (Lat: 38.942500,  Lng: -95.710278),  Route carried "under" structure: US 75,  Year Built: 1995,  Structure Length: 0. m,  Average Daily Traffic: 5,667 (year 2020),  Truck Traffic: 13%,  Features Intersected: US-75 HWY,  Facility Carried by Structure: 69TH STREET
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 8.742,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.3m (86.3ft)

Find on map >>   Show street view

Structure Number: 999907500892131,  Location: 5.95 MI N OSAGE COLN (Lat: 38.949722,  Lng: -95.710278),  Route carried "under" structure: US 75,  Year Built: 1998,  Structure Length: 0. m,  Average Daily Traffic: 5,667 (year 2020),  Truck Traffic: 13%,  Features Intersected: US-75 HWY,  Facility Carried by Structure: 65TH STREET
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 9.551,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.3m (86.3ft)

Find on map >>   Show street view

Structure Number: 999907500892161,  Location: 8.01 MI N OSAGE COLN (Lat: 38.978611,  Lng: -95.703056),  Route carried "under" structure: US 75,  Year Built: 1996,  Structure Length: 0. m,  Average Daily Traffic: 7,319 (year 2020),  Truck Traffic: 10%,  Features Intersected: US-75 HWY,  Facility Carried by Structure: 49TH STREET
Minimum Vertical Clearance: 5.10m (16.73ft),  Kilometerpoint: 12.880,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.3m (86.3ft)

Find on map >>   Show street view

Structure Number: 999907500892401,  Location: 8.35 MI N OSAGE COLN (Lat: 38.983611,  Lng: -95.702778),  Route carried "under" structure: Interstate 335,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 5,508 (year 2020),  Truck Traffic: 28%,  Features Intersected: KANSAS TURNPIKE (KTA),  Facility Carried by Structure: US-75 HWY NB
Minimum Vertical Clearance: 5.10m (16.73ft),  Kilometerpoint: 17.370,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 999907500892451,  Location: JCT470/75/BURLINGAME RD (Lat: 38.997500,  Lng: -95.705278),  Route carried "under" structure: City street 5391,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 17,488 (year 2020),  Truck Traffic: 10%,  Features Intersected: I470/RAMP/BURLINGAME RD.,  Facility Carried by Structure: US-75 HWY RAMP NB
Minimum Vertical Clearance: 8.76m (28.74ft),  Kilometerpoint: 9.793,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 61.6m (202.1ft)

Find on map >>   Show street view

Structure Number: 999907500892451,  Location: JCT470/75/BURLINGAME RD (Lat: 38.997500,  Lng: -95.705278),  Route carried "under" structure: City street 5391,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 17,488 (year 2020),  Truck Traffic: 10%,  Features Intersected: I470/RAMP/BURLINGAME RD.,  Facility Carried by Structure: US-75 HWY RAMP NB
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 9.793,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 61.6m (202.1ft)

Find on map >>   Show street view

Structure Number: 999907500892721,  Location: 8.35 MI N OSAGE COLN, SB (Lat: 38.983333,  Lng: -95.703056),  Route carried "under" structure: Interstate 335,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 5,508 (year 2020),  Truck Traffic: 28%,  Features Intersected: KANSAS TURNPIKE (KTA),  Facility Carried by Structure: US-75 HIGHWAY, SB
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 17.328,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 999933500891293,  Location: 5.84 MI NE OSAGE CO LINE (Lat: 38.930278,  Lng: -95.761944),  Route carried "under" structure: Interstate 335,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 5,508 (year 2020),  Truck Traffic: 28%,  Features Intersected: I-335 HWY (KTA),  Facility Carried by Structure: RS1540, WANAMAKER
Minimum Vertical Clearance: 4.24m (13.91ft),  Kilometerpoint: 9.395,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.4m (57.1ft)

Find on map >>   Show street view

Structure Number: 999933500891303,  Location: 6.97 MI NE OSAGE CO LINE (Lat: 38.942222,  Lng: -95.747500),  Route carried "under" structure: Interstate 335,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 5,508 (year 2020),  Truck Traffic: 28%,  Features Intersected: I-335 HWY (KTA),  Facility Carried by Structure: CLARK RD(SW 69TH
Minimum Vertical Clearance: 4.36m (14.30ft),  Kilometerpoint: 11.203,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 999933500891313,  Location: 8.19 MI NE OSAGE CO LINE (Lat: 38.956389,  Lng: -95.734444),  Route carried "under" structure: Interstate 335,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 5,508 (year 2020),  Truck Traffic: 28%,  Features Intersected: I-335 HWY (KTA),  Facility Carried by Structure: SW 61ST
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 13.166,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 999933500891323,  Location: 9.47 MI NE OSAGE CO LINE (Lat: 38.967222,  Lng: -95.715556),  Route carried "under" structure: Interstate 335,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 5,508 (year 2020),  Truck Traffic: 28%,  Features Intersected: I-335 HWY (KTA),  Facility Carried by Structure: RS0616, BURLINGAME
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 15.234,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 999947000890461,  Location: 0.21 MI NW 10TH STREET,EL (Lat: 39.053333,  Lng: -95.774444),  Route carried "under" structure: Interstate 70,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 11,587 (year 2020),  Truck Traffic: 28%,  Features Intersected: I70 HWY, WB/EB
Minimum Vertical Clearance: 4.91m (16.11ft),  Kilometerpoint: 15.097,  Lanes on structure: 1,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 33.5m (109.9ft)

Find on map >>   Show street view

Structure Number: 999947000890541,  Location: 1.01 MI SE W JCT US75 (Lat: 39.029167,  Lng: -95.754167),  Route carried "under" structure: Interstate 470,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 18,891 (year 2020),  Truck Traffic: 8%,  Features Intersected: I470 HWY, WL-EL,  Facility Carried by Structure: URB5390, 21ST WB
Minimum Vertical Clearance: 5.25m (17.22ft),  Kilometerpoint: 4.002,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 999947000890551,  Location: 1.49 MI SE WJCT US75 (Lat: 39.022500,  Lng: -95.751667),  Route carried "under" structure: Interstate 470,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 18,891 (year 2020),  Truck Traffic: 8%,  Features Intersected: I470 HWY, WL-EL,  Facility Carried by Structure: 25TH ST.
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 4.780,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 999947000890681,  Location: 0.50 MI E BURLINGAME ROAD (Lat: 38.996667,  Lng: -95.696667),  Route carried "under" structure: Interstate 470,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 11,690 (year 2020),  Truck Traffic: 14%,  Features Intersected: I470 HWY NL-SL,  Facility Carried by Structure: MARTIN DRIVE
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 10.591,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 24.4m (80.1ft)

Find on map >>   Show street view

Structure Number: 999947000890953,  Location: TOPEKA AVE / 470 (KTA) (Lat: 38.991389,  Lng: -95.686389),  Route carried "under" structure: City street 5553,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 10,181 (year 2020),  Truck Traffic: 5%,  Features Intersected: TOPEKA AVE, BNSF RR,  Facility Carried by Structure: I-470 HWY (KTA) SB
Minimum Vertical Clearance: 5.96m (19.55ft),  Kilometerpoint: 9.712,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 999947000890971,  Location: JCT I470/TOPEKA CONNECTOR (Lat: 38.994722,  Lng: -95.692500),  Route carried "under" structure: Ramp State highway 43,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 11,690 (year 2020),  Truck Traffic: 17%,  Features Intersected: I470 HWY,  Facility Carried by Structure: US75 CONNECTOR
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 11.093,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 999947000891353,  Location: JCT KTA/I470 (Lat: 38.991389,  Lng: -95.692222),  Route carried "under" structure: Interstate 470,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 8,847 (year 2020),  Truck Traffic: 19%,  Features Intersected: KTA HWY
Minimum Vertical Clearance: 4.49m (14.73ft),  Kilometerpoint: 18.639,  Lanes on structure: 2,  Lanes under structure: 5,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.6m (61.0ft)

Find on map >>   Show street view

Structure Number: 999947000891423,  Location: 3.17 MI NE TOPEKA AVE (Lat: 39.015000,  Lng: -95.640000),  Route carried "under" structure: Interstate 470,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 8,847 (year 2020),  Truck Traffic: 19%,  Features Intersected: I-470 HWY (KTA),  Facility Carried by Structure: RS0617, 29TH ST
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 17.046,  Lanes on structure: 4,  Lanes under structure: 4,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 999947000891503,  Location: JCT470 (KTA) / TOPKA AVE (Lat: 38.991389,  Lng: -95.686389),  Route carried "under" structure: City street 5553,  Year Built: 1956,  Structure Length: 0. m,  Average Daily Traffic: 10,181 (year 2020),  Truck Traffic: 5%,  Features Intersected: TOPEKA AVE, BNSF RR,  Facility Carried by Structure: I-470 HWY (KTA) NB
Minimum Vertical Clearance: 6.19m (20.31ft),  Kilometerpoint: 9.700,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Find on map >>   Show street view

Structure Number: 999947000891511,  Location: 1.01 MI SE W JCT US75 (Lat: 39.028889,  Lng: -95.754167),  Route carried "under" structure: Interstate 470,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 18,891 (year 2020),  Truck Traffic: 8%,  Features Intersected: I-470 HWY,  Facility Carried by Structure: URB5390, 21ST EB
Minimum Vertical Clearance: 5.25m (17.22ft),  Kilometerpoint: 4.017,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 21.3m (69.9ft)

Find on map >>   Show street view

Structure Number: 999947000891831,  Location: 0.49 MI SE WJCT US75 (Lat: 39.036389,  Lng: -95.756667),  Route carried "under" structure: Interstate 470,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 18,891 (year 2020),  Truck Traffic: 8%,  Features Intersected: I470 HWY WL-EL,  Facility Carried by Structure: URB5370, 17TH ST
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 3.172,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 999947000892461,  Location: JCT BURLINGAME /470/75 (Lat: 38.997778,  Lng: -95.705833),  Route carried "under" structure: Interstate 470,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 17,488 (year 2020),  Truck Traffic: 9%,  Features Intersected: I-470 HWY NL-SL,  Facility Carried by Structure: BURLINGAME SB
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 9.786,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 999947000892471,  Location: BURLINGAME RD/470/75NB (Lat: 38.997500,  Lng: -95.705556),  Route carried "under" structure: Interstate 470,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 17,488 (year 2020),  Truck Traffic: 9%,  Features Intersected: I-470 HWY NL-SL,  Facility Carried by Structure: BURLINGAME NB
Minimum Vertical Clearance: 5.23m (17.16ft),  Kilometerpoint: 9.801,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 999947000892513,  Location: JCT CROCO RD/I470 (Lat: 39.030278,  Lng: -95.613889),  Route carried "under" structure: State highway 30,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 6,290 (year 2020),  Truck Traffic: 20%,  Features Intersected: I-470 AND CONNECTORS,  Facility Carried by Structure: CROCO ROAD
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 19.929,  Lanes on structure: 4,  Lanes under structure: 3,  Toll: On toll road,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 999947000892513,  Location: JCT CROCO RD/I470 (Lat: 39.030278,  Lng: -95.613889),  Route carried "under" structure: State highway 30,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 6,290 (year 2020),  Truck Traffic: 20%,  Features Intersected: I-470 AND CONNECTORS,  Facility Carried by Structure: CROCO ROAD
Minimum Vertical Clearance: 5.48m (17.98ft),  Kilometerpoint: 19.929,  Lanes on structure: 4,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 29.9m (98.1ft)

Find on map >>   Show street view

Structure Number: 999947000893163,  Location: 3.85 ME NE TOPEKA AVE (Lat: 39.022778,  Lng: -95.631667),  Route carried "under" structure: Interstate 470,  Year Built: 2015,  Structure Length: 0. m,  Average Daily Traffic: 8,847 (year 2020),  Truck Traffic: 19%,  Features Intersected: I-470 HWY (KTA),  Facility Carried by Structure: WITTENBERG ROAD
Minimum Vertical Clearance: 4.54m (14.90ft),  Kilometerpoint: 18.153,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.9m (85.0ft)

Find on map >>   Show street view

Structure Number: 9999470C0892535,  Location: .22 M E CROCO RD OVRPS (Lat: 39.030833,  Lng: -95.610000),  Route carried "under" structure: Interstate 470,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 7,640 (year 2020),  Truck Traffic: 19%,  Features Intersected: I-470 HWY
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 20.225,  Lanes on structure: 1,  Lanes under structure: 4,  Toll: On Interstate toll segment,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 58.5m (191.9ft)

Discuss Topeka, Kansas (KS) on our hugely popular Kansas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.